Loading...
HomeMy WebLinkAboutNCG190057_COMPLETE FILE - HISTORICAL_20100318STORMWATER DIVISION CODING -SHEET RESCISSIONS . PERMIT NO.. LV Vl .n DOC TYPE COMPLETE FILE - HISTORICAL DATE OF RESCISSION ❑ YYYYMMDD North Carolina Beverly Eaves Perdue, Govemor Robert A. Scarpena 100 Quality Drive Navassa, NC 28451 Dear Mr. Scarpena, AMA. NC®ENR Department of Environment and March18, 2010 Natural Resources Subject: NPDES Compliance Evaluation Inspection NPDES Permit CDC NCG190057 Brunswick County Dee Freeman, secretary A compliance evaluation inspection of the Sea Ray facility was conducted on March 15, 2010. This inspection was to verify that the facilities are operating in compliance with the requirements specified in the NPDES General Permit NCG 190000, The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". The facility does not appear to have any industrial activity. Please contact this office if you would like to pursue a no exposure or would like to request rescission of the permit. Should you have any questions concerning this correspondence or the enclosed inspection report, please contact me at 910-796-7343, Sincerely, Linda Willis Wilmington Regional Office Division of Water Quality Surface Water Protection Section CC: WiRO NPDES NCG 190 Brunswick CO DWQ files One NorthCarolina Naturally 1601 Mail Sarvica Center, Raleiah, Norlh Carolina 27699-1601 Phone: 919-733-49,841 FAX: 919-715-30601 Internet: vrww.enr.staie.nc.us/ENRI An Erpu;l Opco,n miry l AIE�rotative A.dirnt Employer 50'%, RM:jdod 110 /, Post CCnsnmer Prn+er Permit: NCG190057 SOC: County: Brunswick Region: Wilmington Compliance Inspection Report Effective:09/01/04 Expiration: 08/31/09 Effective: Expiration: Contact Person: Robert A Scarpena Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: Certification: Owner: US Marine Facility: US Marine 100 Quality Dr Navassa NC 28451 Phone:910-371-3663 Phone: Inspection Date: 03/15/2010 Entry Time: 09:00 AM Exit Time: 09:20 AM Primary Inspector: Linda Willis .,r„ lam. )f' Phone: 910-796-7396 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ship and Boat Building Stormwater Discharge COC Facility Status: El Compliant ❑ Not Compliant Question Areas: ® Storm water (See attachment summary) Page:1 Permit: NCG190057 Owner -.Facility: US Marine Inspection Date: 03/15/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The site is closed, no activity, abandoned building. No exposure threat to stormwater concerning the operation was seen by Division Representative Linda Willis and Jean Conway. Page:2 Mr. Bob Scarpena US Marine 100 Quality Drive Navassa, NC 28451 Dear Mr. Scarpena: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality June 16, 2008 R- I-E C T-L'I V ED JUN 1.8 2008 BY: Subject: NPDES General Permit NCG190000 Certificate of Coverage NCG 190057 US Marine Formerly KCS International, Inc. Brunswick County Division personnel have reviewed and approved your request to transfer coverage under the General Permit, received on February 22, 2008. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact the Stormwater Permitting Unit at (919) 733-5083, extension 502. Sincerely, ORIGINAL SIGNED BY KEN PICKLE Coleen H. Sullins cc: DWQ Central Files Wilmington Regional Office Stormwater Permitting Unit ` rCarolina urn!/y North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.encstale,nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycledl10% Post Consumer Paper if .% STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG190000 CERTIFICATE OF COVERAGE No. NCG190057 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, US MARINE is hereby authorized to discharge stormwater from a facility located at US MARINE 100 QUALITY DRIVE NAVASSA BRUNS W ICK COUNTY to receiving waters designated as the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG 190000 as attached. This certificate of coverage shall become effective June 16, 2008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day June 16, 2008. ORIGINAL SIGNED BY KEN PICKLE Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission f1I � �•� � r x a ,t t. .. i . ,4 4Ma^ �_ f u :`Fy`+• O '�`f'1�'F"'r ` - ,r <<.'� a� I�11'�'�•'' ?j � � '.`. - �� � 'T`'. ' r , � ' j': Y r, 4, ��4 { v �Li. v ( x.a.� •�,t' F j i � S, IUl',Yk i��Q'vl- it p e '`b('` .ti �l +�+1�' �R�� � � � �cl• -0`- � r n:l '..�� / � t °'tY( �q%A� .V � r• v�v ' 4� , � X �wwtE +r•r, h! I 4� C �! s -.t� � ' � .A �h CC(rFlr+,s� �3.k-'J.''•�-. 5 � r t o �'!y `Y �r•r " fir, -' `1'� —° _ --- �A �Ik� � ,�`, an eI .'.� . �- xc, i ,, �'���� I'y,\ . ", BM'� ` ` IU! >� •l ��'v-` �, yT r �• 7,,. 'c'�, y�` ;a. � `\ ` ' �v'+„�\'`;V� 9q,+� •' 3". 1'.. art r s y, .( ' y"` t1\`I U. cQ"•'.� �• l 04111 g� J� \ -Navassa IN fie`._ .� '\����)/-- •�•,1�� �'. r� isn,�{y{ - A ,� t �'� '�s�.^�SE: ,y� rs "7Ya \''�+ r sq� a!F%' •)A.- 4M..•Jlh._ d -�� ,I' lFleldi i t�54"t•^� a�,'�''r-�•+�_: 1. •�•�iK; �', Yµ. { ( \. }1_lil /a3 ,//� l �. Y.y:�� L �Nti�J'yR'a1. �`tM' WV D �� �Y _�'� L � y'"n' , y0 . � -yam., � J.. I � •1'. F 't } .w 1 �, t�� 1F :.p ; �, �. ��' r �; . ��.�y � ka r� + V.�a�: h$ ` -r�gr7 +,.•9,s ice" rZ��e� w� I �'+ t. as r-n�oa •s b ay E tt�', � $a rt , .�., � �, n. .rsvrg • lu'h ,tSry ¢ d`}7+ .. (�� 'ttM a, a r �. :i -y.3>7 r w.,, r•�s Q. �\fiH•u ,`c v� ,*\ s n" �• 1 r �^TV y R'v .- /{T� 4 r r '� i ' t �� ��*�� � ��'! � Y, ,.�. fe 17 T_ , ,a ft'.i � �t ;,+ � , r`.��$"`�� �.�3#° t is �r�'a•3��. �r�. 9' W� e r t` ....#� s e _ r @., _ N:Yr _ • L��\"t?'"`�. w..�:. �4. r . r _ � d? Copyright (C) 1997, Maptech, Inc Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE Industrial SWPPP Template Introduction To help you develop a SWPPP that is consistent with the 2008 MSGP, the U.S Environmental Protection Agency (EPA) has created this Industrial SWPPP Template (or, "the Template"). Use of the Template will help ensure that your SWPPP addresses all the necessary elements required in Part 5 of the 2008 MSGP. Before completing the Template, make sure you read and understand the requirements in the 2008 MSGP. A copy of the MSGP is available at www.epa.gov/npdes/stormwater/msqp. Using the Industrial SWPPP Template Tips for completing the Template: • This Template is designed for use by all facilities eligible for coverage under the 2008 MSGP. The Template is NOT tailored to your individual industrial sector. Depending on which industrial sector you fall under (see Appendix D of the 2008 MSGP) and on where your facility is located (see Appendix C of the 2008 MSGP), you will need to address additional SWPPP requirements outlined in Part 8 and/or Part 9 of the permit, respectively. • Complete a SWPPP before submitting your Notice of Intent (NO1) for permit coverage. • Each section includes "instructions" and space for your facility's specific information. You should read the instructions for each section before you complete that section. • The Template was developed in Microsoft Word so that you can easily add tables and additional text. Some sections may require only a brief description while others may require several pages of explanation. • To make it easier to complete, the Template generally uses blue text where the operator is expected to enter information. EPA notes that while EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the Template, the actual obligations of regulated industrial facilities are determined by the relevant provisions of the permit, not by the Template. In the event of a conflict between the Template and any corresponding provision of the MSGP, the permit controls. EPA welcomes comments on the Template at any time and will consider those comments in any future revision of this document. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT 17ACII-ITY NAME and DATE Stormwater Pollution Prevention Plan for: Insert Facility Name Insert Facility Address Insert City, State, Zip Code Insert Facility Telephone Number (if applicable) SWPPP Contact(s): Insert Facility Operator Insert Name Insert Address Insert City, State, Zip Code Insert Telephone Number Insert Fax/Email SWPPP Preparation Date: EPA Industrial SWPPP Template, January 13, 2009 t Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME" and DATE Contents SECTION 1: FACILITY DESCRIPTION AND CONTACT INFORMATION......................................................1 1.1 Facility Information................................................................................................................. 1 1.2 Contact Information/Responsible Parties................................................................................ ?3 1.3 Stormwater Pollution Prevention Team.................................................................................. 33 1 A Activities at the Facility......................................................................................................... 33 1.5 General Location Map.......................................................................................................... 44 1.6 Site Map..............................................................................................................................» SECTION 2: POTENTIAL POLLUTANT SOURCES.....................................................................................66 2.1 Industrial Activity and Associated Pollutants........................................................................... 66 2.2 Spills and Leaks................................................................................................................... 7-7 2.3 Non-Stormwater Discharges Documentation.......................................................................... 7-7 2.4 Salt Storage........................................................................................................................ 88 2.5 Sampling Data Summary ...................................................................................................... 88 SECTION 3: STORMWATER CONTROL MEASURES.................................................................................88 3.1 Minimize Exposure............................................................................................................... 99 3.2 Good Housekeeping............................................................................................................. 99 3.3 Maintenance........................................................................................................................94 3.4 Spill Prevention and Response.......................................................................................... 101-0 3.5 Erosion and Sediment Controls......................................................................................... 104-0 3.6 Management of Runoff..................................................................................................... 101-0 3.7 Salt Storage Piles or Piles Containing Salt......................................................................... 1144 3.8 MSGP Sector -Specific Non -Numeric Effluent Limits............................................................ 1144 3.9 Employee Training...........................................................................................................1144 3.10 Non-Stormwater Discharges............................................................................................. 1 144 3.11 Waste, Garbage and Floatable Debris............................................................................... 124-2- 3.12 Dust Generation and Vehicle Tracking of Industrial Materials ............................................... 121-3 SECTION 4: SCHEDULES AND PROCEDURES FOR MONITORING.....................................................1343 SECTION 5: INSPECTIONS.......................................................................................................................1545 SECTION 6: DOCUMENTATION TO SUPPORT ELIGIBILITY CONSIDERATIONS UNDER OTHER FEDERALLAWS.......................................................................................................................................1646 6.1 Documentation Regarding Endangered Species................................................................. 1646 6.2 Documentation Regarding Historic Properties..................................................................... 1164-6 6.3 Documentation Regarding NEPA Review (if applicable)...................................................... 164-6 SECTION 7: SWPPP CERTIFICATION.....................................................................................................16U SECTION 8: SWPPP MODIFICATIONS....................................................................................................1848 SWPPP ATTACHMENTS...........................................................................................................................1949 Attachment A - General Location Map Attachment B - Site Maps Attachment C - 2008 MSGP EPA Industrial SWPPP Template, January 13, 2009 ii Stormwater Pollution Prevention Plan (SWPPP) INSERTFACILITY NAME and DATE i SECTION 1: FACILITY DESCRIPTION AND CONTACT INFORMATION 1.1 Facility Information Facility Information Name of Facility: Street: City: State: ZIP Code: County or Similar Subdivision: Permit Tracking Number: (if covered under a previous permit) Latitude/Longitude (Use one of three possible formats, and specify method) Latitude: Longitude: 1. _ _ ° _ _' _ _" N (degrees, minutes, seconds) 1. _ _ ° _ _' _ _" W (degrees, minutes, seconds) 2. _ _ ° _ _ . _ _' N (degrees, minutes, decimal) 2. _ _ ° _ _ . _ _' W (degrees, minutes, decimal) 3. _ _ .----IN (decimal) 3. _ _ . _ _ _ _ ° W (decimal) Method for determining latitude/longitude (check one): ❑ USGS topographic map (specify scale: ) ❑ EPA Web site ❑ GPS ❑ Other (please specify): Is the facility located in Indian Country? ❑ Yes ❑ No If yes, name of Reservation, or if not part of a Reservation, indicate "not applicable." Is this facility considered a Federal Facility? ❑ Yes ❑ No Estimated area of industrial activity at site exposed to stormwater: Discharge Information EPA Industrial SWPPP Template, January 13, 2009 (acres) Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME -and DATE Does this facility discharge stormwater into an MS4? ❑ Yes ❑ No If yes, name of MS4 operator: _ Name(s) of water(s) that receive stormwater from your facility Are any of your discharges directly into any segment of an "impaired" water? ❑ Yes ❑ No If Yes, identify name of the impaired water (and segment, if applicable): Identify the pollutant(s) causing the impairment: For pollutants identified, which do you have reason to believe will be present in your discharge? For pollutants identified, which have a completed TMDL? Do you discharge into a receiving water designated as a Tier 2 (or Tier 2.5) water? ❑ Yes ❑ No Are any of your stormwater discharges subject to effluent guidelines? ❑ Yes ❑ No If Yes, which guidelines apply? Primary SIC Code or 2-letter Activity Code: (refer to Appendix D of the 2008 MSGP) Identify your applicable sector and subsector: 1.2 Contact Information/Responsible Parties Instructions: — List the facility operator(s), facility owner, and 24 hour emergency contact. Indicate respective responsibilities, where appropriate: — You will need the information from this section of the SWPPP Template for your NOI. — Refer to Section B of the NOI instructions (available in Appendix G of the 2008 MSGP). Facility Operator (s): Name: Insert Name Address: Insert Address City, State, Zip Code: Insert City, State, Zip Code Telephone Number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) Facility Owner (s): Name: Insert Name Address: Insert Address City, State, Zip Code: Insert City, State, Zip Code EPA Industrial SWPPP Template, January 13, 2009 2 Stormwater Pollution Prevention Plan (SWPPP) ; INSERT FACILITY NAME and DATE Telephone Number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) SWPPP Contact: Name: Insert SWPPP Contact Name Telephone number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) 1.3 Stormwater Pollution Prevention Team Instructions (see 2008 MSGP Part 5.1.1)`. — Identify the staff members (byname or title) that comprise the facility's stormwater pollution prevention team as well as their individual responsibilities. Your stormwater pollution prevention team is responsible for assisting the facility manager in developing and revising the facility's SWPPP, implementing and maintaining control measures/BMPs, and taking corrective, actions where required. Each member of the stormwater pollution prevention team must have ready access to either an electronic or paper copy.of applicable portions of the MSGP and your SWPPP. Staff Names Individual Responsibilities Insert name of SWPPP team member Insert explanation of that staff person's responsibilities relating to compliance with the permit [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] 1.4 Activities at the Facility Instrdctioris (see 2008 MSGP Part 5°11):' Provide'a general description of the nature of the industrial activities at your facility . Insert text here EPA Industrial SWPPP Template, January 13, 2009 3 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE: 1.5 General Location Map Instructions (see 2008 MSGP Part 5.1.2): Provide a general location map (e.g., U:S. Geological Survey (USGS)`quadrangle map) with enough detail to identify the location of your facility and all receiving waters for your stormwater discharges (include as Attachment A of this SWPPP Template). Include a copy of the general location map for this facility in Attachment A. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) r INSERT FACILITY NAME and DATE 1.6 Site Map Instructions (see:2008.MSGP Part5.1.2): Include a map showing the followinginformation. The site map should be included as Attachment B of thisSWPPP Template: the size of the property in acres; ■ the location and extent of'significant structures and impervious surfaces; • directions of stormwater flow (use arrows); ■, locations of all existing structural control measures; • locations of all receiving waters in the immediate vicinity of your facility, indicating if any of the waters are impaired and, if so, whether the waters have TMDLs established for them_ ; ■ locations of all stormwater conveyances including ditches, pipes, and swales; ■ locations of potential pollutant sources identified under MSGP, Part 5.1.3.2; • locations where significant spills or leaks identified under MSGP, Part 5.1.3.3 have occurred; • locations of all stormwater monitoring points; ■ . locations of stormwater inlets and outfalls, with a unique identification code,for each outfall (e.g:, OutfalLNo. 1, No. 2, etc), indicating if you are treating one or more outfalls as - "substantially identical" under MSGP; Parts 4.2.3, 5.1.5.2, and 6.1.1, and an approximate outline of the areas draining to,each outfall; " ■ 'municipal separate storm sewer systems, where your stormwater discharges to them;, locations"and descriptions of all non-stormwater discharges identified under MSGP, Part 21.210; locations of the following activities where such activities are exposed to precipitation: o " fueling stations; o vehicle and equipment"maintenance,and/or cleaning areas, o loading/unloading areas; o locations used for the treatment;`storage, or disposal of wastes; � ouid,stor"ge ' . , li g atanks; .. ... o processing, and storage areas; o " immediate, access'roads and rail lines used or traveled bycarriers of raw materials, manufactured products, waste material, or by products used or created by the facility; o transfer, areas for substances in bulk; . o., machinery; and locations and sources Y 1 P P Y, contains significant quantities of ollutantsof run-on to, our site from ad;acent ro ert that contai f Include a copy of the site map for this facility in Attachment B. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 2: POTENTIAL POLLUTANT SOURCES Instructlons (see 2008 MSG P Part 51 3)K. — ° In this section you are regmred to dekribde a,reas at your facili 'where"industrial dmatenals or activities are p to stormwater or from which allowable non stormwater discharges are`released. exposed �F 2.1 Industrial Activity and Associated Pollutants Instructlons (see 2008 MSGP Parts 51 31 and 51 3 2 f Js Ld@ 91 :IY�d; d F ddi ilbtVdF :' Include a'Ilst of industnal activities exposed to stormwaler (e g matenal storagi3egwpment/vehicle fueling maintenance ,and cleamng `cutting steel beams)'arid the poll�gtatoFpollutant constltuentsl(esg f motor oil fuel battery acid and cleamng solvents) associated with t 6Wactiwties ' ' `} F s h do 61f" Ei i 4it3{'� dl lsa WF d ad33 d a 1 t e — In ygilf list of pollutantsiassoclated with yourmdustnal activities llnclFude,allislgnl5cant matenals that have mwv been handledrtreated stored or disposed and that have been exposed tostormwater In the 3 years pnorto ....y: :I. the date you prepare -yourP..SWPPP Industrial Activity Associated Pollutants Insert specific industrial activity Insert names of pollutants or pollutant constituents that could be associated with this activity and released in stormwater Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] EPA Industrial SWPPP Template, January 13, 2009 6 Stormwater Pollution Prevention Plan (SWPPP) ; INSERT FACILITY NAME and DATE 2.2 Spills and Leaks Instructions (See,2008 MSGP Part 5.1.3.3): , Include the following in this section: .o Potential,spills and leaks: A description -of where potential spills and leaks could occur at your site that could contribute pollutants to your stormwater discharge, and specify which ouffall(s) are' likely to be affected bysuch spills and leaks. o.., Past spills and leaks: A description of significant spills and leaks in the past 3 years of oil or toxic, or hazardous pollutants that actually occurred at exposed areas, or that draineflo a stormwater conveyance. Note: Significant spills and leaks include, but are not limited to, releases of oil or hazardous substances in excess of quantities that are reportable under CWA Section. 