Loading...
HomeMy WebLinkAboutNCG140397_COMPLETE FILE - HISTORICAL_20100318- ° STORMWATER- DIVISION CODING SHEET RESCISSIONS . PERMIT NO.. I` DOC TYPE C, COMPLETE FILE - HISTORICAL DATE OF RESCISSION ❑ DID u U 31 YYYYMMDD Compliance Inspection Report Permit: NGG140397 Effective: Expiration: Owner: Blue Ridge Concrete SOC: Effective: Expiration: Facility: Blue Ridge Concrete County: Buncombe 50 Murphy Hill Rd Region: Asheville Weaverville NC 28787 Contact Person: Johnny Maroney Title: Phone: 912-596-1609 n Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: Phone: Inspection Date: 03/18/2010 Entry Time: 10:45 AM Exit Time: 11:30 AM Primary Inspector: Susan A Wilson Phone: 828-294-4500 Secondary Inspector(s): Linda S Wiggs Phone: 828-296-4500 Ext.4653 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG140397 Owner - Facility: Blue Ridge Concrete Inspection Date: 03/18/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Linda Wiggs and Susan Wilson were met on -site by Johnny Maroney and Mark Turner of Blue Ridge Concrete (they happened to be actively grading the site when we were out there). DWQ was reviewing the site in order to provide comments to Raleigh SWPU staff regarding issuance of the permit. The site appeared to be graded as detailed in the plans. We discussed lining of the washwater basin, etc. They were going to get back with Bethany (SWPU) about this. We also discussed the construction stormwater permit with them. DWQ will have a more thorough industrial stormwater inspection after the facility is in operation. Page: 2 J Permit: NCG140397 Owner - Facility: Blue Ridge Concrete Inspection Date: 03/18/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ■ ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: The facility turned in a plan in conjunction with the permit application. Linda W and I had some comments (re. pH adjustment, etc.); after site completion - a more thorough stormwater inspection will be conducted. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ■ ❑ Comment: Site is not completed - no monitoring required yet. Site was being graded during visit. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ■ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: Not yet required - not in operation. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ■ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ■ ❑ # If the facility has representative outfall status, is It properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ■ ❑ Page: 3 Permit: NCG140397 Owner - Facility: Blue Ridge Concrete Inspection Date: 03/18/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: We observed where the outfall was proposed in the plans. This coincided with how the site was being constructed/graded. Page:4