Loading...
HomeMy WebLinkAboutWQ0007169_COMPLETE FILE - HISTORICAL_19921028STORMWATER-DIVISION CODING SHEET - RESCISSION S PERMIT N0.. v I (� {� `V "s V DOC TYPE COMPLETE FILE — HISTORICAL DATE OF RESCISSION ❑ : Qi �o� YYYYMMDD V a a seat State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Governor William W. Cobey, Jr., Secretary October 28, 1992 MR MICHAEL L. TRIPPLET CALDWELL READY M1X, INC. PO BOX 461 GRANPfE FALLS, NORTH CAROLINA 28630 Dear MR TRIPPLET: George T. Evereu,Ph.D. Director Subject: Application No. WQ0007169 Washout Recovery System Recycle Facility Caldwell County The Division's Permits and Engineering Unit acknowledges receipt of your permit application and supporting materials on October 26, 1992. This application has been assigned the number shown above. Please refer to this number when making inquiries on this project. Your project has been assigned to Angela Griffin for a detailed engineering review. A technical acknowledgement will be forthcoming. Be aware that the Division's regional office, copied below, must provide recommendations from the Regional Supervisor or a Procedure Four Evaluation for this project, prior to final aciion by the Division. If you have any questions, please contact Angela Griffin at (919) 733-5083. Sincerely, J onard SafrP.. Supervisor, eE rim I and Engineering Unit RECEIVED cc: Asheville Regional Office Water Quality Section HAYNES ENGINEERING ASSOCIATES Nov 9 - 1992 Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-7 p 7,o4S1E Regional Offft An Equal Opponumry Affirmative Action Empioycr ,theville, North Car jl V r S0111A SPECIFICATIONS FOR CONCRETE RECYCLE FACILITY WASHOUT RECOVERY SYSTEM CALDWELL READY MIX, INC. GRANITE FALLS, N. C. BY: Haynes Engineering Associates Granite Falls, N.C. October 1992 .ouwnn.r. ,•'• �' ''EESSIp,�•,? ''•,s ��SEAI (•� s :; ��ti'••�NCI NE�Q:�-ate': .,;p N,� a�O� ✓.�a�-ems D /o%Z//92 0 • 01010 SUMMARY OF WORK Part I. General .1 Scope of Work This specification covers the work necessary to install a washout water recovery system for the Caldwell Ready Mix, Inc. concrete batch mixing plant. 1.2 System Description This system is designed to treat 100% of all wastewater generated in cleaning out concrete mixing drums and in washing the exterior concrete mixing trucks. Additionally, the system reclaims sand and gravel from the washout effluent. The sand and gravel is separated by mechanical screening into individual stockpiles. The wastewater originates from cleaning the batch truck mixing drums which are manually washed out and the contents expelled into a hopper that feeds mechanical screw screening conveyors. The screening augers are continually washed to eliminate cement and flyash residue from the saved materials, which drain off into sedimentation basins. The hopper is located on a drainage slab so that the water from extericr washing of the mixer trucks is contained and allowed to drain into the sedimentation (clarification) basins. The drainage effluent from the drum washout, the screening process and from the exterior truck washing all drain in common to clarification basins noted as B1, B2, and B3 on the drawings. The water from the last basin is pumped back to the start of the system for reuse and recycling. A portion of this reclaimed water is used in the batch mixing of fresh concrete to be delivered off site. This loss of reclaimed water requires the addition of daily make-up water to offset the loss. Settled solids will be removed from B1 and B2 by front end