Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG160201_COMPLETE FILE - HISTORICAL_20100702
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. /V (�� I u 0 DO DOC TYPE 1. HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ 9 % -6c.) YYYYM M DD `.. 1 NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 2, 2010 Mr. David Glover Barnhill Contracting Company PO Box 1529 Tarboro, NC 27886 Subject: General Permit No. NCG160000 Weldon Asphalt Plant COC NCG160201 Halifax County Dear Mr. Glover: Dee Freeman Secretary In accordance with your application for a discharge pern3it received on June 17, 2010, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the ' US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Robert Patterson at telephone number (919) 807-6375, or robert.pattcrson@ticdenr.gov. ncdenr.gov. Sincerely, PRIGINA!.. SIGNED 13111 for Coleen 1-Mullins', I cc: Raleigh Regional Office - Myrl 1�Ilsely Central Files Stormwater Permitting Unit Files Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-80764941 Customer Service: 1-877623-6748 Internet: w .ncwaterquality.org An Equal opportunity 1 Affirmative Action Employer t�l One Not-thCarolina, Natuhally STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160201 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision ofNorth Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Barnhill Contracting Company - is hereby authorized to discharge stormwater from a facility located at Weldon Asphalt Plant. Hwy 301 (-1,000 ft. south of Washington Ave.) Weldon Halifax County to receiving waters designated as UT to Mush Island Gut, a class C water in the Roanoke River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, Ill, IV, V, and VI of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective July 2, 2010. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 2nd day of July, 2010. ORIGINAL SIGNED BY KEN PICKLE for Coleen H. Sullins, Director Division of Water Quality By the Authority of the Environmental Management Commission NCG160201 Map Scale 1:30,000 Barnhill Contracting Company Weldon Asphalt Plant Latitude: 361 24' 04" N Longitude: 771 35' 37" W County: Halifax Receiving Stream: UT to Mush Island Gut Stream Class: C Sub -basin:( 03-02-08 (Roanoke River Basin) r��1i+r-�.�► �iit�u ��� .rna da.•�.�i Facility Location Division of Water Quality / Surface Water Protection w NCDENRNational Pollutant Discharge Elimination System Dnrxun.e+, n rx�nox.r,vr v,n Naw,u. nrw.:vrs NCG160000 NOTICE OF INTENT FOR AGENCY USEONLY Dmc Rmcmd Year Month Ua 2.6161 Coo d cenifi.w fC.,� .. I[-)Il check a I Aimunt Vomit Assi ncJ to Va r National Pollutant Discharge Elimination System application for coverage under General NCG160000: STORMWATER DISCHARGES associated with activities classified as: iEIVE JUN 1 7 2010 Coverage under this general permit is applicable to all owners or operators of stormwater point guuft"dt5cl lai associated with activities classified as establishments primarily engaged in Asphalt Paving Mixtures and Blocks [standard industrial classification (SIC) 2951]. VKA For questions, please contact the DWO Regional Office for your area. (See page 4) (Please print or type) 1) Mailing address of owner/operator (address to which all permit correspondence will be mailed): Name Barnhill Contracting Company Owner Contact David Glover Asphalt/ OC General Manager Street Address PO Box 1529 City Tarboro State NC ZIP Code 27886 Telephone No. 252.823.1021 Fax: - 2-57— 824.8276 E-mail Address dglover@barnhillcontracting.com 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. Email