HomeMy WebLinkAbout20200253 Ver 1_Oak Park West Preliminary Storm Water Report 20200115_20200214MAGNOLIA PARK PRELIMINARY STORMWATER IMPACT ANALYSIS 0 NEW BETHEL CHURCH ROAD 1408 NEW BETHEL CHURCH ROAD 1520 NEW BETHEL CHURCH ROAD GARNER, WAKE COUNTY, NC JANUARY 15, 2020 PREPARED FOR: PREPARED BY: Royal Oaks Timmons Group, NC License No. C-1652 1210 Trinity Road, Suite 102 5410 Trinity Road, Suite 102 Cary, NC 27513 Raleigh, North Carolina 27607 Rob Bailey Jim Chandler, P.E. 919.235.2964 919.866.4507 phone 919.833.8124 fax rob.bailey@mattamycorp.com jim.chandler@timmons.com www.timmons.com Magnolia Park Garner, NC Project Number: 41300 Table of Contents Project Summary and Introduction ..................................................................................................................... 1 Storm Drainage Area Map ................................................................................................................................. 2 Rainfall Data Town of Garner IDF Chart ............................................................................................................ 3 Nitrogen Calculations ........................................................................................................................................ 4 Dry Detention Calculations ................................................................................................................................ 5 HydroCAD Reports ............................................................................................................................................ 6 Magnolia Park Garner, NC Project Number: 41300 1 | www.timmons.com Project Summary Introduction Oak Park West is a proposed 189.34 acre community, located to the west of the intersection of New Bethel Church Road with Clifford Road. The project is comprised of five parcels located on the south side of New Bethel Church Road. The site is currently zoned R-40 and R-20, requesting to be rezoned to a Planned Residential Development (PRD). The requested zoning will have a maximum density of 3.2 dwelling units per acre (600 homes). The site is generally between elevations 240 and 300. Streams, wetlands, and Neuse Riparian Buffers are located on site and along the property boundaries. The property is bounded to the South by Swift Creek and contains FEMA floodplains. The site and all surrounding areas are part of the Swift Creek Conservation Overlay District. The property drains into Swift Creek and is within the Neuse River Basin. Stormwater measures are proposed on-site to control and treat the difference between pre- development and the post-development stormwater runoff rate for the 1-year (24hr) storm, the 2-year (24hr) storm and the 10-year (24hr) storm. These stormwater measures will provide storage volume to retain on-site runoff from the first inch of rainfall and will be released between 2 to 5 days. Stormwater Methodology · Stormwater conveyances will be provided to meet the Town of Garner’s requirements to control gutter spread and minimum pipe sizes to control the required storm events. · The site drains directly into a FEMA regulated floodplain and as required by the Town, the site will not provide stormwater treatment. If treatment of stormwater is necessary at final design, the overall design will be modified to provide nitrogen reduction. The stormwater analysis numbers below reflect pre/post development runoff with dry detention. The NRCS Method will be used. · RCP is specified for all storm pipe on site and off site with a Manning’s N value of 0.013 · The various inlet types are shown on the plan detail sheets. Flared end sections are used at all culvert inlet and discharge points. Stormwater Treatment and Detention: Five dry detention basins have been proposed and designed to treat the requirements for 85% TSS removal, drawdown of the first inch of rainfall between 2-5 days and reduction of the peak flow for the 1”- 24 hour storm event. In addition, 100-year event has been analyzed to ensure safe passage through the site. Magnolia Park Garner, NC Project Number: 41300 2 | www.timmons.com Detention: This project is required to reduce the post-development peak flow rates for the 1-year, 24 hour storm event such that it does not exceed the pre-development peak flow rates. Detention within the proposed BMPs will be used to achieve the required results. The results of the routing are provided below. Pre-Development Drainage Area Q1 (cfs) Q2 (cfs) Q10(cfs) Q100 (cfs) xx.xx AC (Including Offsite) 141.3 223.5 481.0 943.8 Post-Development Drainage Area Q1 (cfs) Q2 (cfs) Q10(cfs) Q100 (cfs) xx.xx AC. (Including Offsite) 302.5 423.7 774.5 1,353 Post-Development with Dry Detention Drainage Area Q1 (cfs) Q2 (cfs) Q10(cfs) Q100 (cfs) xx.xx AC. (Including Offsite) 141.2 205.7 421.8 1,013 · Hydraflow Hydrographs software has been used to calculate the peak flow rates using the Modified Rational Method. A report of all the calculations for the site has been included for review. Magnolia Park Garner, NC Project Number: 41300 3 | www.timmons.com Area Maps Storm Drainage Area 8" SSWR92.84 LF @0.75%8" SSWR191.28 LF @3.66%8" SSWR191.28 LF @1.36%8" SSWR134.57 LF @8.62%8" SSWR147.92 LF @1.62%8" SSWR294.44 LF @1.02%8" S S W R 170. 4 3 L F @ 0 . 5 8 % SWIFT C R E E K SWIFT CREEKSWIFT CREEK PaD CeB PaD CeC WeD W CeB CeC PaD ChA PaE CeB PaD CeC WPaD CeC ChA ApB CeC ChA AaA CeB PaD POINT OF ANALYSIS #3 1,707' OVERLAND FLOW CALCULATED 14.6 MIN Tc POINT OF ANALYSIS #2 POINT OF ANALYSIS #1 2,913' OVERLAND FLOW CALCULATED 17.3 MIN Tc 4,377' OVERLAND FLOW CALCULATED 20.2 MIN Tc JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.MAGNOLIA WALKGARNER, WAKE COUNTY, NORTH CAROLINA413005410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 331 12/02/19 PRE-DEVELOPMENT STORMWATER ANALYSISDA -1.0 NAD 83 0 SCALE 1"=500' 1000'500' 1" = 500' 8" SSWR92.84 LF @0.75%8" SSWR191.28 LF @3.66%8" SSWR191.28 LF @1.36%8" SSWR134.57 LF @8.62%8" SSWR147.92 LF @1.62%8" SSWR294.44 LF @1.02%8" S S W R 170. 4 3 L F @ 0 . 5 8 % SWIFT C R E E K SWIFT CREEKSWIFT CREEK 8'' SANF M FM FMFM FMFM FM FM F M FMTP TP T P TPTPTPTPTP TP TPTPTPTPTPTPTPTPT PTP TPTP POINT OF ANALYSIS #3 STORM NETWORK TO BE DESIGNED ASSUMED 10 MIN Tc POINT OF ANALYSIS #2 POINT OF ANALYSIS #1 STORM NETWORK TO BE DESIGNED ASSUMED 12 MIN Tc STORM NETWORK TO BE DESIGNED ASSUMED 14 MIN Tc 79.60AC 75.47 AC 34.34 AC DA POI 1 SCM 1 = 10.24 AC SCM 2 = 7.03 AC BYPASS = 17.07 AC DA POI 2 SCM 3 = 23.35 AC SCM 4 = 10.03 AC BYPASS = 42.09 AC DA POI 3 SCM 5 = 30.09 AC BYPASS = 49.51 AC JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.MAGNOLIA WALKGARNER, WAKE COUNTY, NORTH CAROLINA413005410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 331 01/16/2020 POST-DEVELOPMENT STORMWATER ANALYSISDA -2.0 NAD 83 0 SCALE 1"=500' 1000'500' 1" = 500' Magnolia Park Garner, NC Project Number: 41300 4 | www.timmons.com Rainfall Data Town of Garner NOAA Atlas 14, Volume 2, Version 3 Location name: Garner, North Carolina, USA* Latitude: 35.7168°, Longitude: -78.6044° Elevation: 306.26 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.409 (0.375-0.447) 0.478 (0.438-0.522) 0.548 (0.502-0.598) 0.611 (0.559-0.667) 0.676 (0.616-0.737) 0.725 (0.658-0.790) 0.770 (0.694-0.839) 0.808 (0.725-0.882) 0.852 (0.757-0.929) 0.889 (0.783-0.971) 10-min 0.654 (0.599-0.715) 0.764 (0.700-0.835) 0.878 (0.805-0.958) 0.977 (0.894-1.07) 1.08 (0.981-1.17) 1.16 (1.05-1.26) 1.22 (1.10-1.33) 1.28 (1.15-1.40) 1.35 (1.20-1.47) 1.40 (1.23-1.53) 15-min 0.817 (0.748-0.893) 0.960 (0.880-1.05) 1.11 (1.02-1.21) 1.24 (1.13-1.35) 1.37 (1.24-1.49) 1.46 (1.33-1.59) 1.55 (1.39-1.68) 1.62 (1.45-1.76) 1.70 (1.51-1.85) 1.76 (1.55-1.92) 30-min 1.12 (1.03-1.23) 1.33 (1.22-1.45) 1.58 (1.45-1.72) 1.79 (1.64-1.96) 2.02 (1.84-2.21) 2.20 (2.00-2.40) 2.37 (2.13-2.58) 2.52 (2.26-2.75) 2.70 (2.40-2.94) 2.84 (2.51-3.11) 60-min 1.40 (1.28-1.53) 1.66 (1.53-1.82) 2.02 (1.85-2.21) 2.33 (2.13-2.55) 2.69 (2.45-2.94) 2.99 (2.71-3.25) 3.26 (2.94-3.55) 3.53 (3.17-3.85) 3.87 (3.44-4.22) 4.15 (3.66-4.54) 2-hr 1.64 (1.49-1.81) 1.96 (1.79-2.15) 2.41 (2.19-2.65) 2.80 (2.54-3.08) 3.29 (2.96-3.60) 3.69 (3.31-4.04) 4.08 (3.64-4.47) 4.48 (3.97-4.91) 5.00 (4.39-5.47) 5.44 (4.73-5.96) 3-hr 1.74 (1.58-1.91) 2.08 (1.90-2.29) 2.56 (2.33-2.82) 3.01 (2.73-3.31) 3.56 (3.21-3.91) 4.04 (3.62-4.43) 4.51 (4.01-4.95) 5.01 (4.42-5.48) 5.67 (4.95-6.21) 6.25 (5.40-6.86) 6-hr 2.08 (1.91-2.29) 2.49 (2.28-2.74) 3.07 (2.81-3.37) 3.61 (3.29-3.96) 4.30 (3.89-4.69) 4.89 (4.39-5.34) 5.48 (4.89-5.98) 6.11 (5.39-6.66) 6.96 (6.07-7.58) 7.71 (6.64-8.41) 12-hr 2.45 (2.24-2.69) 2.93 (2.69-3.22) 3.63 (3.32-3.99) 4.29 (3.90-4.71) 5.14 (4.64-5.62) 5.89 (5.28-6.41) 6.65 (5.90-7.24) 7.47 (6.55-8.12) 8.59 (7.41-9.33) 9.59 (8.15-10.4) 24-hr 2.90 (2.68-3.14) 3.50 (3.25-3.80) 4.41 (4.08-4.78) 5.13 (4.73-5.56) 6.12 (5.63-6.62) 6.91 (6.33-7.47) 7.71 (7.05-8.35) 8.55 (7.80-9.26) 9.71 (8.81-10.5) 10.6 (9.59-11.5) 2-day 3.36 (3.11-3.62) 4.05 (3.75-4.37) 5.06 (4.68-5.47) 5.86 (5.41-6.32) 6.95 (6.40-7.50) 7.82 (7.18-8.44) 8.71 (7.98-9.41) 9.63 (8.79-10.4) 10.9 (9.90-11.8) 11.9 (10.8-12.9) 3-day 3.56 (3.31-3.83) 4.28 (3.98-4.61) 5.33 (4.94-5.73) 6.15 (5.69-6.61) 7.28 (6.72-7.83) 8.18 (7.53-8.80) 9.10 (8.35-9.80) 10.1 (9.19-10.8) 11.4 (10.3-12.3) 12.4 (11.2-13.4) 4-day 3.76 (3.50-4.04) 4.51 (4.20-4.85) 5.59 (5.20-6.00) 6.44 (5.98-6.90) 7.60 (7.03-8.16) 8.53 (7.87-9.15) 9.49 (8.72-10.2) 10.5 (9.59-11.2) 11.8 (10.8-12.7) 12.9 (11.7-13.9) 7-day 4.36 (4.07-4.67) 5.21 (4.86-5.58) 6.37 (5.94-6.81) 7.28 (6.78-7.79) 8.54 (7.93-9.14) 9.55 (8.84-10.2) 10.6 (9.76-11.3) 11.6 (10.7-12.5) 13.1 (12.0-14.1) 14.2 (13.0-15.3) 10-day 4.97 (4.66-5.32) 5.93 (5.54-6.32) 7.14 (6.67-7.62) 8.09 (7.55-8.63) 9.38 (8.73-10.0) 10.4 (9.65-11.1) 11.4 (10.6-12.2) 12.5 (11.5-13.3) 13.9 (12.8-14.8) 15.0 (13.7-16.0) 20-day 6.67 (6.25-7.12) 7.88 (7.38-8.41) 9.34 (8.74-9.97) 10.5 (9.80-11.2) 12.0 (11.2-12.8) 13.3 (12.3-14.1) 14.5 (13.4-15.4) 15.7 (14.5-16.8) 17.4 (16.0-18.6) 18.7 (17.2-20.0) 30-day 8.29 (7.78-8.82) 9.75 (9.16-10.4) 11.4 (10.7-12.1) 12.6 (11.8-13.4) 14.3 (13.3-15.2) 15.5 (14.5-16.5) 16.8 (15.6-17.9) 18.1 (16.8-19.3) 19.7 (18.3-21.1) 21.0 (19.4-22.5) 45-day 10.6 (10.0-11.2) 12.4 (11.7-13.1) 14.2 (13.4-15.0) 15.6 (14.8-16.5) 17.4 (16.4-18.4) 18.8 (17.7-19.9) 20.1 (18.9-21.3) 21.4 (20.1-22.7) 23.2 (21.7-24.6) 24.5 (22.8-26.0) 60-day 12.6 (12.0-13.3) 14.8 (14.0-15.6) 16.8 (15.9-17.7) 18.3 (17.3-19.3) 20.3 (19.1-21.4) 21.7 (20.5-23.0) 23.2 (21.8-24.5) 24.6 (23.1-26.0) 26.4 (24.7-27.9) 27.7 (25.9-29.4) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top Page 1 of 4Precipitation Frequency Data Server 2/25/2019https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7168&lon=-78.6044&dat... PF graphical Back to Top Page 2 of 4Precipitation Frequency Data Server 2/25/2019https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7168&lon=-78.6044&dat... Maps & aerials Small scale terrain Large scale terrain Large scale map + – 3km 2mi + – 100km 60mi + – 100km 60mi Page 3 of 4Precipitation Frequency Data Server 2/25/2019https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7168&lon=-78.6044&dat... Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer + – 100km 60mi Page 4 of 4Precipitation Frequency Data Server 2/25/2019https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7168&lon=-78.6044&dat... Nitrogen Control Plan – January 2017 Method 1: Residential Subdivisions with No Known Building Footprints Project Name: __________________________________________ Date: ___________________ Applicant: __________________________________________ Telephone: ___________________ Part I. Riparian Buffers Does site contain riparian buffers? [ ] No [ ] Yes (show on site plan) [ ] Exempt (attach basis for exemption) Part II. Nitrogen Calculation Item Proposed Subdivision Information 1 Total project acreage (acres) 2 Total area of lots excluding Right-of-Way (R/W) and open space (acres) 3 Number of lots 4 Number of lots per acre [Item 3  Item 2] (use in Graph 1) 5 Existing impervious area (prior to 3/9/01) (acres) 6 Total proposed impervious surface in R/W (acres) 7 New impervious area in R/W (acres) [Item 6 – Item 5] 8 Total area of R/W (acres) 9 Percentage of R/W that is impervious [Item 7  Item 8) x 100] (use in Graph 2) 10 Permanently protected undisturbed open space (acres) 11 Permanently protected managed open space (acres) Pre-Development Nitrogen Loading Type of Land Cover Area (acres) TN export coefficient (lbs/ac/yr) TN export from use (lbs/yr) Existing forest land 1.7 Existing pasture 4.4 Existing residential 7.5 Existing cropland 13.6 Existing commercial/industrial 13 TOTAL Nitrogen Loading Ratea (lbs/ac/yr) a Nitrogen Loading Rate (lbs/ac/yr) = Total TN export from use (lbs/yr) ÷ Total Area (acres) Post-Development Nitrogen Loading Before BMPs and/or Offset Payments Type of Land Cover Area (acres) TN export coefficient (lbs/ac/yr) TN export from use (lbs/yr) Permanently protected undisturbed open space (Item 10) (forest, unmown meadow, wetlands, buffers) 0.6 Permanently protected managed open space (Item 11) (grass, landscaping, etc.) 1.2 Lots (Item 4) (read TN export coefficient from Graph 1) Right-of-Way (Item 9) (read TN export coefficient from Graph 2) TOTAL Nitrogen Loading Ratea (lbs/ac/yr) a Nitrogen Loading Rate (lbs/ac/yr) = Total TN export from use (lbs/yr) ÷ Total Area (acres) BMP Type TN Removal Rate (%) Check which apply Wet Pond 30 Stormwater Wetland 40 Sand Filter 35 Bioretention 35 Pollutant Removal (wet) swale 30 Vegetated Filter Strip w/Level Spreader 30 Pollutant removal (dry) swale 10 Dry Detention 10 Magnolia Park Garner, NC Project Number: 41300 5 | www.timmons.com Nitrogen Calculations Post-Development Loading after BMPs and/or Offset Payments Item Description Nitrogen Loading Rate (lbs/ac/yr) 12 Nitrogen load after BMPs (show separately in detail) 13 Nitrogen load offset by payments [Item 12 – 3.6] Amount of Offset (Pounds of Nitrogen) [Item 13 × (Item 1 – Item 5)] ____________________________ *Please refer to the link below to determine the procedure for payment of the nitrogen offset payment. It is necessary for applicants to demonstrate compliance with SL 2009-337, which indicates that applicants must first purchase offset credits through private mitigation banks. If no such credits are available, applicants may then buy their offset credits from the NC EEP. These banks are listed by basin and further information regarding this session law can be found at the following link: http://test.nceep.net/pages/ILF_Program_intro.html Part III. Control of Peak Stormwater Flow Calculated Pre-development Peak Flow (1-year) ____________________________ Calculated Post-development Peak Flow without Controls (1-year) ____________________________ Calculated Post-development Peak Flow with Controls (1-year) ____________________________ Calculations and details showing control of nitrogen and peak stormwater runoff control must be included. Part IV. Watershed Development Permit 1. Total project acreage (in Lake Benson Watershed) ____________________________ 2. Total proposed impervious surface (in Lake Benson Watershed)* ____________________________ 3. Existing impervious surface (in Lake Benson Watershed) ** ____________________________ 4. Equivalent project acreage (Item 1 – Item 3) ____________________________ 5. New impervious acreage (Item 2 – Item 3) ____________________________ 6. Percent impervious [(Item 5  Item 4) x 100] ____________________________ * Total proposed impervious surface is determined by adding known impervious surfaces and estimated typical impervious surfaces for the individual lots. ** Limited to impervious surfaces existing before 7/1/93. I, the undersigned, certify to the best of my knowledge that the above information is correct (affix seal). ________________________________________________ (sign) To be filled in by staff Project Watershed Protection Requirements Project Exempt: Explain ______________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ Project Located in Lake Benson Conservation District – LBCD (Critical Area) Standards Apply Project Located Outside LBCD – On-site treatment required. Minor Variance Requested (WRB) Approved (date): ___________ Disapproved (date): ___________ Major Variance Requested (EMC) Approved (date): ___________ Disapproved (date): ___________ Recommended by WRB (circle one): YES NO Comments (use additional sheet if necessary) ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ Approved by Watershed Administrator: __________________________________________ (sign) Date: _____________________ Graph 1: Total Nitrogen Export from Lots 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Number