Loading...
HomeMy WebLinkAbout740022_Inspection_20191025Division of Water Resources Facility Number - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: *Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access 0"�) Date of Visit: ® Arrival Time: Departure Time: County: ,' T� Region A Farm Name: VRQ fy _ Owner Name: % a'. �) SLA6'3 Mailing Address: 7:),s -(O5 Physical Address: Facility Contact: 'b!! n 1 S.Q '6QCU Jk— Title: Onsite Representative: 1 S-L. Act A A OCJ`__ Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Latitude: Owner Email: Phone: Gf 10 Phone: \ \ Integrator: ON Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Fa er Non -Layer Design Current nry Poultry Canaeity Pun. Layers Non -Layers Pullets Turkeys ,Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes U/No ❑ Yes ❑ No ❑ Yes ❑ No ❑NA ❑NE ❑NA ❑NE ❑NA ❑NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ o ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ YesVNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: Date of inspection: a / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Spillway?: _ Designed Freeboard (in): _ Observed Freeboard (in):_ _ 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? [%'No ❑ NA ❑ No ❑ NA Structure 6 ❑ Yes No ❑ NA ❑ Yes M/No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [Zo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes LJ ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes dNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes [?No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes Q4 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes YNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑'No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [�To ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes []4 ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Ej4o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes E�Ao ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need i prove e �? f yes, ch�1k the appropriate box below. [;]/Yes ❑ No ❑ NA ❑ NE ❑ Waste Application Weekly Fir-eeb and ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued s10Z/Y/Z uoqd co —Lob -` rr'l sum [2 £ fo £ asvd :amluuSiS aoloadsul/aamalnaN :autt,N aoloadsul/iannatnOd Y\ 4-PL 1 kag -�1 l (-N sue, Y'�� s z ' 1 be-s0-7 l�' 7 J (is �5 •(Caussaaau ss satud Isuolllppu asn) suollsnlls ulrldxa aallaq of ,14glas3 3o stlutmvap asn •sluammoa aaglo ,fur ao suollupuatumoaaa Isuolllppu fuu ao/pus saamsus SgA Sus ululdxg :(# uoilsanb of ta;aa) sluammo j aN ❑ `dN ❑ oN/-1 saA LAoua& amus agl Xg llsin dn-mollo3 u aunbal f4!j!ou3 agI saoQ •},£ am t/N El Lanlluluasaadaa olls-uo ut, gl!m uolloadsul/enainaa ssnosip of Itu3 aoloadsul/aanma► -d aqI PIQ '££ dN ❑ vN ❑ oN/f n saA LdWAkVD zo lluuad agl jo amulldum-uou asnuo golgnn palou suzalgoad Isuolllppu Auu aaaM -Z£ :aag10 puod asuaols/u002u-1 plai3 uolluollddy ❑ 3N El d N El o� saA ❑ •nnolaq xoq aluudoaddu agI 31oag3 `sari 3I LAI?Ilot,3 agI It, Istxa suluap alit aot,3ansgns oQ ' I £ (umluollddu-aano `smalgoad pmogaag 135aug3sip `•a•I) Llluuad gN M dN El oN D sa k Efl aqj Aq paambaa su suotlunlls AmaSaaut33o aogJO Iuu0123-1 agI Aigou oI llt,3 AlIlloui agI PIG '0£ 11319lpautml antluluasaadaa fQ!luno atd luumow t, Iouluoo `sari jl AN ❑ v N ❑ o N F1 sak Luaamoo f4!junb alu ao aopo uu asod ,14lliau3 agI plp uotloadsui agl jo anvil agI Id -6Z �`- Llt,uuou uugl aagglg aaam Iugl salua [%3Ilruom Iaodaa put, gN ❑ dN ❑ oN Fl soA 7 Iuaumoop zo/put, smog tZ gllm sluunuu pt,aP3o osodslp Apadoad of ilu3 �iI►Ilouj aqI plQ •gZ sanssl aaglO J N ❑ dN El oN saA ❑ Luollt,ogtlaao (IV-ld) sluouissassu ssol stuogdsogd t, amoas of Iiu3 f4lilou3 agI pIQ -LZ A N dN Nsad LaRmga ul aoluaado pagtlaao 1ilanllot, ut,30 uollt,luoumoop apinoad Ilu3 �lilot,j aqI PiQ '9Z :aouugdmoo-uou gutluolpul XoAms Isig jo amp put, (s)aanlotuls Isl'I uooSul Auu ul slanal agpnls Iuulldmoo-uoN slanal 32pnls ioj dOd u dolanap oI amllud El Aanans aSpnls Imum alaldutoo of amllt,d - molaq (sa)xoq alupdo.tddu agI gN ❑ dN ❑ oN sa' 3Ioago `saA3I LaSpnls of palulaa suolllpuoo lluuad gllm aouulldmoo3o Ino f4Illau3 agI sI 'SZ gN dN oN saA ❑ Llluuod agI Aq pazlnbat st, Iuamdtnba uotluollddu alsum alt,aglluo of Ilt,3 �lilou3 agI PIQ •bZ _S -o :uo!Iaa su13o alr�I - :aaq[anN Ilias