Loading...
HomeMy WebLinkAboutNCG160080_COMPLETE FILE - HISTORICAL_20160126�c I TkIA STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v u% ' b A v DOC TYPE, HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ D I c� YYYYM M DD WAMffu[K6Bi11MIA Governor DONALD R. VAN DER VAART Environmental Quality January 20, 2016 Mr. Marcus Hackler, Environmental Coordinator Lane Construction Corporation 8205 Wilkinson Blvd. Charlotte, NC 28214-7006 Subject: Multimedia Compliance Inspection Lane Gresham Lake Asphalt Plant Wake County Dear Permittee: Department of Environment and Natural Resources staff conducted a multimedia compliance inspection of Lane Gresham Lake Asphalt Plant on December 16, 2015 for permitted and/or other activities administered by the following Divisions: Secretary Division of Air Division of Energy, Division of Water Division of Waste Quality(DAQ) Mineral, and Land Resources (DWR) Management (DWM) Resources DEMLR We hope that you have enjoyed the benefit of our initiative to provide a single inspector capable of handling multiple areas of environmental compliance at your facility. The results of each applicable inspection area and any associated response actions or necessary corrective measures are detailed in the Division specific areas of the attached report. If there are no notes or comments under each Division header, you may assume compliance with that particular Division's rules and regulations at the time of inspection. Should violations be noted in the attached report, you may receive separate enforcement related correspondence in addition to this report. If you have any questions regarding this multimedia inspection, please contact me at Cheng Zhang (cheng.zhang@ncdenr.gov). Thank you for your cooperation. cc: DAQ RRO Files DEMLR RRO Files DWR RRO Files Department of F„nvironmental Quality, Raleigh Regional Offiec http://I)ortal.tic(lenr.org 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone (919) 791-4200 Location: M00 Barrett Drive, Ralcigh, NC 27609 Fax: (919) 571-4718 .rn4 c5:rd�.- PAT MCCRORY Governor DONALD R. VAN DER VAART Seo'emry Environmental Quality January 20, 2016 Mr. Marcus Hackler, Environmental Coordinator Lane Construction Corporation 8205 Wilkinson Blvd. Charlotte, NC 28214-7006 Subject: NPDES Stormwater Compliance Evaluation Inspection Certificate of Coverage No. NCG160080 Lane Gresham Lake Asphalt Plant Wake County Dear Mr. Hackler: Staff from the Department of Environmental Quality (DEQ) conducted a stormwater inspection on December 16, 2015, as part of a multimedia inspection of your facility. The assistance provide by Mr. Jerry Storms and Mr. Johnny Williams during the inspection was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: 1. Certificate of Coverage (COC) No. NCG 160080 under NPDES General Permit NCG 160000 was issued to Lane Gresham Lake Asphalt Plant to discharge stormwater runoff to Burdens Creek, a WS-V, NSW stream, in the Neuse River Basin. 2. The facility has developed a stormwater pollution prevention plan (SPPP). A review of the plan indicated that it included all components required by the general permit. It was noted that the settling basin/pond should be included in the BMP summery and clearly depicted on the site map. The General Permit in the file was the expired version and needs to be replaced with the most recent version. Semi-annual qualitative and analytical monitoring has been conducted at the only stormwater discharge outfall (SDO1). However, no monitoring records were available for the last quarter of 2014, and the first half of 2015 at the time of inspection, please explain why monitoring was conducted during this period in your response to this letter. It was also noted that TSS result from July 2015 sampling exceeded bench mark. 4. The lone outfall was observed during the inspection, which was found accessible and well maintained. Raleigh Regional Office1628 Mail Service Center, Raleigh, North Carolina 27699-1628 Phone: 919-791-4200 / FAX: 919-571-4718 / Internet: http://portal.ncdenr.org/web/ir/ An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper Page 2 of 2 Please respond in writing to DEQ Raleigh Regional Office regarding Items 2 and 3 within 60 days of receipt of this letter. If you have any questions regarding the attached report or any of the findings, please contact Cheng Zhang at 919-791-4200 (or email: chen =.i� .liang_no iicdenr.gov). Sincerely, y- Cheng Zhang Environmental Senior Specialist Raleigh Regional Office Enclosure: Compliance Evaluation Inspection Form cc: Central Files RRO SWP files Compliance Inspection Report Permit: NCG160080 Effective: 10/02/14 Expiration: 09/30/19 Owner: The Lane Construction Corporation