Weldon State NC ZIP Code 27890 Halifax 252 977.9637 Fax: —d-gTo—v-er@barnhilicontracting.com 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From 1-95. take all #173 at Roanoke Rapids onto NC 158, Take NC 158 (Julien R Nlsbrook Highway) appropmalely 3 miles east to the Town of IVeldon. Continue east on E 3rd Stree4 and turn right onto US Hwy 301 South. continue south on US Hwy 301 for approximately 1.8 miles, then turn left onto a dirt driveway mr.hed by a sign indicating'Rightrnyer Machine Rentals.' The site is approximately 0.1 mile on the left - 4) Latitude 36.40138 Longitude-77.59367 (degrees, minutes, seconds) 5) This NPDES Permit Application applies to which of the following: X New or Proposed Facility' Date operation is to begin ❑ Existing July 2010 `If this new or proposed facility in one of the 20 coastal counties, you must contact the appropriate Regional Office (see page 4) to determine if a State Stormwater Permit is also needed prior to construction. Page 1 of 4 SWU-234-030909 Last revised 3/9/09 NCG190000 N.0.1. 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 2 9 5 1 7) Services and Activites a) Provide a brief narrative description of the types of industrial activities and products manufactured at this facility: (Include a site diagram showing the process areas and location of activities present at this facility.) Asphalt and asphalt mixture for paving b) Check all services and activities offered or allowed at this facility 1_' Outdoor stockpiling of materials *r Storage of raw materials ;;a Storage of materials in above- ground tanks X Material Loading and Unloading 8) Discharge points / Receiving waters: 5C Transport of materials by a conveyor or front-end loader ❑ Vehicle and equipment maintenance X Vehicle/Equipment Washing 5' Vehicle and equipment fueling How many discharge points (ditches, pipes, channels, boat ramps, lift wells, etc.) convey stormwater from the property? 1 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? unnamed tributary to Mush Island If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). n/a Receiving water classification (if known): n/a 9) Does this facility a) Have an untreated wastewater discharge? A'No ❑ Yes b) Have a treated wastewater discharge? NrNo ❑ Yes If yes, list the permit number. n/a c) Have a wastewater discharge from a recycle system? VNo ❑ Yes If yes, list the permit number. n/a d) Have a non -discharge permit? K No ❑ Yes If yes, list the permit number e) Discharge wastewater to a municipal wastewater collection system? If yes, list the municipality and permit number n/a W No ❑ Yes Note: Stormwater discharge permit NCG160000 does not authorize the discharge of any wastewater. If this site discharges wastewater, you must obtain the appropriate wastewater discharge permit in addition to coverage for stormwater discharges under NCG160000. 10) Does this facility employ any best management practices for stormwater control? ❑ No bkYes (Show any structural BMP's on the site diagram.) The existing basin, aka watering hole, has no outlet and will flood back into the large ditch and law lying area of the existing pit. All runoff from the asphalt plant will run into the ditch and be contained in in the pond. Page 2 of 4 SWU-234-030909 Last revised 3/9/09 NCG190000 N.O.I. 11) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No K Yes If yes, when was it implemented? currently being implemented 12) Are vehicle/equipment maintenance activities occurring at this facility? -kNo ❑ Yes 13) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? `RL