311 (see 40 CFR I'10.6 and.40 CFO 117.21) or Section 102 of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), 42 USC §9602. Areas of Site Where Potential Spills/Leaks Could Occur Location Outfalls Insert description of area where spill/leak could occur Specify which outfall(s) would be affected [Repeat as necessary] [Repeat as necessary] [Repeat as necessarvl fReoeat as necessarvl [Repeat as necessary] ] [Repeat as necessary] Description of Past Spills/Leaks Date Description Outfalls Insert date of Insert description of spill/leak (where it occurred, what Specify which outfall(s) spill/leak happened, types of pollutants, extent of damage) were affected [Repeat as [Repeat as necessary] [Repeat as necessary] [Repeat as I [Repeat as necessary] I [Repeat as [Repeat as I [Repeat as necessary] I [Repeat as necessary] necessary] 2.3 Non-Stormwater Discharges Documentation Inst ructions.(see 2008'MSGP Part 51.3.4):. . The questions below, require you'to provide documentation of the following o Your evaluation for, the presence of non-stormwater discharges at your site; and ` o "Your elimination of any unauthorized non-stormwater discharges. EPA Industrial SWPPP Template, January 13, 2009 7 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE • Date of evaluation: Insert the date(s) of your evaluation. • Description of the evaluation criteria used: Describe the method you used to conduct your evaluation and to determine for each non-stormwater sources whether it is prohibited or allowed under the permit. • List of the outfalls or onsite drainage points that were directly observed during the evaluation: Insert outfalls/drainage points observed. • Different types of non-stormwater discharge(s) and source locations: Describe types of non- stormwater discharges observed and the corresponding outfall or drainage point. • Action(s) taken, such as a list of control measures used to eliminate unauthorized discharge(s), if any were identified. For example, a floor drain was sealed, a sink drain was re-routed to sanitary, or an NPDES permit application was submitted for an unauthorized cooling water discharge: Describe actions taken to eliminate unauthorized non-stormwater discharges and the corresponding outfall/drainage point affected. 2.4 Salt Storage Instructions (see, 2008IMSGP Part 5.1.3.5): Document the location of any storage piles containing salt used for deicing or other commercial or industrial purposes. - Note: You will be asked additional questions concerning salt storage in Section 3.7 of this SWPPP template, below.` Insert description of the location of any storage piles containing salt. 2.5 Sampling Data Summary Instructions (See 2008 MSGP Part 5.1.3.6): summari ze all stormwater sampling data collected,from your permitted outfalls during the previous permit term. Insert summary of stormwater sampling data collected for the past permit, and/or attach discharge monitoring reports or laboratory results. SECTION 3: STORMWATER CONTROL MEASURES Instructions (See 2006 MSGP Pans 5.1.4.1 and 2.1.2): that you have installed at our site to meet each of the permit's "non -numeric — In Sections 3.1 - 3.12 of this SWPPP tem late,' ou are asked'to describe thestormwater control measures . y y p � effluent limits" In Part 2.1.2 of , the 2008 MSGP. f . ° EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.1 Minimize Exposure Instructions (see 2008 MSGP Part 2.1.2.1): Describe any structural controls or practices used to minimize the exposure of industrial activities t — o rain, snow, snowmelt, and runoff. Describe where the controls or practices are being implemented at your site. INSERT DESCRIPTION OF CONTROL MEASURES HERE, 3.2 Good Housekeeping Instructions (see 2008 MSGP Parts 2.1.2.2 and.5.1.5.1): 'Describe any practices you are implementing to keep exposed areas of your site clean. Describe where each practice is being implemented at,your site. Include here your schedule for: (1) regular pickup and disposal of waste materials, and (2) routine inspections for leaks and of the condition of drums, tanks, and containers. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.3 Maintenance Instructions (see 2008 MSGP Parts 2.1.2.3 and5.1.5.1): — Describe procedures (1) to maintain industrial equipment so that spills/leaks are avoided, and (2) to maintain any of your site's control measures in effective operating condition. Include the schedule you will follow for such maintenance activities. Describe where „each applicable procedure is being implemented at the site. INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.4 Spill Prevention and Response Instructions (see 2008 MSGP Parts 2.1.2.4 and 5.1`.5.1): Describe any structural controls or procedures used to minimize the potential for leaks, spills, and other releases.. You mustiimplement the following at a minimum: • Procedures for plainly labeling containers (e.g., "Used Oil," "Spent Solvents," "Fertilizers and Pesticides,° etc.) that could be susceptible to spillage or leakage to encourage proper handling and facilitate raid response if spills or leaks occur; Preventative measures such as barriers between material storage and traffic areas, secondary. containment provisions, and procedures for material storage and handling; Procedures for expeditiously stopping, containing, and cleaning up leaks, spills, and other releases; and Procedures'for,notification of appropriate facility personnel, emergency response agencies, and regulatory agencies. Describe where each'control is to be located or where applicable'procedures will be implemented. Note: Some facilities may be required to develop a Spill Prevention Control and Countermeasure (SPCC) plan under a separate regulatory program (40 CFR 112): If you are required to develop an SPCC plan, or you already have one; you should include references to the relevant requirements from your plan, INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.5 Erosion and Sediment Controls Instructions (see 2068 MSGP Part 2.11.5): Describe structural or non-structural controls used at your site to stabilize exposed areas and contain runoff to minimize'onsite erosion and potential offsite discharges. of sediment. Note: You must at a minimum implement flow velocity dissipation devices at outfalls and discharge channels. Describe the location at your site where each control will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.6 Management of Runoff Instructions ( See 2008 MSGP Part 2your " ter'runoff. Describe controls used at oursite to divert, infiltrate; reuse, contaln;;or otherwise reduce stormwa Describe the location at your site where each control will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, January 13, 2009 10 Stormwater Pollution Prevention Plan (SWPPP) ; INSERT FACILITY NAME and DATE 3.7 Salt Storage Piles or Piles Containing Salt Instructions (see, 2008 MSGP Part 2.1.2.7). If applicable, descnlie structures at your site that either cover or enclose salt storage piles or piles containing salt, or that prevent the discharge of stormwater from'such piles. Also, describe any controls or procedures used to minimize exposure resulting from adding to or removing materials from the pile. Describe the location at your site where each control^and/or procedure will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.8 MSGP Sector -Specific Non -Numeric Effluent Limits Instructions (see 2008 MSGP Part 2.1..2.8): Describe any controls orprocedures that will,be used at your site to comply with.any sector -specific requirements that apply to you in Pan 8 of the 2008 MSGP. Describe the location at your site where each control and/or procedure will be implemented. Note: Sector -specific effluent limits apply to Sectors A, E,`F, G, H, 111, M,N, 0, P, Q, R, S, T,'U, V, X, Y, Z, and AA, INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.9 Employee Training Instructions (see 2008 MSGP,Parts 2.1.2.9 and 5.1.5.1):1 Describe your plan^for training the employees who work in areas where industrial materials or activities are exposed to stormwater, or, who are responsible:for implementing activities necessary to meet the conditions of the 2008 MSGP, including all:members of your pollution Prevention Team IncludW,in your description must be the frequency.of training (note: °recommended at least one time peryear), and the schedule you will follow.' INSERT DESCRIPTION OF PLAN FOR TRAINING APPLICABLE STAFF HERE. 3.10 Non-Stormwater Discharges Instructions (see 2008 MSGP 2.1:2.10): Describe how you eliminated any unauthorized horn stor1.mwater discharges at your site. The unauthorized non-" stormwater discharges include any non-stormwater discharges that are not specifically identified in Part 1.1,3 of. , the 2008 MSGP Note'. If this section is already addressed by your documentation for Section 2.3 of the SWPPP template you,can simply include a cross reference to that wction'of your SWPPP ^,` ^ INSERT DESCRIPTION OF YOUR APPROACH TO ELIMINATING UNAUTHORIZED NON- STORMWATER DISCHARGES HERE. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.11 Waste, Garbage and Floatable Debris Instructions (see 2008 MSGP.Part 2.1.2.11): Describe controls and procedures that will be used at your site to minimize discharges of waste, garbage, and floatable debris. Describe the location at your site where each control and/or procedure will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.12 Dust Generation and Vehicle Tracking of Industrial Materials Instructions (see 2008 MSGP Part 2.1.2.12): Describe controls and procedures you will use at your site to minimize the generation of dust and off -site tracking of raw, final, or waste materials. Describe the location at your site where each control and/or procedures will be implemented: " INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, January 13, 2009 12 Stormwater Pollution Prevention Plan (SWPPP) i INSERT FACILITY NAME and DATE SECTION 4: SCHEDULES AND PROCEDURES FOR MONITORING Instructions (see 2008 MSGP Part 5.1.5.2): Describe your procedures for conducting the five types of analytical monitoring specified by the MSGP,, where applicable to your facility, including:, • , Benchmark monitoring (2008 MSGP, Part 6.2.1 and relevant requirements in Part 8 and/or Part 9); Effluent limitations guidelines monitoring (2008 MSGP, Part 6.2.2 and relevant requirements in Part 8); State- or Tribal -specific monitoring (2008 MSGP, Part 6.2.3 and relevant requirements in Part 9);„ Impaired waters monitoring (2008. MSGP; Part 6.2.4); and Other monitoring as required by EPA (2008 MSGP, Part 62.5). Depending on the type of facility you operate, and the monitoring requirements to which you are subject, you must collect and analyze stormwater samples and document monitoring activities consistent with the procedures described in 2008 MSGP, Part 6 and Appendix B, Subsections`10 —12, and any additional sector -specific or StatelTribal-specific requirements in 2008 MSGP, Parts 8 and 9, respectively. Refer to 2008 MSGP, Part 7 for reporting and recordkeeping requirements. Note: All monitoring must be conducted in accordance with the relevant sampling and analysis requirements at 40 CFR Part 136. Include in your description_ procedures for ensuring compliance with these requirements. If you are invoking the exception for inactive and unstaffed sites for benchmark monitoring, you mustinclude in your SWPPP the information to support this claim as.required by 2008 MSGP, Part 6.2.1.3. If.you plan to'use the substantially identical ouffall exception for your benchmark monitoring requirements in 2008 MSGP; Part 6.2.1 and/or your quarterly visual assessment:requirements in 2008 MSGP, Part 4.2.3, you must include the following documentation: • . Location of each of the substantially identical outfalls; Description of the general industrial activities conducted in the drainage area'. of each ouffall; " • Description of the control measures implemented in the drainage area of each ouffall; • Description of the exposed materials located in the drainage area of each ouffall that are likely to be . significant contributors of pollutants to stormwater discharges • An estimate of the runoff coefficient of the drainage areas (low = under 40%; medium = 40 to 65%; high above 65%); and ` • Why the ouffalls;are expected to discharge substantially identical,effiuents. For each type of monitoring, your SWPPP must include a description of: 1. Sample Location(s). Describe where samples will be collected, including any determination that two or more ouffalls are substantially identical. INSERT TEXT HERE. 2. Pollutant Parameters to be Sampled. Include a list of the pollutant parameters that will be sampled and the frequency of sampling for each parameter. INSERT TEXT HERE 3. Monitoring Schedules. Include the schedule you will follow for monitoring your stormwater discharge, including where applicable any alternate monitoring periods to be used for facilities in climates with irregular stormwater runoff (2008 MSGP, Part 6.1.6). INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 13 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 4. Numeric Limitations. List here any pollutant parameters subject to numeric limits (effluent limitations guidelines), and which outfalls are subject to such limits. Note that numeric limits are only included for Sectors A, C, D, E, J, K, L, and 0. INSERT TEXT HERE 5. Procedures. Describe procedures you will follow for collecting samples, including responsible staff who will be involved, logistics for taking and handling samples, laboratory to be used, etc. INSERT TEXT HERE Note: It may be helpful to create a table with columns corresponding to # 1 - 5 above for each type of monitoring you are required to conduct. Inactive and Unstaffed sites exception (if applicable) If you are invoking the exception for inactive and unstaffed sites for benchmark monitoring, include information to support this claim. INSERT TEXT HERE Substantially identical outfall exception (if applicable) If you plan to use the substantially identical outfall exception for your benchmark monitoring and/or quarterly visual assessment requirements, include the following information here to substantiate your claim that these outfalls are substantially identical: • Location of each of the substantially identical outfalls: INSERT TEXT HERE • Description of the general industrial activities conducted in the drainage area of each outfall: INSERT TEXT HERE • Description of the control measures implemented in the drainage area of each outfall: INSERT TEXT HERE • Description of the exposed materials located in the drainage area of each ouffall that are likely to be significant contributors of pollutants to stormwater discharges: INSERT TEXT HERE • An estimate of the runoff coefficient of the drainage areas (low=under 40%; medium=40 to 65%; high =above 65%): INSERT TEXT HERE • Why the outfalls are expected to discharge substantially identical effluents: INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 14 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 5: INSPECTIONS Instructions: Describe your procedures for performing the three types of inspections required by the 2008 MSGP, including: • Routine facility nspections.(2008 MSGP; Part 4.1); • : Quarterly visual assessment of stormwater discharges (2008 MSGP, Part 4.2); and • Comprehensive site inspections (2008 MSGP, Part 4.3). If youare invoking the exception for inactive and unstaffed sites relating to routine facility inspections and quarterly visual assessments, you must'include in your SWPPP the information to support this claim as required by 2008 MSGP,'Parts 4,1.3 and 4.2.3. pa�mp!.e routine (www.6agov/npdes/stormwater/msgp) in the 'Additio al MSGP Documentation" webs efacility p lassessment form Iavailable n EPA's MSGP on" file. Appendix I of the 2008 MSGP includes a comprehensive site inspection form (Annual Reporting Form). For the routine facility inspections and the comprehensive site inspections to be performed at your site, include a description of the following: The names of the person(s), or the positions of the person(s), responsible for inspection: INSERT TEXT HERE The schedules to be used for conducting inspections. Include here any tentative schedule that will be used for facilities in climates with irregular stormwater runoff discharges (2008 MSGP, Part 4.2.3): INSERT TEXT HERE and Specific areas of the facility to be inspected, including schedules for specific outfalls: INSERT TEXT HERE For the quarterly visual assessments to be performed at your site, include a description of the following: • The names of the person(s), or the positions of the person(s), responsible for inspection: INSERT TEXT HERE • The schedules to be used for conducting inspections. Include here any tentative schedule that will be used for facilities in climates with irregular stormwater runoff discharges (2008 MSGP, Part 4.2.3): INSERT TEXT HERE and • Specific areas of the facility to be inspected, including schedules for specific outfalls: INSERT TEXT HERE Inactive and Unstaffed sites exception (if applicable) If you are invoking the exception for inactive and unstaffed sites for your routine facility inspections and quarterly visual assessments, include information to support this claim. INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 15 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 6: DOCUMENTATION TO SUPPORT ELIGIBILITY CONSIDERATIONS UNDER OTHER FEDERAL LAWS 6.1 Documentation Regarding Endangered Species. Instructions (see 2008 MSGP Part 5.1.6.1): `Include any documentation you have that supports your determination of eligibility consistent with 2008 MSGP, Part 1.1.4.5 (Endangered and Threatened Species and Critical Habitat Protection). Refer to Appendix E of the 2008 MSGP for specific instructions for establishing eligibility. INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. 6.2 Documentation Regarding Historic Properties Instructions (see 2008,MSGP Part 5.1.6.2): Include any documentation you have that supports your determination of eligibility consistent with 2008 MSGP, Part 1.1.4.6 (Historic Properties Preservation). Refer to Appendix F of the 2008 MSGP for specific instructionsfor establishing eligibility. INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. 