SOC: Effective: Expiration: Facility: LANE (Gresham Lake) County: Wake 3010 Gresham Lk Rd Region: Raleigh Raleigh NC 27615 Contact Person: Marcus W Heckler Title: Phone: 704-395-3264 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/16/2015 Primary Inspector: Chang Zhang Secondary Inspector(s): Certification: Phone: Entry Time: 09:30AM Exit Time: 11:30AM / t , n 11L 4� � Phone: 919-791-4200 Gary Perlmutter Phone Thaddeus W Valentine Phone Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: Compliant ® Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 permit: NCG160080 Owner -Facility: The Lane Construction Corporation Inspection Data: 1211612015 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? It Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: BMP summary needs to include the settling basin/pond as a structural BMP. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Yes No NA NE ® ❑ ❑ ❑ ® ❑ ❑ ❑ ® Cl ❑ Cl • Cl ❑ ❑ ❑❑■❑ ® ❑ ❑ ❑ ® Cl ❑ ❑ ® ❑ ❑ ❑ ® ❑ ❑ ❑ ■❑❑❑ ®❑❑❑ ®❑ ❑ ❑ ® ❑ ❑ ❑ O❑❑❑ ®❑[In Yes No NA NE ® ❑ ❑ ❑ Comment: Qualitative monitoring was not conducted during the last quarter of 2014 and first half of 2015 appears that the change of monitoring schedule in the new permit and no facility operation might cause the gap of monitoring during the period. TSS result (145 mg/L) from June 2015 sampling was over the bench mark (100 mg/L). Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Analytical monitoring was not conducted during the last quarter of 2014 and first half of 2015. It appears that the change of monitoring schedule in the new permit and no facility operation might cause the gap of monitoring during the period. Permit and Outfalis Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all oulfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ® ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ®❑ ❑ ❑ Comment: The copy of General Permit at the site was the expired version. Page: 3 NC® NR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director December 4, 2009 Marcus Hackler Rea Contracting, A Division of The Lane Construction Corp. 8205 Wilkinson Blvd. Charlotte, NC 28214-7006 Dear Mr. Hackler: Dee Freeman Secretary ;�i✓. DEC - 9 2009 i Subject: NPDES General Permit NCG160000 Certificate of Coverage NCG 160080 Rea Contracting (Gresham Lake) Formerly Rea Contracting, LLC Wake County On October.1, 2009, division personnel received your request to revise your storniwater permit Certificate of Coverage to accurately include your new company name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. This revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact the Stormwater Permitting Unit at 919-807-6303. Sincerely, Coleen H. Sullins cc: DWQ Central Files Raleigh Regional Office Stormwater Permitting Unit Wake County Wetlands and Stoonwater Branch 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Ralegh, North Carolina 27604 Phone: 919�807-63001 FAX: 919-807-64941 Customer Service: 1-877 623-6748 Internet: www.ncwalerquality.org An Equal Oppodunity l Affrmadve Action Employer One NorthiCarolina Naturally STATE OF NORTH CAROLINA DEPARTMENT OP ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO NCG160000 CERTIFICATE OE COVERAGE No. NCG160080 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rea Contracting, A Division of The Lane Construction Corp. is hereby authorized to discharge stormwater from a facility located at Rea Contracting (Gresham Lake) 3010 Gresham.Lake Road Raleigh . Wake County to receiving waters designated as a UT to Gresham Lake, a class B NSW water, in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III, IV, V and VI of General Permit No. NCG 160000 as attached. This certificate of coverage shall become effective December 4, 2009. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 4, 2009. P`Z- Coleen 1-1. Sullins, Director. Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan. W. Klimek, P.E., Director December 19, 2003 Mr. Gene Mills Rea Contracting, LLC. 8205 Wilkinson Boulevard Charlotte, North Carolina 28214-7006 '14mC®ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: NPDES Permit Modification - Name/Ownership Change Permit NCG160080 Rea Contracting LLC - West Raleigh 081 (Formerly Rea Construction Company) Wake County Dear Mr. Mills: In accordance with your request received November 10, 2003, the Division is forwarding the subject permit modification. This modification documents the change in name/ownership at the subject facility. All other terms and conditions in the original permit remain unchanged and in full effect. This permit modification is issued under the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the U. S. Environmental