Loading...
HomeMy WebLinkAboutNCG140332_MONITORING INFO_20101101STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. w 3 DOC TYPE. ❑ HISTORICAL FILE l MONITORING REPORTS DOC DATE ❑ o� �) Q ((� I YYYYM M D D 8916 Oregon Inlet Court Raleigh, North Carolina 27603 Phone: 919.661.9954 Fax: 919.661.8108 November 1, 2010 Mr. Myrl A. Nisely NCDWQ—Raleigh RO 1628 Mail Service Center Raleigh NC 27699-1628 RE: Powell's Ready Mix, Inc. — NPDES General Per t NCG 140332 Dear Mr. Nisely: In response to your letter dated October 15 2010, we offer the following: A stormwater permit training session was held on October 26 2010. The workshop was attended by all production personnel; the workshop agenda is attached. Quantitative monitoring was conducted on February 9 2010. Both the laboratory analysis report and the completed NCDFNR Discharge Outfall Monitoring Report form are tiled in Appendix F of the SWPPP notebook. All required copies were submitted to Central Files in February; additional copies are attached for your review. General Permit NCG140000 does not require semi-annual quantitative monitoring. It does require semi-annual qualitative monitoring which has been completed at the subject facility by this consultant. The next quantitative monitoring event will occur during the first quarter of 2011 as suggested by the extended General Permit NCG140000. We appreciate this opportunity to respond to your concerns. In the meantime, if you have any questions, do not hesitate to call. Sincerely, ST WATER SERVICES GROUP, LLC ames D. Frei Senior Project Manager RECEIVED Attachments. NOV " 2 NA cc: A. Powell (w/o attachments) NC DENS File Raleigh Regional office Stormwater Permit Compliance Workshop Powell's Ready Mix, Inc. North Carolina Ready -Mix Concrete Plants October 26 2010 Agenda 1. Introduction 2. Stormwater Permits 2.1. General Permit NCG 140000 2.2. Authorized Discharges 2.3. Non -allowable Discharges 2.4. Permit Requirements 3. What is a SWPPP and Why do we need one? 3.1. Exposure Problems (Form 6) 3.2. Potential Spill Sources (Form 7) 3.3. Specific Elements 4. Monitoring Outfalls 4.1. How do we monitor? (w/ field exercise) 4.2. Using observation checklist 96 5. Compliance Documentation 5.1. Forms 5.2. Checklists 5.3. Appendix F 6. Reports 6.1. Significant Spill Incident Report 6.2. Non -Compliance Report 7. Review Best Management Practices 7.1. Baseline BMPs 7.2. Activity -Specific BMPs 7.3. Site -Specific BMPs (Table 4) 8. Plan Implementation 8.1. Making copies of forms and checklists 8.2. Identify SWPP Team members 8.3. Obtain corporate certifications 8.4. Table I and Table 4 completed tasks Powell 's Readv Xfix Slorntwaler Pollution Prevention Dviniug NPDES Petmit No. NCG140000 Page i DISCHARGE OUTFALL MONITORING REPORT NCDENR GENERAL PERMIT NCG140000 , _ �®pM (All sample data shall he reported'.no later than 30 days after,mceipt of lab results):., Sample Information Pennit Term Year` Year. Start7End Dates;_ , ; .; ,� .;j , . e ' Place check mark to indicate ;: applicable sampling•penod �.` Discharge Ty a (check zipp Stottnwat r ; -Waste �� I August 1, 2009'to Jul 3I,2010 �� -� ❑ ❑ ❑ ❑ ❑ ❑ 2 August 1, 2010 to June 30, 2011 Other - ropriate)'� _ water Part A: Stormwater Discharge Monitoring Data (For stormwater not combined with process wastewater) Storm Even[ Characteristics -. Da[e ••.'.TotalBvenGGPreci i[ation!(inches) c : 'Event Duratiom hours) �P� 2oI o Stormwater-Discharge Monitoring Outfall-, ^, •Date -Sam le :•• p -, •Total Flow ••Total Event'-. Event --: pH - -:•�-Total. N0. Collected Precipitation -':: Suspended Solids .(inches) (hours)_.. __(Std.,Umts) Oo 1 2 OR O O : o0 2 Does this facility perform ehicle Maintenance Activities using on average more than 55 gallons of new motor oil per month? ❑Yes No If.yes,.complete information below. SWU-241-080109 Page d of 2 o b Page 1 of 1 MIDTEST Laboratory Report Lab Location 'R' Lab Location 'C' Lab Location 'W' i NCMNV Cert.0 067 NC/0W Cert.#: 37731 NCNNW Cert.#: 103 NC/DW CertA 37733 NCA'VW Ccrt.#: 075 NC/DW Cert.#: 37721 1 6701 Conference Or, Raleigh, NC 27607 630D Ramada Dr, Suite C2, Clemmons, NO 27012 6624 Gordon Rd. Unit G, Wlmington, NO 26411 Ph: (919)834-4984 Fax:(919) 834-6497 Ph: (336)766-7846 'Fax: (336)766-2514 Ph: (910)763-9793 Far. (910) 343-9688 Project No.: Project ID: POWELL'S — Prepared for -- JIM FREI . STORMWATERSERVICES GROUP 8916 OREGON INLET CT. RALEIGH, NC 27603 Report Date: 2117/2010 Date Received: 2/11/2010 Work Order #: 1002-00865 Cust. Code: ST0691 Cust. P.O.