No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 9 No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? K No ❑ Yes d) Is hazardous waste stored in the 100-year flood plain? K No ❑ Yes If yes, include information to demonstrate protection from flooding. e) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: n/a How is material stored: Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: 14) Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Articls shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person of Applicant) David Glover a (Dot fgned) S W U-234-030909 Page 3 of 4 Last revised 3/9/09 NCGI90000 N.O.I. Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR Final Checklist This application will be returned as incomplete unless all of the following items have been included: J2r Check for $100 made payable to NCDENR Z This completed application and all supporting documents A site diagram showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater management structures, (c) location of stormwater outfalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e) areas where materials and/or boats are stored, (f) impervious areas, (g) site property lines, (h) boat maintenance, blasting, painting and washing areas, and (i) location of services and activities listed in 7b. Copy of county map or USGS quad sheet (preferred) with location of facility clearly, marked on map Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DINO Regional Office for your area. DWO Reoional Office Contact Informa*t^ Asheville Office ...... (828) 296-4500 Fayetteville Office... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 4 of 4 SWU-234-030909 Last revised 3/9/09 uments an( '�etungsVIAMcrr2Il \:Vly uocumen[$VIAevinVu9-I"u-DUrnlll-vvCluun-JiYJI-Vu,-IYv-JI_owg uu/lu/1u" - ". -'-. IL Hm - I'll uy n LEGEND DA 30,000 GAL. ASPHALT CEMENT AST I 15- 2 I _ © 20,000 GAL. #2 DIESEL FUEL AST EXISTING DITCH — © 250 GAL. RELEASE AGENT (2 TOTES) 6p'aG SLOPE OF GRADE 510PE ® VARIOUS SIZED AGGREGATE BULK STORAGE I _ -• - SS VARIOUS E4$EMemr I ._ _, ` • VASE Wf(DO, GIN co - - \ KC£ OA I-Jl/Jl] I wl - - _ OAK cl EIP'S BASE OF o FENCE CORNER POSE I ; ,I — — — — — — — — — — — — — — — WE OREIB£LOIS 22o6/>21 PLAJ +/235 O I j �I•• ml I II I I O D Ilp EASEMENT 1 .20' c/c57 20.1.D.LE..... -zo.li;� X I I 1 II 11 I I ,I 60ACCESS EASEMENT 1456/27 611.aY e0]5/6JG 10 UNDISTURBED BUFFER ,d IKt, 9'c,11 boW road N80'34'44'E 99,13 i I I SLOPE Bd-fiIPM — Poknq. J- 0 LOCKABLE GA v 4 EQUIPMENT STOft AG ' -' -e,. .oads- I� .._............._. N/£ ' I COA$JAL LIMBER CO. ' SAND - L1' PCa; 4/J9 1.1U STOCKPILE Pear 17/5+ L h. CLEAN STONE STOCKPILE SO i 4- S L; 9O c�. ``...". I nE �r PO 02 6 Po ..'•. CLEAN ST-ONE i [ 1 STOCKPiLEI N - 968065.41 2413539.0 E - 241363] d \ Recydetl Asphol t. `: �Slockpile (RAP) - '\•.., P �oo v iL - Sediment B ... 9 prel OPL i / ..- -q 405sw 25990 -SJCCP ROPE- i 56, yD 53" _y TFA S79'57'45-W 569.56 `\ V ECM WEIR 361F 0.AC = 92 03-55CFS3 N \ LOA$JA( LUMBER CO •'� /364/2J PC AV 4/39 PLAJ O/54 NORTH �❑� ®® �o � w � w V m Iiz —> E V W U V W U No �omA wFw: i i n�o' f m on I Ujz 3m c corn r m o W'^>c coNrvo �av13 �`o 0 JU23 m Uzi; na4J a Zia oo _> 3 O > O n U � V rn N O � a N I I Z � r Z w lT r O n J O m J Q O O N O N I O m s= � y m m m Z Y - 0 D s � Z ...