of Lots per AcreTN Export Coefficient in lbs/ac/yr Graph 2: Total Nitrogen Export from Right-of-Way 0.0 5.0 10.0 15.0 20.0 25.0 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Percentage of Right-of-Way that is ImperviousTN Export Coefficient in lbs/ac/yr Nitrogen Control Plan – January 2017 Method 2: Commercial/Industrial/Residential Sites with Known Impervious Area Project Name: _Oak Park West (Townhomes)__________________________ Date: ____04/12/2019________ Applicant: _Timmons Group_____________________________________ Telephone: _919.866.4934_____ Part I. Riparian Buffers Does site contain riparian buffers? [ ] No [X ] Yes (show buffers on plan) [ ] Exempt (show basis for exemption) Part II. Nitrogen Calculation Item Proposed Site Information Area (acres) 1 Total project acreage 40.77 2 Total proposed impervious area 17.23 3 Existing impervious area (prior to 3/9/01) 0.0 4 New impervious area [Item 2 – Item 3] 17.23 5 Permanently protected undisturbed open space 8.93 6 Permanently protected managed open space 14.61 Pre-Development Loading Type of Land Cover Area (acres) TN export coefficient (lbs/ac/yr) TN export from use (lbs/yr) Existing forest land 40.77 1.7 69.31 Existing pasture 0 4.4 0 Existing residential 0 7.5 0 Existing cropland 0 13.6 0 Existing commercial/industrial 0 13 0 TOTAL 40.77 69.31 Nitrogen Loading Ratea (lbs/ac/yr) 1.7 a Nitrogen Loading Rate (lbs/ac/yr) = Total TN export from use (lbs/yr) ÷ Total Area (acres) Post-Development Loading before BMPs and/or Offset Payments Type of Land Cover Area (acres) TN export coefficient (lbs/ac/yr) TN export from use (lbs/yr) Permanently protected undisturbed open space (forest, unmown meadow, wetlands, buffers) (Item 5) 8.93 0.6 5.36 Permanently protected managed open space (grass, landscaping, etc.) (Item 6) 14.61 1.2 17.53 Impervious surfaces (roads, parking lots, driveways, roofs, paved storage areas, etc.) (Item 4) 17.23 21.2 365.28 TOTAL 40.77 388.17 (Item 7) (Item 8) Nitrogen Loading Rate (lbs/ac/yr) (Equals Item 8 ÷ Item 7) 9.52 BMP Type TN Removal Rate (%) Check which apply Wet Pond 30 Stormwater Wetland 40 Sand Filter 35 Bioretention 35 Pollutant Removal (wet) swale 30 Vegetated Filter Strip w/Level Spreader 30 Permeable Pavement 30 Dry Detention 10 Used for Detention Only – No Credit Post-Development Loading after BMPs and/or Offset Payments Item Description Nitrogen Loading Rate (lbs/ac/yr) 9 Nitrogen load after BMPs (show separately in detail) 9.52 10 Nitrogen load offset by payments [Item 9 – 3.6] 5.92 Amount of Offset (Pounds of Nitrogen) [Item 10 × (Item 1 – Item 3) × 30 years] _____7241___________________ *Please refer to the link below to determine the procedure for payment of the nitrogen offset payment. It is necessary for applicants to demonstrate compliance with SL 2009-337, which indicates that applicants must first purchase offset credits through private mitigation banks. If no such credits are available, applicants may then buy their offset credits from the NC EEP. These banks are listed by basin and further information regarding this session law can be found at the following link: http://test.nceep.net/pages/ILF_Program_intro.html Part III. Control of Peak Stormwater Flow Calculated Pre-development Peak Flow (1-year) _____18.26__________________ Calculated Post-development Peak Flow without Controls (1-year) _____63.90__________________ Calculated Post-development Peak Flow with Controls (1-year) _____17.27__________________ Calculations and details showing control of nitrogen and peak stormwater runoff control must be included. Part IV: Watershed Development Permit 1. Total project acreage (in Lake Benson Watershed) ____________________________ 2. Total proposed impervious surface (in Lake Benson Watershed) ____________________________ 3. Existing impervious surface (in Lake Benson Watershed) * ____________________________ 4. Equivalent project acreage (Item 1 – Item 3) ____________________________ 5. New impervious surface (Item 2 – Item 3) ____________________________ 6. Percent impervious [(Item 5 ÷ Item 4) x 100] ____________________________ * Limited to impervious surface existing before 7/1/93 I, the undersigned, certify that to the best of my knowledge that the above information is correct (affix seal) _____________________________________(sign) To be filled in by staff Project Watershed Protection Requirements š Project Exempt: Explain ______________________________________________________________ ___________________________________________________________________________________ ___________________________________________________________________________________ š Project Located in Lake Benson Conservation District – LBCD (Critical Area) Standards Apply š Project Located Outside LBCD – On-site treatment required. š Minor Variance Requested (WRB) Approved (date): ___________ Disapproved (date): ___________ š Major Variance Requested (EMC) Approved (date): ___________ Disapproved (date): ___________ Recommended by WRB (circle one): YES NO Comments (use additional sheet if necessary) ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ Approved by Watershed Administrator: __________________________________________ (sign) Date: _____________________ Magnolia Park Garner, NC Project Number: 41300 6 | www.timmons.com Dry Detention Calculations 1/15/2020Dry Detention CalculationsTypeLots 4250Town 1450Road 4500Dry Detention Basinarea lots townsLF road100' section roadimpervious on lotsimpervios on townsimpervious in roadtotal impervious (sf)total impervious (ac)% imperviousRunoff CoefficientRequired Volume (sf)1 10.24 48 0 1849 18.49 201875 0 83205 2850806.5464% 0.63 23,2392 7.03 0 71 2058 20.58 0 102950 92610 1955604.4964% 0.62 15,9433 23.35 32 63 4712 47.12 133875 91350 212040 43726510.0443% 0.44 37,0334 10.03 33 0 2038 20.38 140250 0 91710 2319605.3353% 0.53 19,2175 30.09 131 0 6415 64.15 556750 0 288675 84542519.4165% 0.63 68,868Project Number:Calculated By:Allison StoneDate:Impervious Areassf/lotsf/lotAreaProject:Magnolia Park41300sf/100 lf section Magnolia Park Garner, NC Project Number: 41300 7 | www.timmons.com Hydraflow Reports Hydraflow Table of Contents Magnolia Park 20200115.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Watershed Model Schematic...................................................................................... 1 1 - Year Hydrograph Reports................................................................................................................... 2 Hydrograph No. 1, SCS Runoff, POI-1 - Pre............................................................................ 2 Hydrograph No. 2, SCS Runoff, POI-2 - Pre............................................................................ 3 Hydrograph No. 3, SCS Runoff, POI-3 - Pre............................................................................ 4 Hydrograph No. 4, Combine, Pre Dev Total............................................................................. 5 Hydrograph No. 5, SCS Runoff, POI-1 - Post.......................................................................... 6 Hydrograph No. 6, SCS Runoff, POI-2 - Post.......................................................................... 7 Hydrograph No. 7, SCS Runoff, POI-3 - Post.......................................................................... 8 Hydrograph No. 8, Combine, Post Dev Total........................................................................... 9 Hydrograph No. 9, SCS Runoff, POI-1 - Post - BYPASS....................................................... 10 Hydrograph No. 10, SCS Runoff, POI-1 - Post - SCM 1........................................................ 11 Hydrograph No. 11, SCS Runoff, POI-1 - Post - SCM 2........................................................ 12 Hydrograph No. 12, Reservoir, SCM 1................................................................................... 13 Hydrograph No. 13, Reservoir, SCM 2................................................................................... 14 Hydrograph No. 14, Combine, POI-1 POST-BMP.................................................................. 15 Hydrograph No. 15, SCS Runoff, POI-2 - Post - SCM 3........................................................ 16 Hydrograph No. 16, SCS Runoff, POI-2 - Post - BYPASS..................................................... 