6.3 Documentation Regarding NEPA Review (if applicable) ( 5.1.6.3): Instructions see 2008 MSGP Part Include any documentation you have that supports your determination of eligibility consistent with MSGP 2008 Part 1.1.2.5 (Discharges Subjectto Any New Source Performance Standards). INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. SECTION 7: SWPPP CERTIFICATION Instructions (see 2008 MSGP Part 5.1.7): The following certification statement must be signed and dated by a person who meets the requirements of Appendix B, Subsection 11.A or 113, of the 2008 MSGP. Note: This certification must be re -signed in the event of a SWPPP modification in response p to a Part3.1 trigger for corrective"action. „ EPA Industrial SWPPP Template, January 13, 2009 16 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Signature: Title: Date: EPA Industrial SWPPP Template, January 13, 2009 17 Stonnwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATF SECTION 8: SWPPP MODIFICATIONS Instructions (see 2008 MSGP Part 5.2): . Your SWPPP is a "living" document and is required to be modified and updated, as necessary, in response to corrective actions. See Part 3.4 of the 2008 MSGP. o If you need to modify the SWPPP in response to a corrective action required by Part, 3.1 of the 2008 MSGP, then the certification statement in section 7 of this SWPPP template must be re -signed in accordance with 2008 MSGP Appendix B, Subsection 11.A or 11.B.. o ., -For any other SWPPP modification, you should keep a log with a description of the modification, the name of the person making it, and the date and signature of that person. See 2008 MSGP. Appendix B, Subsection 11.C. INSERT LOG HERE or REFERENCE ATTACHMENT EPA Industrial SWPPP Template, January 13, 2009 18 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SWPPP ATTACHMENTS Attach the following documentation to the SWPPP: Attachment A - General Location Map Include a copy of your general location map in Attachment A. Attachment B - Site Map Include a copy of your site map(s) in Attachment B. Attachment C - 2008 MSGP Note: It is helpful to keep a printed -out copy of the 2008 MSGP so that it is accessible to you for easy reference. However, you do not need to formally incorporate the entire 2008 MSGP into your SWPPP. As an alternative, you can include a reference to the permit and where it is kept at the site. EPA Industrial SWPPP Template, January 13, 2009 19 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER Additional MSGP Documentation Template Introduction After you become permitted under the 2008 MSGP, you are required to keep certain minimum records (or documentation) as part of the implementation of your permit responsibilities. As required in Part 5.4 of the 2008 MSGP, these records must be kept in the same place your SWPPP (which you completed prior to submitting your NOI to be covered) is kept. This "Additional MSGP Documentation Template' (or "Template") will assist you in complying with this requirement. Using the Additional MSGP Documentation Template Tips for using the Template: This Template is designed for use by all facilities permitted under the 2008 MSGP. The Template is NOT tailored to your individual industrial sector. Depending on which industrial sector(s) you fall under (see Appendix D of the 2008 MSGP) and where your facility is located (see Appendix C of the 2008 MSGP), you will need to address any additional documentation requirements outlined in Part 8 and/or Part 9 of the permit, respectively. • Each section of the template includes "instructions" and space for your facility's specific information. You should read the instructions before you complete each section. The text you will need to complete is generally indicated through the use of blue form fields (e.g., "Insert Facility Name"). Click on the form field and your text will replace the instructional text. • The Template was developed in Microsoft Word so that you can easily add tables and additional text. • Because many of the activities you are required to document occur throughout the permit term, you will need to continually modify and add records to this Template. You may wish to create separate electronic files for each category of documentation (e.g., files for monitoring, employee training, etc.) so that they can be easily modified. • The records you create using this Template must be kept in the same location as your SWPPP. EPA notes that while EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the Template, the actual obligations of regulated industrial facilities are determined by the relevant provisions of the permit, not by the Template. In the event of a conflict between the Template and any corresponding provision of the MSGP, the permit provisions establish your actual requirements. EPA welcomes comments on the Template at any time and will consider those comments in any future revision of this document. EPA Additional MSGP Documentation Template, January 13, 2009 Additional MSGP Documentation t INSERT FACILITY NAME INSERT- FACILITY PERMIT TRACKING NUMBER Additional MSGP Documentation For: Insert Facility Name Insert Facility Address Insert City, State, Zip Code Insert Facility Telephone Number (if applicable) Insert Facility Permit Tracking Number Instructions: k Keep the following inspection oni mtoring and certification records in the same location that you'Wep your SWPPR _ Az Copy!of the N01 submitted to EPA along with any correspondence exchanged between you and ,EPA specific to coverage under this permit (you should already have this) A copy`of the acknowledgment letter you received from the NO[ Processing :Center oreNOI system assigning you[ permit tracking number (you should'already have"fhis) • A copy of P008 MSGP (ybu Can provide an electronic'copy), = Descriptions anddates of any:incidences of significant spills leaks or other releases;,,,.- N Records of employee training;I`' Documentation ofmaintenance and tepairs of control, measures AlHnspection reports 4,. +. Description of any;deviations from the schedule for visual assessments and/or monitoring, Description of any corrective action taken at your site Documentation of any benchmark exceedances and how they were responded to in .'F 3 :' �� • ff ., Documentation toaupport anydetermination that pollutants of concern are not expected to be present above natural background levels; and that such pollutantsywere not detected in your E �o discharge or were solely attributable to natural background sources and4 • ' Documentation to support your claim'that your facility has changed its status'from ac ivetto mactive`44; w t s and unstaffed r : QE a J M x. ,..:^cf Iv.. ..n , ., With the exception of the frst 3 items these e are records that you will be updating throughout theVpermit r{ term z ,u� 1 x S, '4C 4 yt ,r ` u, Follow the instructions in sections A through M of'this template to keep your records complete ' u r..J _�.�:_ .. .'� � :� e._4r:2 A.r.=.%e`� .�x_:•[•. �; .lw..-a�edu ni ...: �?syt ...=a..e."�* `�' �-' EPA Additional MSGP Documentation Template, January 13, 2009 i Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER Contents A. Significant spills, leaks or other releases B. Employee training.............................................................................................................. 2 C. Maintenance...................................................................................................................... 3 D. Routine Facility Inspection Reports...................................................................................... 5 E. Quarterly Visual Assessment Reports................................................................................ 10 F. Comprehensive Site Inspection Reports............................................................................. 12 G. Monitoring results............................................................................................................ 13 H. Deviations from assessment or monitoring schedule........................................................... 14 I. Benchmark Exceedances................................................................................................... 15 J. Impaired Waters Monitoring: Documentation of Natural Background Sources or Non -Presence ofImpairment Pollutant......................................................................................................... 16 K. Active/Inactive status change............................................................................................ 17 L. SWPPP Amendment Log.................................................................................................. 18 M. Miscellaneous Documentation.......................................................................................... 19 EPA Additional MSGP Documentation Template, January 13, 2009 iii Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER A. Significant spills, leaks or other releases Instructions: — Include the descriptions and dates of any incidences of significant spills, leaks, or other releases that resulted in discharges of pollutants to waters of the U.S., through stonnwater or otherwise; the. - circumstances leading to the release and actions taken in response to the release; and measures taken to prevent the recurrence of such releases (see Part 2.1:2.4 of the 2008 MSGP):. — .Provide information; as shown below, for each incident, and attach additional documentation (e.g., photos, spill cleanup records) as necessary: Repeat as necessary by copying and pasting the fields below.' Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence EPA Additional MSGP Documentation Template, January 13, 2009 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT "TRACKING NUMBER B. Employee training Instructions: Keep records'of employee training, including the date of the training (see Part 2.1.2.9 of the 2008 MSGP). — For in -person training, consider using the tables below to document your employee traihings. For computer -based or other types of training, keep similar records on who was trained and the type of training conducted. Training Date: Insert Date of Training Training Description: Insert Description of Training Trainer: Insert Trainers names Employee(s) trained Employee signature Insert Name Insert Name Insert Name Insert Name Insert Name Insert Name Training Date: Insert Date of Training Training Description: Insert Description of Training Trainer: Insert Trainers names Employee(s) trained Employee signature Insert Name Insert Name Insert Name Insert Name Insert Name Insert Name Training Date: Insert Date of Training Training Description: Insert Description of Training Trainer: Insert Trainers names Employee(s) trained Employee signature Insert Name Insert Name Insert Name Insert Name Insert Name Insert Name EPA Additional MSGP Documentation Template, January 13, 2009 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER C. Maintenance Instructions: — Include in your records documentation of maintenance and repairs of control measures and industrial equipment, including: the control measure/equipment maintained, -"' date(s) of regular maintenance, - O discovery p P and for repairs, . dates of discove of areas in need of re airlre lacement, , date(s) that the control measure/equipment was returned to full function, and - the justification for any extended maintenance/repair schedules (see Part 2.1:2:3 of.the 2008 MSGP). — Provide information, as shown below, to document your maintenance activities for each control 'measu'Ye and industrial equipment. Repeat as necessary by copying and pasting the information below for additional control measures. , Control Measure Maintenance Records (copy information below for each control measure) Control Measure: Insert Name of Control Measure Regular Maintenance Activities: Describe maintenance activities Regular Maintenance Schedule: Insert Maintenance Schedule Date of Action: Insert Date of Action Reason for Action: ❑ Regular Maintenance ❑ Discovery of Problem If Problem, • Description of Action Required: Describe actions taken in response to problem • Date Control Measure Returned to Full Function: Insert Date • Justification for Extended Schedule, if applicable: Insert Justification (if applicable) Notes: Insert Notes (if applicable) EPA Additional MSGP Documentation Template, January 13, 2009 1 3 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMITTRACKING NUMBER Industrial Equipment and Systems Maintenance Records (copy information below for each industrial equipmenUsystem) Industrial Equipment/Systems: Insert Name of Industrial EquipmenUSystem Regular Maintenance Activities: Describe maintenance activities Regular Maintenance Schedule: Insert Maintenance Schedule Date of Action: Insert Date of Action Reason for Action: ❑ Regular Maintenance ❑ Discovery of Problem If Problem, • Description of Action Required: Describe actions taken in response to problem • Date Industrial Equipment Returned to Full Function: Insert Date • Justification for Extended Schedule, if applicable: Insert Justification (if applicable) Notes: Insert Notes (if applicable) EPA Additional MSGP Documentation Template, January 13, 2009 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER D. Routine Facility Inspection Reports Instructions: Include in your records copies of all routine facility inspection reports completed for the facility: The "sample inspection report is consistent with the requirements in Parts 4.1 of the 2008 MSGP relating to routine facility inspections. Facilities subject to State industrial stormwater permits may also find this form useful. If your permitting authority provides you with an inspection report, use that form., Using the Sample Routine Facility Inspection Report , — This inspection report is designed to be customized according to the specific control measures and activities at your facility. For ease 'of use, you should take a copy of your site plan and number all of the stormwater control measures and areas of industrial activity that will be inspected. A brief "description of . 'the control measures and areas that were inspected should then be listed in the site -specific section of the inspection report. You can complete the items in the "General Information" section that will remain constant, such as the facility name, NPDES tracking number, and inspector (if you only use one inspector). Print out multiple ,. ,4 copies of this customized inspection `report to use during your inspections. — When conducting the inspection, walk the site.byfollowing ,your site map and numbered control: measures/areas of industrial activity to be inspected. Also note whether the "Areas of Industrial Materials or Activities exposed to stormwater" have been addressed(customize' this Irst according'to .the conditions at your facility). Note any required corrective actions and the date and responsible person.for the correction. EPA Additional MSGP Documentation Template, January 13, 2009 5 Stormwater Industrial Routine Facility Inspection Report General Information Facility Name Insert Name NPDES Tracking No. Insert Tracking No. Date of Inspection Insert Date Start/End Time I Insert Start/End Time Inspector's Name(s) Insert Name Inspector's Title(s) Insert Title Inspector's Contact Information Insert Contact Info Inspector's Qualifications I Insert qualifications or add reference to the SWPPP Weather Information Weather at time of this inspection? ❑ Clear ❑Cloudy ❑ Rain ❑ Other: ❑ Sleet ❑ Fog ❑ Snow ❑ High Winds Temperature: Have any previously unidentified discharges of pollutants occurred since the last inspection? ❑Yes ❑No If yes, describe: Describe Are there any discharges occurring at the time of inspection? ❑Yes ❑No If yes, describe: Describe Control Measures • Number the structural s'tormwater control measures identified in your SWPPP on your site map and list them below (add as many control measures as are implemented on -site). Carry a copy of the numbered site map with You during your inspections. This list will ensure that you are inspecting all required control measures at your facility. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Actior Log. Structural Control Control If No, In Need of Corrective Action Needed and Notes ' j Measure Measure is Maintenance, (identify needed maintenance and repairs, or any Operating Repair, or failed control measures that need replacement) Qlj Effectively? Replacement? I Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement z Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 4 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 5 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 6 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 7 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 8 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement Structural Control : Control If No, In Need of _Corrective Action Needed and Notes Measure Measure is Maintenance, (identify needed maintenance and repairs, or any Operating Repair, or failed control measures that need replacement). Effectively? Replacement? 9 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 10 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement Areas of Industrial Materials or Activities exposed to stormwater Below are some general areas that should be assessed during routine inspections. Customize this list as needed for the specific types of industrial materials or activities at vour facility. Area/Activity Inspected? Controls Corrective Action Needed and Notes Adequate (appropriate, effective, and operating)? I Material ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions loading/unloading and storage areas 2 Equipment operations ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions and maintenance areas 3 Fueling areas ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions 4 Outdoor vehicle and ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions equipment washing areas 5 Waste handling and ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions disposal areas 6 Erodible ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions areas/construction 7 Non-stormwater/ illicit ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions connections 8 Salt storage piles or pile ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions containing salt 9 Dust generation and ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions vehicle tracking 10 (Other) ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions 11 (Other) ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions 12 (Other) ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions Non -Compliance Additional Control Measures Describe any additional control measures needed to comply with the permit requirements: Describe Additional Controls Needed Notes Use this space for any additional notes or observations from the inspection: Additional Notes CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and title: Signatu Additional MSGP Documentation INSEKT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER E. Quarterly Visual Assessment Reports Instructions: — Include in your records copies of all quarterly visual assessment reports completed for the facility. An example quarterly visual assessment report can be found on the following pager EPA Additional MSGP Documentation Template, January 13, 2009 10 MSGP Quarterly Visual Assessment Form (Complete a separate form for each outfall you assess) Vame of Facility: Name of Facility NPDES Tracking No. Insert Tracking No. Dutfall Name: Name "Substantially Identical Outfall"? ❑ No ❑ Yes (identify substantially identical outfalls): 'erson(s)ITitle(s) collecting sample: Name/Title 'erson(s)/Title(s) examining sample: Name/Title Dale & Time Discharge Began: Date & Time Sample Collected: Date & Time Sample Examined: Enter date and time Enter date and time Enter date and time Substitute Sample? ❑ No ❑ Yes (identify quarterlyear when sample was originally scheduled to be collected): Nature of Discharge: ❑ Rainfall ❑ Snowmen If rainfall: Rainfall Amount: No of Previous Storm Ended > 72 hours ❑ Yes ❑ No' (explain): riches inches Before Start of This Storm? Parameter Color ❑ None ❑ Other (describe): Odor ❑ None ❑ Musty ❑ Sewage ❑ Sulfur ❑ Sour ❑ Petroleum/Gas ❑ Solvents ❑ Other (describe): Clarity ❑ Clear ❑ Slightly Cloudy ❑ Cloudy ❑ Opaque ❑ Other Floating Solids ❑ No ❑ Yes (describe): Settled Solids" ❑ No ❑ Yes (describe): Suspended Solids ❑ No ❑ Yes (describe): Foam (gently shake sample) ❑ No ❑ Yes (describe): Oil Sheen ❑ None ❑ Flecks ❑ Globs ❑ Sheen ❑ Slick ❑ Other (describe): Other Obvious Indicators ❑ No ❑ Yes (describe): of Stormwater Pollution The 72-hour interval can be waived when the previous stone did not yield a measurable discharge or if you are able to document (attach applicable documentE that less than a 72-hour interval is representative of local storm events during the sampling period. "Observe for settled solids after allowing the sample to sit for approximately one-half hour. Detail any concerns, additional comments, descriptions of pictures taken, and any corrective actions taken below (attach additional sheets as necessary). Insert details Certification by Facility Responsible Official (Refer to MSGP Subpart i t Appendix IS for Signatory Requirements) I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to a that qualified personnel propedy gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or U persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I ai aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. A. Name: B. Title: C. Signature: D. Date Signed: Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER F. Comprehensive Site Inspection Reports Instructions: - Include in your records copies of all comprehensive site inspection reports completed for the facility. Copies of the comprehensive site inspection report form (also called the Annual Reporting Form) can be obtained at hftp://www.epa.gov/nodes/pubs/msgp2008 appendixi odf — For corrective actions, complete part (Corrective Actions) of the Annual Reporting Form.. EPA Additional MSGP Documentation Template, January 13, 2009 12 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER G. Monitoring results Instructions: — Include in your records copies of all monitoring results (including benchmarks, effluent limits, and other monitoring conducted) for the facility. Also include copies of MSGP Industrial Discharge Monitoring Reports (DMRs) submitted to EPA, or copies of monitoring data submitted to EPA's eN01 reporting system, . EPA Additional MSGP Documentation Template, January 13, 2009 13 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER H. Deviations from assessment or monitoring schedule Instructions: Include in your records: A description of any deviations from the schedule you provided in your SWPPP for visual assessments and/or monitoring, and The reason for the deviations (e.g., adverse weather or it was impracticable to collect samples within the first 30 minutes of a measurable storm event) (see Parts 4.2.1, 6.1.4, and 6.2.1.2 of the 2008 MSGP). Use the fields below to document the deviations. Repeat as necessary for any deviations. Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason EPA Additional MSGP Documentation Template, January 13, 2009 14 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER I. Benchmark Exceedances Instructions: Include in your records documentation of any benchmark"exceedances and how they were responded to, including either. — (1) corrective action taken, — (2) a finding that the exceedence was due to natural background pollutant levels, or — (3) a finding that no further pollutant reductions were 'technologically available and economically practicable and achievable in light of best industry practice consistent with Part 6.2.1.2 of the 2008 MSGP, Date: Insert Date Parameter Exceeded and Results: Insert Parameter Name Quarter 1 (Sample date: Insert Sample Date) Result: Insert Sample Result Quarter 2 (Sample date: Insert Sample Date) Result: Insert Sample Result Quarter 3 (Sample date: Insert Sample Date) Result: Insert Sample Result Quarter 4 (Sample date: Insert Sample Date) Result: Insert Sample Result Average Result: Insert Value Benchmark Value: Insert Benchmark Value from 2008 MSGP Document how benchmark exceedance(s) responded to: ❑ Corrective action taken Parameter(s): Insert Parameter Complete Part D (corrective actions) of the Annual Report Form (see section F of the Additional MSGP Documentation). ❑ Finding that the exceedence was due to natural background pollutant levels Parameter(s): Insert Parameter Attach the following documentation: • An explanation of why you believe that the presence of the pollutant causing the impairment in your discharge is not related to the activities at your facility; and • Data and/or studies that tie the presence of the pollutant causing the impairment in your discharge to natural background sources in the watershed. ❑ Finding that no further pollutant reductions are technologically available and economically practicable and achievable in light of best industry practice consistent with Part 6.2.1.2. Parameter(s): Insert Parameter Attach documentation. EPA Additional MSGP Documentation Template, January 13, 2009 15 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT" I RACKING NUMBER J. Impaired Waters Monitoring: Documentation of Natural Background Sources or Non -Presence of Impairment Pollutant Instructions: This se ction applies only if your facility: • Discharges directly to an impaired water without an EPA approved or established total maximum daily load (TMDL), and either your impaired Waters monitoring results shows that the pollutant(s) for which the water is Impalred is .1. Not present and not expected,to be present in;your discharge, or 2. Present, but you have determined its presence is caused solely by natural ' background sources. See Part 6;2.4.2 of the 2008 M SGP. If # 1. applies to your facility, include here documentation that the impairment pollutant(s) was not detected in your discharge sample. , If # 2 applies to your facility, include the following documentation here: • An explanation of why you believe thatthe presence of the pollutants) causing the impairment in your discharge is not related to the activities at your facility; and •. Data,and/or studies that tie the presence of the pollutant(s) causing the 'impairment in your discharge to natural background sources in the watershed. p Note: You are reminded that the ermit requires, y you,to mclude,a notification that you have met either condition # 1 or # 2 (above), in your monitoring report that you submit to EPA. Date: Insert Date Check one of the boxes below and complete the additional documentation: ❑ #1— Pollutant(s) for which the water is impaired is not present and not expected to be present in your discharge Attach documentation that the impairment pollutant(s) was not detected in your discharge sample(s). ❑ #2 — Pollutant(s) for which the water is impaired is present, but you have determined its presence is caused solely by natural background sources. Attach the following documentation: • An explanation of why you believe that the presence of the pollutant(s) causing the impairment in your discharge is not related to the activities at your facility; and • Data and/or studies that tie the presence of the pollutant(s) causing the impairment in your discharge to natural background sources in the watershed. EPA Additional MSG Documentation Template, January 13, 2009 16 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT" TRACKING NUMBER K. Active/Inactive status change Instructions: If your facility changes it status from active to inactive and unstaffed (or from inactive/unstaffed to active), include documentation in this section, to support your claim. Date: Insert Date of Change in Status New Facility Status: ❑ Inactive and Unstaffed ❑ Active Reason for change in status: Describe reason EPA Additional MSGP Documentation Template, January 13, 2009 17 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER L. SWPPP Amendment Log Instructions:, Include in your records: — A log of the date and Description of any amendments to your SWPPP. Fill in the appropriate columns of this table for each amendment to your SWPPP. Copy and paste additional rows into the table as necessary. Amerid. No. Description of'tlie Amendment Daterof Amendment x Amendment Prepared' by [Name(s) and Twit ej 1 Insert description of amendment Insert date Insert name/title 2 Insert description of amendment Insert date Insert name/title 3 Insert description of amendment Insert date Insert nameltitle 4 Insert description of amendment Insert date Insert name/title 5 Insert description of amendment Insert date Insert name/title 6 Insert description of amendment Insert date Insert name/title 7 Insert description of amendment Insert date Insert name/title 8 Insert description of amendment Insert date Insert name/title 9 Insert description of amendment Insert date Insert name/title 10 Insert description of amendment Insert date Insert name/title 11 Insert description of amendment Insert date Insert name/title EPA Additional MSGP Documentation Template, January 13, 2009 18 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER M. Miscellaneous Documentation Instructions: Use this section to keep records of any additional documentation that relates to your compliance with the permit. EPA Additional MSGP Documentation Template, January 13, 2009 19 I. Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE Industrial SWPPP Template Introduction To help you develop a SWPPP that is consistent with the 2008 MSGP, the U.S Environmental Protection Agency (EPA) has created this Industrial SWPPP Template (or, "the Template"). Use of the Template will help ensure that your SWPPP addresses all the necessary elements required in Part 5 of the 2008 MSGP. Before completing the Template, make sure you read and understand the requirements in the 2008 MSGP. A copy of the MSGP is available at www.epa.gov/npdes/stormwater/msgp. Using the Industrial SWPPP Template Tips for completing the Template: • This Template is designed for use by all facilities eligible for coverage under the 2008 MSGP. The Template is NOT tailored to your individual industrial sector. Depending on which industrial sector you fall under (see Appendix D of the 2008 MSGP) and on where your facility is located (see Appendix C of the 2008 MSGP), you will need to address additional SWPPP requirements outlined in Part 8 and/or Part 9 of the permit, respectively. • Complete a SWPPP before submitting your Notice of Intent (NO1) for permit coverage. Each section includes "instructions" and space for your facility's specific information. You should read the instructions for each section before you complete that section. • The Template was developed in Microsoft Word so that you can easily add tables and additional text. Some sections may require only a brief description while others may require several pages of explanation. • To make it easier to complete, the Template generally uses blue text where the operator is expected to enter information. EPA notes that while EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the Template, the actual obligations of regulated industrial facilities are determined by the relevant provisions of the permit, not by the Template. In the event of a conflict between the Template and any corresponding provision of the MSGP, the permit controls. EPA welcomes comments on the Template at any time and will consider those comments in any future revision of this document. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE Stormwater Pollution Prevention Plan for: Insert Facility Name Insert Facility Address Insert City, State, Zip Code Insert Facility Telephone Number (if applicable) SWPPP Contact(s): Insert Facility Operator Insert Name Insert Address Insert City, State, Zip Code Insert Telephone Number Insert Fax/Email SWPPP Preparation Date: EPA Industrial SWPPP Template, January 13, 2009 i Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE Contents SECTION 1: FACILITY DESCRIPTION AND CONTACT INFORMATION......................................................1 1.1 Facility Information................................................................................................................. 1 1.2 Contact Information/Responsible Parties................................................................................ 23 1.3 Stormwater Pollution Prevention Team.................................................................................. 33 1.4 Activities at the Facility......................................................................................................... 33 1.5 General Location Map.......................................................................................................... 44 1.6 Site Map.............................................................................................................................. 54 SECTION 2: POTENTIAL POLLUTANT SOURCES.....................................................................................66 2.1 Industrial Activity and Associated Pollutants........................................................................... 66 2.2 Spills and Leaks................................................................................................................... 7-7 2.3 Non-Stormwater Discharges Documentation.......................................................................... 7- 2.4 Salt Storage........................................................................................................................ 88 2.5 Sampling Data Summary ...................................................................................................... 88 SECTION 3: STORMWATER CONTROL MEASURES.................................................................................88 3.1 Minimize Exposure............................................................................................................... 99 3.2 Good Housekeeping............................................................................................................. 99 3.3 Maintenance........................................................................................................................99 3.4 Spill Prevention and Response.......................................................................................... 104-0 3.5 Erosion and Sediment Controls......................................................................................... 104-0 3.6 Management of Runoff..................................................................................................... 101-0 3.7 Salt Storage Piles or Piles Containing Salt......................................................................... 1 144 3.8 MSGP Sector -Specific Non -Numeric Effluent Limits............................................................ 1 144 3.9 Employee Training........................................................................................................... 1 144 3.10 Non-Stormwater Discharges............................................................................................. 1 1144 3.11 Waste, Garbage and Floatable Debris............................................................................... 121-3 3.12 Dust Generation and Vehicle Tracking of Industrial Materials ............................................... 124-3 SECTION 4: SCHEDULES AND PROCEDURES FOR MONITORING.....................................................1333 SECTION 5: INSPECTIONS.......................................................................................................................1545 SECTION 6: DOCUMENTATION TO SUPPORT ELIGIBILITY CONSIDERATIONS UNDER OTHER FEDERALLAWS .......................................................................................................................................1646 6.1 Documentation Regarding Endangered Species................................................................. 164-6 6.2 Documentation Regarding Historic Properties..................................................................... 164-6 6.3 Documentation Regarding NEPA Review (if applicable)...................................................... 161-6 SECTION 7: SWPPP CERTIFICATION.....................................................................................................1646 SECTION 8: SWPPP MODIFICATIONS....................................................................................................1848 SWPPPATTACHMENTS...........................................................................................................................1949 Attachment A — General Location Map Attachment 8 — Site Maps Attachment C — 2008 MSGP EPA Industrial SWPPP Template, January 13, 2009 ii Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 1: FACILITY DESCRIPTION AND CONTACT INFORMATION 1.1 Facility Information Facility Information Name of Facility: Street: City: State: ZIP Code: County or Similar Subdivision: Permit Tracking Number: (if covered under a previous permit) Latitude/Longitude (Use one of three possible formats, and specify method) Latitude: Longitude: 1. _ _ ° _ _' _ _" N (degrees, minutes, seconds) 1. _ _ ° _ _' _ _" W (degrees, minutes, seconds) 2. _ _ ° _ _ . _ —'N (degrees, minutes, decimal) 2. _ _ ° _ _ . _ —'W (degrees, minutes, decimal) 3. _ _ . _ _ _ _ ° N (decimal) 3. _ _ . _ _ _ _ ° W (decimal) Method for determining latitude/longitude (check one): ❑ USGS topographic map (specify scale: ) ❑ EPA Web site ❑ GPS ❑ Other (please specify): Is the facility located in Indian Country? ❑ Yes ❑ No If yes, name of Reservation, or if not part of a Reservation, indicate "not applicable." Is this facility considered a Federal Facility? ❑ Yes ❑ No Estimated area of industrial activity at site exposed to stormwater: (acres) Discharge Information EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSBR"I FACILITY NAML and DATE Does this facility discharge stormwater into an MS4? ❑ Yes ❑ No If yes, name of MS4 operator: _ Name(s) of water(s) that receive stormwater from your facility Are any of your discharges directly into any segment of an "impaired" water? ❑ Yes ❑ No If Yes, identify name of the impaired water (and segment, if applicable): Identify the pollutant(s) causing the impairment: For pollutants identified, which do you have reason to believe will be present in your discharge? For pollutants identified, which have a completed TMDL? Do you discharge into a receiving water designated as a Tier 2 (or Tier 2.5) water? ❑ Yes ❑ No Are any of your stormwater discharges subject to effluent guidelines? ❑ Yes ❑ No If Yes, which guidelines apply? Primary SIC Code or 2-letter Activity Code: (refer to Appendix D of the 2008 MSGP) Identify your applicable sector and subsector: 1.2 Contact Information/Responsible Parties Instructions: List the facility, operator(s),,facility owner, and 24 hour emergency contact. Indicate respective responsibilities, where appropriate. You will need the information from this section of the SWPPP Template for your NO1. Refer to Section B of the NO1 instructions available in Appendix G of the 2008 MSGP): - ( PP , Facility Operator (s): Name: Insert Name Address: Insert Address City, State, Zip Code: Insert City, State, Zip Code Telephone Number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) Facility Owner (s): Name: Insert Name Address: Insert Address City, State, Zip Code: Insert City, State, Zip Code EPA Industrial SWPPP Template, January 13, 2009 2 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAM17 and DATE Telephone Number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) SWPPP Contact: Name: Insert SWPPP Contact Name Telephone number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) 1.3 Stormwater Pollution Prevention Team . Instructions (see 2008 MSGP Part 5.1:1): Identify the staff members (by name or title) that comprise the facility's stormwater pollution prevention team' as well as their individual responsibilities. Your stormwater pollution prevention team is responsible for assisting the facility manager in developing and revising the facility's SWPPP,implementing and maintaining control measures/BMPs, and taking corrective actions where reguired. Each member of the stormwaterpollution prevention team must have ready access ; to either an electronic or paper copy of applicable ortions of the MSGP and your SWPPP. .. Staff Names Individual Responsibilities Insert name of SWPPP team member Insert explanation of that staff person's responsibilities relating to compliance with the permit [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] Repeat as necessary] [Repeat as necessary] [Repeat as necessary) [Repeat as necessary] [Repeat as necessary) [Repeat as necessary] [Repeat as necessary] 1.4 Activities at the Facility Instructions,(see 2008 MSGP Part 51 2). Provide a general description of the nature of.the industrial activities at your facility Insert text here EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 1.5 General Location Map Instructions (see 2008 MSGP Part5.1.2): Provide a general location map (e.g., U.S. Geological Survey (USGS) quadrangle map) with enough detail to identify the location of your facility and all receiving waters for your stonnwater discharges (include as Attachment A of this SWPPP Template). Include a copy of the general location map for this facility in Attachment A. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 1.6 Site Map Instructions (see 2008 MSGP Part 5.1.2): — Include a map showing the following information., The site map should be Included as Attachment of this SWPPP Template. • the size of the property in acres; • the location and extent of significant structures and Impervious surfaces, directions dons of stormwater flow (use arrows); , ' • locations of all existing structural control measures; ■ `locations of all receiving waters in the immediate vicinity of your facility; indicating if any of the " waters are impaired and, if so, whether the waters have TMDLs established for them;` ■ locations of all stormwater conveyances including ditches, pipes, and swales; ` ■ locations of potential pollutant sources identified underMSGP, Part"5.13.2;" ■ locations where significant spills or leaks identified'under MSGP, Part 5.1.3.3 have occurred; • ° water monitoring points; locations of all storm • locations of stormwater inlets and outfalls, with a unique identification code for each outfall (e.g. Outfall No. 1, No. 2, etc), indicating if you are treating one or more outfalls as . "substantially identical" under MSGP, Parts 4:2.3, 5.1.5.2, and 6.1.1, and an approximate outline of the areas draining to each outfall; municipal separate storm sewer systems, where your s ° • tormwater discharges to them; •' locations and descriptions of all non-stormwaterdischarges identified under MSGP, Part ° : °p locations of followin9activities where such activities are exposed to, precipitation: o" fueling stations; o vehicle and equipment maintenance and/or cleaning areas; o loading/unloading areas; o locations used for,the treatment, storage, or disposal of wastes; oliquid storage tanks; o processing and storage areas, ' o' ;immediate access roads and raillines used "or traveled by carriers of raw materials, manufactured products, waste material, or by-products used or created bythe facility; ` o transfer areas for substances in bulk; o machinery; and locations and sources of.run=onto your site from adjacent'property that contains'significant quantities of pollutants. Include a copy of the site map for this facility in Attachment B. EPA Industrial SWPPP Template, January 13, 2009 Storrnwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 2: POTENTIAL POLLUTANT SOURCES .Instructions (see 200.8 MSGP Part 5.1.3). .. e Ih this section, you are required to describe areas at your facility where Industrial materials or activties arel . exposed to"stortnwater or from vihich allowable non-stormwater discharges°are'released ,.: f .:vP.fiIFF 2.1 Industrial Activity and Associated Pollutants ►nstructlons (see 2008`MSGP Parts 51 3 t'andl5 l 3 2) iPE t i9 ' 1 ke " ljfk41 j Id9.33Y G:PFpC£'j,I9 9y 3 9� Ii9�?