• < < c u < c 1 CP Z a 0aU %— U2T�Z r Z cnao J ��W co)Z3 W I n r z 0 I_ z VICINITY SKETCHES for DRAWN K ev: Kevin Harrell J.N. 09-140 CONSULTING ENGINEERS, P.A. CIVIL, MUNICIPAL &STRUCTURAL ENGINEERS e ecnevs n n n r BARNHILL ASPHALT PLANT WELDON N.C. COMPRE ENVIRONMENTAL SERVICES www.a www.appionengineers.com PO Box 7966 / Rocky Mounl, N.C. 27804 Phone: (252) 972-7703 Fax: (252) 972-7638 EMAIL: admin®appioneegineers.com O O ❑ 0 ofto AproAn SCALE'. NOT TO SCALE FILE NAM[ 09-140—S1.dwg CAIE June 9, 2010 SHEET H: 1 OF 2 Bamhil Contracting Company Weldon Asphalt Plant Exisiting'Pierce Pit' by Rightmyer Machine Rentals December 2009 TerraServer Image Courtesy of the USGS http://terraserver-usa.com/Printlrrege.aspx7T=2&S=1 I &Z=I &&X=667... Send To Printer Back To TerraServer Change to 11x 17 Print Size Show Grid Lines Change to Landscape aluGS 1 km S of South Weldon North Carolina, United States 01 Jul 1974 cr. '� Barnhill Asphalt Plant 1 one `: 4�` — .,.tk Weldon, NC Halifax County 17 I•, � _ 1- '200M V Long:-77.59367 Lat: 36.40138 11• 5 V t' �\ Site 0' '200yd Image courtesy of the U.S. Geological Survey © 2004 Microsoft Corporation. Terms of Use Privacy Statement I of 1 12/2/2009 11:46 AM 08 �C Q Y Z m 0 Oj o c I?cp @Ocn 2.0 ]1' 36Y 'i n• 35' ir' 1T 3G 1 V' n' 35' 15" 0 0 Z a0 A m m Soil Map —Halifax County, North Carolina (Weldon- Pierce Pit) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Very Stony Spot Map Scale: 1:5,370 if printed on A size (8.5" s 11 ") sheet. Area of Interest (AOI) Wet Spot The soil surveys that comprise your ACI were mapped at 1:24,000. Soils Other Please rely on the bar scale on each map sheet for accurate map Soil Map Units measurements. Special Line Fsarea W Special Point Features Gully Source of Map: Natural Resources Conservation Service Vy Blowout Web Soil Survey URL: http://websoilsuNey.nrr .usda.gov Short Steep Slope Coordinate System: UTM Zone 18N NAD83 ® Borrow Pit X say soot ... Other This product is generated from the USDA-NRCS certified data as of Political Feature the version date(s) listed below. s Closed Depression Cities Soil Survey Area: Halifax County, North Carolina X Gravel Pit Water Features Survey Area Data: Version 12, Mar 29, 2009 .. Gravely Spot Oceans Date(s) aerial images were photographed: 6/30/2006 ® Landfill Streams and Canals The orthophoto or other base map on which the soil lines were A Lava Flow Transportation compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting ,6 Marsh or swamp a..t. Rails of map unit boundaries may be evident. V Mine or Quarry N Interstate Highways ® Miscellaneous Water - US Routes p Perennial Water Major Roads v Rock Outcrop N Local Roads } Saline Spot .. Sandy Spot s Severely Eroded Spot O Sinkhole )t Slide or Slip q Sodic Spot M Spoil Area 0 Stony Spot DANatural Resources Web Soil Survey 121212009 Conservation Service National Cooperative Soil Survey Page 2 of 3 Sail Map —Halifax County, North Carolina Weldon- Pierce Pit Map Unit Legend Halifax County, North Carolina (NC083) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaA Bethera loam, 0 to 1 percent slopes 3.4 3.4% DgA Dogue silt loam, 0 to 3 percent slopes 3.4 3.4% EmA Emporia fine sandy loam, 0 to 2 percent slopes 7.1 7.1 % EmB Emporia fine sandy loam, 2 to 6 percent slopes 15.4 15.5% GoA Goldsboro fine sandy loam, 0 to 2 percent slopes 14.0 14A % GtB Gdtney fine sandy loam, 2 to 6 percent slopes 1.6 1.6 % MrA Marlboro fine sandy loam, 0 to 2 percent slopes 9.1 9.2 % RoA Roanoke loam, 0 to 2 percent slopes, occasionally flooded 5.6 5.7% Ud Udorthents, loamy 31.2 31.4% WnF Winton fine sandy loam, 25 to 45 percent slopes 8.4 8.5% Totals for Area of Interest 99.3 100.0% USDA Natural Resources Web Soil Survey 12/2/2009 ;am Conservation Service National Cooperative Soil Survey Page 3 of 3 N���'I�IIillk"j _1' 1I� 111 4l�i tlll l,lll il�nllll Ilro w:��� BRANCH BANKING AND TRUST F RA J s v "'= COMPANY ` ANY'""jz"' TARBORO NORTH CAROLINA^ 1'lppynt �1611�106/ r 6n' 'Hundred Dollars and 00 Cents J I, p mpI n ry pllri]16I"I jen ll� C ll7 FFF / q NCDENR DIVISION`OF._. WATER. QUALITY 1617 MAIL SERVICE CENTER ,RALEIGH NC 27699 1617 - x �:< ✓ + � � � s+ i� i pl �IllJl�i "`II u 692488n . a ias�.., aa ,, 5 1.n"tis9i } rt ti 1�r,t :.4 W o t �',�✓W 7 4 f i, E ,I, i � G y j�►► nr? � r,7r � ci; & I�' ,' It i ,..