Protection Agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit modification are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be a written petition conforming to Chapter 150B of the North Carolina General Statutes, filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such demand is made, this decision shall be final and binding. This permit does not affect the legal requirement to obtain other permits which may be required by the Division of Water Quality, the Division of Land Resources, Coastal Area Management Act, or any other Federal or Local government permit that may be required. If you have any questions concerning this permit, please contact Valery Stephens at the telephone number or address listed below. cc: Central Files Raleigh Regional Office, Water Quality Section NPDES Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Sincerely, Alan W. Klimek, P.E. 919 733-5083, extension 520 (fax) 919 733-0719 VISIT US ON THE INTERNET @ hitp:im2oa Lstate, nc.us/ Valery.Slephens@ncmail.net STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160080 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rea Contracting LLC. is hereby authorized to discharge stormwater from a facility located at Rea Contracting LLC — Gresham Lake 082 3110 Gresham Lake Road Raleigh Wake County to receiving waters designated as unnamed tributary to Gresham Lake, a class B NSW water in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective December 19, 2003. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 19, 2003. /I Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission `t State of North Carolina. Department of Environments • and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor NCDENR Wayne McDevitt, Secretary Kerr T. Stevens, Director NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES GENE MILLS REA CONSTRUCTION COMPANY P.O BOX 32487 CHARLOTTE. NC 28232 Dear Pennittee: July 27, 1999 Subject: Reissue - NPDES Stormwater Permit Rea Construction Company COC Number NCG 160080 Wake County In response to your renewal application for continued coverage under general permit NCG160000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A copy of general stormwater permit NCG160000 * A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to certify that you have developed and implemented the SPPP as per the conditions of the permit. This form must be completed and returned to the Division within 30 days of receipt of this letter. DO NOT SEND the SPPP with the signed form. * Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form * A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements, and addresses frequently asked questions * A Certificate of Coverage Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Tony Evans of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 584 Sincerely, /J/I,LCCL/1./ 1��1o9v�.L' — for Kerr T. Stevens cc: Central Files Stormwater and General permits Unit Files Raleigh Regional Office 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160080 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, REA CONSTRUCTION COMPANY is hereby authorized to discharge stormwater from a facility located at REA CONSTRUCTION COMPANY 3110 GRESHAM LAKE RD RALEIGH WAKE COUNTY to receiving waters designated as a UT of Gresham Lake in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I. II, 111, IV. V. and VI of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective August 1, 1999. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day July 27, 1999. for Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental Management Commission ,.1 State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director Paul Schulz Rea Construction Co -Gresham P.O Box 32487 Charlotte, NC 28232 Dear Paul Schulz: June 30, 1995 ' JUN 3 0 1995 L----J 10114NR RM C16Fi h, ,. p141cr Subject: General Permit No. NCG1 60000---- Rea Construction Co -Gresham COC NCG160080 Wake County In accordance with your application for discharge permit received on May 2, 1995, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division pf Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any question concerning this permit, please contact MR. ANTONIO EVANS at telephone number 919/733-5083. cc: Raleigh Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 An Equal Opportunity Affirmative Action Employer Sincerely, A. Preston Howard, Jr. P.E. Telephone 919.733-7015 FAX 919-733-2496 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO, NCG160000 CERTIFICATE OF COVERAGE No, NCG160080 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rea Construction Co. is hereby authorized to discharge stomtwater from a facility located at Rea Construction Co. 3110 Gresham Lake Road Raleigh, NC Wake County to receiving waters designated as an unnamed tributary to Gresham Lake in the Neuse River Basin, Class B, NSW in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, I1, III and IV of General Permit No. NCG160000 as attached. This certificate of coverage shall become effective June 30, 1995. