Loading...
HomeMy WebLinkAboutNCS000003_OTHER_20040517STORMWATER DIVISION CODING SHEET PERMIT NO. DOC TYPE DOC DATE ❑ FINAL PERMIT ❑ MONITORING INFO ❑ APPLICATION ❑ COMPLIANCE 0 OTHER ❑ aod`1oS1-7 YYYYM M D D STORMWATER POLLUTION PREVE TION PLAN DEVELOPMENTAND IMPLEMENTATION CE:TIFtiCATION N.C. Division of Water Quality, Stormwater and General Facility Name: CASTLE HAYNE, NC MANUFACTURING FACILITY Permit Number: NCS000003 Location Address: 5408 HOLLY SHELTER ROAD CASTLE HAYNE, NC 28429 County: NEW HANOVER Unit "! certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SP )document and all attachments were developed and implemented undo my direction or supervision in accordance wth a system designed to assure that qualified personnel properly gather and evaluate the information required by EliSPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsi a for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate. nd complete" "I certify that the SPPP has been developed, signed and retained at the facility implemented at the named facility location in accordance with the terms and c permit." "1 am aware that there are significant penalties for falsifying information, imprisonment for knowing violations" Sign (according to permit signatory requirements) and return this STORMWATER POLLUTION PREVENTION PLAN WITH THE Signature Z� ;) 000&- - Gene F. Renzagi a Print or type name of person signing above and the SPPP has been fully of the stormwater general possibility of fines and rtitiea ion. DO NOT SENT) THE ERTIFICATION. Date r7 yI/'% Si a Manager Title SPPPCnafmation Y99 SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL F INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order ii the application to be considered complete (Do not submit the site Stormwater Pollution Preventin Plan) Initial 1. A current Site Map from the Stonnwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage aicas for each outfall, building locations and impervious surfaces should be clearly noted. 2. A summary of Analytical Monitoring results during the term f the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. The summary can consist of a table including such items as outfall number, parameters sampled, lab ^ results, date sampled, and storm event data. * 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can Consist of a table including such items as o ithall number, parameters surveyed, observations, and date monitoring conducted. 4. A summary of the Best Management Practices utilized at the rinitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include info mation on these BMP's. 5. A short narrative describing any significant changes in indus iel activities at the permitted facility. Significant changes could include the addition or deletion of work processes, changes in material handling practices, changes in material storage practices, and/or changes in the raw materials used by the facility. 6. Certification of the development and implementation of a St water Pollution Prevention Plan for the permitted facility (Sign and return attached form ttr If the final year analytical monitoring of the existing permit t has not been completed prior to filing the renewal submittal, then the last, moor ring results should be submitted within 30 days of receipt of the laboratory reports. r.e. do not withhold renewal submittal waiting on lab results) Representative storm sampling may now be conducted anyti during the year (the April to November window has been eliminated) and the represented rainfall event is now defined as a storm event that measures greater than O.l inches and is preceded by at least 72 hours in which no storm event measuring greater than 0.! irrc has occurred. c Google Earth y i 2616 tt 7,7 TIM 005 PERMITTED STROMWATER POINTS DIHEH AVVHUVALs: DACE PLANT APPROVALS: DATE APPROVAL: Q'D.LDR ENGR. DATESTRn n/� nnnn MECHANICAL 8 CIVIL F R F /� /� F � TRS �MW�UW�VWU MECHANICAL �\��//`is� �\�J�� lllJ � ELECT.& INST. CASTLE HAYNE. NC PROCESS PROJECT CASTLE HAYNE PLANT B ADD PLANT SITE PLAN (M9290105-E.DGN) GNL },-0. FDESG.CAL.BY: AWN BY: BST DATE11-15 STORMWATER POLLUTION PREVENTION PLAN SITE MAP A INITIAL ISSUE BST „a ECKDATEECKED BY: DATE NO. 1 REVISIONS IDRWNICHKD APP DATE NO. REVISIONS DRWN CHKD APP DATE SCALE:SEE BAR SCALE AREA NO. GEN PLANT I DWG. NO. 3WO983-17 B +DGN\ �830C17-For the State.dgn 05/17/2004 03:45:21 FM JL -77