17 Hydrograph No. 17, SCS Runoff, POI-2 - Post - SCM 4........................................................ 18 Hydrograph No. 18, Reservoir, SCM 3................................................................................... 19 Hydrograph No. 19, Reservoir, SCM 4................................................................................... 20 Hydrograph No. 20, Combine, POI-2 POST-BMP.................................................................. 21 Hydrograph No. 21, SCS Runoff, POI-3 - Post - BYPASS..................................................... 22 Hydrograph No. 22, SCS Runoff, POI-3 - Post - SCM 5........................................................ 23 Hydrograph No. 23, Reservoir, SCM 5................................................................................... 24 Hydrograph No. 24, Combine, POI 3 POST-BMP.................................................................. 25 Hydrograph No. 25, Combine, POST DEV BMP.................................................................... 26 10 - Year Hydrograph Reports................................................................................................................. 27 Hydrograph No. 1, SCS Runoff, POI-1 - Pre.......................................................................... 27 Hydrograph No. 2, SCS Runoff, POI-2 - Pre.......................................................................... 28 Hydrograph No. 3, SCS Runoff, POI-3 - Pre.......................................................................... 29 Hydrograph No. 4, Combine, Pre Dev Total........................................................................... 30 Hydrograph No. 5, SCS Runoff, POI-1 - Post........................................................................ 31 Hydrograph No. 6, SCS Runoff, POI-2 - Post........................................................................ 32 Hydrograph No. 7, SCS Runoff, POI-3 - Post........................................................................ 33 Hydrograph No. 8, Combine, Post Dev Total......................................................................... 34 Hydrograph No. 9, SCS Runoff, POI-1 - Post - BYPASS....................................................... 35 Hydrograph No. 10, SCS Runoff, POI-1 - Post - SCM 1........................................................ 36 Hydrograph No. 11, SCS Runoff, POI-1 - Post - SCM 2........................................................ 37 Hydrograph No. 12, Reservoir, SCM 1................................................................................... 38 Hydrograph No. 13, Reservoir, SCM 2................................................................................... 39 Hydrograph No. 14, Combine, POI-1 POST-BMP.................................................................. 40 Hydrograph No. 15, SCS Runoff, POI-2 - Post - SCM 3........................................................ 41 Hydrograph No. 16, SCS Runoff, POI-2 - Post - BYPASS..................................................... 42 Contents continued...Magnolia Park 20200115.gpw Hydrograph No. 17, SCS Runoff, POI-2 - Post - SCM 4........................................................ 43 Hydrograph No. 18, Reservoir, SCM 3................................................................................... 44 Hydrograph No. 19, Reservoir, SCM 4................................................................................... 45 Hydrograph No. 20, Combine, POI-2 POST-BMP.................................................................. 46 Hydrograph No. 21, SCS Runoff, POI-3 - Post - BYPASS..................................................... 47 Hydrograph No. 22, SCS Runoff, POI-3 - Post - SCM 5........................................................ 48 Hydrograph No. 23, Reservoir, SCM 5................................................................................... 49 Hydrograph No. 24, Combine, POI 3 POST-BMP.................................................................. 50 Hydrograph No. 25, Combine, POST DEV BMP.................................................................... 51 100 - Year Hydrograph Reports................................................................................................................. 52 Hydrograph No. 1, SCS Runoff, POI-1 - Pre.......................................................................... 52 Hydrograph No. 2, SCS Runoff, POI-2 - Pre.......................................................................... 53 Hydrograph No. 3, SCS Runoff, POI-3 - Pre.......................................................................... 54 Hydrograph No. 4, Combine, Pre Dev Total........................................................................... 55 Hydrograph No. 5, SCS Runoff, POI-1 - Post........................................................................ 56 Hydrograph No. 6, SCS Runoff, POI-2 - Post........................................................................ 57 Hydrograph No. 7, SCS Runoff, POI-3 - Post........................................................................ 58 Hydrograph No. 8, Combine, Post Dev Total......................................................................... 59 Hydrograph No. 9, SCS Runoff, POI-1 - Post - BYPASS....................................................... 60 Hydrograph No. 10, SCS Runoff, POI-1 - Post - SCM 1........................................................ 61 Hydrograph No. 11, SCS Runoff, POI-1 - Post - SCM 2........................................................ 62 Hydrograph No. 12, Reservoir, SCM 1................................................................................... 63 Hydrograph No. 13, Reservoir, SCM 2................................................................................... 64 Hydrograph No. 14, Combine, POI-1 POST-BMP.................................................................. 65 Hydrograph No. 15, SCS Runoff, POI-2 - Post - SCM 3........................................................ 66 Hydrograph No. 16, SCS Runoff, POI-2 - Post - BYPASS..................................................... 67 Hydrograph No. 17, SCS Runoff, POI-2 - Post - SCM 4........................................................ 68 Hydrograph No. 18, Reservoir, SCM 3................................................................................... 69 Hydrograph No. 19, Reservoir, SCM 4................................................................................... 70 Hydrograph No. 20, Combine, POI-2 POST-BMP.................................................................. 71 Hydrograph No. 21, SCS Runoff, POI-3 - Post - BYPASS..................................................... 72 Hydrograph No. 22, SCS Runoff, POI-3 - Post - SCM 5........................................................ 73 Hydrograph No. 23, Reservoir, SCM 5................................................................................... 74 Hydrograph No. 24, Combine, POI 3 POST-BMP.................................................................. 75 Hydrograph No. 25, Combine, POST DEV BMP.................................................................... 76 1 2 3 4 5 6 7 8 9 10 11 1213 14 15 16 17 18 19 20 21 22 23 24 25 1 Watershed Model SchematicHydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Project: Magnolia Park 20200115.gpw Friday, 01 / 17 / 2020 Hyd.Origin Description Legend 1 SCS Runoff POI-1 - Pre 2 SCS Runoff POI-2 - Pre 3 SCS Runoff POI-3 - Pre 4 Combine Pre Dev Total 5 SCS Runoff POI-1 - Post 6 SCS Runoff POI-2 - Post 7 SCS Runoff POI-3 - Post 8 Combine Post Dev Total 9 SCS Runoff POI-1 - Post - BYPASS 10 SCS Runoff POI-1 - Post - SCM 1 11 SCS Runoff POI-1 - Post - SCM 2 12 Reservoir SCM 1 13 Reservoir SCM 2 14 Combine POI-1 POST-BMP 15 SCS Runoff POI-2 - Post - SCM 3 16 SCS Runoff POI-2 - Post - BYPASS 17 SCS Runoff POI-2 - Post - SCM 4 18 Reservoir SCM 3 19 Reservoir SCM 4 20 Combine POI-2 POST-BMP 21 SCS Runoff POI-3 - Post - BYPASS 22 SCS Runoff POI-3 - Post - SCM 5 23 Reservoir SCM 5 24 Combine POI 3 POST-BMP 25 Combine POST DEV BMP Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 1 POI-1 - Pre Hydrograph type = SCS Runoff Peak discharge = 31.97 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 99,329 cuft Drainage area = 39.890 ac Curve number = 71* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.60 