Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG140293_MONITORING INFO_20030731
AQ1u,� IW STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. IV U& ' q G .,? i 3 DOC TYPE ❑ HISTORICAL FILE �J MONITORING REPORTS DOC DATE ❑ a b 63 (� 3 YYYYMMDD ��� j' NCDENK DISCHARGE OUTFALL MONITORING REPORT GENERAL PERMIT NCG140000 . (All sample data shall be reported no Inter d= 30 days after receipt of lab insults) Certificate of Coverage NCG14�®©� Facility Name County Phone Number 2T1�19 ._6 U Sample Information Pcrmit Term Year Year Stait/End Dates ., Placecheck mark to indicaw .::applicablesamplingperiod .. Discharge Type (check as appropriate) 5torinwater .. 'Wastewater 1 August 1. 1999 to July 31, 2000 0❑ ❑ ❑�/ tQ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 2 August 1, 20W to July 31, 2001 3 August 1, 2001 to July 31, 2002 4 August 1, 2002 to Rdy 31, 2003 5 August 1, 2003 to July 31, 2004 '- -t A:. Stoiviwater Discharge Monitoring Data (1'ror`storinwater not combined with process wastewater): Storm Event Characteristics Date - Total Evem 'cation inches. .Event Duration. ours Stortrlwater Discharge Monitoring Outfall .. Date Sample Total Plow Total' No Collected - Precrpltahon S[Lspend'A sO1179 dS (mo/dd(w) - •'(MG) :. .. _ (inches) a... Ltwtrrs (Std. Units . - m 1 Does this facility perform Vehicle Maintenance Activities using on average more than 55 gallons of new motor oil per month? O Yes El' -No If yes, complete information below. Stormwater Discharge Monitoring from Vehicle Maintenance Areas SWU441-090199 - Page loft Q) 7-20 Part B: Process wastewater discharge monitoring data Sample # Effluent Source(s) for this sample Vehicle / FAuipment Cleanin ❑ Raw Material Stock -pile Wettin E Mixing Drum Clean -out E, Recycle System Overflow u Parameter Unit _Data Collection Date mo/dd/yr -7-63 Total Flow MG Event Duration hours 2 t PH Std. units 'L . TSS.. mg/1 O Settleable Solids m1/1 L 6,1 . Sample #. 2. Effluent Source(s) for this le -: ❑ ❑ Vehicle / Equipment CleaningI� Raw Material Stock -pile Wetting❑ `xin Drum Clean -out __cc cle System Overflow Parameter =_Unrt = `cData. .. Collection Date mo/dd/yr Total Flow MG, UO/f Event Duration . hours l7 PH, Std. units r TSS . mg/1 Settleable Solids niM G. Mail original and one copy to: Attn: Central Files Division of Water Quality DENR 1617 Mail Service Center Raleigh, NC 27699-1617 Sample # _ Effluent Source(s) for this sarule ./ Vehicle / ui tment Cleanin ❑ Raw Material Stock -pile Wettin ❑ -Mixing Drum Clean -out ❑ Recycle System Overflow ❑ Patanteter Unit :. Data Collection Date mo/dd/yr Total Flow MG Event Duration hours PH Std. units TSS mg/I Settleable Solids .. ml/1 Sample # Mfiluent Sources .for this le '; Vehicle / ui went Cleanin ❑ Raw Material Stock -pile Wettin ❑ -Mixing Drum. Clean -out ❑ Recvcle Svstem Ove.rflnw r i. +Parameter Umt Data Collection Date mo/dd/yr Total Flow MG Event Duration hours. pH- Std. units TSS :mg/1 Settleable Solids ml/1 "I,certify,.under penalty of. law, that this document.and all attachmentswere prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or: those.. persons .directly responsibler for.L gathering the information, the information submitted is, to the best of my knowledge and belief,, true, accurate, . and complete_ .1 am aware that there are significant penalties for submitting false m inforation,including the ibility of fines and imprisonment for knowing