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day June 30, 1995. Original Signed By Coleen H. Sullins A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission �''� Y „ wag � w�� \� ��r'� ,�'�, ��"\ \ ����:._�✓, j /2oc— 1•" it ry J Ve�i .vI r.� •� � � /.i{ v,�.,,„ • 6/ f. f' l \ _.✓ifs..._/ � / 6'' r.� a • � �.. � /i /� / _e...!° 1 � � � '� /\ter �.� �- UG H 21, � 1 �_�-- t` e, •'— 'G e * .off v' � �,i �A� _ zou Gres awls LaAe Golf �• •/\�•a _ T \\ / , t / 715 — 116 717 12120000 FEET rlg3g �. RALewn rus. sal6 ML !R, edited, and published by the Geological Survey SGS, NOS/NOAA, and North Carolina Geodetic Survey : by photogrammetric methods from aerial photographs MN ON 1000 0 low 2000 Field checked 1967 I s ejection. 10,000-foot grid ticks based on North Carolina 7` 124 MILS 1.26' CONTOUR ystem. 1000-meter Universal Transverse Mercator grid 26 M'LS NATIONAL GEODE .7, shown in blue. 1927 North American Datum the predicted North American Datum 1983 move In lines 12 meters south and 23 meters west dashed corner ticks UTM GRID AND 1987 MAGNETIC NORTH P COMPLIES WITH FOR SALE WITH I hed lines indicate selected fence and field lines where DECLINATION AT CENTER OF SHEET THIS NA ible on aerial photographs. This information is unchecked DENVER, COLORS B R 1wn in purple and woodland compiled in Cooperation A FOLDER DESCRIBING TOPOGRAPHIC North Carolina agencies from aerial photographs taken Ter sources. This information not field checked 987 `ter NCDENR North Carolina Department of Environment and Division of Water Quality Pat Mc Crory Charles Wakild, P.E. Governor Director May 13, 2013 Lane Construction Company Marcus W. Hackler 8205 Wilkinson Blvd. Charlotte, NC 28214-7006 Natural Resources Subject: Compliance Evaluation Inspection Lane (Gresham Lake Asphalt Plant) 3010 Gresham Lake Road, Raleigh NC 27615 Certificate of Coverage No. NCG160080 Wake County Dear Mr. Hackler: John E. Skvarla, III Secretary On May 9, 2013, Thomas Ascenzo of the Raleigh Regional Office (RRO) conducted a compliance inspection (CEI) of -Lane Construction Company's Gresham Lake Asphalt plant's stormwater pollution program. The assistance of Johnny Williams, Asphalt Plant Manager and Kenneth P. Cates Assistant District Manager was appreciated as it facilitated the inspection process. The Lane Construction Company (Gresham Lake) Asphalt facility discharges stormwater to receiving waters designated as UT of Gresham Lake in the Neuse River Basin. The following observations were made: 1. The Stormwater Pollution Prevention Plan (SP3) was reviewed and revealed the following : • The plan contained the required general location map that included outfall location and drainage areas. • Employee training documents were included in the SP3. The last training was conducted on February 2013. • List of responsible parties for emergency spill response notification was available for review. • The plan included stormwater facility inspection reports, best management summary, current certificate of coverage, narrative description of practices and a spill prevention and response plan. • The SP3 is being updated annually (or more frequently if needed) as required by the permit. N""o��ennCarolina ura(ly Noah Carolina Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service Internet: w�v.ncwaterquality.org Location: 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788-7159 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper Lane (Gresham Lake Asphalt Plant) NCG160080 2. Qualitative monitoring was conducted on September 12, 2012 and March 25, 2013. (It was noted during the inspection the plant was not fully in operation until July, 2012.) 3. Analytical Monitoring was conducted on September 12, 2012 and March 25, 2013. 4. Outfall #1 was observed running clear with no solids or pollutants visible. 