Loading...
HomeMy WebLinkAboutNCG160159_COMPLETE FILE - HISTORICAL_20180101STORMWATER-DIVISION CODING SHEET RESCISSIONS PERMIT NO. DOC TYPE COMPLETE FILE - HISTORICAL DATE OF RESCISSION ❑ DIn S YYYYMMDD May 12, 2014 RECEIVED Mr. Bradley Bennett M NCDENR AY j 61G14 Division of Energy, Mineral and Land Resources Sr DENR.LAND QUA LITY 1612 Mail Service Center GRMWATERPERMITTING Raleigh, North Carolina 27699-1612 Dear Mr. Bennett; Enclosed, please find a completed PERMIT NAME/OWNERSHIP CHANGE FORM, for our Knightdale Asphalt plant, COC# NCG 160159. The form updates company name change, facility name, facility address, facility contact and permit contact names and numbers. Should additional information be required, 1 can be reached at email: Donald. ScheII@fredsmithcomoany.net, or cell phone number 919 868 7377. Res ectfullly, Donald Schell Plant Manager FSC 11, LLC dba Fred Smith Company. �V 1 �LI T;\, _ _ _ �. �{ �� � if i`j` �� t -. l,� � ... �A Division of Energy, Mineral & Land Resources �I Land Quality Section/Stormwater Permitting NCDENR National Pollutant Discharge Elimination System °°°° '°"" '.eE•°°°°° PERMIT NAME/OWNERSHIP CHANGE FORM FOR AGENCY USE ONLY Date Received Year Month Da Please enter the permit number for which the change is requested. NPDES Permit (or) Certificate of Coverage N C S O N C G Permit status prior to requested change. a. Permit issued to (company name): b. Person legally responsible for permit: REGE�vE'D MA'1 16 2014 )4j DENR-�'ND PERM WING SZORM`NA�ER c. Facility name (discharge) d. Facility address: e. Facility contact person: CC ffhk fW,(j-, CC)r',2F%Ni C.(_C/ ZuuC S ,T)J First MI Last Title eo (soy z /� Permit Holder Mailing Address ir�r� CE r�N N C City State Zip ( qIC) 7 'S'?DO ( > Phone �t Fax Alklyru r� itnr clirwY Aspjm .; r-kAN —43 U'V3 U s ALUY Gy Address KNICArINfCt /\(c.. �7syS City State Zip w(/� �C/ cZ (9/ 0 ) ac c '7196 First / MI / Last Phone 111. Please provide the following for the requested change (revised permit). a. Request for change is a result of: ❑ Change in ownership of the facility Name change of the facility or owner If other please explain b. Permit issued to (company name): FSOI C U, d tia Moo Ss', a -A ('pr-fAW ` c. Person legally responsible for permit: '5r6t (E ls;f)%N First\ MI Last Title /� /�,Gi V'1 0OS m /-,f/Cc a, Peril Holder M�ai)ing Address Qyl(EyCdq /VC, )-2(o07 City State Zip (PIM) '793S71)D ��s3(Jfrcds.�;tNCcrn�any.�et Phone E-mai ddress d. Facility nante (discharge): KAI t W LA(6 Asi;VAG PtAWr e. Facility address: GOS CCU MnArw--UL Gj, ° Addre s l�nr'iG.HTY% & i�C_ City State Zip f. Facility contact person: SV/V60 _ /ai Awn/ First Nil Last (`?0S--.,2s�a Phone E-mail Address IV. Permit contact information (if different fiom the person legally responsible for the permit) Revised Jan. 27, 2014 Yr— o� r3' w-. �7 '.� �._.,'� t Y,' C� � �. r-= :�' �' ��, •�; cr. �- r-r� _: NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 Permit contact: 1)OnIAOd Sc/ Ce First MI Last P(,AN i MptNPG6e2 Title �0105 e/I�E� L lr/ Lc vri�. Mailing Address Qw(t:/C-r4 /V C )i(,0? City State Zip (9Irl )Slr$ 2i17 1\r. d„�Cdlzl%( �i1 n�S.,tCcts r`� Phone E-mail Address V. Will the permitted facility continue to conduct the same industrial activities conducted prior vv II to this ownership or name change? Yes ❑ No (please explain) Vl Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: ❑ This completed application is required for both name change and/or ownership change requests. ❑ Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. ....................................................................................................................... The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): 1, , attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signature APPLICANT CERTIFICATION Date I, , attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I unders rd that if all required parts of this application are not completed and that if all required supporting ilmynnatimn is not it eluded, this application package will be returned as incomplete. LA Signature Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Energy. Mineral and Land Resources Stormwater Permitting Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Revised Jan. 27, 20A W Michael F. Easley, Governor William G. Ross Jr., Secretary (— North Carolina Department of Environment and Natural Resources `( Alan W. Klimek, P.E. Director Division of Water Quality July 15, 2005 Mr. Michael D. Mangum CC Mangum Company, LLC PO Box 31768 Raleigh, NC 27622 Dear Mr. Mangum: Subject: NPDES General Permit NCG160000 Certificate of Coverage NCG160159 CC Mangum Company, LLC-Plant #3 Formerly The Mangum Group Wake County Division personnel have reviewed and approved your request to change your name under the General Permit, received on July 1, 2005. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact the Stormwater Permitting Unit at (919) 733-5083, extension 502. Sincerely, ORIGINAL SIGNED BY BRADLEY BENNETT Alan W. Klimek P. E. CC. DWQ Central Files Raleigh Regional Office, Water Quality Section Stormwater Permitting Unit N'o 0 arn ma wnkrrn/ly North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.entstate.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal OpporlunitylAff rmative Action Employer — 50 % Recycled110°/ Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160159 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, CC Mangum Company, LLC is hereby authorized to discharge stormwater from a facility located at CC Mangum Company -Asphalt Plant #3 6643 US HWY 64 RALEIGH WAKE COUNTY to receiving waters designated as an unnamed tributary to Milburnie Creek (Milburnie Lake) in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts L II, III, IV, V, and VI of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective July 15, 2005. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 15, 2005. r ORIGINAL SIGNED BY BRA BENNETT a j S Alan W.-Klimek„Director, n- Division of Water Quality By Authority of the Environmental Management Commission wAT c9 I Y July 15, 2005 Mr. Michael D. Mangum CC Mangum Company, LLC PO Box 31768 Raleigh, NC 27622 Dear Mr. Mangum: Michael F. Easley. Governor William G. Ros's.h., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek. P.E. Director Division of Water Quality Subject: NPDES General Permit NCG160000 Certificate of Coverage NCG160159 CC Mangum Company, 1-LC-Plant #3 Formerly The Mangum Group Wake County Division personnel have reviewed and approved your request to change your name under the General Permit, received on July 1, 2005. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agcncy. If you have any questions, please contact the Stormwater Permitting Unit at (919) 733-5083, extension 502. Sinccfely," f OFJGNNAL SIGNED B`i BRADLEY BEwi•le: Alan W. Klimek P. E. CC; DWQ Central Files Raleigh Regional Office, Water Quality Section Stonnwnter Permitting Unit No licimolina North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: h2o.encstate.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6749 An Equal Opportunity/Affirmative Action Employer -50%Recycled/10%Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160159 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, CC Mangum Company, LLC is hereby authorized to discharge stormwater from a facility located at CC Mangum Company -Asphalt Plant #3 6643 US HWY 64 RALEIGH WAKE COUNTY to receiving waters designated as an unnamed tributary to Milburnie Creek (Milburnie Lake) in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, Ill, IV, V, and VI of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective July 15, 2005. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 15, 2005. Jc� f>: I- R MEY IB" Nif:Y Alan W. Klimek, Director'""�"""'"""� Division of Water Quality By Authority of the Environmental Management Commission f "� Michael F. Easley \Ot' OG Governor �. r William G. Ross Jr., Secretary Department of Environment and Natural Resources Y Alan W. Klimek, P.E., Director DivisionI of Water Quality Mr. Kevin Hicks, President The Mangum Group 3141 John Humphries Wynd PO Box 31768 Raleigh, NC 27622 December 2, 2002 Subject: General Permit No. NCG160000 Mangum Asphalt Plant-Knightdale COC NCG160159 Wake County Dear Mr. Hicks: I In accordance with your application for discharge permit received on September 3, 2002, we are: forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of, Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. I. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. I This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental pennit that may be required. I If you have any questions concerning this permit, please contact Mack Wiggins at telephone number 919/733- 5083 ext. 542. cc: Raleigh Regional Office Central Files_- ( tormwater and_General Permits Unit Files Sincerely, Dame %) HLUAM 0. %MEI Alan W. Klimek, P.E. a�n NCOEN Customer Service 1 800 623-7748 Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160159 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Mangum Group, Mangum Asphalt Plant is hereby authorized to discharge stormwater from a facility located at Mangum Asphalt Plant-Knightdale 1.5 mile east of Neuse River off US 64 west Wake County to receiving waters designated as an unnamed tributary to Milburnie Creek (Milburnie Lake) in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, III, 1V, V, and VI of General Permit No. NCG 160000 as attached. This certificate of coverage shall become effective December 2, 2002 This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 2, 2002 "s99NAL! �y~;�LL1AM v t IiLt= far Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission 0 9° W (C) Markers Name: Discharge Site-NCG160159 Short Name: Dschrg Coordinates: 035' 48' 10.8" N, 078' 30' 26.9" W Comment: Mangum Asphalt Plant-Knightdale, Subbasin 030402, Neuse River Basin, Wake County, unnamed tributary to Milburnie Creek (Milburnie Lake), Class C NSW NSW, Quad D24SE Semi-annual Stormwater Discharge Monitoring Report(DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 09/14/15 CERTIFICATE OF COVERAGE NO. NCG16 0159 _ FACILITY NAME Fred Smith ComDany - Knlohtda_le Plant COUNTY Wake PERSON COLLECTING SAMPLES Matthew James LABORATORY ESC Lab Sciences Lab Cert. if ENV375 Comments on sample collection or analysis: None Part A: Stormwater Benchmarks and Monitoring Results RECEIVED SEP 17 2015 Year 2 Period 10ENTRAL FILES SAMPLE COLLECTION YEAR DWR SECTION SAMPLE PERIOD ❑ Jan -June [X] July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW [:]Trout❑PNA ❑Zero -flow [_]WaterSupply ❑SA [X]Other C; NSW PLEASE REMEMBER TO SIGN ON THE REVERSE 4 ❑ No discharge this period?' Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L 001 08/31/15 1.37 20.2 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. ' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX ma/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. .14 n No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G by EPA 1664(SGT-HEM) - Total Suspended Solids Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. see General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO [XI IF YES, HAVE YOU CONTACTED THE DEMUR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copv of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of_monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persopA directly respo ible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aw3rr$ at there ar ificant pena or submitting false information, including the possibility of fines and imprisonment for knowing violations." ofPermittee) Permit Date: 10/1/2014-9/31/2019 (Date) SWU-252, last revised 9/17/2014 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 06/30/15 CERTIFICATE OF COVERAGE NO. NCG16 0159 _ _ FACILITY NAME Fred Smith Comoany - I<nlghtdale Plant COUNTY Wake PERSON COLLECTING SAMPLES Matthew James LABORATORY ESC Lab Sciences Lab Cart. # ENV375 Comments on sample collection or analysis: None Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Year 1 Period 2 SAMPLE PERIOD LX] Jan -June ❑ July -Dec or ❑ Monthly' (monthl LASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA49(5�1Iw� [x]Other C; NSW JUL 0 6 2015 -.99C CENTRAL PLEASE REMEMBER TO SIGN ON THE REVERSE DWR SFILES SECTION No discharge this period?' Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids Benchmarks - - 100 mg/L or so mg/L 001 06-19-15 2.63 30 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Non -polar 0&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L4 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO [X] IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES [--]Nor-] REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitorina period in the case of "No Discharge" reports) to Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware�t�r�i here are sig,;�ficant pens submitting false information, including the possibility of fines and imprisonment for knowing violations." - (Date) Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out thisform, please visit: hout ,//oorta1.ncdenr.ore/web/Ir/nudes-stormwater/ Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Fred Smith Company Knightdale Plant County: Wake Phone No. 919-783-5700 Inspector: Austin Paid - WithersRavenel Inc. Date of Inspection: 10/28/2018 p€r Time of Inspection: 1015 NOV19 Nib Total Event Precipitation (inches): 0.67 CENTRAL FILES DWR SECTION Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ❑■ Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the I permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. j By this signature, 1 certify (Signature of Permittee or Designee) rate and complete to the best of my knowledge: SWU-242, Last modified 7/31/2013 Page 1 of 2 T 1. Outfall Description: Outfall No. 001 Structure (pipe, ditch, etc.) Retention Pond with Overflow Discharge Receiving Stream: Milburnie creek (Milbumle Lake); Class C; NSW Describe the industrial activities that occur within the outfall drainage area: Asphalt Plant and Aggregate 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light tan 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No Odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 02 3 4 5 S. Floating Solids: Choose the number which best describes the amount of Floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: O 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 0 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes IS 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. SWU-242, Last modified 7/31/2013 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt CERTIFICATE OF COVERAGE NO. NCG16 0 1 5 9 FACILITY NAME Fred Smith Company - Knighldale Asphalt Plant COUNTY Wake PERSON COLLECTING SAMPLES Martin Richmond LABORATORY ESC Lab Sciences Date submitted o2J2212018 Lab Cert. ft ENV375 Comments on sample collection or analysis: None Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Year 4 Period 2 SAMPLE PERIOD ■❑ Jan -June ❑ July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow [:]WaterSupply [:]SA ■❑Other class C: NSW PLEASE REMEMBER TO SIGN ON THE REVERSE -) ❑ No discharge this period?' Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids Benchmarks =__> - - 100mg/L or 50 mg/L 001 01/29/2018 1.89 31.6 JUN 2 0 2018 CENTR'"L FILES DWR SECTION 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. ' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. "See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX m¢/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. - • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑® IF YES, HAVE YOU CONTACTED THE DEMUR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑■ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the inf mation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for su fitting false information, including the possibility of fines and imprisonment for knowing violations." 02rz2/2018 ignature of Permi ee) (Date) Permit Date: 10/1 014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 i' Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 09/22/17 CERTIFICATE OF COVERAGE NO. NCG16 0159 _ FACILITY NAME Fred Smith - Knightdale Asphalt Plant COUNTY Wake PERSON COLLECTING SAMPLES Matt James LABORATORY ESC Lab Sciences Lab Cert. # ENV375 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Year 4 Period 1 SAMPLE PERIOD ❑ Jan -June X❑ July -Dec or ❑ Monthly' month DISCHARGING TO CLASS ❑ORW LJHQW LjTrout PNA �i(��L` �+ // ❑Zero -flow [:]WaterSupply [:]SA `-'vp, QOther C NSW SEP 2 8 'i117 F1J Cf jv7. PLEASE REMEMBER TO SIGN ON THE REVERSE No discharge this period?Z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, inches Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L 001 08/07/2017 0.15 1.68 3 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outtall. ' For sampling periods with no discharge at any single outtall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. Ff No discharge this period?z ----Outfall No. — Date Sample — Collected (mo/dd/yr) —24-hour rainfall amount, Inches Non -polar O&G by EPA. 