- �.BARN.•,�HILi. -n60NTRA'CTINV � r , r a t• �- 1 t .c MINI 19' t _:� <e"'?d sr+-•'� �',,�.-'�"'- `�-+''.�.� � 3 �X f'+'�'��-F,i ��OMPAN: �T'Fi:=. Oarcorporate headquarters is`elocatin j on 9.26 14 Please updateyour records' US Mail: -PO Box � i 7948 Rocky;Mount, NC:27804 ' AII'other deliveries: 800 Tiffany Blvd., Suite 200 Rocky Mount,; NC 27804 P6one:252-823-1021 Fax:252=823-0137' STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE, HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ W V poi YYYYM M DD NC®ENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 2, 2010 Mr. David Glover Barnhill Contracting Company PO Box 1529 Tarboro, NC 27886 Natural Resources Subject: General Permit No. NCG 160000 Weldon Asphalt Plant COC NCG160201 Halifax County Dear Mr. Glover: Dee Freeman Secretary In accordance with your application for a discharge permit received on June 17, 2010, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This pennit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Robert Patterson at telephone number (919) 807-6375, or robert.patterson@ncdeiir.gov. ncdenr.gov. Sincerely, ORIGINAL SIGNE04V KEN PICKLE for Colleen H. Sullins cc: Raleigh Regional Office - Myrl Nisely Central Files Stormwater Permitting Unit Files Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6494 \ Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer JUL - 8 ?010 J'I If 1r[ 1 L OFFICE1 Noi thCarolina Q; STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160201 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Barnhill Contracting Company is hereby authorized to discharge stormwater from a facility located at Weldon Asphalt Plant Hwy 301 (-1,000 ft. south of Washington Ave.) Weldon Halifax County to receiving waters designated as UT to Mush Island Gut, a class C water in the Roanoke River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, 111, IV, V, and VI of General Permit No. NCG 160000 as attached. This certificate of coverage shall become effective July 2, 2010. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 2nd day of July, 2010. ORIGINAL SIGNED BY KEN PICKLE for Coleen 1-1. Sullins, Director Division of Water Quality By the.Authorily of the Environmental Management Commission NCG160201 0 Map Scale 1:30, 000 Barnhill Contracting Company Weldon Asphalt Plant Latitude: 361 24' 04" N Longitude: 77' 35' 37" W County: Halifax Receiving Stream: UT to Mush Island Gut Stream Class: C Sub -basin: 03-02-08 (Roanoke River Basin) 1 Facility Location Permit: NCG160201 Owner - Facility: Barnhill Contracting Company Inspection Date: 07/01/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: This site inspection carried out jointly by RRO and the Stormwater Permitting Unit was made to better understand topographic features of the site as described in the permit application and aerial views of the location. This former mining site is a shallow pit with stable slopes around all sides. The information on hand showed a signficant ditch carved into the middle of the site that carried rainwater to a small retention pond. During the tour of the site, it became evident