Compliance Inspection Report
Permit: NGG140397 Effective: Expiration: Owner: Blue Ridge Concrete
SOC: Effective: Expiration: Facility: Blue Ridge Concrete
County: Buncombe 50 Murphy Hill Rd
Region: Asheville
Weaverville NC 28787
Contact Person: Johnny Maroney Title: Phone: 912-596-1609 n
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Certification: Phone:
Inspection Date: 03/18/2010 Entry Time: 10:45 AM Exit Time: 11:30 AM
Primary Inspector: Susan A Wilson Phone: 828-294-4500
Secondary Inspector(s):
Linda S Wiggs Phone: 828-296-4500 Ext.4653
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge
COC
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
0 Storm Water
(See attachment summary)
Page: 1
Permit: NCG140397 Owner - Facility: Blue Ridge Concrete
Inspection Date: 03/18/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Linda Wiggs and Susan Wilson were met on -site by Johnny Maroney and Mark Turner of Blue Ridge Concrete (they
happened to be actively grading the site when we were out there).
DWQ was reviewing the site in order to provide comments to Raleigh SWPU staff regarding issuance of the permit. The
site appeared to be graded as detailed in the plans. We discussed lining of the washwater basin, etc. They were going to
get back with Bethany (SWPU) about this.
We also discussed the construction stormwater permit with them.
DWQ will have a more thorough industrial stormwater inspection after the facility is in operation.
Page: 2
J
Permit: NCG140397 Owner - Facility: Blue Ridge Concrete
Inspection Date: 03/18/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
❑
❑
❑
# Does the Plan include a General Location (USGS) map?
■
❑
❑
❑
# Does the Plan include a "Narrative Description of Practices"?
■
❑
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
■
❑
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
■
❑
❑
❑
# Does the facility provide all necessary secondary containment?
■
❑
❑
❑
# Does the Plan include a BMP summary?
■
❑
❑
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
❑
❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
❑
❑
❑
# Does the facility provide and document Employee Training?
■
❑
❑
❑
# Does the Plan include a list of Responsible Party(s)?
■
❑
❑
❑
# Is the Plan reviewed and updated annually?
■
❑
❑
❑
# Does the Plan include a Stormwater Facility Inspection Program?
■
❑
❑
❑
Has the Stormwater Pollution Prevention Plan been implemented?
■
❑
❑
❑
Comment: The facility turned in a plan in conjunction with the permit application.
Linda W and I had some comments (re. pH adjustment, etc.); after site completion - a
more thorough stormwater inspection will be conducted.
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
❑
❑
■
❑
Comment: Site is not completed - no monitoring required yet. Site was being graded
during visit.
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
❑
❑
■
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑
❑
■
❑
Comment: Not yet required - not in operation.
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
❑
❑
■
❑
# Were all outfalls observed during the inspection?
❑
❑
■
❑
# If the facility has representative outfall status, is It properly documented by the Division?
❑
❑
■
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑
❑
■
❑
Page: 3
Permit: NCG140397 Owner - Facility: Blue Ridge Concrete
Inspection Date: 03/18/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Comment: We observed where the outfall was proposed in the plans. This coincided
with how the site was being constructed/graded.
Page:4