5. The Spill Prevention Response Plan was reviewed and found to be complete. The Lane (Gresham Lake) Asphalt plant's Stormwater Pollution Prevention Plan (SP3) is considered compliant. Please continue your diligence in the Stormwater Pollution Prevention Plan. Should you or your staff have any questions regarding this inspection or this correspondence, please do not hesitate to contact me at 919-791-4256 or you can e-mail me at tom.ascenzo(a,ncdenr.eov. Sincerely, Thomas Ascenzo Environmental Specialist Surface Water Protection Attachment: Compliance Inspection Reports CC: RRO File NCG160080 Mr. Johnny Williams 3010 Gresham Lake Road Raleigh, NC 27615 C'e. jv, _ ;q'ie s Compliance Inspection Report Permit: NGG160080 Effective: 10/01/09 Expiration: 09/30/14 Owner: The Lane Construction Corp SOC: Effective: Expiration: Facility: LANE (Gresham Lake) 3010 Gresham Lk Rd County: Wake Region: Raleigh Raleigh NC 27615 Contact Person: Marcus W Hackler Title: Phone: 704-395-3264 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/0912013 Primary Inspector: tom ascenzo Secondary Inspector(s): Certification: Entry Time: 09:45 AM Exit Time: 10:30 AM Phone: Phone: 919-791-4200 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: - 0 Storm Water (See attachment summary) Page:1 A Permit: NCG160080 Owner -Facility: The Lane Construction Corp Inspection Date: 05/09/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ Cl ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: No spills reported in the three period. All the components of the SP3 plan were included. SP3 plan is updated accordingly. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: 9/12/2012 and 3/25/2013 Qualitative monitoring was conducted. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: 9/12/2012 and 3/25/2013 Analytical monitoring was conducted. All under permit benchmarks. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ ❑ Page: 3 ,w _T y��gqCDER a �ry��p'r�ryq � North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman Governor Director Secretary Robert Spencer The LANE Construction Corp 3010 Gresham lake Rd Raleigh, NC 27605 Dear Mr. Spencer: November 30, 2012 1� NC Office Subject: NPDES General Permit NCG 160000 Certificate of Coverage NCG 160080 LANE (Gresham Lake) Formerly Rea Contracting (Gresham Lake) Wake County Division personnel received your request to revise your storntwater permit Certificate of Coverage to accurately reflect your new company and facility name. Please find enclosed the revised Certificate of Coverage. The terms and conditions contained in the General Permit remain unchanged and in full effect. "this revised Certificate of Coverage is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact the Stormwater Permitting Unit at 919-807-6300. Sincerely, ORIGINAL SIGNED BW KEN PICKLE for Charles Wakild, P.E. cc: Raleigh Regional Office Central Files Stormwater Permitting Unit Wetlands and Stormwater Branch 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone. 9IM07.63001 FAX: 919-807-64941 Customer Service, 1-877-623-6748 Internet vrww.ncwaterquali y org An Equal Oppoounity 1 Affirmative Action Employer One NorthCarol ina Naturally r STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG160000 CERTIFICATE OF COVERAGE No. NCG160080 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The LANE Construction Corp is hereby authorized to discharge stormwater from a facility located at LANE (Greshaiit Lake) 3010 Gresham Lake Rd Raleigh Wake County to receiving waters designated as a U'I' to Gresham Lake, a class B NSW, waters in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V and VI ofGeneral PermitNo. NCG160000 as attached. This certificate of coverage shall become effective November 30, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day November 30, 2012, for ORIGINAL SIGNED M KEN PICKLE Charles Wakild, P.E., Director Division of Water Quality By Authority ofthe Environmental Management Commission LANE March 2, 2016 NCDEQRRO Attn: Cheng Zhang, Environmental Senior Specialist 3900 Barrett Dr. Raleigh, NC 27615 Re: Multimedia Compliance Inspection Gresham Lake Asphalt Plant MAR - 9 2018 NC DENR Raleigh Regional Office Dear Mr. Zhang, We received your inspection report on January 28 and this letter will address items 2 and 3 of the report. 2. The facility has developed a stormwater pollution prevention plan (SPPP). A review of the plan indicated that it included all components required by the general permit. It was noted that the settling basin/pond should be included in the BMP summary and clearly depicted on the site map. The General permit in the file was the expired version and should be replaced with the most recent version. The settling basin/pond has been added to the BMP summary list attached to this letter. Also the map now clearly depicts the settling basin on site. The valid General Permit has been placed into the binder and staff have been updated once again on the revisions of the new general permit. 