that Barnwell planners had altered the earthmoving plan to remove the ditch and better direct stormwater to minimize velocities. Water from the stone and reclaimed asphalt piles will flow to the north and west, to come to a small retention basin on the north side of the entrance road. When that pond level reaches the 24" culvert pipe, placed at a higher elevation that the existing 48" pipe, the overflow will travel to a larger retention pond. That pond has a standpipe, and its overflow enters a wooded area and spreads as sheet flow on its way to the Roanoke River. Water from the asphalt manufacturing plant will go two directions, either to the east or to the center of the site to the above mentioned small retention pond at the roadway. Water collected on the east side will travel around the perimeter to the south end and through vegetation to join the channel into the final retention pond. This flow pattern will stop erosion observed near the inlet to the final pond. With this new understanding of stormwater management, SWPU will issue the permit immediately. Startup of production is expected in about 2 to 3 weeks. , v l a 6 0 Other Comment: Construction was confirmed to bean improvement from what had been submitted with the permit application. See Summary. Yes No NA NE Page:2 � t 1 ' t � `s,[ l e 3.�#q' ^ s✓ r E.f e$. ♦ ? � � , yi ,iJ' � - - I- •t } J F! t • A \+,'' .J iS - t^ r tNj�(i^ h_�.tti- ^rt .'. •r AT fs � t � j'A. �1 • }��}r' Jf �. �' U '"" �,.% -r, e �� A (` TRH yti` �.rp ^ �.,� �`, �S � _ � � -ti-�✓. �ci i �, �•� rr''� :fit d ,>,�.,r . fi xr jj � �L 4', - t �� r 11 �R u' •.- h`(,.Y, ,; ]' ,', i. K)?tl�\\p}1/ (f�7 , t i `` + l rY� f��'T1" - F , rJ �pj r + IiA "� :�..s _J �• .61 �r'g—�r/. �� . -� r t °{,... V�ti, � a' irE � • '!' '� {�}'}�i15: �'�}. ' �� �v4��- -" �� a + � � � i��u'} ,c l\ (ij � > i �� '�� t�ll s. �+r�# N' .,L `tom � ✓.Y. � �.,. 1 `L[�3+�[� an . "'T- yj' � �r �` fi\ it y1]i'" r � \i 'r tf. 1 �LI;F'���:'r* '� � y"�A.M--'T �''.-•• A {' �/R /rl. 4 jVf)�t l.Gly-.,� R IiN "t A.,• Y+ vcc��?�n✓f sY ~f���iA--.y��`•� - v ,t�, � ` ItS��j� 11t �,• K "r`L�'k tN.. �r`l, .3 r^ti JA�; t �' �I S7f J .f)� 1!r� ,. �,�r}{�.�•� �^Y' t1 ,��. ' Q' -0 � t.n S`vr �r'•y v !f'�df�l. -• ,ja JI�,;••+'�:`iR1�t � - ,.1 i �. � e' � �y��� _ . ��� � f•�. � rl' E� �'�, .. � e�},(f ,�.,-.. � �_.�9 3 - � - [{y�+ ♦q v e 1 � : �( >I �t.�. �y"' ' -tif �Y4/tn/' I '�Y � y ' rl i�.��*. OP, 6 ✓ GL �. `;. L1iv r � �., ^pQ}5r il�"s'�. t�� � �- �ti�_ i tt�/1 45 � ill --� S�t�.i • 2�r • � + �-y "' � ' _ ^`? ^ n ("\17rY'L, r S T.. v. ...l», k • , i},i r..'"1 }L_&�i+-` `t' r V+ �'7 t � b { •�oL .,s. `.i�rfialrn l � ♦. t d[✓ > 4sv j J � c n '�5� 4�r '1 � �j� �-, e9t y. •�t' �. � r J�+ � r ( °S lj'tl rc °-r;'� CC��}}�� T.T• I.� ? _ x =� <. i't'i'";.e ,�(rT O.. • /r �li�'i �`V. r r �'o c� r , � ,� t�jJ' l a�Cd�� i �. � }``'+� 4n/ •�+ : s � L f.... 1 ;'.'�. r11�j1�� •: �-`; !% r <�.� r��J' :r :. - l ` ^ 7 �'`- J ly 11 1`E� I,t #T1 •T �++' � �. ,. ` ATE ++ K1O" 'l .fir jai : • in �* _ v } ` Z. i'��(.i i r �-} g�i %d%. °�. c,-At i<�>.�>„r ( t '•o r i- v> tr'tf'�* 'y.l.i F, _ , r{',.. Y o=:J�, Yf t t# t .i :. • T) JJ .t_r+taS 4> ) � J i 1+r/ � ♦�. 1 .� AtFi�� � :�4� r y�: �� �'F�� . r :. r. cl aryeI r�n�.'L r I +. r `� F,� E t'', t •. j' .i�' +�t4 a.