@PlttBbd of f A { — Include a Ilst of uidustnal activities exposed,to stormwater (e gj�m�a�tenhal storage egwpmenU ehicIe3fueling maintenance and cleaning cutting steel beams) and4he ppoltuttants"or�polfutant constiWents (e'g motor od fuel battery'acid andbl6wirig solvents) associated with these aphvlbes yk�u sF yoE i' k ' — In your list of pollutants associated with your. industrial activlftles include `tall Fslgmficant materials that have been h6h'dled treated stored,` orr disposed and that have been'exposed to stonnwater In th"e 3 y'ea'rs phor"to l er. - the date you prepare your.SWPPP. Industrial Activity Associated Pollutants Insert specific industrial activity Insert names of pollutants or pollutant constituents that could be associated with this activity and released in stormwater Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] Repeat as necessary] EPA Industrial SWPPP Template, January 13, 2009 6 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 2.2 Spills and Leaks Instructions (See 2008 MSGP Part 5.1.3.3): Include the following in this section: o Potential spills and leaks: A description of where potential spills and leaks could occur it your site that could contribute pollutants to your stormwater discharge, and specify which outfall(s) are likely to be affected by such spills and leaks. o Past spills and leaks: A description of significant spills and leaks in the past 3years of oil or toxic or hazardous pollutants that actually occurred at exposed areas, or that drained to a stormwater''' conveyance. Note: Significant spills and leaks include, but are not limited to; releases of oil or hazardous substances in 'excess of quantities that are reportable underCWA Section 311(see 40 CFR 110.6 and 40 CFR 117.21) or Section 102 of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), 42 . USC §9602. Areas of Site Where Potential Spills/Leaks Could Occur Location IOutfalls Insert description of area where spill/leak could occur Specify which outfall(s) would be affected [Kepeat as necessary) I [Repeat as necessary] [Repeat as necessarvl I [Repeat as necessary] [Repeat as necessary] [ [Repeat as necessary] Description of Past Spills/Leaks Date Description Outfalls Insert date of Insert description of spill/leak (where it occurred, what Specify which outfall(s) spill/leak happened, types of pollutants, extent of damage) were affected as I [Repeat as necessary] I [Repeat as necessary] [Repeat as I [Repeat as necessary] I [Repeat as necessary] [Repeat as I [Repeat as necessary] I [Repeat as necessary] necessary] 2.3 Non-Stormwater Discharges Documentation _instiuctioos,(see 2608 MSGP Part 5.1.3.4) ' — .The questions below require you to provide documentation of the following:; o Yourrevaluation for the presence of non-stomiwatertlischarges at your sit e, and, ";, `' " . - o Your elimination of any unauthorized non-stormwater discharges. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE • Date of evaluation: Insert the date(s) of your evaluation. • Description of the evaluation criteria used: Describe the method you used to conduct your evaluation and to determine for each non-stormwater sources whether it is prohibited or allowed under the permit. • List of the outfalls or onsite drainage points that were directly observed during the evaluation: Insert outfalls/drainage points observed. • Different types of non-stormwater discharge(s) and source locations: Describe types of non- stormwater discharges observed and the corresponding outfall or drainage point. • Action(s) taken, such as a list of control measures used to eliminate unauthorized discharge(s), if any were identified. For example, a floor drain was sealed, a sink drain was re-routed to sanitary, or an NPDES permit application was submitted for an unauthorized cooling water discharge: Describe actions taken to eliminate unauthorized non-stormwater discharges and the corresponding outfall/drainage point affected. 2.4 Salt Storage Instructions (see 2008 MSGP Part 5.1.3.5): — Document the location of any storage piles containing salt used for deicing or other commercial or industrial purposes. — Note: You will be asked additional questions concerning salt storage in Section 3.7 of this SWPPP template, below. Insert description of the location of any storage piles containing salt. 2.5 Sampling Data Summary Instructions (See 2008 IVISGP Part 5.1.3.6): - Summarize all stormwater sampling data collected from your permitted outfalls during the previous permit term: Insert summary of stormwater sampling data collected for the past permit, and/or attach discharge monitoring reports or laboratory results. SECTION 3: STORMWATER CONTROL MEASURES Instructions (See 2008 MSGP Parts 5.1.4.1 and 212):." In Sections r asked to describe the — ons 3.1 - 3.12 of this SWPPP.itemplate, you are stormwater control measures that you have installed at your site to meet each of the permit's."non-numeric effluent limits" in Part 2.1.2 of the 2008 MSGP. EPA Industrial SWPPP Template, January 13, 2009 8 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.1 Minimize Exposure Instructions (see 2008 MSGP Part 2.1.2.1): Describe any structural controls or practices'used to minimize the exposure of industrial activifies to rain, snow, snowmelt, and runoff.'. Describe where the controls or practices are being implemented !at your site. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.2 Good Housekeeping Instructions (see 2008,MSGP Parts 2.1.2.2 and 5.15.1): Describe any practices you are, implementing to keep exposed areas of.your site clean. Describe where each practice is being implemented at yoursite. Include here your schedule for: (1) regular pickup and disposal of waste materials, and (2) routine inspections for'leaks and of the condition of drums, tanks; and containers. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.3 Maintenance Instructions (see 2008 MSGP Parts 2.1.2.3 and 5.1.5.1): Describe procedures (1) to maintain industrial equipment so that spills/leaks are avoided, and (2) to maintain any of your site s'controll asures in effective operating condition.;, Include the schedule you will follow for such maintenance activities. Describe where each applicable procedure is being implemented at the site. INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, January 13, 2009 9 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME" and DATE 3.4 Spill Prevention and Response Instructions (see 2008 MSGP Parts 2.1.2.4 and 5.1.5.1): Describe any structural controls or procedures used to minimize the potential for leaks, spills, and other, releases. You must implement the following at a minimum: Procedures for plainly labeling containers (e.g., ".Used Oil," "Spent Solvents, "Fertilizers and Pesticides," etc.) that could be susceptible to spillage or leakage to encourage proper handling and facilitate,rapid response if spills or leaks occur; • Preventative measures such as barriers between material storage and traffic areas, secondary containment provisions, and procedures for material storage and handling; Procedures for expeditiously stopping, containing, and cleaning up leaks, spills, and other releases; and •Procedures for notification of appropriate facility personnel, emergency response agencies, and regulatory agencies. Describe where each control is to be located or where applicable procedures will be implemented. ` Note: Some facilities may be required to develop a Spill Prevention Control and'Countermeasure (SPCC) plan under a separate regulatory program,(40 CFR 112). If you are required to develop anSPCCplan, or you already have one, you should include references to the relevant requirements from your, plan. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.5 Erosion and Sediment Controls Instructions (see 2008 MSGP Part 2.1:2.5): Describe structural or non-structural controls used at your site to stabilize exposed areas and contain runoffto minimize onsite erosion and potential offsite discharges of sediment. Note: You must at a minimum implement flow velocity dissipation devices at outfalls and discharge channels. Describe the location at your site where . each control will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.6 Management of Runoff Instructions (See 2008 MS. GP Part 2.1.2.6 ) , Describe controls used at your site to divert, infiltrate, reuse, contain, or otherwise reduce stormwater runoff.. Describe the location at your site where each control will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, .January 13, 2009 10 Stormwater Pollution Prevention Plan (SWPPP) INSI R"r FACILITY NAME and DATE 3.7 Salt Storage Piles or Piles Containing Salt Instructions (see 2008 MSGP°Part 2.1.2.7): If applicable, describe structures at your site that either cover or enclose salt storage piles or piles containing salt, or that prevent the discharge of stormwater,from such piles. Also, describe any controls or procedures used to minimize exposure resulting from adding to or removing materials from the pile. Describe the location at your site where each control and/or procedure will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.8 MSGP Sector -Specific Non -Numeric Effluent Limits Instructions (see 2008 MSGP°Part 2.1.2.8): Describe any controls or procedures that will be used at your site to comply with any sector -specific requirements that apply to you in Part of the 2008 MSGP. •. Describe the location at your site where each control and/or procedure Will be implemented.,,, Note: Sector -specific effluent limits apply to SectorsA, E, F, G, H, I, L, M; N, 0, P, Q,.R, S, T,"U, V, X, .Y, Z. and AA. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.9 Employee Training Instructions (see 2008 MSGP Parts 2.1.2.9'and 5.1.5.1): ; Describe your plan for training the employees who work in areas where industrial materials or activities are exposed to stormwater, or who are responsible for implementing activities necessary to meet the conditions of the 2008 MSGP; including all members of your Pollution Prevention Team Included in your description must be the frequency of training (note: recommended at least one time per year), and the schedule you,will follow.,, INSERT DESCRIPTION OF PLAN FOR TRAINING APPLICABLE STAFF HERE, 3.10 Non-Stormwater Discharges Instructions (see 2008,MSGP 2.1.2.10): In , Des cribe how you eliminated any "unauthorized non-stormwater discharges at your site. The unauthorized non stormwater discharges include any non-stormwater discharges that are not specifically identified,in Part 1.1.3 ofu„ the, 2008 MSGP. 'Note::If this section is already addressed by your documentabon'for Section 2.3 of the SWPPP' template ,you'ean simply include'a,cross-reference to that section of your SWPPP: INSERT DESCRIPTION OF YOUR APPROACH TO ELIMINATING UNAUTHORIZED NOW STORMWATER DISCHARGES HERE. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SW PPP) INSERT FACILITY NAME and DATE" 3.11 Waste, Garbage and Floatable Debris Instructions (see 2008 MSGP Part 2.1.2.1,1): Describe controls and procedures that will be used at your site to minimize discharges of waste, garbage, and floatable debris. Describe the location at your site where each control and/or procedure will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.12 Dust Generation and Vehicle Tracking of Industrial Materials Instructions(see 2008'MSGP Part 2.1.2.12): Describe controls and procedures you will use at your site to minimize the generation of dust and off -site tracking of,raw, final,'or waste materials. Describe the location at your site where each control and/or procedures will be " implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE, EPA Industrial SWPPP Template, January 13, 2009 12 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 4: SCHEDULES AND PROCEDURES FOR MONITORING Instructions (see 2008 MSGP Part 5.1.5.2): Describe your procedures for conducting'the five types of analytical -monitoring specified by the MSGP, . where applicable to your facility; including: Benchmark monitoring (2008 MSGP, Part 6.2.1 and relevant requirements in Part 8 and/or Part9); • „ Effluent limitations guidelines monitoring (2008 MSGP, Part 6:2.2 and relevant requirements in Part 8); • State- or Tribal -specific monitoring (2008 MSGP, Part 6.2.3 and relevant requirements in Part 9);,', • Impaired waters monitoring (2008 MSGP,"Part 6:2.4); and • Other°monitoring as required by EPA (2008 MSGP, Part 6.2.5); - Depending on the type of facility you operate, and the monitoring requirements to which you are subject, you must collect and analyze stormwater samples,and document monitoring activities consistent with the procedures described in 2008 MSGP, Part 6 and Appendix B, Subsections 10 -12, and any, additional sector -specific or State/Tribal-specific requirements in 2008 MSGP, Parts 8 and 9 respectively. Refer to 2008 MSGP, Part 7 for reporting and mcordkeeping requirements. Note: All monitoring must be conducted in accordance with the relevant sampling and analysis requirements at 40 CFR Part 136. Include in your, description procedures for ensuring compliance with these requirements. If you are invoking the exception for inactive and unstaffed sites for benchmark monrtoring, you must include in your SWPPP the infomiation,to support this claim as required by 2008 MSGP; Part 6.2:1.3. -` If you plan to'use the substantially identical outfall exception for your benchmark monitoring requirements in 2008 MSGP, Part 6.2.1 and/or your quarterly visual assessment requirements in 2008 MSGP; Part 4.2.3, you must include the,following documentation: • Location of each of the substantially identical outfalls, • Description of the general industrial activities conducted in the drainage area of each outfall; Description of the control measures implemented in the drainage area of each ouffall; Description of the exposed materials located in the drainage area of each outfall that are likely to' be significant contributors of pollutants to stonmwater discharges; An estimate of the runoff coefficient of the drainage areas (low under 40° - ° g • , /o; medium - 40 to 65 /o; high above 65%); and • ^ Why, the outfalls are expected to discharge substanfially. identical effluents. For each type of monitoring, your SWPPP must include a description of: 1. Sample Location(s). Describe where samples will be collected, including any determination that two or more outfalls are substantially identical. INSERT TEXT HERE 2. Pollutant Parameters to be Sampled. Include a list of the pollutant parameters that will be sampled and the frequency of sampling for each parameter. INSERT TEXT HERE 3. Monitoring Schedules. Include the schedule you will follow for monitoring your stormwater discharge, including where applicable any alternate monitoring periods to be used for facilities in climates with irregular stormwater runoff (2008 MSGP, Part 6.1.6). INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 13 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 4. Numeric Limitations. List here any pollutant parameters subject to numeric limits (effluent limitations guidelines), and which ouffalls are subject to such limits. Note that numeric limits are only included for Sectors A, C, D, E, J, K, L, and 0. INSERT TEXT HERE 5. Procedures. Describe procedures you will follow for collecting samples, including responsible staff who will be involved, logistics for taking and handling samples, laboratory to be used, etc. INSERT TEXT HERE Note: It may be helpful to create a table with columns corresponding to # 1 - 5 above for each type of monitoring you are required to conduct. Inactive and Unstaffed sites exception (if applicable) If you are invoking the exception for inactive and unstaffed sites for benchmark monitoring, include information to support this claim. INSERT TEXT HERE Substantially identical outfall exception (if applicable) If you plan to use the substantially identical outfall exception for your benchmark monitoring and/or quarterly visual assessment requirements, include the following information here to substantiate your claim that these ouffalls are substantially identical: • Location of each of the substantially identical ouffalls: INSERT TEXT HERE • Description of the general industrial activities conducted in the drainage area of each outfall: INSERT TEXT HERE • Description of the control measures implemented in the drainage area of each outfall: INSERT TEXT HERE • Description of the exposed materials located in the drainage area of each outfall that are likely to be significant contributors of pollutants to stormwater discharges: INSERT TEXT HERE • An estimate of the runoff coefficient of the drainage areas (low=under 40%; medium=40 to 65%; high =above 65%): INSERT TEXT HERE • Why the ouffalls are expected to discharge substantially identical effluents: INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 14 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 5: INSPECTIONS Instructions: Describe your procedures for performing the three types of inspections required by the 2008 MSGP, including: • Routine facility inspections (2008 MSGP, Part 4.1); Quarterly visual assessment of stormwater discharges (2008 MSGP, Part 4.2); and Comprehensive site inspections (2008 MSGP, Part 4.3). y gexception,inactive andvnstaffed sites relating' to routine facility inspections and If you invoking the for y p quarterly visual assessments, you must include in your SWPPP the information to support this claim as required by 2008 MSGP, Parts 4.1.3 and 4,2.3. A sample routine facility inspection and quarterly,visual assessment form is available on EPA's MSGP website (www.epa.gov/npdes/stormwater/msqp) in the "Additional MSGP Documentation" file., Appendix I.of the 2008 MSGP includes a comprehensive site inspection form (Annual Reporting Form). For the routine facility inspections and the comprehensive site inspections to be performed at your site, include a description of the following: • The names of the person(s), or the positions of the person(s), responsible for inspection: INSERT TEXT HERE • The schedules to be used for conducting inspections. Include here any tentative schedule that will be used for facilities in climates with irregular stormwater runoff discharges (2008 MSGP, Part 4.2.3): INSERT TEXT HERE and • Specific areas of the facility to be inspected, including schedules for specific outfalls: INSERT TEXT HERE For the quarterly visual assessments to be performed at your site, include a description of the following: • The names of the person(s), or the positions of the person(s), responsible for inspection: INSERT TEXT HERE • The schedules to be used for conducting inspections. Include here any tentative schedule that will be used for facilities in climates with irregular stormwater runoff discharges (2008 MSGP, Part 4.2.3): INSERT TEXT HERE and • Specific areas of the facility to be inspected, including schedules for specific outfalls: INSERT TEXT HERE Inactive and Unstaffed sites exception (if applicable) If you are invoking the exception for inactive and unstaffed sites for your routine facility inspections and quarterly visual assessments, include information to support this claim. INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 15 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 6: DOCUMENTATION TO SUPPORT ELIGIBILITY CONSIDERATIONS UNDER OTHER FEDERAL LAWS 6.1 Documentation Regarding Endangered Species. Instructions (see 2008 MSGP Part 5.1.6.1): Include any documentation you have that supports your determination of eligibility consistent with 2008 MSGP,` Part 1.1.4.5 (Endangered and Threatened Species and Critical Habitat Protection). Refer to Appendix E of the 2008 MSGP for specific instructions for establishing eligibility. INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. 6.2 Documentation Regarding Historic Properties Instructions (see 2008 MSGP Part 5.1.6.2): Include any documentation you have that supports your determination of eligibility consistent with 2008 MSGP; Part 1.1.4.6 (Historic Properties Preservation). Refer to Appendix, F of the 2008 MSGP for specific instructions for establishing eligibility. INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. 