Loading...
HomeMy WebLinkAboutNCG200341_COMPLETE FILE - HISTORICAL_20110518STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE, HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ so I I D�9 iS YYYYMMDD A UjLA NC®ENR North Carolina Department of Environment and Natural Reso rces Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 18, 2011 Scott Carpenter Lee Iron & Metal Company Incorporated 2219 S Horner Blvd Sanford, NC 27330 Subject: Compliance Evaluation Inspection Lee Iron & Metal Company Incorporated Certificate of Coverage NCG200341 Lee County Dear Mr. Carpenter On May 16, 2011, Thomas Ascenzo & Vicki Webb of the Raleigh Regional Office (RRO) conducted a compliance inspection (CEI) of facilities stormwater pollution program. The assistance of yourself & George Orlovsky was appreciated as it facilitated the inspection process. The Lee Iron & Metal Company facility discharges stormwater to receiving waters of Buffalo Creek stream from 2 outfalls. The following observations were made Review of your Stormwater Pollution Prevention Plan (SP3) revealed the following : • The plan contained the required general location map that included outfall location and drainage areas. • Employee training documents such as training forms were included however were not filled out to document employee training was commenced. Provide Employee training annually to all staff and document it on the appropriate forms. • List of responsible parties for Emergency spill response notification • No spills were noted for the 3 year period as noted in the documentation in the manual on page 4. • Plan includes Stormwater Facility Inspection reports but forms have not been filled out to indicate an inspection has been documented. • Best Management Practices summary was observed on page 9 of the manual. • The plan contains all the necessary components for the SP3 manual. Suggestion to add tabs to make it easier to find a particular component or subject. 2. Qualitative Monitoring should be conducted semi-annually, reviews of monitoring documents indicate for 2008, 2010 there were only one monitoring event filled out. As of the date of the inspection it is noted that monitoring for 2011 not was conducted. Ensure Qualitative Monitoring is conducted semi-annually and documented in the SP3 manual. 3. Outfall #1 near fence line appears clear and has a slight red iron deposits color noted. Outfall #2 is located in parking lot that appears to be sheet flow and overland flow. Update information on permit renewal stating this fact since this is not a valid outfall. NorthCarolina Natitrally North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791.4200 Customer Service Internet: w .ncwaterqualny.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788-7159 877-623.6748 An Equal Opportunity/Affirmative Action Employer — 50 % Recycled/10% Post Consumer Paper Lee Iron Works Company NCG200341 Page 2 of 2 r gr Can v l W"I • vY e� 5. Outfall #3 has metal debris and needs to be cleared of vegetation and debris. No visible signs of a pollutant were observed. 6. Secondary Containment is provided for the diesel tank located on site. No signs of leakage or spill noted on ground services. 7. Analytical Monitoring for 2/2010 shows over benchmarks for Total Suspended Solids, Chemical Oxygen Demand, Cadmium, Copper, Iron, Lead, Zinc, Conduct Tier 1 or Tier 2 investigations to determine cause of being over benchmarks and document results of investigation in SP3 notebook. Please continue your diligence with the Stormwater Pollution Prevention Plan. Should you or your staff have any questions regarding this inspection or this notice, please do not hesitate to contact me at 919-791-4317 or you can e-mail me at tom.ascenzo(a)ncdenr.gov. Sincerely, Thomas Ascenzo Environmental Specialist Surface Water Protection Attachment: Compliance Inspection Reports CC: Central Files NCG200341 Raleigh Regional Office SWP George Orlovsky- Safety'Manager 2219 South Horner Blvd Sanford. NC 27330 Compliance Inspection Report Permit: NCG200341 Effective: 01/01/10 Expiration: 12/31/14 Owner: Lee Iron & Metal Cc Inc SOC: Effective: Expiration: Facility: Lee Iron & Metal Cc Incorporated County: Lee 2219 S Horner Blvd Region: Raleigh Sanford NC 27330 Contact Person: Jonathan Carpenter Title: Phone:919-775-7961 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 0511612011 Entry Time: 11:20 AM Exit Time: 12:20 PM Primary Inspector: tom ascenzo Phone: 919-791-4200 Secondary Inspector(s): Vicki Webb Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Metal Waste and Scrap Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E Storm Water (See attachment summary) Page:1 4. Permit: NCG200341 Owner - Facility: Lee Iron & Metal Co Inc Inspection Data: 05/1612011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page:2 Permit: NCG200341 Owner - Facility: Lee Iron & Metal Cc Inc Inspection Date: 05/16/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine. Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ■ ❑ ❑ Cl # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ■ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ■ ❑ Cl # Does the Plan include a list of Responsible Party(s)? ■ Cl ❑ ❑ At Is the Plan reviewed and updated annually? ❑ ■ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Employee training forms are in the the manual however no documentation to prove training was commenced. Plan needs to be reviewed and updated annually and as needed. No spill reported and documented in SP 3 manual. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ■ ❑ ❑ Comment: 2008 Qualitative Monitoring was completed only once 2009 Qualitative Monitoring shows semi-annual monitoring 2010 Qualitative Monitoring was completed only once 2011- No Evidence of Qualitative Monitoring from the date of inspection Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ ❑ Comment: Outfall #2 should not be classified as an outfall. It was noted to be in low lying area that collected sheetflow . Page:3