} � Y ,. �� � � � �'tl �1 �� ❑ b 44, ( n". ,.t f, - N� t ' f r ul,t i� , fr• tP l , ol , - - i i � u r , IO ''�-El rJ,7J� 'r ? G�� _ .E:• � !"A � �*_ ii� 5�� 0 �, 1 1 1 \ N m r 1 \ OX N Y/ o = m z 01� o O Ol I k a o 0 0 oil x' II ~ I � I A v �lii J am p R ( rnm�rll�>Innn��rr __ 1 , )0J } wtA-'x V�� r 9r 7-r Yam-' 1 �- %1 �•' KT9aJ� jll &w' i ( N ` t8 1 '•. I a L • A N • , •Zl5'IS'3•Y In.33H L u 11 I YKmlo Harrell o9-1ao CONSULTING ENGINEERS, P.A. n l SITE SKETCH for nviL. NHHIEIGAL = $IFpEIHi.L LH .EEwS In COYPPEHf N$IVE [NVIPONN(NILL $LFVICC$ O � � BARNHILL ASPHALT PLANT Nor TO SCALE O9r taO—Sl.tlwg w°m L"=2 M^kl wl r ; 1 ', ,•I . v.o. e•. a°es /tzsvi�9�i� iue <. neo. A Dail n �� NC®ENR n Cwaru Gw✓,r.e+r w FnJY1JJwe�♦ y�lr N/MV.M�0..\!S Division of Water Quality / Surface Water Protection National Pollutant Discharge Elimination System alitil11i1)lllc FOR AGENCY USE ONLY Dam Received Yca, Month Da i.airt I CcdifkaeoFCove c n 9. '7 Check q 1 Amount c sti y , Pe ut Assi med to (' NOTICE OF INTENT 0 @@� V IS National Pollutant Discharge Elimination System application for coverage under General it NCG160000: JUN 1 7 7010 STORMWATER DISCHARGES associated with activities classified as: DENR -WATER Coverage under this general permit is applicable to all owners or operators of stormwater point �r Brar associated with activities classified as establishments primarily engaged in Asphalt Paving Mixtures and Blocks [standard industrial classification (SIC) 29511. For questions, please contact the DWQ Regional Office for your area. (See page 4) (Please print or type) 1) Mailing address of owner/operator (address to which all permit correspondence will be mailed): Name Barnhill Contracting Company Owner Contact Street Address City Telephone No. E-mail Address David Glover PO Box 1529 Tarboro State NC ZIP Code 27886 252.823.1021 Fax: 257— 824.827 dglover@barnhillcontracting.com 2) Location of facility producing discharge: Facility Name Facility Contact Emerson Etheridge Jr Plant Superintendent Street Address Hwy 301 City Weldon State NC ZIP Code 27890 County Halifax Telephone No. 252 977,9637 Fax: Email �CgTo—ver am I contracting.com 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From 1.95, take exit #173 at Roanoke Rapids onto NC 158. Take NC 158 (Julien R. Allsbrook Highway) approximately 3 miles east to the Town of Weldon. Continue east on E 3rd Street and bum right onto US Hwy 301 South. Continue south on US Hwy 301 for approximately 1.8 miles, then turn left onto a din driveway marked by a sign indicating'Pighhnyer Machine Rentals' The site is approximately 0.1 mile on the IeR 4) Latitude 36.40138 Longitude -77.59367 (degrees, minutes, seconds) 5) This NPDES Permit Application applies to which of the following : 0 New or Proposed Facility" ❑ Existing Date operation is to begin July 2010 'If this new or proposed facility in one of the 20 coastal counties, you must contact the appropriate Regional Office (see page 4) to determine if a State Stormwater Permit is also needed prior to construction. Page t of 4 SW I I-2a4-nsn4no I SQr Mvinwl aiam4 NCG190000 N.O.I. 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 2 9 5 1 7) Services and Activites a) Provide a brief narrative description of the types of Industrial activities and products manufactured at this facility: (Include a site diagram showing the process areas and location of activities present at this facility.)_ Asphalt and asphalt mixture for paving b) Check all services and activities offered or allowed at this facility D? Outdoor stockpiling of materials 10' Storage of raw materials Storage of materials in above- ground tanks �t Material Loading and Unloading 8) Discharge points I Receiving waters: 5r Transport of materials by a conveyor or front-end loader ❑ Vehicle and equipment maintenance 9 Vehicle/Equipment Washing R Vehicle and equipment fueling How many discharge points (ditches, pipes, channels, boat ramps, lift wells, etc.) convey stormwater from the property? 