leader and manually from B3 and will be either recycled or handled as solid waste. No surface drainage water will be allowed to enter the system. It will be diverted around the reclaim facility to exit by the natural water shed. 1.3 Project Description The project shall consist of removing the existing sedimentation lagoon and stock pile, site grading, construction of slabs and sedimentation basins, installation of mechanical equipment, and site drainage grading for diversion of surface run-off. Page 1 of 6 1.4 Regulatory Requirements All work, materials, supplies, and equipment shall be in compliance with all local, state and applicable federal codes and regulations. No work shall be commenced until such time that all permits and approvals have been obtained. 1.5 Erosion Control An Erosion/Sedimentation Control Plan will not be required for the project. However, prior to construction, proper protection of the nearby stream shall be obtained by installing protective measures to prevent excessive siltation from impacting the stream. These protection measures will be maintained throughout the construction process. Any temporary sedimentation basins constructed during the construction phase shall be maintained in a manner to prevent overflowing or runoff into the stream. Protection features will be removed at the completion of construction as necessary by removal and disposal of siltatious materials. All de-nuded areas shall be properly grassed and mulched as soon as practicable. Part II. Products 2.1 Concrete All concrete shall have a minimum of 3,000 psi compressive strength and a slump of 5 inches or less. 2.2 Equipment All equipment, pumps, conveyors, hoppers, etc. shall be consistant to the requirements of the project. The mechanical equipment shall be as manufactured by J&H Equipment Inc., Roswell, Georgia or equal. All mechanical equipment including pumps, shall be provided by the Owner and installed by the contractors. 2.3.Reinforcing Steel All reinforcing steel shall be intermediate grade billet steel, deformed bar stock, clean and free of all rust and corrosion. 2.4 Backfill Materials Exterior walls of the recycle facility clean, well compacted soil and/or with as manufactured by the on site concrete Page 2 of 6 shall be backfilled with flowable backfill material batch plant. 0 • Part III. Execution 3.1 Definitions Owner - Caldwell Ready Mix, Inc. Michael Triplett, President Engineer - Haynes Engineering Associates, Granite Falls, N.C. Contractor - Parties providing equipment, materials, supplies and/or installation of the same. Vendor - Any firm and/or party supplying materials or equipment only. 3.2 Construction Management All work will be performed under contracts, purchase orders, and/or agreements administered by the Owner. Construction, installation of equipment and start-up procedures shall be supervised and inspected by the Engineer and any other regulatory authority as required. 3.3 Site Work The existing sedimentation basin and concrete spoil pile will be removed to the extent necessary to allow installation of the new system. 3.4 Footings All footings shall be poured in level trenches cut into natural soil or flowable backfill. Footings shall contain #4 bars @ 8"o.c. continuous for length of footing trench. 