STORMWATER POLLUTION PREVE TION PLAN
DEVELOPMENTAND IMPLEMENTATION
CE:TIFtiCATION
N.C. Division of Water Quality, Stormwater and General
Facility Name:
CASTLE HAYNE, NC MANUFACTURING FACILITY
Permit Number:
NCS000003
Location Address:
5408 HOLLY SHELTER ROAD
CASTLE HAYNE, NC 28429
County:
NEW HANOVER
Unit
"! certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SP )document and all attachments
were developed and implemented undo my direction or supervision in accordance wth a system designed to assure
that qualified personnel properly gather and evaluate the information required by EliSPPP. Based on my inquiry of
the person or persons who manage the system, or those persons directly responsi a for gathering the information,
the information gathered is, to the best of my knowledge and belief, true, accurate. nd complete"
"I certify that the SPPP has been developed, signed and retained at the facility
implemented at the named facility location in accordance with the terms and c
permit."
"1 am aware that there are significant penalties for falsifying information,
imprisonment for knowing violations"
Sign (according to permit signatory requirements) and return this
STORMWATER POLLUTION PREVENTION PLAN WITH THE
Signature Z� ;) 000&- -
Gene F. Renzagi a
Print or type name of person signing above
and the SPPP has been fully
of the stormwater general
possibility of fines and
rtitiea ion. DO NOT SENT) THE
ERTIFICATION.
Date r7 yI/'%
Si a Manager
Title
SPPPCnafmation Y99
SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL F INDIVIDUAL NPDES
STORMWATER PERMIT
Two copies of each of the following shall accompany this submittal in order ii the application to be
considered complete
(Do not submit the site Stormwater Pollution Preventin Plan)
Initial
1. A current Site Map from the Stonnwater Pollution Prevention Plan. The location of
industrial activities (including storage of materials, disposal areas, process areas and
loading and unloading areas), drainage structures, drainage aicas for each outfall, building
locations and impervious surfaces should be clearly noted.
2. A summary of Analytical Monitoring results during the term f the existing permit (if your
permit required analytical sampling). Do not submit individual lab reports. The summary
can consist of a table including such items as outfall number, parameters sampled, lab
^ results, date sampled, and storm event data. *
3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports.
The summary can Consist of a table including such items as o ithall number, parameters
surveyed, observations, and date monitoring conducted.
4. A summary of the Best Management Practices utilized at the rinitted facility. Summary
should consist of a short narrative description of each BMP's in place at the facility. If the
implementation of any BMP's is planned, please include info mation on these BMP's.
5. A short narrative describing any significant changes in indus iel activities at the permitted
facility. Significant changes could include the addition or deletion of work processes,
changes in material handling practices, changes in material storage practices, and/or
changes in the raw materials used by the facility.
6. Certification of the development and implementation of a St water Pollution Prevention
Plan for the permitted facility (Sign and return attached form
ttr If the final year analytical monitoring of the existing permit t has not been completed
prior to filing the renewal submittal, then the last, moor ring results should be
submitted within 30 days of receipt of the laboratory reports. r.e. do not withhold renewal
submittal waiting on lab results)
Representative storm sampling may now be conducted anyti during the year (the April to
November window has been eliminated) and the represented rainfall event is now
defined as a storm event that measures greater than O.l inches and is preceded by at least 72
hours in which no storm event measuring greater than 0.! irrc has occurred.
c Google Earth
y i
2616 tt
7,7
TIM
005 PERMITTED STROMWATER POINTS
DIHEH AVVHUVALs: DACE PLANT APPROVALS: DATE APPROVAL: Q'D.LDR ENGR. DATESTRn n/� nnnn
MECHANICAL
8 CIVIL F R F /� /� F � TRS �MW�UW�VWU
MECHANICAL �\��//`is� �\�J�� lllJ �
ELECT.& INST. CASTLE HAYNE. NC
PROCESS
PROJECT CASTLE HAYNE PLANT
B ADD PLANT SITE PLAN (M9290105-E.DGN) GNL },-0. FDESG.CAL.BY:
AWN BY: BST DATE11-15 STORMWATER POLLUTION PREVENTION PLAN SITE MAP
A INITIAL ISSUE BST „a ECKDATEECKED BY: DATE
NO. 1 REVISIONS IDRWNICHKD APP DATE NO. REVISIONS DRWN CHKD APP DATE SCALE:SEE BAR SCALE AREA NO. GEN PLANT I DWG. NO. 3WO983-17 B
+DGN\ �830C17-For the State.dgn 05/17/2004 03:45:21 FM
JL
-77