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.510 x 98) + (72.700 x 71)] / 39.890 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) POI-1 - Pre Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 2 POI-2 - Pre Hydrograph type = SCS Runoff Peak discharge = 59.81 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 207,193 cuft Drainage area = 76.180 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.30 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.550 x 98) + (54.000 x 72) + (18.750 x 72)] / 76.180 3 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POI-2 - Pre Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 3 POI-3 - Pre Hydrograph type = SCS Runoff Peak discharge = 52.39 cfs Storm frequency = 1 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 203,086 cuft Drainage area = 73.360 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.20 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.550 x 98) + (54.000 x 72) + (18.750 x 72)] / 73.360 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POI-3 - Pre Hyd. No. 3 -- 1 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 4 Pre Dev Total Hydrograph type = Combine Peak discharge = 141.32 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 509,608 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 189.430 ac 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) Pre Dev Total Hyd. No. 4 -- 1 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 5 POI-1 - Post Hydrograph type = SCS Runoff Peak discharge = 65.98 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 172,080 cuft Drainage area = 35.340 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.310 x 71) + (14.030 x 98)] / 35.340 6 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POI-1 - Post Hyd. No. 5 -- 1 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 6 POI-2 - Post Hydrograph type = SCS Runoff Peak discharge = 126.66 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 332,102 cuft Drainage area = 75.470 ac Curve number = 80* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(25.690 x 98) + (49.780 x 71)] / 75.470 7 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) POI-2 - Post Hyd. No. 6 -- 1 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 7 POI-3 - Post Hydrograph type = SCS Runoff Peak discharge = 109.95 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 315,163 cuft Drainage area = 79.800 ac Curve number = 79* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.490 x 98) + (58.310 x 72)] / 79.800 8 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POI-3 - Post Hyd. No. 7 -- 1 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 8 Post Dev Total Hydrograph type = Combine Peak discharge = 302.45 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 819,344 cuft Inflow hyds. = 5, 6, 7 Contrib. drain. area = 190.610 ac 9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (hrs) Post Dev Total Hyd. No. 8 -- 1 Year Hyd No. 8 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 9 POI-1 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 21.28 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 57,255 cuft Drainage area = 17.070 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.950 x 98) + (15.120 x 72)] / 17.070 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) POI-1 - Post - BYPASS Hyd. No. 9 -- 1 Year Hyd No. 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 10 POI-1 - Post - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 25.50 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 66,299 cuft Drainage area = 10.240 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.700 x 71) + (6.540 x 98)] / 10.240 11 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) POI-1 - Post - SCM 1 Hyd. No. 10 -- 1 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 11 POI-1 - Post - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 17.51 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 45,516 cuft Drainage area = 7.030 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.540 x 71) + (4.490 x 98)] / 7.030 12 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) POI-1 - Post - SCM 2 Hyd. No. 11 -- 1 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 12 SCM 1 Hydrograph type = Reservoir Peak discharge = 0.833 cfs Storm frequency = 1 yrs Time to peak = 14.90 hrs Time interval = 2 min Hyd. volume = 66,264 cuft Inflow hyd. No. = 10 - POI-1 - Post - SCM 1 Max. Elevation = 265.10 ft Reservoir name = SCM 1 Max. Storage = 41,468 cuft Storage Indication method used. 13 0 6 12 18 24 30 36 42 48 54 60 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) SCM 1 Hyd. No. 12 -- 1 Year Hyd No. 12 Hyd No. 10 Total storage used = 41,468 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 13 SCM 2 Hydrograph type = Reservoir Peak discharge = 0.836 cfs Storm frequency = 1 yrs Time to peak = 13.67 hrs Time interval = 2 min Hyd. volume = 45,497 cuft Inflow hyd. No. = 11 - POI-1 - Post - SCM 2 Max. Elevation = 247.12 ft Reservoir name = SCM 2 Max. Storage = 25,769 cuft Storage Indication method used. 14 0 4 8 12 16 20 24 28 32 36 40 44 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) SCM 2 Hyd. No. 13 -- 1 Year Hyd No. 13 Hyd No. 11 Total storage used = 25,769 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 14 POI-1 POST-BMP Hydrograph type = Combine Peak discharge = 22.59 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 169,016 cuft Inflow hyds. = 9, 12, 13 Contrib. drain. area = 17.070 ac 15 0 4 8 12 16 20 24 28 32 36 40 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) POI-1 POST-BMP Hyd. No. 14 -- 1 Year Hyd No. 14 Hyd No. 9 Hyd No. 12 Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 15 POI-2 - Post - SCM 3 Hydrograph type = SCS Runoff Peak discharge = 45.93 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 119,444 cuft Drainage area = 23.350 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.040 x 98) + (13.310 x 71)] / 23.350 16 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POI-2 - Post - SCM 3 Hyd. No. 15 -- 1 Year Hyd No. 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 16 POI-2 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 52.48 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 141,176 cuft Drainage area = 42.090 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.290 x 98) + (37.800 x 72)] / 42.090 17 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POI-2 - Post - BYPASS Hyd. No. 16 -- 1 Year Hyd No. 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 17 POI-2 - Post - SCM 4 Hydrograph type = SCS Runoff Peak discharge = 21.79 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 56,493 cuft Drainage area = 10.030 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.330 x 98) + (4.700 x 71)] / 10.030 18 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) POI-2 - Post - SCM 4 Hyd. No. 17 -- 1 Year Hyd No. 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 18 SCM 3 Hydrograph type = Reservoir Peak discharge = 1.658 cfs Storm frequency = 1 yrs Time to peak = 14.97 hrs Time interval = 2 min Hyd. volume = 119,302 cuft Inflow hyd. No. = 15 - POI-2 - Post - SCM 3 Max. Elevation = 240.32 ft Reservoir name = SCM 3 Max. Storage = 71,435 cuft Storage Indication method used. 19 0 6 12 18 24 30 36 42 48 54 60 66 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) SCM 3 Hyd. No. 18 -- 1 Year Hyd No. 18 Hyd No. 15 Total storage used = 71,435 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 19 SCM 4 Hydrograph type = Reservoir Peak discharge = 1.659 cfs Storm frequency = 1 yrs Time to peak = 12.93 hrs Time interval = 2 min Hyd. volume = 56,470 cuft Inflow hyd. No. = 17 - POI-2 - Post - SCM 4 Max. Elevation = 240.33 ft Reservoir name = SCM 4 Max. Storage = 28,360 cuft Storage Indication method used. 20 0 4 8 12 16 20 24 28 32 36 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) SCM 4 Hyd. No. 19 -- 1 Year Hyd No. 19 Hyd No. 17 Total storage used = 28,360 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 20 POI-2 POST-BMP Hydrograph type = Combine Peak discharge = 54.96 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 316,948 cuft Inflow hyds. = 16, 18, 19 Contrib. drain. area = 42.090 ac 21 0 4 8 12 16 20 24 28 32 36 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POI-2 POST-BMP Hyd. No. 20 -- 1 Year Hyd No. 20 Hyd No. 16 Hyd No. 18 Hyd No. 