3. Semi-annual qualitative and analytical monitoring has been conducted at the only stormwater discharge outfoll (SDO1). However no monitoring records were available for the lost quarter bf 2014, and the first half of 2015 at the time of inspection, please explain why monitoring was conducted during this period in your response to this letter. It was also noted that TSS results were high for July 2015 sampling exceeded benchmark. This facility is currently shutdown and has been closed since 2014. This facility is visited by personnel occasionally and staff have been sent to other facilities for the interim. A reminder that semiannual sampling is required throughout the permit life alerted staff to restart sampling. The latest sample was high for TSS and is being looked at for sampling improvement methods. We expect the next sample to be below the benchmark taking us out of "TIER 1" status. Should you have any further questions or concerns please Marcus Hackler, Environmental Coordinator at704-395-3264. Sincerely, William H Tomlinson District Manager Cc: WHIT HLB JWS MRS The Lane Construction Corporation 8205 Wilkinson Boulevard Charlotte, NC 28214 USA T 704.394.8354 F 704.394.5354 LaneConstruct.com An Equal Opportunity Employer M/F/D/V Tn7l REGIONAL OFFICE LL� I oa' / CRS TACK TANKS D D MAINTENANCE SHOP D B Os�q,�o \LOW _ FLOW r � 3 o 4 E31�SE �F_UEL TANKS ow A ESE h� _ I z o O10 A Il C Low G Fes° C cn i y v c� m CD of F ACCREATE BINS Flow RAP BIN �AC+EAJE A EA _ OUTFALL 1 s� n 0 z a 0 n v .Zml I m SHED RAP LANE Construction J Appendix 8: BMP Summary Inspection Form Semi Annual Inspection (Jan 1- Jun30, Jul 1-Dec 30) Date of inspection Facility Name Inspector MAR - 9 2016 NC DENR Raleigh Regional office Date of implementation Location of BMP around yard Codes implemented (as shown on facility site map ) Appendix 8- BMP Summary: codes list 001 Straw bales 002 Boom or pads 003 Stone for check dams 004 Rip Rap for check dams 005 Sweeping 006 Yard watering 007 Retention/detention pond clean out 008 Addition silt fence 009 Rebuild slit fence 010 Seeding 011 Grading of yard to control storm water 012 Paving yard 013 Re- organization of materials, stockpile 014 Trash clean up around yard 015 Addition of trash bins or dumpsters 016 ditch or grate clean out 017 Addition of diversion structure( i.e. speed bumps) 018 Re -structure of pond or berm 019 Add or Replenish spill kit 020 Other PAT MCCRORY G'arernor DONALD R. VAN DER VAART Environmental Semlary Quality January 20, 2016 ti, i lp �!} ' MAR - 9 20116 Mr. Marcus Hackler, Environmental Coordinator Lane Construction Corporation 8205 Wilkinson Blvd. NC DENR Raleigh Regional Office Charlotte, NC 28214-7006 Subject: Multimedia Compliance Inspection Lane Gresham Lake Asphalt Plant Wake County Dear Permittee: Department of Environment and Natural Resources staff conducted a multimedia compliance inspection of Lane Gresham Lake Asphalt Plant on December 16, 2015 for pennitted and/or other activities administered by the following Divisions: Division of Air Division of Energy, Division of Water Division of Waste Quality(DAQ) Mineral, and Land Resources (DWR) Management (DWM) Resources DEMLR We hope that you have enjoyed the benefit of our initiative to provide a single inspector capable of handling multiple areas of environmental compliance at your facility. The results of each applicable inspection area and any associated response actions or necessary corrective measures are detailed in the Division specific areas of the attached report. If there are no notes or comments under each Division header, you may assume compliance with that particular Division's rules and regulations at the time of inspection. Should violations be noted in the attached report, you may receive separate enforcement related correspondence in addition to this report. If you have any questions regarding this multimedia inspection, please contact me at Cheng Zhang (cheng.zhang@ncdenr.gov). Thank you for your cooperation. cc: DAQ RRO Files DEMLR RRO Files DWR RRO Files Department of Environmental Quality, Raleigh Regional Office http:/il)onal.nedenr.org 1628 Mail Service Center, Raleigh, NC 27699-1628 phone: (919) 7914200 Location: 3800 Garrett Drive, Raleigh. NC 27609 Fax: (919) 571-47I8 PAT MCCRORY Gmrmar DONALD R. VAN DER VAART •. Srrmrar), Environmental Quality January 20, 2016 '� j;lutri fd ��dfjJllj MAIR Mr. Marcus Hackler, Environmental Coordinator Lane Construction Corporation 8205 Wilkinson Blvd. NC DENR Raleigh Regional Office Charlotte, NC 28214-7006 Subject: NPDES Stonnwater Compliance Evaluation Inspection Certificate of Coverage No. NCG160080 Lane Gresham Lake Asphalt Plant Wake County Dear Mr. Hackler: Staff from the Department of Environmental Quality (DEQ) conducted a stormwater inspection on December 16, 2015, as part of a multimedia inspection of your facility. The assistance provide by Mr. Jerry Storms and Mr. Johnny Williams during the inspection was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: 1. Certificate of Coverage (COC) No. NCG160080 under NPDES General Permit NCG160000 was issued to Lane Gresham Lake Asphalt Plant to discharge stormwatcr runoff to Burdens Creek, a WS-V, NSW stream, in the Neuse River Basin. 