HomeMy WebLinkAboutNCG210394_COMPLETE FILE - HISTORICAL RRO_20090320q)4kIA644v-c
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
--------------
1v U% I b 3 � q
DOC TYPE,
HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑ b D 3 a- v
YYYYMMDD
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Pe d Division of Water Quality
r ue Coleen H. Sullins
Governor Director
March 20, 2009
Mr. Richard Morgan
Franklin Veneers, Inc.
PO Box 70
Franklinton, North Carolina 27525
Subject:
Dear Mr. Morgan:
Dee Freeman
,-----...-.-Secretary,
MAR 2 4 2009
�rrICE
General Permit No. NCG210000
Franklin Veneers, Inc.
COC NCG210394
Franklin County
In accordance with your application for a discharge permit received on February 9, 2009, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES
general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-
215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection
Agency dated October 15, 2007 (or as subsequently amended).
Please take notice that this certificate of coverage is not transferable except after notice to the
Division of Water Quality. The Division of Water Quality may require modification or revocation and
reissuance of the certificate of coverage.
Per the requirements of the Tar -Pamlico Riparian Buffer Rule, all stormwater drainage From
portions of this site that have been constructed after January 1, 2000 must be discharged through a
correctly designed level spreader or another device that meets diffuse flow requirements per 15A NCAC
2B .0261. Diffuse flow requirements are described in Chapter 8 of the North Carolina Stornwator BMP
Manual, available at: http://h2o err strte nc us/su/bmn forms htm.
This permit does not affect the legal requirements to obtain other permits which may be required
by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area
Management Act or any other federal or local govemmental permit that may be required. If you have any
questions concerning this permit, please contact Cory Larsen at telephone number (919) 807-6365 or
cory.larsen@nemail.net
SMMi .L SIGNED BY
BETHANY GEORGOULIAS
for Coleen H. Sullins
cc: Raleigh Regional Office, Dave Parnell
Central Files, SPU Files
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919 807-63001 FAX: 919-607-64941 Customer Service: 1-877$23.6748
Internet www ^cwaterquality.org
Nne
orth Carolina
Naturally
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG210000
CERTIFICATE OF COVERAGE No. NCG210394
STORM WATER DISCHARGES
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Franklin Veneers, inc
is hereby authorized to discharge stormwater from a facility located at
Franklin Veneers, hIc
5735 Hwy 56 E
Franklinton
Franklin County
to receiving waters designated as Franklinton Branch, a class C; NSW water in the Tar-Panilico
River Basin, in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG210000 as
attached.
This certificate of coverage shall become effective March 20, 2009.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 201h day of March, 2009.
ORIGINAL SIGNED BY
BETHANY GEORGOULIAS
for Coleen H. Sullins., Director
Division of Water Quality
By the Authority of the Environmental Management Commission
LOCATION MAP:
MCG210394
Map Scale 1.20 000
Franklin Veneers, Inc
Lab bade: 360 05' 4 1 " N
Longitude: 780 24' 43" W
County: Franklin
Receiving Stream: Franklinton Branch
Stream Class: C; NSW
Sub -basin: 03-03-01 (Tar-Pardlico River Basin)
L-101C
;;���I�.i
Facility Location
W41LULNR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
.tune 9, 2011
CERTIFIED MAIL 7010 1870 0001 3423 0353
RETURN RECEIPT REQUESTED
Mr. Richard Morgan
Franklin Veneers, Inc.
P. 0. Box 70
Franklinton, NC 27525
Subject: NOTICE OF VIOLATION
Case No. NOV-201 I-PC-0338
Compliance Evaluation Inspection
Stormwater Permit NCG21094
Franklin Veneers, Inc.
Franklin County
Dear Mr. Morgan:
On June 3, 2011, Dave Parnell of the Raleigh Regional Office carried out a stormwater compliance
evaluation inspection (CEI) for the above permit. Mr. Richard Morgan III, was available to assist Mr.
Parnell. A file review indicates that this was the first time DWQ had inspected this facility, although a
technical assistance site visit by Mr. Ken Pickle of DWQ was reported by Mr. Morgan III. See the
enclosed inspection checklist. A number of issues emerged and are discussed below:
1. This permit was issued March 20, 2009 and it expires July 31, 2013. The permit was available
during the CEI, although the text of the permit was not.
2. Mr. Morgan III had possession of the Stormwater Pollution Prevention Plan (SPPP) for this
facility. The SPPP has been reviewed and updated annually. There is a good deal of relevant
information within the plan, but a complete re -production of the plan is required. The following
items required to be within the SPPP but are not present currently are: a Narrative Description
of Practices, a Site Plan (which includes the locations of the stormwater Discharge OUtlallS
(SDO) and drainage areas), a Preventative Maintenance and Good Housekeeping Plan,
documented annual Employee Training and a Stormwater Facility Inspection Program. Mr.
