HomeMy WebLinkAboutNCG200341_COMPLETE FILE - HISTORICAL_20110518STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DOC TYPE,
HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑ so I I D�9 iS
YYYYMMDD
A UjLA
NC®ENR
North Carolina Department of Environment and Natural Reso rces
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
May 18, 2011
Scott Carpenter
Lee Iron & Metal Company Incorporated
2219 S Horner Blvd
Sanford, NC 27330
Subject: Compliance Evaluation Inspection
Lee Iron & Metal Company Incorporated
Certificate of Coverage NCG200341
Lee County
Dear Mr. Carpenter
On May 16, 2011, Thomas Ascenzo & Vicki Webb of the Raleigh Regional Office (RRO) conducted a compliance
inspection (CEI) of facilities stormwater pollution program. The assistance of yourself & George Orlovsky was
appreciated as it facilitated the inspection process.
The Lee Iron & Metal Company facility discharges stormwater to receiving waters of Buffalo Creek stream from 2
outfalls.
The following observations were made
Review of your Stormwater Pollution Prevention Plan (SP3) revealed the following :
• The plan contained the required general location map that included outfall location and drainage
areas.
• Employee training documents such as training forms were included however were not filled out to
document employee training was commenced. Provide Employee training annually to all staff and
document it on the appropriate forms.
• List of responsible parties for Emergency spill response notification
• No spills were noted for the 3 year period as noted in the documentation in the manual on page 4.
• Plan includes Stormwater Facility Inspection reports but forms have not been filled out to indicate
an inspection has been documented.
• Best Management Practices summary was observed on page 9 of the manual.
• The plan contains all the necessary components for the SP3 manual. Suggestion to add tabs to
make it easier to find a particular component or subject.
2. Qualitative Monitoring should be conducted semi-annually, reviews of monitoring documents indicate for
2008, 2010 there were only one monitoring event filled out. As of the date of the inspection it is noted that
monitoring for 2011 not was conducted. Ensure Qualitative Monitoring is conducted semi-annually and
documented in the SP3 manual.
3. Outfall #1 near fence line appears clear and has a slight red iron deposits color noted.
Outfall #2 is located in parking lot that appears to be sheet flow and overland flow. Update information on
permit renewal stating this fact since this is not a valid outfall.
NorthCarolina
Natitrally
North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791.4200 Customer Service
Internet: w .ncwaterqualny.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788-7159 877-623.6748
An Equal Opportunity/Affirmative Action Employer — 50 % Recycled/10% Post Consumer Paper
Lee Iron Works Company NCG200341
Page 2 of 2 r gr Can v l W"I • vY
e�
5. Outfall #3 has metal debris and needs to be cleared of vegetation and debris. No visible signs of a
pollutant were observed.
6. Secondary Containment is provided for the diesel tank located on site. No signs of leakage or spill noted
on ground services.
7. Analytical Monitoring for 2/2010 shows over benchmarks for Total Suspended Solids, Chemical Oxygen
Demand, Cadmium, Copper, Iron, Lead, Zinc, Conduct Tier 1 or Tier 2 investigations to determine cause
of being over benchmarks and document results of investigation in SP3 notebook.
Please continue your diligence with the Stormwater Pollution Prevention Plan. Should you or your staff have any
questions regarding this inspection or this notice, please do not hesitate to contact me at 919-791-4317 or you
can e-mail me at tom.ascenzo(a)ncdenr.gov.
Sincerely,
Thomas Ascenzo
Environmental Specialist
Surface Water Protection
Attachment: Compliance Inspection Reports
CC: Central Files NCG200341
Raleigh Regional Office SWP
George Orlovsky- Safety'Manager
2219 South Horner Blvd
Sanford. NC 27330
Compliance Inspection Report
Permit: NCG200341 Effective: 01/01/10 Expiration: 12/31/14 Owner: Lee Iron & Metal Cc Inc
SOC: Effective: Expiration: Facility: Lee Iron & Metal Cc Incorporated
County: Lee 2219 S Horner Blvd
Region: Raleigh
Sanford NC 27330
Contact Person: Jonathan Carpenter Title: Phone:919-775-7961
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 0511612011 Entry Time: 11:20 AM Exit Time: 12:20 PM
Primary Inspector: tom ascenzo Phone: 919-791-4200
Secondary Inspector(s):
Vicki Webb Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Wholesale Trade of Metal Waste and Scrap Stormwater
Discharge COC
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
E Storm Water
(See attachment summary)
Page:1
4.
Permit: NCG200341 Owner - Facility: Lee Iron & Metal Co Inc
Inspection Data: 05/1612011 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page:2
Permit: NCG200341 Owner - Facility: Lee Iron & Metal Cc Inc
Inspection Date: 05/16/2011 Inspection Type: Compliance Evaluation
Reason for Visit: Routine.
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
❑
❑
❑
# Does the Plan include a General Location (USGS) map?
■
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices'?
■
❑
❑
Cl
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
❑
■
❑
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
❑
# Does the facility provide all necessary secondary containment?
■
❑
❑
❑
# Does the Plan include a BMP summary?
■
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
❑
❑
❑
# Does the facility provide and document Employee Training?
❑
■
❑
Cl
# Does the Plan include a list of Responsible Party(s)?
■
Cl
❑
❑
At Is the Plan reviewed and updated annually?
❑
■
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
■
❑
❑
❑
Has the Stormwater Pollution Prevention Plan been implemented?
■
❑
❑
❑
Comment: Employee training forms are in the the manual however no documentation
to prove training was commenced.
Plan needs to be reviewed and updated annually and as needed.
No spill reported and documented in SP 3 manual.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ■ ❑ ❑
Comment: 2008 Qualitative Monitoring was completed only once
2009 Qualitative Monitoring shows semi-annual monitoring
2010 Qualitative Monitoring was completed only once
2011- No Evidence of Qualitative Monitoring from the date of inspection
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
■
❑
❑
❑
# Were all outfalls observed during the inspection?
■
❑
❑
❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑
■
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
■
❑
❑
❑
Comment: Outfall #2 should not be classified as an outfall. It was noted to be in low
lying area that collected sheetflow .
Page:3