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 21 POI-3 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 60.48 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 175,637 cuft Drainage area = 49.510 ac Curve number = 77* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(9.230 x 98) + (40.280 x 72)] / 49.510 22 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POI-3 - Post - BYPASS Hyd. No. 21 -- 1 Year Hyd No. 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 22 POI-3 - Post - SCM 5 Hydrograph type = SCS Runoff Peak discharge = 68.42 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 192,723 cuft Drainage area = 30.090 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(19.410 x 98) + (10.680 x 72)] / 30.090 23 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POI-3 - Post - SCM 5 Hyd. No. 22 -- 1 Year Hyd No. 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 23 SCM 5 Hydrograph type = Reservoir Peak discharge = 4.126 cfs Storm frequency = 1 yrs Time to peak = 13.37 hrs Time interval = 2 min Hyd. volume = 192,719 cuft Inflow hyd. No. = 22 - POI-3 - Post - SCM 5 Max. Elevation = 227.36 ft Reservoir name = SCM 5 Max. Storage = 97,258 cuft Storage Indication method used. 24 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) SCM 5 Hyd. No. 23 -- 1 Year Hyd No. 23 Hyd No. 22 Total storage used = 97,258 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 24 POI 3 POST-BMP Hydrograph type = Combine Peak discharge = 64.05 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 368,356 cuft Inflow hyds. = 21, 23 Contrib. drain. area = 49.510 ac 25 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POI 3 POST-BMP Hyd. No. 24 -- 1 Year Hyd No. 24 Hyd No. 21 Hyd No. 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 25 POST DEV BMP Hydrograph type = Combine Peak discharge = 141.29 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 854,321 cuft Inflow hyds. = 14, 20, 24 Contrib. drain. area = 0.000 ac 26 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POST DEV BMP Hyd. No. 25 -- 1 Year Hyd No. 25 Hyd No. 14 Hyd No. 20 Hyd No. 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 1 POI-1 - Pre Hydrograph type = SCS Runoff Peak discharge = 110.47 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 312,750 cuft Drainage area = 39.890 ac Curve number = 71* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.60 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.510 x 98) + (72.700 x 71)] / 39.890 27 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POI-1 - Pre Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 2 POI-2 - Pre Hydrograph type = SCS Runoff Peak discharge = 201.06 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 635,600 cuft Drainage area = 76.180 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.30 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.550 x 98) + (54.000 x 72) + (18.750 x 72)] / 76.180 28 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) POI-2 - Pre Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 3 POI-3 - Pre Hydrograph type = SCS Runoff Peak discharge = 177.81 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 623,001 cuft Drainage area = 73.360 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.20 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.550 x 98) + (54.000 x 72) + (18.750 x 72)] / 73.360 29 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 Q (cfs) Time (hrs) POI-3 - Pre Hyd. No. 3 -- 10 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 4 Pre Dev Total Hydrograph type = Combine Peak discharge = 480.97 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,571,352 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 189.430 ac 30 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 70.00 70.00 140.00 140.00 210.00 210.00 280.00 280.00 350.00 350.00 420.00 420.00 490.00 490.00 Q (cfs) Time (hrs) Pre Dev Total Hyd. No. 4 -- 10 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 5 POI-1 - Post Hydrograph type = SCS Runoff Peak discharge = 162.15 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 422,757 cuft Drainage area = 35.340 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.310 x 71) + (14.030 x 98)] / 35.340 31 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) POI-1 - Post Hyd. No. 5 -- 10 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 6 POI-2 - Post Hydrograph type = SCS Runoff Peak discharge = 327.01 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 849,411 cuft Drainage area = 75.470 ac Curve number = 80* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(25.690 x 98) + (49.780 x 71)] / 75.470 32 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (hrs) POI-2 - Post Hyd. No. 6 -- 10 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 7 POI-3 - Post Hydrograph type = SCS Runoff Peak discharge = 293.45 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 822,975 cuft Drainage area = 79.800 ac Curve number = 79* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.490 x 98) + (58.310 x 72)] / 79.800 33 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (hrs) POI-3 - Post Hyd. No. 7 -- 10 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 8 Post Dev Total Hydrograph type = Combine Peak discharge = 774.49 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 2,095,142 cuft Inflow hyds. = 5, 6, 7 Contrib. drain. area = 190.610 ac 34 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 111.00 111.00 222.00 222.00 333.00 333.00 444.00 444.00 555.00 555.00 666.00 666.00 777.00 777.00 Q (cfs) Time (hrs) Post Dev Total Hyd. No. 8 -- 10 Year Hyd No. 8 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 9 POI-1 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 62.92 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 163,273 cuft Drainage area = 17.070 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.950 x 98) + (15.120 x 72)] / 17.070 35 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POI-1 - Post - BYPASS Hyd. No. 9 -- 10 Year Hyd No. 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 10 POI-1 - Post - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 54.44 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 145,379 cuft Drainage area = 10.240 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.700 x 71) + (6.540 x 98)] / 10.240 36 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) POI-1 - Post - SCM 1 Hyd. No. 10 -- 10 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 11 POI-1 - Post - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 37.37 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 99,806 cuft Drainage area = 7.030 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.540 x 71) + (4.490 x 98)] / 7.030 37 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) POI-1 - Post - SCM 2 Hyd. No. 11 -- 10 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 12 SCM 1 Hydrograph type = Reservoir Peak discharge = 6.738 cfs Storm frequency = 10 yrs Time to peak = 12.43 hrs Time interval = 2 min Hyd. volume = 145,343 cuft Inflow hyd. No. = 10 - POI-1 - Post - SCM 1 Max. Elevation = 267.86 ft Reservoir name = SCM 1 Max. Storage = 81,275 cuft Storage Indication method used. 38 0 6 12 18 24 30 36 42 48 54 60 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) SCM 1 Hyd. No. 12 -- 10 Year Hyd No. 12 Hyd No. 10 Total storage used = 81,275 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 13 SCM 2 Hydrograph type = Reservoir Peak discharge = 10.01 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 99,787 cuft Inflow hyd. No. = 11 - POI-1 - Post - SCM 2 Max. Elevation = 249.50 ft Reservoir name = SCM 2 Max. Storage = 49,664 cuft Storage Indication method used. 39 0 4 8 12 16 20 24 28 32 36 40 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) SCM 2 Hyd. No. 13 -- 10 Year Hyd No. 13 Hyd No. 11 Total storage used = 49,664 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 14 POI-1 POST-BMP Hydrograph type = Combine Peak discharge = 64.74 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 408,403 cuft Inflow hyds. = 9, 12, 13 Contrib. drain. area = 17.070 ac 40 0 4 8 12 16 20 24 28 32 36 40 44 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POI-1 POST-BMP Hyd. No. 14 -- 10 Year Hyd No. 14 Hyd No. 9 Hyd No. 12 Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 15 POI-2 - Post - SCM 3 Hydrograph type = SCS Runoff Peak discharge = 110.08 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 287,748 cuft Drainage area = 23.350 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.040 x 98) + (13.310 x 71)] / 23.350 41 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POI-2 - Post - SCM 3 Hyd. No. 15 -- 10 Year Hyd No. 