3.5 Slabs All slabs shall be poured on soil compacted to 95% standard proctor or cured flowable backfill. Slabs shall be reinforced with #4 bars @ 12"o.c. both ways. 3.6 Walls All containment walls shall be poured in concrete, 12" thick to the height indicated on plans. All walls shall have #4 reinforcing bars @ 12"o.c. each way. Wall pours shall be continuous until forms are filled with no cold joints. All walls shall be keyed to the floor slabs and to the footings. Page 3 of 6 ' 0 • 3.7 Mechanical Equipment The mechanical system will be shipped assembled. Field installation will include locating and mounting the system, providing water supply and connection to return flow recycle water, and electrical wiring. The system shall be installed in conformance with the manufacturer's instructions. Part IV. Calculations 4.1 Criteria Production - 72 cubic yards per day Trucks - 9 cubic yard each = 8 trucks per day Use Rate - Maximum load out in 4 hours Water Use - Truck Wash Out Internal - 8 trucks @ 300 gal = 2,400 gallons External - 8 trucks @ 200 gal = 1,600 gallons Total recycled water Concrete Mix Water 72 cu yds @ 35 gal/cu yd Total Maximum Daily Use 4,000 gallons = 2,520 gallons Recycled Use 4,000 gal/day = 1,000 gal/hour 6,520 gallons Concrete Mix Use (2,520 gal/day) (1/4 hrs) = 630 gal/hour Total Hourly Use (6,520 gal/day) (1/4 hrs) = 1,630 gal/hour 4.2 Given Flow Rate - 1,000 gal/hour = 133.7 cu ft/hour Flow Rate Peak Time = 4 hours = 1/6 day Clarification Basin #1 Volume = 9,087.5 gallons = 1,214.99 cu ft Bottom Area = 348 sq ft Note: Portion of bottom area sloped Cross Sectional Area = 12' wide x 4.5' deep = 54.0 sq ft Clarification Basin #2 Volume = 8,522.51 gallons = 1,139.46 cu ft Bottom Area = 320 sq ft Note: Portion of bottom area sloped Cross Sectional Area = 10' wide x 4.5' deep = 45.0 sq ft Page 4 of 6 0 • Clarification Basin #3 Volume = 22,737.47 gallons = 3.039.99 cu ft Bottom Area = 10'x 32' = 320 sq ft Cross Sectional Area = 10' wide x 9.5' deep = 95 sq ft Formulas: Detention - Cubic Volume Detention in ;-lours Flow Rate/Hour Horizontal Velocity - Cubic ft/minute Velocity in ft/min Cross Sectional Areas Overflow Rate - (24 hr day/4 hr rate) (Daily volume) = Gal/day/ft sq Sediment Area Detention Time: Clarification Basin #1 - 1,215 cu ft = 9.087 hours 133.7 cu ft/hr Clarification Basin #2 - 1,139.5 cu ft = 8.523 hours 133.7 cu ft/hr Clarification Basin #3 - 3,040 cu ft = 22.737 hours 133.7 cu ft/hr Horizontal Velocity: Clarification Basin #1 - 2.228 cu ft/min _ .04126 ft/min 54 sq ft Page 5 of 6 E • Clarification Basin #2 - 2.228 cu ft/min 45 sq ft Clarification Basin #3 - 2.228 cu ft/min 95 sq ft Overflow Rate: Clarification Basin #1 - (24 hr day/4 fir rate) (4,000 gal/day) 48 sq _ .04951 ft/min _ .02345 ft/min = 68.965 gal/day/sq ft Clarification Basin #2 - 6 x 4,000 gal/day Clarification Basin #3 - 320 sq ft 6 x 4,000 gal/day 320 sq ft = 75.0 gal/day/sq ft = 75.0 gal/day/sq ft Based on worst case flow condition - 4 hours Page 6 of 6 E 2 C7 a I Q i I r l I 0 d • Caldwell Ready -Mix Inc - Maps and Driving Directions - Switchboard Page 1 of 2 ® • IN Switchboard Your Digital Directory Business Name or Category Location Within caldwell ready mix I Granite Falls, NC 28630 1. 0 Driving Directions Map IJ L rls s �l km�0�� ki , 0. 0. On Click: 0 Recenter t ?Zoom In R2Set Driving Directions III 0 OUT C To this Location C From this Location Start Location Choose a Saved Location ii e.g. Address, City and State or Zip Add Location Add an intermediate Location along this Route (optional) End Location Caldwell Ready -Mix Inc 2823 Mission Rd. Hudson, NC 28638 Show me the 0 Fastest C Shortest Distance Help Business Caldwell -Ready -Mix 2823 Mission Rd Hudson, NC 28638 Phone: (828)396-2 Send -to -,Phone What's Nearby? Dining C Restaurants C Pizza C Italian C Chinese C Steak House C Mexican C Japanese C Seafood C Fast Food C Delivery C Coffee shops C Bars Recreation & Ente > Community Servic Shopping & Servi( » Travel )) Finance )) Health Care http://www.switchboard.com/bin/cgimap.dll?FUNC=MAP&S I D=opj fx5bkg 1 p4ya55yvpgdt... 