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑X IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑X REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all tents were prepared under my direction or supervision in accordance with a system designed to assure that qualified pe7es el properly gather evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons a rsible for ga ring the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware t e arificant nalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." of Permit Date:10/1/2014-9/31/2019 09/22/17 (Date) SWU-252, last revised 9/17/2014 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 04/06/17 CERTIFICATE OF COVERAGE NO. NCG16 0159 _ FACILITY NAME Fred Smith - Knightdale Asphalt Plant COUNTY Wake PERSON COLLECTING SAMPLES Matt James LABORATORY ESC Lab Sciences Lab Cert. # Comments on sample collection or analysis: ENV375 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Year 3 Period 2 SAMPLE PERIOD ® Jan -June ❑ July -Dec or ❑ Monthly'�Februa month ❑ DISCHARGING TO CLASS ORW HQW Trout LjPNA ❑Zero -flow ❑Water Supply ❑SA RECEIVED QOther C NSW APR 10 ZQ17 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 CENTRAL FILES DWR SECTION ❑ No discharge this period?Z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L 001 02/15/2017 0.34 37.8 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 --Outfall No.-- - - - —_Date Sample— Collected' - (mo/dd/yr) _24-hour rainfall-- amount, Inches"' Non -polar O&G by EPA 1664.(SGT-HEM) Total Suspended Solids Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR.PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO Q IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant p�oties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 04/06/17 (Date) Permit Date:10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt Date submitted 09/30/16 CERTIFICATE OF COVERAGE NO. NCG16 0159 _ FACILITY NAME Fred Smith - Knightdale Asphalt Plant COUNTY Wake PERSON COLLECTING SAMPLES Matt James LABORATORY ESC Lab Sciences Lab Cert. q ENV375 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Year 3 Period 1 SAMPLE PERIOD ❑ Jan -June ERJuly-Dec or ❑ Monthly' September (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA RECEIVED ❑Zero -flow ❑Water Supply ❑SA ©Other C NSW OCT 05 2016 PLEASE REMEMBER TO SIGN ON THE REVERSE � CENTRAL FILES DWR SECTION No discharge this period?z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amounts, Inches Total Suspended Solids Benchmarks =__> _ - - 100 mg/L or 50 mg/L. 001 09/19/16 0.71 12.8 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mR/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-2S2, last revised 9/17/2014 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?Z Outfall No, . Date Sample Collected' (mo/dd/yr) 24-hour rainfall -amount, Inches3 Non-polarO&G by EPA 1664 (SGT-HEM) - Total Suspended Solids Benchmarks===> _ - 15 mg/L 100 mg/L or SO mg/L4 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO Q IF YES, HAVE YOU CONTACTED THE DEMUR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one coov of this DMR, including all "No Discharqe" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly re nsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am awaythat ther re significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." re of Permittee) Permit Date: 10/1/2014-9/31/2019 9/30/16 (Date) SWU-252, last revised 9/17/2014 Page 2 of 2 Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt F Date submitted 05/31/16 CERTIFICATE OF COVERAGE NO. NCG16 0159 FACILITY NAME Fred Smith ComDan\ Kni - ghtda__le Plant COUNTY Wake PERSON COLLECTING SAMPLES Matthew James LABORATORY ESC Lab Sciences Lab Cert. # ENV375 Comments on sample collection or analysis: None Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR Year 2 Period 2 SAMPLE PERIOD X❑ Jan -June ❑ July -Dec or ❑ Monthly' (month) �} DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA RECe VED ❑Zero -flow ❑Water Supply ❑SA JUN 0 6 2016 [X]Other C; NSW CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE DWR SECTION 1-1 No discharge this period?2 Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L 001 04/12/16 0.85 82.5 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. ' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014 Page I of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ,,, ❑ No discharge this period?' Outfall No. Date Sample i Collected (mo/dd/yr) 24-hour rainfall amount, Inches' Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L4 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO [XI IF YES, HAVE YOU CONTACTED THE DEMUR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one copv of this DMR, includinq all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those per directly response for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am awa hat there are s' i icant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permittee) Permit Date: 10/l/2014-9/31/2019 � - (Date) SWU-252, last revised 9/17/2014 Page 2 of 2