#: No. Sample ID Date Sampled Time Sampled Matrix Sample Type Condition 001 S130-0011.._ - 21912010 17:30 SW Grab 4 +1- 2 deg C Test Performed Method Results -Lab Loc Da��ed Tme Qualifier Total Suspended Solids - SM 2640D - 121 mgfL - R 2112110 13:52 . Reviewed by: y/7 for Tritest, Inc. Services Group, LLC January 4,' 2005 Mr. Kenneth Schuster, PE NCDENR-DWQ"Surface Water Protection 1628 Mail Service Center Raleigh, NC 27699-1628 . RE: Notice of Violation Powell Ready Mixed Concrete Permit No. NCG140332 Dear'Mr. Schuster: 1251-6 Trillium Circle } .. Raleigh, North Carolina 27606 Phone i 919.816.0591 Fax: 919.816.0661 - Is 11 L (j �n 4 U 'JAN - 5 2005 In regards to your NOV letter dated December 29, 2004, I believe an error has been made by NCDENR-DWQ. Your letter indicates that the limit violation was of a Process Wastewater Discharge: Powell Ready Mixed Concrete does not generate nor discharge Process Wastewater at this site. The discharge monitoring report form submitted to NCDENR-DWQ (see attached copy) is for a stormwater discharge sample. According to NPDES General Permit NCG140000 Part 11 Section B.1. Table 2, the TSS cut-off limit is 100 mg/L for stormwater discharges. The Permittee understands that the cut-off limit is not a not -to -exceed -limit, and therefore cannot be violated. The cut-off value provides guidance in accessing the effectiveness of implemented BMPs and the need to improve certain BMPs. The Permittee will collect a stormwater discharge sample during Calendar Year 2005 as required by the Permit, and will continue to implement appropriate TSS-reducing BMPs. We request that NCDENR-DWQ withdraw this Notice of Violation as no violation has occurred. In the meantime, if you have any questions, do not hesitate to call. Sincerely, ST TER SERVICES GROUP, LLC ames D. Frei Project -Manager Attachment: cc: Allie Powell, Powell Ready Mixed Concrete Myrl Nisely, NCDENR-DWQ File r - i VA NCDEHR ifrcate of Coverage lity Name ay - — re Number----- IIit 3 Crm Year - DISCHARGE OUTFALL MONITORING REPORT GENERAL PERMIT NCG140000 e� (All sample data shall be reported no later than 30 days after receipt of lab results) u N�G14on®FZ] �IELL 4 PFIrcY Alx Sa) S 3S -911-1 1. 1999 to 2001 M _ _ �saG.7 *r5os4 Certified Laboratory # - Person Collecting Sample(s) Collectors Signature -I Stele Information Place check mark to indicatA applicable sampling period 31,2W7 ❑ ❑ ❑ 31, 2W2_ ❑ ❑ ❑ 31, 2W3 ❑ 62r ❑ �'� ❑ ❑ 31.2004 Part A.- Stertawater Discharge Monitoring Data (For Stormwater not combined with process wastewater) Storm Event Characterj.qig-� Drte Total h,vent. Precllutanon fmches� _ __- _ F.vent_Dumtion (hours) 406 23 Zoo4- -- D.3t'o - -- Stormwater Discharge Nlonitorine outfall Date Sample Total Flow Total Event Event Duration PH Total No. Collected Precipitation Suspended Solids _Q ours G _1Std. Units) (mj^0� Does this facility perform Vehicle Maintenance Activities using on average more than 55 gallons of new motor oil per month? ❑ Yes 6d'Nlo If yes, complete information below. Stormwater Discharge Monitoring -from Vehicle Maintenance Areas --- --- (Trdall No. Date Sample Collected Total Flow Total Event Precipitation kc(iticlics� Event Duration . h � New Motor Oil Usage Unt .- pH . td. Units Total Suspended Solids m lkl and Grease _�� - Swu;241-080199 Page loft Part B: Process wastewater discharge monitoring data Sample # _ Efiluem Sourc s for this sample rvehicle / EcEM!genl Cleam ❑ Raw Material Stock- de Wettin ❑ LMiring Drum Clean -out ❑ ec cle System Overflow _ ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours pH Std. unity TSS mg/l _ Settleable Solids mill Sample # __ Effluent Source(s) for this sum le Vehicle / Equipment Cleaning ❑ Raw Material Stock -pile Wetting _ ❑ Mixing Drum Clean -out ❑ R �cle System Overflow _--�_0 Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours - pit Std. units TSS mg/l Settleable Solids mill Mall original and one copy to: Attn: Central Files Division of Water Quality DENR 1617 Mail Service Center Raleigh, NC 27699-1617 Sample # — �Effluueen_t S�ottrec(_s for this sample___ vehicle/ Equipment Cleaning 0.1 1 .,,. Raw Material Stock -pile W ettin ❑ t . Mixin Drum Clean -out ❑ Recycle System Overflow ❑ Parameter Unit Data Collection Date mo/dd/yr., Total Flow MG Event Duration hours pH Std. units TSS mg/1 Settleable Solids mill Sample # _ Effluent Source(s) for this sample Vehicle / Equipment Cleanin__ ❑ Raw Material Stock- ile_wett� ❑ Mining Drum Clean -out rRecycle System Overflow — - ❑ Parameter Unit Data Collection Date mo/dd/yr Total Flow MG Event Duration hours pH Std. units TSS mg/1 Settleable Solids ml/1 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, acetnate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ORlriti A erfNt61>, W Pe"LITE%P­ (Print Name of Permittee or Designee) (Signature of Permittee or Designee) (Date) Swu-241-080199 Page 2 of 2