7/3/2006 Caldwell Ready -Mix Inc - Maps and Driving Directions - Switchboard ® 0 Page I of 2 51 Switchboard Your Digital Directory Business Name or Category Location Within caldwell ready mix Granite Falls, NC 28630 (� Driving Directions Map UA SwitcF board® �920o61Aicrosoft Cory L km , 0.5 1. mi ' 0.25 0 Driving Directions 23 Missi HAV7EQ,anAJarGDP lnc�r�' hlllls.Si On Click: @ Recenter C Zoom In Falls Reset (6. To this Location C From this Location Start Location Choose a Saved Location e.g. Address, City and State or Zip Add -Location Add an intermediate Location along this Route (optional) End Location Caldwell Ready -Mix Inc 2823 Mission Rd. Hudson, NC 28638 Show me the n Fastest C Shortest Distance l Help I Business Caldwell Ready_Mix 2823 Mission Rd Hudson, NC 28638 Phone: (828) 396-2 Send to Phone What's Nearby? Dining O Restaurants C Pizza Italian C Chinese C Steak House C Mexican C Japanese C Seafood C Fast Food C Delivery C Coffee shops C Bars » Recreation & Ente " Community Servic Shopping & Servic » Travel Finance » Health Care http://www.switchboard.com/bi n/cgimap.d] I?FUNC=MAP&S ID=opj fx5bkg I p4ya55yvpgdt... 7/3/2006 Caldwell Ready -Mix Inc - Maps and Driving Directions - Switchboard Page I of2 ® • X Switchboard Your Digital Directory Business Name or Category Location Within caldwell ready mix Granite Falls, NC 28630 L1 a Driving Directions Map rA 11 L kMI 0 Mi mi F0.2 e. Driving Directions IN On Click: 0 Recenter 0 Zoom In HE n To this Location 0 From this Location Start Location Choose a Saved Location e.g. Address, City and State or Zip Add -Location Add an intermediate Location along this Route (optional) End Location Caldwell Ready -Mix Inc 2823 Mission Rd. Hudson, NC 28638 Show me the � Fastest 0 Shortest Distance .. Help Business Caldwell -Ready -Mix 2823 Mission Rd Hudson, NC 28638 Phone: (828) 396-2 Send to Phone WhaVs Nearby? Dining Restaurants Pizza (� Italian 0 Chinese 0 Steak House 0 Mexican C''Japanese 0 Seafood O Fast Food 0 Delivery O Coffee shops C) Bars » Recreation & Ente %, Community Servic » Shopping & Servic » Travel Finance Health Care http://www.switchboard.com/bi n/egi map.dl I?FUNC—MAP&SI D=opj fx5bkg 1 p4ya55yvpgdt... 7/3/2006 OF.000M"%%.. QG Michael F. Easley, Governor ® William G. Ross Jr., Secretary North Carolina DepartmentfEnvironment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality 3/1712003 RETURN RECEIPT IS RETURN RECEIPT REQUESTED Michael Triplette Caldwell Ready -Mix Inc 1 MAR 9 2003 PO Box 461 l� Granite Falls NC 28630 ' 6 Al fR �GAtIN SECiI J SUBJECT: NOTICE OF VIOLATION AND REVOCATION FOR NON PAYMENT L ISHFVIt[c REGION PERMIT NUMBER NCG140303 - Al OFFICE Caldwell Ready Mix Incorporated Caldwell COUNTY Dear Permittee: Payment of the required annual administering and compliance monitoring fee of $80.00 for this year has not been received for the subject permit. This fee is required by Title 15 North Carolina Administrative Code 2H.0105, under the authority of North Carolina General Statutes 143-215.3(a)(1), (ta) and (1b). Because this fee was not fully paid within 30 days after being billed, this letter initiates action to revoke the subject