violations." . (Print :Nam"f Permittee o ign ) 7/30�03 Signature of Permittee or Designee) (Date)' . Swu-241-080199 Page 2.of 2 R E P O R T Southern Testi, & Research Laboratories. Inc. 3809 Airport Drive NW, Wilson, NC 27896-8649 0 252-237-4175 0 FAX: 252-237-9341 www.Soutliern'festiilg.com of A N A L Y S I S SAMPLE No.: M0780-002 Date Reported: 09/05/02 Paul Strickland PLT Concrete Services 3214 Turnage Road Wilson Phone:(252)293-0909 X NC 27893 Fax: (252)293-0838 /P. O.: 637 Client Sample ID: Marks: Truck Wash -Grab collected: 08/27/02 08:50 Matrix: Received: 08/27/02 12:25 STORMWATER Classification• ENV CAT No. ANALYSES METHOD ANALYZED by PQL RESULT UNITS EW-040.1 Solids: Total Suspended EPA 160.2 08/27/02 PEB 10 26 m L EW-040.4 Solids: Settleable EPA 160.5 08/27/02 AMF 0.1 <0.1 mL/L COMMENTS: Laboratory Contact(s): Reviewed and Approved by: n - Jer,dfiy gr yyfj ' En ronm tat Manager Page 2 of 2 M0780R.245 (LJL:V2R08.2) 09/05/102 13:30 Chemical and Microbiological Analyses: Environmental • Agrochemical • Foods • Pharmaceuticals ® Another Company Southern Te & Research Laboratories, Inc. 3809 Airport Drive NNV, Wilson, NC 27896-8649 e 252-237-4175 e l� AX: 252-237-9341 www-Southern felting.com R E P O R T of A N A L Y S I S Paul Strickland PLT Concrete Services 3214 Turnage Road Wilson NC 27893 Client Sample ID: Marks: Detention Pond -Grab Collected: 08/27/02 08:35 Received: 08/27/02 12:25 CAT No. ANALYSES EW-040.1 EW-040.4 COMMENTS SAMPLE No.: M0780-001 Date Reported: 09/05/02 P.`,one: (252)293-0909 X Fax: (252)293-0838 P. O.: 637 W6:Noa q� Matrix: STORMWATER Classification: ENV METHOD ANALYZED by PQL Solids: Total Suspended EPA 160.2 08/27/02 PEB 10 Solids: Settleable EPA 160.5 08/27/02 AMF 0.1 Laboratory Contact(s): Page 1 of 2 M0780R.245 Reviewed and Approved by: �114 Je y B own En ronmental Manager RESULT UNITS 42 mg/L <0.1 mL/L (LJL:V2R08.2) 09/05/102 13:30 Chemical and Microhiological Analyses: Environmental • Agrochemical • Foods • pharmaceuticals AnotherARM Company A EI�VA - NC®ENR DISCHARGE OUTFALL MONITORING REPORT GENERAL PERMIT NCG140000 . (All sample data shall be reported no later than 30 days after receipt pf lab insults) Certificate of Coverage NCG14 Facility Name G eJ ' G1F G d County Phone Number Sample Information Permit Term Year Year Start/End Dates Place check . nark to,inditate applicable sampling period Discharge Type (check as appropriate) Stormwater Wastewater I Au t 1, 1.999 to July 31, 2'nm U ❑ . Q ❑ .. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ . 2 August 1, 2000 to July 31, 2001 3 August 1, 2001 to July 31, 2002 4 August 1, 2002 to July 31, 2003 5 August 1, 2003 to July 31, 2004 -t A: Stoi-mwaterDischarge Monitoring Data (For stormwater not combined with process wastewater) Storm Event Characteristics Date - Total Event Piecipitation inches Event Duration (hours) Stormwater Discharge Monitoring Outfall 'Date Sample Total Flow, .Total Event a Event Duration pH ,Tatal . No. - Collected Precipttahon ,Suspended '. inches oms (Std Urns m i-I- I I- qi0 Does this facility perform Vehicle Maintenance Activities using on average more than 55 gallons of new motor oil `per month? .0 Yes O'No If yes, complete information below. Stormwater Discharge Monitoring from Vehicle Maintenance Areas . Outfall Date Sample Total Flow Total Ever No Collected . °Pnx4pitatk frnn/d&w) (MG) (niches) SwU-241-080199 Page lof 2 7-20 Part P: Process wastewater discharge