Loading...
HomeMy WebLinkAbout20090586 Ver 1_Certification of Completion_20091113for file 09-0586 for file 09-0586 Homewood, Sue Sent: Friday, November 20, 2009 9:08 AM To: Dennison, Laurie; Strickland, Bev Attachments: DOC112009.tif (54 KB) Sue Homewood NC DENR Winston-Salem Regional Office Division of Water Quality 585 Waughtown Street Winston-Salem, NC 27107 Voice: (336) 771-4964 FAX: (336) 771-4630 Page 1 of 1 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. https://mail.nc.gov/OWA/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vHV... 11/20/2009 Duke Energy Fairfax Yard DWQ# 09-0586 June 3, 2009 Page 3 of 3 N.0. Dey. 01 E N R NOV 13 2009 Yh rsmc-jp; i.- .negien .., - DWQ Project No.: 0`7 _ 05 No County: __ClUI ? ?V1-j Applicant: 15L)E ?I wli,6PUt) 62 Project Name: DLJk C 6?1t'' 6?-e(> Y t f i K 1 }tom Date of Issuance of 401 Water Quality Certification: )??U Cf% Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be retuned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. A licant's Certi ication I, _ 5?TJ. %??,OWIM l( hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance WE777-Date:-/O///3 tion and Buffer Rules, the approved plans and specifications, and other suppoSignature: 2 9 .4zent's Certi tcation I, P- - Goff ` se%L-? hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting mate'a'ls/l ((??j ``11 ® C Signature: l Date: 0 / Engineer's (ertiification Partial Vll?rinal I,_ ? -0 r 1 j (t _ as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observ - eriodicall , weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abi thes, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certifjcati)R-apd Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. a? q ,5 Date it._t V V? 9e`{ytuarr aYB}g?pB -1- 9 1. SGt y J fC© ?? . SEAL S 26975 i ?'`a` QOTT V? e<