permit, pursuant to 15 ncac 2H.0105(b) (2) (k) (4), and G.S. 143-215.1 (b) (3). Effective 60 days from receipt of this notice, subject permit is hereby revoked unless the required Annual Administering and Compliance Monitoring Fee is received within that time. Discharges without a permit are subject to the enforcement authority of the Division of Water Quality. Your payment should be sent to: N.C. Department of Environment and Natural Resources Division of Water Quality Budget Office 1617 Mail Service Center Raleigh, NC 27699-1617 If you are dissatisfied with this decision, you have the right to request an administrative hearing within Thirty (30) days following recipt of this notice, identifying the specific issues to be contended. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina, 27611-7447. Unless such request for hearing is made or payments received, revocation shall be final and binding. If you have any questions, please contact: Mr. Forrest Westall, Asheville Water Quality Regional Supervisor, (828) 251-6208. cc: Supevisor, Water Quality Permits and Engineering Unit Asheville Regional Office County Health Department 04 nce.t t Alan W. Klimek, P.E. 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Affirmative Action Employer Telephone 919-733-5083 FAX 919-733-9919 50% recycled / 10% post -consumer paper 771 4 50.00' (Partial) v 327. 00 NO2 SS' 21 .9cm.- 404.50' Total SOO 17 ' 55' V 0 CARO SEAL 7453 I (ell 17 2- 2` NOT TO SCALE TO LENOIR TO HICKORY VICINITY MAP CONCRETE RECYCLE FACILITY SITE LOCATION MAP CALDVELL READY MIX, INC, SAWMILLS, N,C, I ' . DRAVN BYi APPROVED BYi SCALEi mm=TTEi mmr�RAVING I, - 20' DA 8/14/92 J-266-0 r � . • e. •i .. r.. .... •.. r .... .. t rr•. .. I. \1 .r Is tr'.... ti. .. 1..• ✓ED BY'. DWG. J-266- L s\i 4 a ELEV. = 100.0' --- - - - - - \T, ELEV. = 98.0' -� - - i /f" ,UI - U;, ELEV. = 93.0' --\ N - i ELEV. = 100.0' O CJ ELEV. = 98.0'-- I �p U� i ELEV. = 93.0' I N ELEV. = 88.0' L ELEV. = 83.0' ► ' C,' 12"X 24'' ��G• Basin - 1 /2!o f, ,!3°GOdIG, WIW&0, 40 ti 12 ` a14 E. vV - rY," IC1 Silt Basin 8"CD��• SG.dS /11' Z"d50/JG , W.t,$ L G IV1 db, 412 "al - SECTION °A-A�' sc. 1/4" = I'-0" ICI i a o� f kI z — /O e ---- 2-d° V1/. a'/Z"D� CD.teC• Fib• 'A/� ¢'� f',UT/,�/0005 Truck Washout Slab /2 I, T �o N I - --- — ------ _ — — --- -i-- -- — — -i ! ----- - ----- --- -- ---� /2°W xG DP CF'C, I �• I — ---r1—�-J r--1 1 I Basin - 3 ------�-------- ----- u/�3 4s�D4/%_7yn FooTi�✓G ,BE yoNo--� 'C' roNC'R SECTION °B-Bsc. 1/4"= 1'-0" C QR,;,,,.,, ESSIq..' SE Al 7453 11 s.Fi�� CEP : • �_ • �1�8 �42 0 1j ELEV. = 106.0' ELEV. = 103.0' ELEV. = 100.0' —� ELEV. =106.0' M� ELEV. = 103.0' — ELEV. = 100,0' l 1' 1 f r �1 1f f ;y t r I• �.-.�.L �. 11:«�..1.�C11.1J.i1�Ll ..�.. i�•��.�_I,..::.ii �.- a CoNG, EX44PI — C.-o ll — .—� V1 YZ4 op Dp�,. lo -- — --- Basin - I I A a 0 M I--- --- --- ,Z'-W x6�`oP aP /6-O 8"TH/C4 GOA/G, 5-14,5 t'V/ Ala 'a Z5 a / 2" % e%o, w.t Y L Sj&p GDa/C, FDor-/N4 SECTION °C-C° sC. 1/4"= 1'-0 A ELEV. = 107.33' ELEV. = 106.0' ELEV.= 103.0' ELEV. = 100.0' 0 N ELEV =98.0' 0 'Jd L 'r R /-1 l E Basin-2 r�N T i �-7 Basin - 3 vAL'.i? OK <FLrsF_ - /2" ca v K'd 41- �V/ we), 2"% EW.- i- B" 7W ee)AIC. sL dn5 V/,o4r; ^s J21°4/G G7,W, B1 I CPTlrl,IA: w, c wk,E-R 7-Y,!', AT M L 4 /y-'A5 CTIDUS ,Z,f-F 551n.;' -v SEAL =f , 7453 's f �RONAIt�� ..1� 9/8 E /Z " i k- ELEV.