1 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? unnamed tributary to Mush Island If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). n/a Receiving water classification (if known): n/a 9) Does this facility a) Have an untreated wastewater discharge? ArNo ❑ Yes b) Have a treated wastewater discharge? NrNo ❑ Yes If yes, list the permit number. n!a c) Have a wastewater discharge from a recycle system? 5rNo ❑ Yes If yes, list the permit number. n/a d) Have a non -discharge permit? 9 No ❑ Yes If yes, list the permit number e) Discharge wastewater to a municipal wastewater collection system? If yes, list the municipality and permit number n/a 5? No ❑ Yes Note: Stormwater discharge permit NCG160000 does not authorize the discharge of any wastewater. If this site discharges wastewater, you must obtain the appropriate wastewater discharge permit in addition to coverage for stormwater discharges under NCG160000. 10) Does this facility employ any best management practices for stormwater control? ❑ No CCYes (Show any structural BMP's on the site diagram.) The existing basin, aka watering hole, has no outlet and will flood back into the large ditch and low lying area of the existing pit. All runoff from the asphalt plant will run into the ditch and be contained in in the pond. Page 2 of 4 S W U-234-030909 1 aromo NCG190000 N.O.J. 11) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No R Yes If yes, when was it implemented? currently being implemented 12) Are vehicle/equipment maintenance activities occurring at this facility? 'kNo ❑ Yes 13) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? `4 No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 9 No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? No ❑ Yes d) Is hazardous waste stored in the 100-year flood plain? K No ❑ Yes If yes, include information to demonstrate protection from flooding. e) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: _ Where is material stored: n/a How many disposal shipments per year: Name of transport / disposal vendor: _ Vendor address: 14) Certification: North Carolina General Statute 143-215.6 B(I) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested rase under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management) Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: David Glover 4s halt/ QC a ral Manager c a of Applicant) (Dat gned) Page 3 of 4 SW U-234-030909 1 acr rcvfeui vomo NCG190000 N.O.I. Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR Final Checklist This application will be returned as incomplete unless all of the following hems have been included: R' Check for $100 made payable to NCDENR This completed application and all supporting documents A site diagram showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater management structures, (c) location of stormwater ouffalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e) areas where materials and/or boats are stored, (f) impervious areas, (g) site property lines, (h) boat maintenance, blasting, painting and washing areas, and (i) location of services and activities listed in 7b. Copy of county map or USGS quad sheet (preferred) with location of facility clearly marked on map Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Nye The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWO Regional Office for your area. DWO Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 4 of 4 SWU-234-030909 Last revised 3/9/09