2. The facility has developed a stormwater pollution prevention plan (SPPP). A review of the plan indicated that it included all components required by the general permit. It was noted that the settling basin/pond should be included in the BMP summery and clearly depicted on the site map. The General Permit in the file was the expired version and needs to be replaced with the most recent version. 3. Semi-annual qualitative and analytical monitoring has been conducted at the only stormwater discharge outfall (SDO1). However, no monitoring records were available for the last quarter of 2014, and the first half of 2015 at the time of inspection, please explain why monitoring was conducted during this period in your response to this letter. It was also noted that TSS result from July 2015 sampling exceeded bench mark. 4. The lone outfall was observed during the inspection, which was found accessible and well maintained. Raleigh Regional Officel628 Mail Service Center, Raleigh, North Carolina 27699-1628 Phone: 919-791-4200 / FAX: 919-571-4718 / Internet: http://portal.ncdenr.org/web/Ir/ An Equal Opportunity \ Affirmative Action Employer— 50% Recycled \ 10% Post Consumer Paper Page 2 of 2 Please respond in writing to DEQ Raleigh Regional Office regarding Items 2 and 3 within 60 days of receipt of this letter. If you have any questions regarding the attached report or any of the findings, please contact Cheng Zhang at 919-791-4200 (or email: chene.zhang(ancdenr. >o ). Sincerely, Cheng Zhang Environmental Senior Specialist Raleigh Regional Office Enclosure: Compliance Evaluation Inspection Fonn cc: Central Files RRO SWP files Compliance Inspection Report Permit: NCG160080 Effective: 10/02/14 Expiration: 09/30/19 Owner: The Lane Construction Corporation SOC: Effective: Expiration: Facility: LANE (Gresham Lake) County: Wake 3010 Gresham Lk Rd Region: Raleigh Raleigh NC 27615 Contact Person: Marcus W Hackler Title: Phone: 704-395-3264 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/16/2015 Primary Inspector: Chang Zhang Secondary Inspector(s): Certification: Phone: Entry Time: D9:30AM Exit Time: 11:30AM e ? ,�_ Phone: 919-791-4200 Gary Perlmutter Phone: Thaddeus W Valentine Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge CDC Facility Status: ❑ Compliant . Not Compliant Question Areas: i Storm Water (See attachment summary) Page: 1 permlt: NCO160080 Owner - Facility: The Lane Construction Corporation Inspection Date: 12/16/2015 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan Include a General Location (USGS) map? IN ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? ■ Q ❑ ❑ If Does the Plan include a detailed site map including outfall locatlons and drainage areas? 0 Q Q ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ Q El # Does the facility provide all necessary secondary containment? Q ❑ ❑ # Does the Plan include a BMP summary? i ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 El ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ # Does the facility provide and document Employee Training? 0❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ Q ❑ # Does the Plan include a Stormwater Facility Inspection Program? E 11 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: BMP summary needs to include the settling basin/pond as a structural BMP Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ! ❑ ❑ ❑ Comment: Qualitative monitoring was not conducted during the last quarter of 2014 and first half of 2015. It appears that the change of monitoring schedule in the new permit and no facility operation might cause the gal) of monitoring during the period. TSS result (145 mg/L) from June 2015 sampling was over the bench mark (100 mq/L). Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? N❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ Comment: Analytical monitoring was not conducted during the last quarter of 2014 and first half of 2015 It appears that the change of monitoring schedule in the new permit and no facility operation might cause the gap of monitoring during the period. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ # Were all outfalls observed during the inspection? Q ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N EI # Has the facility evaluated all illicit (non stormwater) discharges? E ❑ ❑ El Comment: The copy of General Permit at the site was the exoired version Page: 3