=93.0' `olELEV. =88.0' ELEV. = 83.0' CONCRETE RECYCLING FACILITY SECTION "C" CALDWELL READY MIX, INC. HUDSON, N.C. DRAWN BY: M.T. APPROVED BY: SCALE: 1/4" DATE: AUG. '92 DWG. J-°^4-06-3 C7 - L \ BUNCOMBE COUNTY RECKIRY \ \ o r ID \ o o \\\ \ < r- N OCD eV� R S \\\\\ \\\ = U oq�'OOOZco N2jb % l ,�<<f H/cHwgY lu Stormwater \ \ \ \n. Discharge Outfall D-1 \\ co Z> CC) r � vv -- D' vvvv _ _v vvv p-----`v TO v -�v vvvv �(n0 A v `v �_ --_ vvv vvv�vv tiFR �5• � 0� , SHf \ \ w \O = \\ \\ \37 0 \\ \\ \\ \\ \ �--------- ---- --- �90 (n C \ V I v\/�'-V� v\ ------ 'x/ F PQ fTl Silo \ t, CFN o V AV I (O ---��' \ V� �� vv ������ A OD A F RFF �Lock vvv vvvTrI - - - - - - -----� Yh N 3 Aggregate Batcher \ CD 3 0TOn� \ rn ffl� 1259 ca' 2 40»E z --94, Z v vv �o -- 31 '�i � � rZl - - - _ v_— — -- _ -------_Z �56 v \ v v v v v� ---- — — vv _ ��vv— z v ao _ vvv v / �' �/v A 1 / rTI Q / /��� —_ — — — — — v � v AVv �` ��— _ �� �� � i' � � \ — ---- \ _ _ �_ \vv 1 �V A 1 II ,/ �� / �' v.vv ---y vv�v ��0 �v-- --' �' ,-,Z� LA 4� —_ AAVAA — � 0� — — — — — 0M 0010E0Z - _��---- Z Cp l- - - - - - - - - - - j v I I / �! �p v l�v.v vvA ..� v v v v v ____ �� 1 ��/w I I I / (`F� `v' �I�w vy l ��v v v----00b'0Z _--- --- - 0-- - 10 �- - - - - __ -- _ - -- - - - --------------y --- ------ _- TO ---------------------- qs -_ 00,0902 ---__ ------- - \ ------------------ a --------------- -� -- _- ——------- -- ----—w ------ 200' x 30' x 6' - - I _ .._ /' \\ \ oo'o- - - I I — O r- zm 0 Stormwater Parking Area - \\ `\ --\ - ---- Aggregate Hoppers / Retention Basin Piles and Storage Area VADE \ \\ 0.o \ \ \ -_ - No Aggregate Irrigation PRIVATE DRIVE co \ ,\ I Storage Building' Diversions shall be installed and maintained as needed to ensure all flow from plant processing and parking area drain into the detention pond. Base drawing Provided by Cwwh P.A. 11 Norlh Market Street, Suite 101, , NC 4016 8801 Latitude 35 43' 34.83" Longitude 82 33' 11.37" Property Identification Number 9743.02-59-3926 GRAPHIC SCALE 40 0 20 40 80 160 (n1FEET ) Proposed Private Well F9 V � m CD M I 1 ( N1 1-4 O 50' x 15' x 4' Deep Concrete Truck -qw 1 1 � Washout Basin Area rn ' rn m \ l �9i1 •'w '' srwra As Shawn 't2'v �m WSA im n AprH 12, 2010 Outline of Site Drainage Area (SRO VIA' t IIiiJ� ,,N CARoZ ¢ Q.aFE�sio L sEA rL : No. 02 A;lO�eC- s°e �-3o-IO �, 1, ti �r , r •. „� , h A� % ` � � � \ � � BI■ICOIH (YlIN1Y IE9SlRY D Cn N N Ott) CG 0 0002o F \\ E y/GyW,4 Y \ \ Leave Existing v vvvvvv --- Erosion Control \ _ -�Q Measures Intact IU > . \\ _ \ (on D \ \ (/ ^/ "I to WO / 0/2 ----- 1AAVv `v`v`vv`v�v A CCTI \ \ \\ R Ul o OF 00 - ---- '�---------------------- Stormwater Discharge \ A� -'1 =_vvv x- ''Z / �__ \\N132g,� Outfall D-1 ------------- 9 (APp� �- � �-, XLOCA rOV ---- ---- � 01� CREED NOD 72.5g \ ` \\ - No / / \ -\` 1 9 --v w-------- �v o / 21 4, Legend -n (A Fn ---------- ---- \\ i 'Ot"ZB z mvvvZ• c r�, ------------ 00 r� QO. �� i i 00 2 Cl v Z� v v vv ' Opp /v'�� -- v vvvv 0w- ------ -' o - - �---- ------0602 O S -. iYi-----��._- D -- Zvv----- v v - 00 p 00'oiroa __-'�� v O ------ $' m• \�\ 1 �`�\ I /(�/jw. \ \1 �/\�\�\�\��l `\\\\\\ \\ \\\`\ \\\------------- _ ----- _-gym-_ -_ \ v v `� v ----- 00'OSOZ - - - _-_--- 4Rrx)- '\v ` I I°/ Q4� _� vv vv v------------------- ����� _ ------ _ Leave Existing To 9� 08 —III I M A ______=- __------ - _-- -_--_= ___ O ly 1), vl r / / v -- Erosion Control <<F \ ,-- \\--------------------- ----------------- - Measures Intact —� = Direction of Surface Flow DA-1 = Drainage Area 2.72 Acres with Gravel Surface DA-2 = Drainage Area .277 Acres with Brush < 50 /o Covered TWB = Truck Washout Basin D-1 = Stormwater Discharge Outfall 1 PROPoseD W WIDE pRIVA'm DRIVE \ \ mia Note: Diversions shall be installed and maintained as needed to ensure all flow from plant processing and parking area drain into the detention pond. / I17 U� 111.