6.3 Documentation Regarding NEPA Review (if applicable) Instructions (see 2008 MSGP Part 5.1.6.3): Include any documentation you have that supports your determination of eligibility consistent with MSGP 2008 (Discharges t to An New Source Performance Standards). Part1.1.2.5 Discha esSubect y .. INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. SECTION 7: SWPPP CERTIFICATION Instructions (see 2008 MSGP Part 5.1.7): The following certification statement must be signed and dated by a person who meets the requirements of AppendixB, Subsection 11.A or 11.B, of the 2008 MSGP. Note: This certification must be re -signed in the event of a SWPPP modification in response to a Part 3.1.trigger for corrective action.. . EPA Industrial SWPPP Template, January 13, 2009 16 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Signature: Title: Date: EPA Industrial SWPPP Template, January 13, 2009 17 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME" and DATE SECTION 8: SWPPP MODIFICATIONS Instructions (see 2008 MSGP Part 5.2): Your SWPPP is a "living" document and is required to be modified and updated, as, necessary, in response, to corrective actions. See Part3.4 of the 2008 MSGP. o ''If you need to modify the SWPPP in response to a corrective action required by Part 3.1 of the 2008 MSGP, then the certification statement in section 7 of this SWPPP template must be resigned in accordance with 2008 MSGP Appendix B, Subsection 11.A or 11.B. I", o For any other SWPPP modification, you should keep a log with a description of the modification, the .name of the person making it, and the date and signature of that person. See 2008 MSGP Appendix B, Subsection 11.C. INSERT LOG HERE or REFERENCE ATTACHMENT EPA Industrial SWPPP Template, January 13, 2009 18 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SWPPP ATTACHMENTS Attach the following documentation to the SWPPP: Attachment A - General Location Map Include a copy of your general location map in Attachment A. Attachment B - Site Map Include a copy of your site map(s) in Attachment B. Attachment C - 2008 MSGP Note: It is helpful to keep a printed -out copy of the 2008 MSGP so that it is accessible to you for easy reference. However, you do not need to formally incorporate the entire 2008 MSGP into your SWPPP. As an alternative, you can include a reference to the permit and where it is kept at the site. EPA Industrial SWPPP Template, January 13, 2009 19 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE Industrial SWPPP Template Introduction To help you develop a SWPPP that is consistent with the 2008 MSGP, the U.S Environmental Protection Agency (EPA) has created this Industrial SWPPP Template (or, "the Template'). Use of the Template will help ensure that your SWPPP addresses all the necessary elements required in Part 5 of the 2008 MSGP. Before completing the Template, make sure you read and understand the requirements in the 2008 MSGP. A copy of the MSGP is available at www.epa.gov/npdes/stormwater/msqp. Using the Industrial SWPPP Template Tips for completing the Template: • This Template is designed for use by all facilities eligible for coverage under the 2008 MSGP. The Template is NOT tailored to your individual industrial sector. Depending on which industrial sector you fall under (see Appendix D of the 2008 MSGP) and on where your facility is located (see Appendix C of the 2008 MSGP), you will need to address additional SWPPP requirements outlined in Part 8 and/or Part 9 of the permit, respectively. • Complete a SWPPP before submitting your Notice of Intent (NO1) for permit coverage. • Each section includes "instructions" and space for your facility's specific information. You should read the instructions for each section before you complete that section. • The Template was developed in Microsoft Word so that you can easily add tables and additional text. Some sections may require only a brief description while others may require several pages of explanation. • To make it easier to complete, the Template generally uses blue text where the operator is expected to enter information. EPA notes that while EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the Template, the actual obligations of regulated industrial facilities are determined by the relevant provisions of the permit, not by the Template. In the event of a conflict between the Template and any corresponding provision of the MSGP, the permit controls. EPA welcomes comments on the Template at any time and will consider those comments in any future revision of this document. EPA Industrial SWPPP Template, January 13, 2009 y { Stormwater Pollution Prevention Plan (SWPPP) ' INSERT FACILITY NAME and DATE Stormwater Pollution Prevention Plan for: Insert Facility Name Insert Facility Address Insert City, State, Zip Code Insert Facility Telephone Number (if applicable) SWPPP Contact(s): Insert Facility Operator Insert Name Insert Address Insert City, State, Zip Code Insert Telephone Number Insert Fax/Email SWPPP Preparation Date: EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DA'1'6 Contents SECTION 1: FACILITY DESCRIPTION AND CONTACT INFORMATION......................................................1 1.1 Facility Information................................................................................................................. 1 1.2 Contact Information/Responsible Parties.................................................................................. 2 1.3 Stormwater Pollution Prevention Team.................................................................................... 3 1.4 Activities at the Facility........................................................................................................... 3 1.5 General Location Map............................................................................................................ 4 1.6 Site Map................................................................................................................................ 5 SECTION 2: POTENTIAL POLLUTANT SOURCES.......................................................................................6 2.1 Industrial Activity and Associated Pollutants............................................................................. 6 2.2 Spills and Leaks..................................................................................................................... 7 2.3 Non-Stormwater Discharges Documentation............................................................................ 7 2.4 Salt Storage.......................................................................................................................... 8 2.5 Sampling Data Summary ........................................................................................................ 8 SECTION 3: STORMWATER CONTROL MEASURES...................................................................................8 3.1 Minimize Exposure................................................................................................................. 9 3.2 Good Housekeeping............................................................................................................... 9 3.3 Maintenance..........................................................................................................................9 3.4 Spill Prevention and Response.............................................................................................. 10 3.5 Erosion and Sediment Controls............................................................................................. 10 3.6 Management of Runoff......................................................................................................... 10 3.7 Salt Storage Piles or Piles Containing Salt............................................................................. 11 3.8 MSGP Sector -Specific Non -Numeric Effluent Limits................................................................ 11 3.9 Employee Training...............................................................................................................11 3.10 Non-Stormwater Discharges................................................................................................. 11 3.11 Waste, Garbage and Floatable Debris................................................................................... 12 3.12 Dust Generation and Vehicle Tracking of Industrial Materials ................................................... 12 SECTION 4: SCHEDULES AND PROCEDURES FOR MONITORING.........................................................13 SECTION 5: INSPECTIONS...........................................................................................................................15 SECTION 6: DOCUMENTATION TO SUPPORT ELIGIBILITY CONSIDERATIONS UNDER OTHER FEDERALLAWS...........................................................................................................................................16 6.1 Documentation Regarding Endangered Species..................................................................... 16 6.2 Documentation Regarding Historic Properties......................................................................... 16 6.3 Documentation Regarding NEPA Review (if applicable).......................................................... 16 SECTION 7: SWPPP CERTIFICATION.........................................................................................................16 SECTION 8: SWPPP MODIFICATIONS........................................................................................................18 SWPPPATTACHMENTS...............................................................................................................................19 Attachment A — General Location Map Attachment B — Site Maps Attachment C — 2008 MSGP EPA Industrial SWPPP Template, January 13, 2009 ii Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 1: FACILITY DESCRIPTION AND CONTACT INFORMATION 1.1 Facility Information Facility Information Name of Facility: Street: City: County or Similar Subdivision: Permit Tracking Number: _ State ZIP Code: (if covered under a previous permit) Latitude/Longitude (Use one of three possible formats, and specify method) Latitude: Longitude: 1. _ _ ° _ _' _ _" N (degrees, minutes, seconds) 1. _ _ ° _ _' _ _" W (degrees, minutes, seconds) 2. _ _ ° _ _ _ _' N (degrees, minutes, decimal) 3. _ _ . _ _ _ _ ° N (decimal) Method for determining latitude/longitude (check one): ❑ USGS topographic map (specify scale: ❑ Other (please specify): 2. _ _ ° _ _ _ _' W (degrees, minutes, decimal) 3. _ _ . _ _ _ _ ° W (decimal) ❑ EPA Web site ❑ GPS Is the facility located in Indian Country? ❑ Yes ❑ No If yes, name of Reservation, or if not part of a Reservation, indicate "not applicable." Is this facility considered a Federal Facility? ❑ Yes ❑ No Estimated area of industrial activity at site exposed to stormwater: Discharge Information EPA Industrial SWPPP Template, January 13, 2009 (acres) Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE Does this facility discharge stormwater into an MS4? ❑ Yes ❑ No If yes, name of MS4 operator: _ Name(s) of water(s) that receive stormwater from your facility Are any of your discharges directly into any segment of an "impaired" water? ❑ Yes ❑ No If Yes, identify name of the impaired water (and segment, if applicable): Identify the pollutant(s) causing the impairment: For pollutants identified, which do you have reason to believe will be present in your discharge? For pollutants identified, which have a completed TMDL? Do you discharge into a receiving water designated as a Tier 2 (or Tier 2.5) water? ❑ Yes ❑ No Are any of your stormwater discharges subject to effluent guidelines? ❑ Yes ❑ No If Yes, which guidelines apply? Primary SIC Code or 2-letter Activity Code:_ (refer to Appendix D of the 2008 MSGP) Identify your applicable sector and subsector: 1.2 Contact Information/Responsible Parties .Instructions:. . r emergency . t... . List the facility dperator(s), facility owner, 24 hour y pective responsibilities, where appropriate. contact. Indicate res — You will need the information from this section of the SWPPP Template for your NO1. ' — (- pp. ) Refer Section B of the NOl instructions available. in Appendix G of the 2008 MSGP Facility Operator (s): Name: Insert Name Address: Insert Address City, State, Zip Code: Insert City, State, Zip Code Telephone Number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) Facility Owner (s): Name: Insert Name Address: Insert Address City, State, Zip Code: Insert City, State, Zip Code EPA Industrial SWPPP Template, January 13, 2009 2 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE Telephone Number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) SWPPP Contact: Name: Insert SWPPP Contact Name Telephone number: Insert Telephone Number Email address: Insert email address Fax number: Insert fax number (optional) 1.3 Stormwater Pollution Prevention Team Instructions (see 2008 MSGP Part 5.1.1): — Identify the staff members (by name or title) that comprise the facility's stonnwaterpollution prevention team as well as their individual responsibilities. Your stormwater pollution prevention team is responsible for assisting the facility manager in developing and revising the facility's SWPPP, implementing and maintaining control measures/BMPs, and taking corrective actions where required Each member of the storrrlwater pollution prevention team must have ready access to either an electronic or paper copy of applicable portions of the MSGP and you' SWPPP. Staff Names Individual Responsibilities Insert name of SWPPP team member Insert explanation of that staff person's responsibilities relating to compliance with the permit [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] 1.4 Activities at the Facility Provide a general description of the nature o Instructions see 2008 MSGP Part 5.1.2 "' g p f the industrial activities at your facility. Insert text here EPA Industrial SWPPP Template, January 13, 2009 3 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE. 1.5 General Location Map Instructions (see 2008 MSGP'Part 5.1.2): , — Provide a general location map (e.g., U.S.. Geological Survey (USGS) quadrangle map) with enough detail to identify the location of your facility and all receiving waters for your stormwater discharges (include as Attachment A of this SWPPP Template). Include a copy of the general location map for this facility in Attachment A. EPA Industrial SWPPP'Iemplate, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 1.6 Site Map Instructions (see 2008 MSGP Part 5.1.2): — include a map showing the following information. The site map should be included as Attachment B of this°SWPPP Template. ■ - the size ofthe property in acres; • the location and extent of significant structures and impervious surfaces; ■ directions of stormwaterflow (use arrows); ■ locations of all existing structural control measures;' locati• waters are f all areceiving ired and, f ter whether the waters to vicinity of your facility, indicating if any of the y , ters have TMDLs established for them; all stormwater conve ■ locations of a 'antes including ditches, pipes, and swales; ° ■ locations of potential pollutant sources identified under MSGP, Part 5.1.3.2 • _ locations where significant spills or leaks identified under MSGP, Part 5.1.3.3 have occurred, ■ locations of all stormwater monitoring points; -• locations of stormwater inlets and outfalls; with a unique identification code for each outfall (e.g., Outfall No. 1, No. 2, etc), indicating if you are treating one or more outfalls as "substantially, identical" under MSGP; Parts 4.2.3, 5.1.5.2, and 6:1.1, and an approximate outline of the"areas draining to each" outfall; ■ municipal separate storm sewer systems, where your stormwater discharges,to them; locations and descriptions of all non-stormwater discharges identified under MSGP; Part 2.1.2.10; locations of the following activities are ex osed to precipitation: g ere such p o fueling stations; n activities where o vehicle and equipment maintenance and/or cleaning areas; o loadjnglunloading areas; o :locations used for the treatment, storage, or disposal of wastes; o 'liquid storage tanks;' ; o processing ;and storage'' areas; o immediate access roads and rail lines used or"traveled by carriers of raw materials, manufactured promaterial, ducts, waste mal, or by-products, used orcreated by the facility;` " o transfer areas =for substances in bulk; o, •machinery; and locations and sources of run-on to your site from adjacent property that contains significant . . quantities of pollutants. Include a copy of the site map for this facility in Attachment B. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 2: POTENTIAL POLLUTANT SOURCES Instructions;(see 2008'MSGP Part5.1.3)r In this section, you 'are required to descnbe,areas at younfacility..wherelindustrial,materials or activities are exposed to stonmwater or from which allowable non-stormwater discharges are 'released.:.! , 2.1 Industrial Activity and Associated Pollutants Industrial Activity Associated Pollutants Insert specific industrial activity Insert names of pollutants or pollutant constituents that could be associated with this activity and released in stormwater Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] [Repeat as necessary] Repeat as necessary] [Repeat as necessary] [Repeat as necessary] Repeat as necessary] Repeat as necessary] [Repeat as necessary] EPA Industrial SWPPP Template, January 13, 2009 6 Storrnwater Pollution Prevention Plan (SWPPP) INSFRT FACILITY NAME and DATE 2.2 Spills and Leaks Instructions (See 2008 MSGP Part 5.1.3.3): Include the following in this section:. o "Potential spills and teaks:A description of where potential spills and, leaks could occur at your site that could contribute pollutants to your stormwater discharge, and specify which outfall(s) are. likely to be affected by such spills and leaks. " o : Past spills and leaks: A description of significant spills and leaks in the past 3'years of oil or toxic • or hazardous pollutants that actually occurred at exposed areas; or that drained to a stonnwater conveyance. Note: Significant spills and leaks include, but are not limited to' releases of oil or hazardous substances in excess of quantities that are report02 of the Comprehensive En able under CWA Section 311(see 40 CFR 110.6 and 40 CFR 117.21) or ection p vironmental Resp onse, Compensation and Liability Act (CERCLA),, 42 USC §9602. Areas of Site Where Potential Spills/Leaks Could Occur Location Outfalls Insert description of area where spill/leak could occur Specify which outfall(s) would be affected [Repeat as necessary] [Repeat as necessary] [Repeat as necessarvl lReoeat as necessarvl [Repeat as necessary] [ [Repeat as necessary] Description of Past Spills/Leaks Date Description Outfalls Insert date of Insert description of spill/leak (where it occurred, what Specify which outfall(s) spill/leak happened, types of pollutants, extent of damage) were affected [Repeat as [Repeat as necessary] [Repeat as necessary] [Repeat as I [Repeat as necessary] I [Repeat as necessary] [Repeat as I [Repeat as necessary] I [Repeat as necessary] necessary] 2.3 Non-Stormwater Discharges Documentation "Instructions (see 2008'MSGP Part 5.1.3.4): The questions below require you,to provide'documentation of the following: o Your evaluation"for, the prese,nce,of non-stonnwater dischaiges at your site and ,o Your elimination of any unauthorized non-stonnwater discharges 4 EPA Industrial SWPPP Template, January 13, 2009 7 Stormwater Pollution Prevention Plan (SWPPP) INSFRT FACILITY NAME and DATE- • Date of evaluation: Insert the date(s) of your evaluation. • Description of the evaluation criteria used: Describe the method you used to conduct your evaluation and to determine for each non-stormwater sources whether it is prohibited or allowed under the permit. • List of the outfalls or onsite drainage points that were directly observed during the evaluation: Insert outfalls/drainage points observed. • Different types of non-stormwater discharge(s) and source locations: Describe types of non- stormwater discharges observed and the corresponding outfall or drainage point. • Action(s) taken, such as a list of control measures used to eliminate unauthorized discharge(s), if any were identified. For example, a floor drain was sealed, a sink drain was re-routed to sanitary, or an NPDES permit application was submitted for an unauthorized cooling water discharge: Describe actions taken to eliminate unauthorized non-stormwater discharges and the corresponding outfall/drainage point affected. 2.4 Salt Storage Instructions (see 2008 MSGP Part 51.3.5):. — Document the location of any storage piles containing salt used for,deicing or other commercial or industrial purposes. - Note: You will be asked additional questions concerning salt storage in Section 3.7 of this SWPPP template, below. Insert description of the location of any storage piles containing salt. 2.5 Sampling Data Summary Instructions (See 2008 MSGP'Part5:1.3.6): Summarize all stormwaler sampling data collected from your permitted outfalls during the previous permit " term. Insert summary of stormwater sampling data collected for the past permit, and/or attach discharge monitoring reports or laboratory results. SECTION 3: STORMWATER CONTROL MEASURES `Instructions See2008 MSGP; Parts,5.1.4.1 and 2.1.2): In Sections 3.1 -3.12 of this SWPPP template, you are asked to describe the stormwater control measures that you have installed'at your site to meeteach of the permit's "non -numeric effluent limits", in Part 2.1.2 of the"2008 MSGP: EPA Industrial SWPPP Template, January 13, 2009 8 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.1 Minimize Exposure Instructions (see.2008 MSGP Part 2.1.2.1): Describe any structural controls or practices used to minimize the exposure of industrial activities to rain, snow, snowmelt, and runoff. Describe where the controls or practices are being implemented at your site. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.2 Good Housekeeping Instructions (see 2008 IVISGP Parts 2.1.2.2 and 5.1.5.1)`: Describe any practices you are implementing to keep exposed areas.of your site clean. Describe where each practice is being implemented at your site. Include here your schedule for: (1) regular pickup and disposal of waste materials, and (2) routine inspections for leaks and of the condition of drums, tanks, and containers. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.3 Maintenance Instructions (see 2008 MSGP Parts 2.11.3 and5A.5.1): — Describe procedures (1) to maintain industrial equipment so that spills/leaks are avoided, and (2) to'maintain any of your site's control measures in effective operating condition Include the scheduleyou will follow for such maintenance activities. Describe where,each applicable procedure is being implemented at the site. INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, January 13, 2009 9 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.4 Spill Prevention and Response Instructions (see 2008 MSGP Parts 2.1.24 and 5.1.5.1): Describe any structural controls or procedures used to minimize the.potential for leaks, spills, and other releases. You must implement the following at a minimum: • Procedures for plainly labeling containers (e.g., "Used Oil," "Spent Solvents, "Fertilizers and Pesticides," etc.),that could be susceptible to spillage or leakage to encourage proper handling and facilitate rapid response if spills or leaks occur, Preventative measures such as barriers between material storage and traffic areas,secondary containment provisions, and procedures for material storage and handling; • Procedures for expeditiously stopping, containing; and cleaning up leaks, spills, and other releases; and • Procedures for notification of appropriate facility personnel, emergency response agencies, and regulatory agencies. Describe where each control is to be located or where applicable procedures:will be implemented., „ Note: Some facilities may be required to develop a Spill Prevention Control and Countermeasure (SPCC) plan under a separate regulatory program (40 CFR 112) If you are required to'develop an SPCC'plan, or you already have one,^you should include references to the relevant requirements from your plan. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.5 Erosion and Sediment Controls Instructions (see 2008 MSGP Part 2.1.2.5) Describe structural or non-structural controls used at your site to stabilize exposed areas and contain runoff to minimize onsite erosion and potential offsite discharges of sediment. Note: You must at a minimum implement flow velocity dissipation devices at ouffalls and discharge channels' Describe the location at your site where each control will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.6 Management of Runoff Instructions "(See )° See 2008 MSGP Part 21 2.6 Describe controls used,atyoursite to divert; "infiltrate, reuse, contain, or otherwise reduce stonnwater nmoff. y controlwill be implemented. Describe the location at our site where each con INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, January 13, 2009 10 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.7 Salt Storage Piles or Piles Containing Salt Instructions (see 2008,MSGP Part 2.1.2.7); If applicable, describe structures at your site that either cover or enclose salt storage piles or piles containing salt, or that prevent the discharge of stormwater from such piles. Also, describe any controls or procedures used to minimize exposure resulting from adding to or removing materials from the pile. Describe the location at your site where each control and/or.procedure will be implemented.; INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.8 MSGP Sector -Specific Non -Numeric Effluent Limits Instructions (see 2008 MSGP Part 2.1.2.8): . Describe any controls or procedures that will be used at your site to comply with any sector -specific 41 requirements that, apply,to you in Part8 of the 2008 MSGP... Describethe location at your site where " each control and/or procedure will be implemented. Note- �H�1,L�M,N,01P,Q,R,S,T,U�"V,X, Y, Z,.andct�or-specifceffluent limits apply to Sectors A, E, F, G INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.9 Employee Training Instructions (see, 2008.MSGP Parts 2.1.2.9 and 5.1.5.1): Describe your plan for training the employees who work inareas where industrial materials or activities are ,exposed to stormwater, or who are responsible for implementing activities necessary. to, meet the conditions of the 2008 MSGP, including all members of your Pollution Prevention Team. Included in your description must be , the frequency of training (note:. recommended at least one time per year), and y the schedule ouwill follow. INSERT DESCRIPTION OF PLAN FOR TRAINING APPLICABLE STAFF HERE. 3.10 Non-Stormwater Discharges Instructions, (see 2008 MSGP 21.210): ; Describe how you`eliminat6d any unauthorized non-stormwater discharges at your site. 'The unauthorized non- stor mwater discharges include any non-stormwater discharges that are not specifically identified'm Part 1:1.3 of the 2008 MSGP. Note: If this section is already;addressed by your documentation for Section 2.3 of the SWPPP template, you can simply include a°"cross reference to that section of your SWPPP." INSERT DESCRIPTION OF YOUR APPROACH TO ELIMINATING UNAUTHORIZED NON- STORMWATER DISCHARGES HERE. EPA Industrial SWPPP Template, January 13, 2009 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE 3.11 Waste, Garbage and Floatable Debris Instructions (see 2008 MSGP Part 2.1.2.11): Describe controls and procedures that will be used at your site to minimize discharges of waste, garbage, and floatable debris. Describe the location at your site where each control and/or procedure will be implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. 3.12 Dust Generation and Vehicle Tracking of Industrial Materials Instructions (see 2008ASGP Part 2.1.2.12): p y y your site where_ each control and/or pro off -site tracking Describe controls and procedures you will use at our site to minimize the eneration of dust a of raw, final, or waste materials. Describe the location at o procedures will be .., implemented. INSERT DESCRIPTION OF CONTROL MEASURES HERE. EPA Industrial SWPPP Template, January 13, 2009 12 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 4: SCHEDULES AND PROCEDURES FOR MONITORING Instructions (see 2008 MSGP Part 5.1.5.2): = Describe your procedures for conducting the five types of analytical monitoring specified by the MSGP; Where applicable to your facility, including: • Benchmark monitoring (2008 MSGP, Part 6.2.1 and relevant requirements in Part 8 and/or Part 9); • Effluent limitations guidelines monitoring (200.8 MSGP, Part 62.2 and relevant requirements in Part 8); • State- or Tribal -specific monitoring (2008 MSGP, Part 6.2 3 and,relevant requirements in Part 9); • .Impaired waters monitoring (2008 MSGP,,Part 6.2.4); and • Other monitoring as required by EPA (2008 MSGP, Part 6.2.5). Depending on the type of facility you operate, and the monitoring`requirements'to which' you are subject, you must collect and anaWe stormwater samples and document monitoring activities consistent with the procedures described in 2008 MSGP; Part 6 and Appendix B, Subsections 10 =12, and any additional. „ sector -specific or State/Tribal-specific requirements in 2008 MSGP, Parts 8 and 9, respectively. Refer to 2008 MSGP, Part 7 for reporting and recordkeeping requirements. Note` All monitoring must be conducted in accordance, with the relevant sampling and analysis requirements of 40 CFR Part 136. Include in'your description procedures for ensuring compliance with these requirements.. If you are invoking the exception for inactive and "unstaffed sites for benchmark monitoring, you must include in your SWPPP the information to support this,claim as required by 2008 MSGP, Part 6.2:1.3. If you plan to use the substantially identical outall exception for your benchmark monitoring,reguirements in ` 2008 MSGP, Part 6:2.1 and/or your quarterly visual assessment.requirements in 2008 MSGP, Part 4.2.3,4 you must include the following documentation: • • Location of each, of the substantially identical outfalls; • Description of the general industrial activities conducted in the drainage area of each outall; • " Description of the'comrol,measures implemented in the drainage area of each outfall; • Description of the exposed materials located in. the drainage area of each ouffall that are likely to be significant contributors of pollutants to stormwater discharges An estimate of the runoff coefficient of_the drainage areas (low = under 4l)%; medium = 40 to 65%; high = above 65%); and • Why " the ouffalls are expected p to discharge rg substantially identical effluents: For each type of monitoring, your SWPPP must include a description of: 1. Sample Location(s). Describe where samples will be collected, including any determination that two or more outfalls are substantially identical. INSERT TEXT HERE 2. Pollutant Parameters to be Sampled. Include a list of the pollutant parameters that will be sampled and the frequency of sampling for each parameter. INSERT TEXT HERE 3. Monitoring Schedules. Include the schedule you will follow for monitoring your stormwater discharge, including where applicable any alternate monitoring periods to be used for facilities in climates with irregular stormwater runoff (2008 MSGP, Part 6.1.6). INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 13 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAML and DATE 4. Numeric Limitations. List here any pollutant parameters subject to numeric limits (effluent limitations guidelines), and which outfalls are subject to such limits. Note that numeric limits are only included for Sectors A, C, D, E, J, K, L, and 0. INSERT TEXT HERE 5. Procedures. Describe procedures you will follow for collecting samples, including responsible staff who will be involved, logistics for taking and handling samples, laboratory to be used, etc. INSERT TEXT HERE Note: It may be helpful to create a table with columns corresponding to # 1 - 5 above for each type of monitoring you are required to conduct. Inactive and Unstaffed sites exception (if applicable) If you are invoking the exception for inactive and unstaffed sites for benchmark monitoring, include information to support this claim. INSERT TEXT HERE Substantially identical outfall exception (if applicable) If you plan to use the substantially identical outfall exception for your benchmark monitoring and/or quarterly visual assessment requirements, include the following information here to substantiate your claim that these outfalls are substantially identical: • Location of each of the substantially identical outfalls: INSERT TEXT HERE • Description of the general industrial activities conducted in the drainage area of each outfall: INSERT TEXT HERE • Description of the control measures implemented in the drainage area of each outfall: INSERT TEXT HERE • Description of the exposed materials located in the drainage area of each outfall that are likely to be significant contributors of pollutants to stormwater discharges: INSERT TEXT HERE • An estimate of the runoff coefficient of the drainage areas (low=under 40%; medium=40 to 65%; high =above 65%): INSERT TEXT HERE • Why the outfalls are expected to discharge substantially identical effluents: INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 14 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SECTION 5: INSPECTIONS Instructions: — : Describe, your, procedures for performing the three types of inspections required by the 2008 MSGP, including: • Routine facility inspections (2008 MSGP, Part 4.1); "Quarterly visual assessment of stormwater discharges (2008 MSGP, Part 4.2); and • Comprehensive site inspections (2008 MSGP, Part 4.3). — If you are invoking the exception for inactive and unstaffed sites relating to routine facility inspections and quarterly visual assessments, you must include in your SWPPP the information to support this claim as required by 2008 MSGP, Parts 4.1 3 and —` A sample routine facility, inspection and quarterly visual assessment form is available on EPA's MSGP` website (wvvw.epa.q'6v/npdes/stormwater/msgp) in the "Additional MSGP Documentation" file. Appendix l of. the 20,08 MSGP includes a comprehensive site inspection form (Annual Reporting Form). For the routine facility inspections and the comprehensive site inspections to be performed at your site, include a description of the following: • The names of the person(s), or the positions of the person(s), responsible for inspection: INSERT TEXT HERE • The schedules to be used for conducting inspections. Include here any tentative schedule that will be used for facilities in climates with irregular stormwater runoff discharges (2008 MSGP, Part 4.2.3): INSERT TEXT HERE and • Specific areas of the facility to be inspected, including schedules for specific outfalls: INSERT TEXT HERE For the quarterly visual assessments to be performed at your site, include a description of the following: • The names of the person(s), or the positions of the person(s), responsible for inspection: INSERT TEXT HERE • The schedules to be used for conducting inspections. Include here any tentative schedule that will be used for facilities in climates with irregular stormwater runoff discharges (2008 MSGP, Part 4.2.3): INSERT TEXT HERE and • Specific areas of the facility to be inspected, including schedules for specific outfalls: INSERT TEXT HERE Inactive and Unstaffed sites exception (if applicable) If you are invoking the exception for inactive and unstaffed sites for your routine facility inspections and quarterly visual assessments, include information to support this claim. INSERT TEXT HERE EPA Industrial SWPPP Template, January 13, 2009 15 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME" and DATE" SECTION 6: DOCUMENTATION TO SUPPORT ELIGIBILITY CONSIDERATIONS UNDER OTHER FEDERAL LAWS 6.1 Documentation Regarding Endangered Species. Instructions (see 2008 MSGP Part 5.1.6.1): Include any documentation you have that supports your determination of eligibility consistent with 2008 MSGP, Part 1.1.4.5 (Endangered and Threatened Species and Critical Habitat Protection). Refer to Appendix E of the 2008 MSGP for specific instructions for establishing eligibility. INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. 6.2 Documentation Regarding Historic Properties Instructions (see 2008 MSGP Part 5.1.6.2): Include any documentation you have; that supports your determination of eligibility consistent with 2008 MSGP, Part 1.1.4.6 (Historic Properties Preservation). Refer to Appendix of the 2008 MSGP for specific instructions for establishing eligibility. INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP. 6.3 Documentation Regarding NEPA Review (if applicable) Instructions (see 2008 MSGP Part 5.1.6.3)`. Include any documentation you have that supports your determination of eligibility consistent with MSGP 2008 Part 1.1.2.5 (Discharges Subject to Any New Source Perfor ante Standards). INSERT TEXT HERE OR KEEP DOCUMENTATION WITH SWPPP, SECTION 7: SWPPP CERTIFICATION Instructions (see 2008'MSGP Part 5.1.7): The following certification statement must be signed and dated by a person who meets the requirements of Appendix B, Subsection 11 A or 113, of.the 2008 MSGP. Note. This certification must be re -signed in the,event of a SWPPP modification in response to a, Part 3.1 trigger for corrective action. EPA Industrial SWPPP Template, January 13, 2009 16 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATL I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name: Signature: Title: Date: EPA Industrial SWPPP Template, January 13, 2009 17 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME" and DATE SECTION 8: SWPPP MODIFICATIONS Instructions (see 2008 MSGP Part 5.2): Your SWPPP is a °living" document and is required to be modified and;updated, as necessary, in response to corrective actions. See Part 3.4 of the 2008 MSGP. o If you need to modify the SWPPP in response to a corrective action required by Part 3.1 of the 2008 MSGP, then the certification statement in section 7 of this SWPPP template must be re -signed in accordance with 2008 MSGP Appendix B, Subsection 11.A or 11.B. name of the person making it, the date a d signature of that person. See 2008 MSGP modification, the o 'For Y Y P 9description Appendix B, Subsection 11.C. INSERT LOG HERE or REFERENCE ATTACHMENT EPA Industrial SWPPP Template, January 13, 2009 18 Stormwater Pollution Prevention Plan (SWPPP) INSERT FACILITY NAME and DATE SWPPP ATTACHMENTS Attach the following documentation to the SWPPP: Attachment A - General Location Map Include a copy of your general location map in Attachment A. Attachment B - Site Map Include a copy of your site map(s) in Attachment B. Attachment C - 2008 MSGP Note: It is helpful to keep a printed -out copy of the 2008 MSGP so that it is accessible to you for easy reference. However, you do not need to formally incorporate the entire 2008 MSGP into your SWPPP. As an alternative, you can include a reference to the permit and where it is kept at the site. EPA Industrial SWPPP Template, January 13, 2009 19 S Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER Additional MSGP Documentation Template Introduction After you become permitted under the 2008 MSGP, you are required to keep certain minimum records (or documentation) as part of the implementation of your permit responsibilities. As required in Part 5.4 of the 2008 MSGP, these records must be kept in the same place your SWPPP (which you completed prior to submitting your NOI to be covered) is kept. This "Additional MSGP Documentation Template" (or "Template") will assist you in complying with this requirement. Using the Additional MSGP Documentation Template Tips for using the Template: This Template is designed for use by all facilities permitted under the 2008 MSGP. The Template is NOT tailored to your individual industrial sector. Depending on which industrial sector(s) you fall under (see Appendix D of the 2008 MSGP) and where your facility is located (see Appendix C of the 2008 MSGP), you will need to address any additional documentation requirements outlined in Part 8 and/or Part 9 of the permit, respectively. • Each section of the template includes "instructions" and space for your facility's specific information. You should read the instructions before you complete each section. The text you will need to complete is generally indicated through the use of blue form fields (e.g., "Insert Facility Name"). Click on the form field and your text will replace the instructional text. • The Template was developed in Microsoft Word so that you can easily add tables and additional text. • Because many of the activities you are required to document occur throughout the permit term, you will need to continually modify and add records to this Template. You may wish to create separate electronic files for each category of documentation (e.g., files for monitoring, employee training, etc.) so that they can be easily modified. • The records you create using this Template must be kept in the same location as your SWPPP. EPA notes that while EPA has made every effort to ensure the accuracy of all instructions and guidance contained in the Template, the actual obligations of regulated industrial facilities are determined by the relevant provisions of the permit, not by the Template. In the event of a conflict between the Template and any corresponding provision of the MSGP, the permit provisions establish your actual requirements. EPA welcomes comments on the Template at any time and will consider those comments in any future revision of this document. EPA Additional MSGP Documentation Template, January 13, 2009 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER Additional MSGP Documentation For: Insert Facility Name Insert Facility Address Insert City, State, Zip Code Insert Facility Telephone Number (if applicable) Insert Facility Permit Tracking Number 'Instructions:',Xl Keep the folldwing inspection momtonrig and certification records m the same location that you keep your SWPPP x 5 A copy of the N01 submitted to EPA along with any correspondence exchanged betweenyou andv EPA specific to:coverage under this permit;(you should already, fiave this) A copy of the acknowledgment letter you received from`the N01 Processmg Center or.. NOl,syster'n10 . assigning your permit tracking number{you should already have this) _' A copy*of 2001i M$GP (you sari provide ah electronic copy) 3 4, f a a 'Description s and dates of any;incidences of significant spills" leak§ or other releases P Records of employee training y . z Documentation of maintenance and repairs of control measures a All Linspection reports * c ` A Description of'any deviations from the schedule for visual assessments and/or monitoring Description of any corrective action taken at your site _,' Documentation of any benchmark exdeedahces and how they were, respontled to Documentahofi to:support any _determination that'pollutants of concern are :not expected_ to be a present, above natural background levels Lnd that such pollutants; aere,notdetected m yourr .I dlscharge,oGwere solely attributable to natural background sources and r� 0 - ., T 4 1 * ✓ � l t �6p Documentation to support your claim that your facility has changed its status from activetoinactiv'l f'* s:. Eand unstaffed ,azra , EPA Additional MSGP Documentation Template, January 13, 2009 ii Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUM1317R Contents A. Significant spills, leaks or other releases B. Employee training.............................................................................................................. 2 C. Maintenance...................................................................................................................... 3 D. Routine Facility Inspection Reports...................................................................................... 5 E. Quarterly Visual Assessment Reports................................................................................ 10 F. Comprehensive Site Inspection Reports............................................................................. 12 G. Monitoring results............................................................................................................ 13 H. Deviations from assessment or monitoring schedule........................................................... 14 I. Benchmark Exceedances................................................................................................... 15 J. Impaired Waters Monitoring: Documentation of Natural Background Sources or Non -Presence ofImpairment Pollutant......................................................................................................... 16 K. Active/Inactive status change............................................................................................ 