Morgan III could not locate the Stormwater Discharge Outfalls (SDO). During Mr. Parnell's
walk-through of the site, he discussed with Mr. Morgan III general locations of SDO, but these
locations must be further defined and correctly located on the detailed site map, within the
SPPP. Mr. Morgan III could not produce any monitoring results for 2010. He stat,ed that he
had contacted adjoining facilities - one
NorthCarolina
,NaiirmaUy
North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 'Customer Service
Internet w .ncwaterquality.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788-7159 877-623-6748
An Equal Opportunity/Affirmative Action Employer— 50 % Recycleo/10 % Post Consumer Paper
Franklin Veneers, Inc. - (fonipliance'Evaluation Inspection Pa,e2 oft
inquiring of their monitoring results. Mr. Morgan 111 and Mr. Parnell discussed the Stormwater
Facility Inspection Program and what is required of the facility by the Permit. As discussed
during the CEI, the NCG210000 Stormwater Permit requires analytical and qualitative
monitoring, be conducted at each (all) designated SDO, in the frequency directed by tables
within your permit.
3. Please address the following:
A) Re -produce a Stormwater Pollution Prevention Plan containing all items required by
the Permit and have it available at the facility. Have the test of your permit available
at the facility. It will be beneficial in reproducing the SPPP.
B) Implement the analytical and qualitative monitoring requirements of your permit as
soon as possible. Follow the guidelines for a representative storm and timelines found
in your permit. Provide documentation of the monitoring results to this office as soon
as they are completed.
Please provide a written response to this letter, within 30 days of the receipt of this letter, detailing
Franklin Veneer's compliance efforts with respect to the bold items found above in #3A and #313. If
there are any questions or comments about this inspection, please contact Dave Parnell at 919-791-420C
or david.pamellancdenr.gov. Please note that a violation of Stormwater Permit conditions, monitoring
and record -keeping, may be subject to civil penalties. Your appropriate response to above mentioned
items in bold will enable us to resolve these violations.
Sine ely,
Danny Smi
Water Quality Regional Supervisor
Raleigh Regional Office
cc:- RRO/SWP Files '
Central Office Files
Enclosure: Inspection checklist for Franklin Veneers Inc., dated June 3, 2011
Permit: NCG210394
SOC:
County: Franklin
Region: Raleigh
Compliance Inspection Report
Effective:03/20/09 Expiration:07/31113
Effective: Expiration:
Contact Person: Richard Morgan
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Title:
Inspection Date: 0610312011 Entry Time: 09:30 AM
Primary Inspector: David R Parnell
Secondary Inspector(s):
Certification:
Owner: Franklin Veeners Inc
Facility: Franklin Veneers, Inc.
5735 Hwy 56 E
Franklinton NC 27525
Phone: 919-494-1076
Exit Time: 11:30 AM
Phone:
Phone: 919-791-4260
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
■ Storm water
(See attachment summary)
Page: 1
w
Permit: NCG210394 Owner - Facility: Franklin Veeners Inc
Inspection Date: 0610312011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page:2
Permit: NCG210394 Owner - Facility: Franklin Veeners Inc
Inspection Date: 06/03/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
❑
❑
❑
# Does the Plan include a General Location (USGS) map?
■
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices'?
❑
■
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑
■
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑
❑
Cl
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
❑
# Does the facility provide all necessary secondary containment?
■
❑
❑
❑
# Does the Plan include a BMP summary?
❑
■
❑
Cl
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
■
❑
❑
# Does the facility provide and document Employee Training?
❑
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
❑
❑
❑
❑
# Is the Plan reviewed and updated annually?
❑
❑
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
■
❑
Cl
Has the Stormwater Pollution Prevention Plan been implemented?
❑
■
❑
❑
Comment: The SPPP is in need of much more further development. Discussed with
Richard Morgan III, the need to use the permit as a guide to develop the plan/program.
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
❑
■
❑
❑
Comment: No Qualitative Monitoring currently
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
■
❑
❑
Cl
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑
■
❑
❑
Comment: No required analytical monitoring being done.
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
■
Cl
Cl
❑
# Were all outfalls observed during the inspection?
❑
■
❑
Cl
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑
■
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
■
❑
❑
❑
Page:3
Y
Permit: NCG210394 Owner - Facility: Franklin Veeners Inc
Inspection Date: 06/03/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Comment: Facility needs the text of the permit to be on site, not just iron cover sheet
of permit. Location of outfalls were discussed with Mr. Morgan during walking tour of
the facility.
Page:4
RICHARD H. MORGAN, JR.
President
October 18, 2011
FRANKLIN VENEERS, INC.
5735 NC Hwy #56 East, P.O. Box 70
FRANKLINTON, NC 27525
Phone: (919) 494-2284 Fax: (919) 494-5848
"Home of Fine Veneers"
Mfg. of Brick Veneer Boards
Mr. Danny Smith
Raleigh Regional Office
1628 Mail Service Center
Raleigh, NC 27699-1628
Mr. Smith:
RICHARD H. MORGAN, III
Vice President/OPR. Manager
k
dioffice
As per your request here is the analytical monitoring information concerning storm water
here at our plant location. This file is also located in my storm water prevention plan
binder.