= � Latitude 35 43' 34.83" Longitude 82 33' 11.37" Property Identification Number 9743.02-59-3926 GRAPHIC SCALE 40 0 20 40 80 160 cINFIET) 00'ocoa- 6� ----- --------- - -- /---- / \ ------ 00.080Z Ovvv �O 6, A \ s` i l \ 0 9., ` I ` \ I \ \ I \ \ I N \ UI 0 I I I / 0 I I I I I / / 1 O wO 0 O -cam ----- 0. �oz zmm � J J J D J -1 o UM CD o� J 00 Cp J J Drainage Area DA-1 - Drainage Area DA-2 Truck Washout Basin TWB As Shown c�®ar VISA �!I►,INHY: JM ns� Apra 12, 2010 CARp��� �e`�OFEesip y y SEAL Y L rL2 No.0214 fzi Dig A- 30--10 lne Ridge Concrlete FacOiky 50 Drainage Sleet EmboameaW Hill 3 1on Sad= Wwmwik Bcmoomhe Caooty, North Carolina "eft VA CW.00168 Stormwater Discharge Outfall Detail (D=1) A/ View Of Riser IV Concrete TrashRack Support Schedule 60 PVC Row cap With Removable 5' -a- RO-FW N. IV A/ A/ \11 L C 31 3L E Reffxwabb Trash Rack Made From Galvanized Welded Wire Fabric Opening Size 1 Inch x I Inch =71, Ulf, D 1.5 Inch x 1.5 Inch Galvanized Argo From Trash Rack support set into Concrete Layer Of Filter Fabric Storm Water Discharge Outfall Detail (Aml) 34! '01 Crass -Section E-E 4! 3 80 Concrete Cross -Section D-D -Riser Pipe Sleeve Set In Concrete Orifices 1.5 Inches In Diameter With Waterproof Seal Top of Embankment IEJ. 2070 77 �:M77, Layer Of Filter Fabric "telzNIVVALOJ:]=r- vor Rafe (IbI 120 50 X7 7TTi 7' 1 =777� i7r, .1 1 SEEDING DATES Mountains - Above 2500ft: Feb-15loMay 15 Below 2500 ft: Feb. I to May I Ijig s'&L's:JJ[ is I OU" i's-1 A r: 111,C- :1 6 a :v: a ewts-s I � 7L77-715 111% 111% 11 T- -M I - Tu*End OfHaar Fabric thidned vow Upsirsern Weep holes set 1 foot below lop of holding basin wall. As washout material builds up wilhin the ramp area so does the water level forcing water through the weep holes into the holding basin. As needed, water from ramp area will be pumped info basin area Floating pump will be located In holding basin to use water from basin as truck wash out water. 0 basin area Is U, the water from the tank will be pumped to Batch Water Tank and used *0 belching. pH of water In holding basin will be manually adjusted to maintain the water within the regulated pH range of 6.0 to 9.0. N fleet size Is Increased additional washout area for truck washout basin will be added. Apply Skew netting NAG S75 to all ditches and I or dwalonew equal per manulaclurars requirements. Cross-Secdon C-C Note: Accumulated Trash and Debris Shall Be PANTOvW From The Trash Rack On An As Needed Basis. -1C 1 re•T 115 Nolls: Riprap Should Extend Up Both Skies Of The Apron And Around The End Of The Prpe At The Drsclage Outlet At A Mlodmurn Slope Of 2:1 And A Height Not Thirds The Pipe Diameter.Lem Than Two Note: Inspect Riprap 0" Structures Alter Heavy Ram To See ff Any Erosion Around Or Below The Riprap Has Taken Place Or If Stone Have Been Dislogged. lffvnedW* Make All Needed Repair To Prevent Further Damage. Truck Washout Basin DaWASOM (TWB) Holding Basin Wall and Footer Reber- Wall #4 on Ills' O.C. Horim #4 on 111" O.C. Vert 4,000 psi Concrete. w- Footers #4 on (r O.C. Horbmisi. Thick Concrete Wall Berm to Prevent Surface Wailer From Entering Washout Area. Ramp 80 Concrete Slab with fiber reinbroarnenlL 4,000 psi 80 Concrete Finished Subgrade Compected to 96% Modified Proctor. All Concrete Skim of WadxKA Area are 60 Higher Than Finished Grade. %%%`L0k CARO SEAL No. 0210 7 7 1 1 T I