17 L. SWPPP Amendment Log.................................................................................................. 18 M. Miscellaneous Documentation.......................................................................................... 19 EPA Additional MSGP Documentation Template, January 13, 2009 iii Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER A. Significant spills, leaks or other releases Instructions: Include the criptions and ates any ces of nificant ks� or other releasds that' r circumstances dig to pollutants of and actions aken" inresponsethe release; and measures take resulted in discharges of llutants to waters of the U S., through stormwater or otherwise; the c n to prevent the recurrence of such releases (see Part 2.1.2.4 of the 2008 MSGP) Provide information, as shown below, for eachincident, and attach additional documentation (e.g., photos,' spill cleanup records) as necessary. Repeafas necessary by copying and pasting the fields below:. Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence Date of incident: Insert Date of Incident Location of incident: Insert Location of Incident Description of incident: Insert Description of Incident Circumstances leading to release: Describe circumstances leading to release Actions taken in response to release: Describe actions taken in response to release Measures taken to prevent recurrence: Describe measures taken to prevent recurrence EPA Additional MSGP Documentation Template, January 13, 2009 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT "[RACKING NUMBER B. Employee training Instructions: — Keep records of employee training, including the date of the training (see Part 2.1.2.9 of the 2008 MSGP). — For in -person training, consider using the tables below to document your employee trainings. For computer -based or other types of training, keep similar records on who was trained and the type of training conducted. Training Date: Insert Date of Training Training Description: Insert Description of Training Trainer: Insert Trainers names Employee(s) trained Employee signature Insert Name Insert Name Insert Name Insert Name Insert Name Insert Name Training Date: Insert Date of Training Training Description: Insert Description of Training Trainer: Insert Trainers names Employee(s) trained Employee signature Insert Name Insert Name Insert Name Insert Name Insert Name Insert Name Training Date: Insert Date of Training Training Description: Insert Description of Training Trainer: Insert Trainers names Employee(s) trained Employee signature Insert Name Insert Name Insert Name Insert Name Insert Name Insert Name EPA Additional MSGP Documentation Template, January 13, 2009 2 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER C. Maintenance Instructions: Include 'in"your records documentation of maintenance and repairs of control measures and: industrial equipment, including: the control measure/equipment maintained, date(s) of regular maintenance, - date(s) of discovery of areas in need of repair/replacement, andfor repairs, - date(s) that the control measure/equipment was returned to full function, and - the justification for any extended maintenance/repair schedules (see Part 2.1.2.3 of the 2008 MSGP). Provide information, as shown below, to document your maintenance activities for each control measure and industrial equipment. Repeat as necessary by copying and pasting the information below for additional, control measures. Control Measure Maintenance Records (copy information below for each control measure) Control Measure: Insert Name of Control Measure Regular Maintenance Activities: Describe maintenance activities Regular Maintenance Schedule: Insert Maintenance Schedule Date of Action: Insert Date of Action Reason for Action: ❑ Regular Maintenance ❑ Discovery of Problem If Problem, - Description of Action Required: Describe actions taken in response to problem - Date Control Measure Returned to Full Function: Insert Date - Justification for Extended Schedule, if applicable: Insert Justification (if applicable) Notes: Insert Notes (if applicable) EPA Additional MSGP Documentation Template, January 13, 2009 3 Additional MSGP Documentation INSERT FACILITY NAM17 INSERT FACILITY PERMIT' TRACKING NUMBER Industrial Equipment and Systems Maintenance Records (copy information below for each industrial equipment/system) Industrial Equipment/Systems: Insert Name of Industrial Equipment/System Regular Maintenance Activities: Describe maintenance activities Regular Maintenance Schedule: Insert Maintenance Schedule Date of Action: Insert Date of Action Reason for Action: ❑ Regular Maintenance ❑ Discovery of Problem If Problem, • Description of Action Required: Describe actions taken in response to problem • Date Industrial Equipment Returned to Full Function: Insert Date • Justification for Extended Schedule, if applicable: Insert Justification (if applicable) Notes: Insert Notes (if applicable) EPA Additional MSGP Documentation Template, January 13, 2009 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER D. Routine Facility Inspection Reports Instructions: Include in your records copies of all routine facility inspection reports completed for the facility. The sample inspection report is consistent with the requirements in Parts 4.1 of the 2008 MSGP relating to routine facility inspections. Facilities subject to State.industrial stormwater permits may also find this form useful. � If your permitting authority provides you with an inspection, report, use that form.; , Using the Sample, Routine Facility Inspection RepgN This inspection reportis designed to be customized according to the specific control measures and activities at your facility. For ease of use, you should take.a copy of your site plan and number all of the stormwater control measures and areas of industrial activity that will be inspected': Abrief description of the control measures and areas that were inspected should then be listed in thesite-specific section of the inspection report. You can complete the items in the "General Information" section that will remain constant, such.as the facility name, NPDES tracking number, and inspector (if you only use one inspector). Print out multiple copies of this customized inspection report to use duringyour inspections. - When conducting the inspection, walk the site by following your site map and numbered control` measures/areas of industrial activity to be inspected. Also note whether the "Areas of Industrial Materials or Activities exposed to stormwater" have been addressed (customize this list according to the conditions at your facility). Note any"required corrective actions and the date and responsible person for the correction.. EPA Additional MSGP Documentation Template, January 13, 2009 5 Stormwater Industrial Routine Facility Inspection Report General Information Facility Name Insert Name NPDES Tracking No. Insert Tracking No. Date of Inspection Insert Date start/End Time I Insert Start/End Time Inspector's Name(s) Insert Name Inspector's Title(s) Insert Title Inspector's Contact Information Insert Contact Info Inspector's Qualifications Insert qualifications or add reference to the SWPPP Weather Information Weather at time of this inspection? ❑ Clear ❑Cloudy ❑ Rain ❑ Sleet ❑ Fog ❑ Snow ❑ High Winds ❑ Other: Temperature: Have any previously unidentified discharges of pollutants occurred since the last inspection? ❑Yes ❑No If yes, describe: Describe Are there any discharges occurring at the time of inspection? ❑Yes ❑No If yes, describe: Describe Control Measures • Number the structural stormwater control measures identified in your SWPPP on your site map and list them below (add as many control measures as are implemented on -site). Carry a copy of the numbered site map with you during your inspections. This list will ensure that you are inspecting all required control measures at your facility. • Describe corrective actions initiated, date completed, and note the person that completed the work in the Corrective Actiot Lo . StructuralControl Control If No, In Need of Corrective Action Needed and Notes Measure Measure is Maintenance, (identify needed maintenance and repairs, or any Operating Repair, or failed control measures that need replacement) Effectively? Replacement? I Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement Z Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 3 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 4 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 5 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 6 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 7 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 8 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement Structural Control Control If No, In Need of Corrective Action Needed and Notes Measure Measure is Maintenance, (identify needed maintenance and repairs, or any Operating Repair, or failed control measures that need replacement) Effective) ? Re lacement? 9 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement 10 Insert Control Measure ❑Yes ❑No ❑ Maintenance Describe Corrective Actions Name ❑ Repair ❑ Replacement Areas of Industrial Materials or Activities exposed to stormwater Below are some general areas that should be assessed during routine inspections. Customize this list as neededfor the specific hpes of industrial materials or activities at your facility. Area/Activity Inspected? Controls Corrective Action Needed and Notes Adequate (appropriate, effective, and 1 Material ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions loading/unloading and storage areas 2 Equipment operations ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions and maintenance areas 3 Fueling areas ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions 4 Outdoor vehicle and ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions equipment washing areas 5 Waste handling and ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions disposal areas 6 Erodible ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions areas/construction 7 Non-stormwater/ illicit ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions connections 8 Salt storage piles or pile ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions containing salt 9 Dust generation and ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions vehicle tracking 10 (Other) ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions 11 (Other) ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions 12 (Other) ❑Yes ❑No ❑ N/A ❑Yes ❑No Describe Corrective Actions Non -Compliance Use this space for any additional notes or Additional Notes CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and title: Signature: Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER E. Quarterly Visual Assessment Reports Instructions: — Include in your records copies of alfquarterly visual assessment reports completed for the facility. An example quarterly visual assessment report can be found on the following page. EPA Additional MSGP Documentation Template, January 13, 2009 10 MSGP Quarterly Visual Assessment Form (Complete a separate form for each outfall you assess) Name of Facility: Name of Facility NPDES Tracking No. Insert Tracking No. Outfall Name: Name "Substantially Identical Outfall"? ❑ No ❑ Yes (identify substantially identical outfalls): Person(s)/Title(s) collecting sample: Name/Title Person(s)/Title(s) examining sample: Name/Title Date & Time Discharge Began: Date & Time Sample Collected: Date & Time Sample Examined: Enter date and time Enter date and time Enter date and time Substitute Sample? ❑ No ❑ Yes (identify quarter/year when sample was originally scheduled to be collected): Nature of Discharge: ❑ Rainfall ❑ Snowmen If rainfall: Rainfall Amount: No of Previous Storm Ended > 72 hours ❑ Yes ❑ No' (explain): riches inches Before Start of This Storm? Parameter Color ❑ None ❑ Other (describe): Odor ❑ None ❑ Musty ❑ Sewage ❑ Sulfur ❑ Sour ❑ Petroleum/Gas ❑ Solvents ❑ Other (describe): Clarity ❑ Clear ❑ Slightly Cloudy ❑ Cloudy ❑ Opaque ❑ Other Floating Solids ❑ No ❑ Yes (describe): Settled Solids" ❑ No ❑ Yes (describe): Suspended Solids ❑ No ❑ Yes (describe): Foam (gently shake sample) ❑ No ❑ Yes (describe): Oil Sheen ❑ None ❑ Flecks ❑ Globs ❑ Sheen ❑ Slick ❑ Other (describe): Other Obvious Indicators ❑ No ❑ Yes (describe): of Stormwater Pollution ' The 72-hour interval can be waived when the previous storm did not yield a measurable discharge or if you are able to document (attach applicable document< that less than a 72-hour interval is representative of local storm events during the sampling period. Observe for settled solids after allowing the sample to sit for approximately one-half hour. Detail any concerns, additional comments, descriptions of pictures taken, and any corrective actions taken below (attach additional sheets as necessary). Insert details Certification by Facility Responsible official (Refer to MSGP Subpart 11 Appendix B for Signatory Requirements) I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to a that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or tt persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I ai aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. A. Name: B. Title: C, Signature: D. Date Signed: Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT" 1 RACKING NUMBER F. Comprehensive Site Inspection Reports Instructions: — Include in your records copies of all comprehensive site inspection reports completed for the facility. " Copies of the comprehensive site inspection report form (also called the'Annual Reporting Form) can be obtained at hffp://www.epa.gov/npdes/pubs/msqp2008'appendixi.pdf — For corrective actions, complete part D (Corrective Actions) of the Annual Reporting Form. EPA Additional MSGP Documentation Template, January 13, 2009 12 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT'IRACRING NUMBER G. Monitoring results Instructions: — Include in your records copies of all monitoring results (including benchmarks, effluent limits, and other monitoring conducted) for the facility. Also include copies of MSGP Industrial Discharge Monitoring Reports (DM) submitted to EPA, or copies of monitoring data submitted to EPA's eN01 reporting system. EPA Additional MSGP Documentation Template, January 13, 2009 13 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER H. Deviations from assessment or monitoring schedule Instructions: Include in your records: — A description of any deviations from the schedule, you provided In your SWPPP for visual assessments and/or monitoring, and The reason for the deviations (e.g., adverse weather"or it was impracticable to collect samples within the first 30 minutes of a measurable storm event) (see Parts 4.2.1, 6.1 4,,and 6:2.1.2 of the 2008 MSGP) Use the fields below to document the deviations. Repeat as necessary for any deviations. Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason Date: Insert Date ❑ Visual assessments ❑ Monitoring Describe deviation from schedule: Describe deviation Reason for deviation: Describe reason EPA Additional MSGP Documentation Template, January 13, 2009 14 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMITTRACKING NUMBER I. Benchmark Exceedances Instructions: Include in your records documentation of any benchmark exceedances and how they were,respondeddo, including either:' — (1) corrective action taken, (2) a finding that the exceedence was due to natural background pollutant levels, or — . (3) a finding that no further pollutant reductions were technologically available and economically practicable and achievable in light of best industry practice consistent with Part 6.2:1.2 of the'2008 MSGP. Date: Insert Date Parameter Exceeded and Results: Insert Parameter Name Quarter 1 (Sample date: Insert Sample Date) Result: Insert Sample Result Quarter 2 (Sample date: Insert Sample Date) Result: Insert Sample Result Quarter 3 (Sample date: Insert Sample Date) Result: Insert Sample Result Quarter 4 (Sample date: Insert Sample Date) Result: Insert Sample Result Average Result: Insert Value Benchmark Value: Insert Benchmark Value from 2008 MSGP Document how benchmark exceedance(s) responded to: ❑ Corrective action taken Parameter(s): Insert Parameter Complete Part D (corrective actions) of the Annual Report Form (see section F of the Additional MSGP Documentation). ❑ Finding that the exceedence was due to natural background pollutant levels Parameter(s): Insert Parameter Attach the following documentation: • An explanation of why you believe that the presence of the pollutant causing the impairment in your discharge is not related to the activities at your facility; and • Data and/or studies that tie the presence of the pollutant causing the impairment in your discharge to natural background sources in the watershed. ❑ Finding that no further pollutant reductions are technologically available and economically practicable and achievable in light of best industry practice consistent with Part 6.2.1.2. Parameter(s): Insert Parameter Attach documentation. EPA Additional MSGP Documentation Template, January 13, 2009 15 Additional MSGP Documentation INSERTFACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER J. Impaired Waters Monitoring: Documentation of Natural Background Sources or Non -Presence of Impairment Pollutant Instructions: •This section applies only if your facility: • Discharges directly to an impaired water without an:EPA approved or established total maximum daily load'(TMDL); and eitheryour impaired waters monitoring results shows'that the pollutant(s) for which the water is impaired is 1. Notpresent and not expected to be present in yourdischarge, or 2. Present, but you have determined its presence is caused solely by natural background sources., See Part 6:2A.2 of the 2008 MSGP: If # 1 applies to your facility, include here documentation that the impairment pollutant(s) was not detected in your discharge sample, If # 2 applies to your facility, include the following documentation here: ^' • An explanation of why you believe that the presence of the pollutant(s) causing the impairment in your discharge is not related to the activities at your facility; and " • .Data and/or studies that tie the, presence of the pollutant(s) causing the 'impalrrnent in your discharge to natural background sources in the watershed, Note: You are reminded that the permit requires you to include a notification that you have met either condition # 1 or # 2 (above) in your monitoring report that you submit to EPA. Date: Insert Date Check one of the boxes below and complete the additional documentation: ❑ #1— Pollutant(s) for which the water is impaired is not present and not expected to be present in your discharge Attach documentation that the impairment pollutant(s) was not detected in your discharge sample(s). ❑ #2 — Pollutant(s) for which the water is impaired is present, but you have determined its presence is caused solely by natural background sources. Attach the following documentation: • An explanation of why you believe that the presence of the pollutant(s) causing the impairment in your discharge is not related to the activities at your facility; and • Data and/or studies that tie the presence of the pollutant(s) causing the impairment in your discharge to natural background sources in the watershed. EPA Additional MSGP Documentation Template, January 13, 2009 16 Additional MSGP Documentation INSERT FACILITY NAME INSEKT FACILITY PERMIT"TRACKING NUMBER K. Active/inactive status change Instruction's: If your facility changes it status from active to inactive and unstaffed (or from inactive/unstaffed to active), include documentation in this section to support your claim. Date: Insert Date of Change in Status New Facility Status: ❑ Inactive and Unstaffed ❑ Active Reason for change in status: Describe reason EPA Additional MSGP Documentation Template, January 13, 2009 17 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER L. SWPPP Amendment Log Instructions: Include in your records: — A log of the date and description of any amendments to your SWPPP. ' Fill in the appropriate columns of this table for each amendment to your SWPPP. Copy and paste additional rows into the table as necessary. sAmend. No:' Descri"ption of"the Ain'enHroerit' Date of Amendment Amendment Prepaied by [Namets) and 7r tl'e] 1 Insert description of amendment Insert date Insert name/title 2 Insert description of amendment Insert date Insert name/title 3 Insert description of amendment Insert date Insert name/title 4 Insert description of amendment Insert date Insert name/title 5 Insert description of amendment Insert date Insert name/title 6 Insert description of amendment Insert date Insert name/title 7 Insert description of amendment Insert date Insert name/title 8 Insert description of amendment Insert date Insert name/title 9 Insert description of amendment Insert date Insert name/title 10 Insert description of amendment Insert date Insert name/title 11 Insert description of amendment Insert date Insert name/title EPA Additional MSGP Documentation Template, January 13, 2009 18 Additional MSGP Documentation INSERT FACILITY NAME INSERT FACILITY PERMIT TRACKING NUMBER M. Miscellaneous Documentation Instructions: Use this section to keep records of any additional documentation that relates to your compliance with the permit. EPA Additional MSGP Documentation Template, January 13, 2009 19