Thank you,
Richard H. Morgan,I
Ool: 30 ZO11 8: 15FIM HP LHSERJET FFX P-4
l
vrww.enwla bs.com
ANALYTICAL RESULTS
Description: Outf II I Lab Sample I0: C109031-01 Receleed: 08/30/11 I1:10
Matra: Surf Water Sampled: 08/29/11 15:00 Work Order: C109031
Project: Fran In Veneer Stormwater Sampled By: Rlrhard Morgan
Classical Chemistry Parameters
^ - ENCO Cary cenif'ed a _ lybe INC 591I
Cavnlral oxygen Deme nd
pH ILCL•aea3] ^
TO[JI $uSptllOM Sd10e I!
BesWts FJam Illi13
BE M"
MBL Batch.
Method
Apalynd
Ju Nslss
51 33 mq/L
1 10
10 1R31016
SM U20
DW31/❑ 18:01
)CC
7.0 pM Units
I :D
I.D IR IN3
SttRW MID
OW31111 13:00
KL] g
^ 1C0 mg/L
1 1.0
LD 110:Duo
SM 25900
09/01/11 08:30
Tas rigor miles orty m du �amge as ra6r W d1e laaeratory, end mar oNY EC rtpoduo:d k, NO.
Page 4 OF8
Oct 10 2011 8:16RM HP LFSERJET FFX
P.5
Batch 1431018 - Same
hank (11/310LB-BLY
CCE NV
ww .encolaiba.com
QUALITY CONTRO(,
Prepared: 08/31/2011 11:59 Anayzed: 08/31/2011 La:01
Cnemlul Wypen Ovnend l0 V 10 mq/L
LCS (1M71018-851) Prepared: 08 31/201111:59 Anah/zed: 0813UZ011 18 01
ChanlCal oa}ym Demand � 1a-MS1) 990 10 mq(L SEO 95 90-11
Matrix Spike (]H:Prepared: 08/31/2011 11:59 Analyzed: 08/31!2011. 18:01
Source: C105124.04
__.
Chemkal OpgeO [emend 990 W mprl 500 as IOl 90a 10
Matrix Spike DUP(I 31018-M501) R pa,ed:081311201111:99 Anal/zed: OEV31/201118:01
Source: C105129-0>
CLtnlcal >y9en Omura 9B0 ]E, mglL 500 Bl 98 90-11E 1 10
Batch IH31023 - NO P P -
LCS (IM31D33-a5]), Preparw A Analyzed: C81311201113:00
PH TI 1.O CH Unix 70) 101 99-101
Duplicalc(1H3102 -0UPS) P�zpared&Ana N red: 09131/Ml113:00
Source: C1D8515-0
PH 3 as
Batch 1101002 - NO PL
I
ahne(IMCO2-Otll) PepYed StM Iyzed: 09f0U201108:20
7.1S ,hoed sole, 1.0 V 1.0 mglL
LCS (1101002-851) - Prepared&Auralzed: 09!01/20L10B:20
ival SuspendeL ids B5 1.0 .melt !0.0 106 9D 122
Duplicate (]10100 Dupl) Prepanc&Analyzed: 091011201108:20
Source: C106959-0
Page 5 of 8
Oct; 30 Z011 S:16AM HP LASERJET FAX P•G
Classical Chemistry Pdrameters - V u
Utch 11DIO02 - NO PfZI�P
ouPliote (11o1a02-ooP]) Continued
$gate: C106959-01
Pagc 6 of 8
PrWarw & Pnalyn!O! 09i0112011 08:20
NGO
www.encolab5.com
OCL 10 ZO11 O: 16111n Y1P LnOCRt CT Fnr
1.2
w .enwlabesom
Xdd Dees/Time(") .
Pmo Date/Ema(a)..
Vera meter
.... ...........
.0
09/D1/11 0820
9/112011 0820
SM 25400
09/05/11
08/Dlpl 11:59
8130011 18:01
5M 5220D
D9/26111
OB!!1/ll 13:00
B1B1/2011 MOO
iM9500-11/B
OB/29/ll 16d4
Page 2 of 3
p.
Oct.10 2011 8:16RM HP LFSERJET FF%
www.errcolaba.wm
SAMPLE DETECTION SUMMARY
ResYU lag
MDL
PQL
Units
Method NoO s
Malym
Ci mlml Os gn Demand
.. '. ..
.
.. .. ...... c3 ......... .......
lo_ ...
_.. .10.. ....
.�/L ......
SM 52200
7.0
L0
1.0
pH UnI3
$f44500.H(0 Q
PH
70tal Sapended Solids
100
1.0
1.0
nfL
SM 2510D
Page 3 of F