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 16 POI-2 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 155.15 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 402,586 cuft Drainage area = 42.090 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.290 x 98) + (37.800 x 72)] / 42.090 42 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POI-2 - Post - BYPASS Hyd. No. 16 -- 10 Year Hyd No. 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 17 POI-2 - Post - SCM 4 Hydrograph type = SCS Runoff Peak discharge = 49.77 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 130,978 cuft Drainage area = 10.030 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.330 x 98) + (4.700 x 71)] / 10.030 43 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) POI-2 - Post - SCM 4 Hyd. No. 17 -- 10 Year Hyd No. 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 18 SCM 3 Hydrograph type = Reservoir Peak discharge = 18.32 cfs Storm frequency = 10 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 287,489 cuft Inflow hyd. No. = 15 - POI-2 - Post - SCM 3 Max. Elevation = 243.23 ft Reservoir name = SCM 3 Max. Storage = 148,873 cuft Storage Indication method used. 44 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) SCM 3 Hyd. No. 18 -- 10 Year Hyd No. 18 Hyd No. 15 Total storage used = 148,873 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 19 SCM 4 Hydrograph type = Reservoir Peak discharge = 20.13 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 130,955 cuft Inflow hyd. No. = 17 - POI-2 - Post - SCM 4 Max. Elevation = 242.80 ft Reservoir name = SCM 4 Max. Storage = 57,164 cuft Storage Indication method used. 45 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) SCM 4 Hyd. No. 19 -- 10 Year Hyd No. 19 Hyd No. 17 Total storage used = 57,164 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 20 POI-2 POST-BMP Hydrograph type = Combine Peak discharge = 158.94 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 821,031 cuft Inflow hyds. = 16, 18, 19 Contrib. drain. area = 42.090 ac 46 0 4 8 12 16 20 24 28 32 36 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POI-2 POST-BMP Hyd. No. 20 -- 10 Year Hyd No. 20 Hyd No. 16 Hyd No. 18 Hyd No. 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 21 POI-3 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 170.80 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 478,744 cuft Drainage area = 49.510 ac Curve number = 77* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(9.230 x 98) + (40.280 x 72)] / 49.510 47 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) POI-3 - Post - BYPASS Hyd. No. 21 -- 10 Year Hyd No. 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 22 POI-3 - Post - SCM 5 Hydrograph type = SCS Runoff Peak discharge = 143.11 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 414,962 cuft Drainage area = 30.090 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 5.13 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(19.410 x 98) + (10.680 x 72)] / 30.090 48 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) POI-3 - Post - SCM 5 Hyd. No. 22 -- 10 Year Hyd No. 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 23 SCM 5 Hydrograph type = Reservoir Peak discharge = 75.84 cfs Storm frequency = 10 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 414,959 cuft Inflow hyd. No. = 22 - POI-3 - Post - SCM 5 Max. Elevation = 229.17 ft Reservoir name = SCM 5 Max. Storage = 154,394 cuft Storage Indication method used. 49 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 Q (cfs) Time (hrs) SCM 5 Hyd. No. 23 -- 10 Year Hyd No. 23 Hyd No. 22 Total storage used = 154,394 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 24 POI 3 POST-BMP Hydrograph type = Combine Peak discharge = 218.87 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 893,703 cuft Inflow hyds. = 21, 23 Contrib. drain. area = 49.510 ac 50 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) POI 3 POST-BMP Hyd. No. 24 -- 10 Year Hyd No. 24 Hyd No. 21 Hyd No. 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 25 POST DEV BMP Hydrograph type = Combine Peak discharge = 421.82 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 2,123,130 cuft Inflow hyds. = 14, 20, 24 Contrib. drain. area = 0.000 ac 51 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 480.00 480.00 Q (cfs) Time (hrs) POST DEV BMP Hyd. No. 25 -- 10 Year Hyd No. 25 Hyd No. 14 Hyd No. 20 Hyd No. 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 1 POI-1 - Pre Hydrograph type = SCS Runoff Peak discharge = 217.95 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 611,078 cuft Drainage area = 39.890 ac Curve number = 71* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.60 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.510 x 98) + (72.700 x 71)] / 39.890 52 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) POI-1 - Pre Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 2 POI-2 - Pre Hydrograph type = SCS Runoff Peak discharge = 392.78 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,228,063 cuft Drainage area = 76.180 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.30 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.550 x 98) + (54.000 x 72) + (18.750 x 72)] / 76.180 53 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 Q (cfs) Time (hrs) POI-2 - Pre Hyd. No. 2 -- 100 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 3 POI-3 - Pre Hydrograph type = SCS Runoff Peak discharge = 348.67 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 1,203,721 cuft Drainage area = 73.360 ac Curve number = 72* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 20.20 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.550 x 98) + (54.000 x 72) + (18.750 x 72)] / 73.360 54 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 50.00 50.00 100.00 100.00 150.00 150.00 200.00 200.00 250.00 250.00 300.00 300.00 350.00 350.00 Q (cfs) Time (hrs) POI-3 - Pre Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 4 Pre Dev Total Hydrograph type = Combine Peak discharge = 943.80 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 3,042,861 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 189.430 ac 55 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 135.00 135.00 270.00 270.00 405.00 405.00 540.00 540.00 675.00 675.00 810.00 810.00 945.00 945.00 Q (cfs) Time (hrs) Pre Dev Total Hyd. No. 4 -- 100 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 5 POI-1 - Post Hydrograph type = SCS Runoff Peak discharge = 277.82 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 738,842 cuft Drainage area = 35.340 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.310 x 71) + (14.030 x 98)] / 35.340 56 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 Q (cfs) Time (hrs) POI-1 - Post Hyd. No. 5 -- 100 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 6 POI-2 - Post Hydrograph type = SCS Runoff Peak discharge = 572.96 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 1,512,503 cuft Drainage area = 75.470 ac Curve number = 80* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(25.690 x 98) + (49.780 x 71)] / 75.470 57 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 80.00 80.00 160.00 160.00 240.00 240.00 320.00 320.00 400.00 400.00 480.00 480.00 560.00 560.00 640.00 640.00 Q (cfs) Time (hrs) POI-2 - Post Hyd. No. 6 -- 100 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 7 POI-3 - Post Hydrograph type = SCS Runoff Peak discharge = 520.73 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 1,479,516 cuft Drainage area = 79.800 ac Curve number = 79* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.490 x 98) + (58.310 x 72)] / 79.800 58 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 80.00 80.00 160.00 160.00 240.00 240.00 320.00 320.00 400.00 400.00 480.00 480.00 560.00 560.00 Q (cfs) Time (hrs) POI-3 - Post Hyd. No. 7 -- 100 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 8 Post Dev Total Hydrograph type = Combine Peak discharge = 1352.67 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 3,730,860 cuft Inflow hyds. = 5, 6, 7 Contrib. drain. area = 190.610 ac 59 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 194.00 194.00 388.00 388.00 582.00 582.00 776.00 776.00 970.00 970.00 1164.00 1164.00 1358.00 1358.00 Q (cfs) Time (hrs) Post Dev Total Hyd. No. 8 -- 100 Year Hyd No. 8 Hyd No. 5 Hyd No. 6 Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 9 POI-1 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 117.22 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 305,494 cuft Drainage area = 17.070 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.950 x 98) + (15.120 x 72)] / 17.070 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) POI-1 - Post - BYPASS Hyd. No. 9 -- 100 Year Hyd No. 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 10 POI-1 - Post - SCM 1 Hydrograph type = SCS Runoff Peak discharge = 87.79 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 240,919 cuft Drainage area = 10.240 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(3.700 x 71) + (6.540 x 98)] / 10.240 61 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) POI-1 - Post - SCM 1 Hyd. No. 10 -- 100 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 11 POI-1 - Post - SCM 2 Hydrograph type = SCS Runoff Peak discharge = 60.27 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 165,396 cuft Drainage area = 7.030 ac Curve number = 88* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.540 x 71) + (4.490 x 98)] / 7.030 62 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) POI-1 - Post - SCM 2 Hyd. No. 11 -- 100 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 12 SCM 1 Hydrograph type = Reservoir Peak discharge = 53.57 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 240,883 cuft Inflow hyd. No. = 10 - POI-1 - Post - SCM 1 Max. Elevation = 269.21 ft Reservoir name = SCM 1 Max. Storage = 104,672 cuft Storage Indication method used. 63 0 4 8 12 16 20 24 28 32 36 40 44 48 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) SCM 1 Hyd. No. 12 -- 100 Year Hyd No. 12 Hyd No. 10 Total storage used = 104,672 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 13 SCM 2 Hydrograph type = Reservoir Peak discharge = 46.55 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 165,378 cuft Inflow hyd. No. = 11 - POI-1 - Post - SCM 2 Max. Elevation = 250.40 ft Reservoir name = SCM 2 Max. Storage = 60,508 cuft Storage Indication method used. 64 0 4 8 12 16 20 24 28 32 36 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 Q (cfs) Time (hrs) SCM 2 Hyd. No. 13 -- 100 Year Hyd No. 13 Hyd No. 11 Total storage used = 60,508 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 14 POI-1 POST-BMP Hydrograph type = Combine Peak discharge = 192.07 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 711,755 cuft Inflow hyds. = 9, 12, 13 Contrib. drain. area = 17.070 ac 65 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) POI-1 POST-BMP Hyd. No. 14 -- 100 Year Hyd No. 14 Hyd No. 9 Hyd No. 12 Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 15 POI-2 - Post - SCM 3 Hydrograph type = SCS Runoff Peak discharge = 186.58 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 498,312 cuft Drainage area = 23.350 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(10.040 x 98) + (13.310 x 71)] / 23.350 66 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) POI-2 - Post - SCM 3 Hyd. No. 15 -- 100 Year Hyd No. 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 16 POI-2 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 289.03 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 753,265 cuft Drainage area = 42.090 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(4.290 x 98) + (37.800 x 72)] / 42.090 67 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (hrs) POI-2 - Post - BYPASS Hyd. No. 16 -- 100 Year Hyd No. 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 17 POI-2 - Post - SCM 4 Hydrograph type = SCS Runoff Peak discharge = 82.62 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 222,793 cuft Drainage area = 10.030 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 12.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(5.330 x 98) + (4.700 x 71)] / 10.030 68 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) POI-2 - Post - SCM 4 Hyd. No. 17 -- 100 Year Hyd No. 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 18 SCM 3 Hydrograph type = Reservoir Peak discharge = 80.30 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 498,027 cuft Inflow hyd. No. = 15 - POI-2 - Post - SCM 3 Max. Elevation = 245.67 ft Reservoir name = SCM 3 Max. Storage = 225,647 cuft Storage Indication method used. 69 0 4 8 12 16 20 24 28 32 36 40 44 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) SCM 3 Hyd. No. 18 -- 100 Year Hyd No. 18 Hyd No. 15 Total storage used = 225,647 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 19 SCM 4 Hydrograph type = Reservoir Peak discharge = 71.62 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 222,770 cuft Inflow hyd. No. = 17 - POI-2 - Post - SCM 4 Max. Elevation = 243.64 ft Reservoir name = SCM 4 Max. Storage = 68,901 cuft Storage Indication method used. 70 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) SCM 4 Hyd. No. 19 -- 100 Year Hyd No. 19 Hyd No. 17 Total storage used = 68,901 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 20 POI-2 POST-BMP Hydrograph type = Combine Peak discharge = 391.26 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 1,474,061 cuft Inflow hyds. = 16, 18, 19 Contrib. drain. area = 42.090 ac 71 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 Q (cfs) Time (hrs) POI-2 POST-BMP Hyd. No. 20 -- 100 Year Hyd No. 20 Hyd No. 16 Hyd No. 18 Hyd No. 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 21 POI-3 - Post - BYPASS Hydrograph type = SCS Runoff Peak discharge = 310.52 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 877,720 cuft Drainage area = 49.510 ac Curve number = 77* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(9.230 x 98) + (40.280 x 72)] / 49.510 72 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 40.00 40.00 80.00 80.00 120.00 120.00 160.00 160.00 200.00 200.00 240.00 240.00 280.00 280.00 320.00 320.00 Q (cfs) Time (hrs) POI-3 - Post - BYPASS Hyd. No. 21 -- 100 Year Hyd No. 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 22 POI-3 - Post - SCM 5 Hydrograph type = SCS Runoff Peak discharge = 228.85 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 681,836 cuft Drainage area = 30.090 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 7.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(19.410 x 98) + (10.680 x 72)] / 30.090 73 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) POI-3 - Post - SCM 5 Hyd. No. 22 -- 100 Year Hyd No. 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 23 SCM 5 Hydrograph type = Reservoir Peak discharge = 177.58 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 681,833 cuft Inflow hyd. No. = 22 - POI-3 - Post - SCM 5 Max. Elevation = 230.71 ft Reservoir name = SCM 5 Max. Storage = 212,580 cuft Storage Indication method used. 74 0 4 8 12 16 20 24 28 32 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 240.00 240.00 Q (cfs) Time (hrs) SCM 5 Hyd. No. 23 -- 100 Year Hyd No. 23 Hyd No. 22 Total storage used = 212,580 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 24 POI 3 POST-BMP Hydrograph type = Combine Peak discharge = 450.16 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,559,553 cuft Inflow hyds. = 21, 23 Contrib. drain. area = 49.510 ac 75 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 60.00 60.00 120.00 120.00 180.00 180.00 240.00 240.00 300.00 300.00 360.00 360.00 420.00 420.00 480.00 480.00 Q (cfs) Time (hrs) POI 3 POST-BMP Hyd. No. 24 -- 100 Year Hyd No. 24 Hyd No. 21 Hyd No. 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 01 / 17 / 2020 Hyd. No. 25 POST DEV BMP Hydrograph type = Combine Peak discharge = 1012.87 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 3,745,363 cuft Inflow hyds. = 14, 20, 24 Contrib. drain. area = 0.000 ac 76 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 145.00 145.00 290.00 290.00 435.00 435.00 580.00 580.00 725.00 725.00 870.00 870.00 1015.00 1015.00 Q (cfs) Time (hrs) POST DEV BMP Hyd. No. 25 -- 100 Year Hyd No. 25 Hyd No. 14 Hyd No. 20 Hyd No. 24