monitoring data Sample # L Effluent Source(s) for le this sam / Vehicle / ui ment Cleanin 12r Raw Material Stock -pile Wettin Mixing Drum Clean -out 2r Recycle System Overflow ❑. Parameter Unit Data Collection Date mo/dd/yr -,x7-64 Total Flow MG p ' ' Event Duration hours PH Std. units O TSS- mg/l Z Settleable Solids ml/l Sample #, ----`EffluentSource(s) for this s le >-'; Vehicle / ui men, Cleanin ❑ Raw Material Stock -pile Wetting❑. .mg Dntm Clean -out ❑ --cc cle System Overflow ❑ Parameter Umt Collection.Date . mo/dd/yr . Total Flow MG. Event Duration. hours pH Std. units TSS .. 1119/1 Settleable Solids MIA Mail original and one copy toc Attn: Central Files Division of Water Quality DENR 1617 Mail Service Center Raleigh, NC 27699-1617 Sample # 2- Effluent Source(s) for this sam le / Vehicle / Equipment Cleaning Raw Material Stock -pile Wetting ❑ Mixing Drum Clean -out ❑ Recycle System Overflow ❑ Parameter Unit .. Data . Collection Date. mo/dd/yr Total Flow MG dG t�j Event Duration hours pH Std. units /G.O TSS mg/l '. Settleable Solids ml/I Sample # Efflluen*Stock- this le Vehicle /eanin ❑ Raw MatWettin Mixin DtRec cle w ❑ =k Parameter =SUmt Data. Collection Date mo/dd/yr. Total Flow MG Event Duration hours PH- Std. units TSS mg/l Settleable Solids M "I certify,,tnrder penalty of. law, that this docomeni.and all attachments were prepared udder my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or, those . persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief,. true, accurate, and complete. I am aware that there are significant penalties for submitting false information, includi g thepo 'bility of fines and imprisonment for knowing violations." (Print Name of 'tree or ghee) SWU-241-08n199 of Permittee or Designee) V. (Date) Page 2 of 2 L iL IlIfiaa CONSTFMTM SEMENCE * EXISTING IRON PIN * NEW IRON PIN L OBTAIN COPY OF APPROVED SEDDIENTATIMN EROSION CONTROL PLAN * NO IRON PIN 2. CONTACT CITY IF RDC2(Y MOANT ENGINEERING DEPARTMENT AND ADVISE m EXISTING CONIC. MIN. 13F DATE THAT LAND ]DISTURBING ACTIVITIES WILL BEGIN ON PROJECT El NEW CDIC MOM. & DISTALL APPROPRIATE TEMPORARY SEDDIEKTATION-EROSION CONTROL MEASURES A P.K. NAIL AND THEN CUMMENCE CLEARING AND GUMMING WORK ACTIVITY A RAILROAD SPIKE C CON124CE ROUGH GRADING OF SITE NO MAINTAIN ALL SEIMNEMTEOII�ERIISION CONTROL MEASURES. INLET PROTECTOR 5, DISTALL STUN DRAINAGE OF SHOWN) AM PROTECT INLETS WITH SILT FENCE, INLET PROTWTURS, AND OTHER APPROPRIATE MEASURES AS SHOWN ON THE PLAN, STABILME SITE AS AREAS ARE DROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVDIG DITCH X X SILT FENCE LDONGS ETC� 7 DSTALL ALL PERMANENT MEASURES SUCH AS ENERGY DISSIPATION PADS. a WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STADLEOED COMPLETELY, CALL FOR INSPECTIDIN BY SEDIMENTATION-ERCISIN CONTROL IRSPECTUL 9 W SITE IS APPORVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS, ETC AND SEED OR PAVE ANY RESULTING RARE AREAS. RUPERT E. BLAND D.8. 1191 P. 457 i rye' C�I MCKENNY & ROSE DIXON, JR Ivy D.B. 1647 P. 703 1 SILT 41 CS 40 4 4 fAk + z bo 0 C6 Ou qxr -7- Vicinity Map Not to Scale iN CL 0 '6 204' -204'-- —204'--- 11915 ---206'-- �205——205'— 205'— -- I .. ... ... IN ............ -16*30'55" W 604.6 .................... .. I. ........... IiIIIIII'm —7aoz ' 20IIIi� No zo 03'12 ------ m INV= 105.00 ro 207' on Ab fo La TEMP STRAW TS=208.00 22. F-F 0 W/ NET UNER SUPPLY TOP WALL BLDG F.F.E. 20&30 it GARAGE -10> z F.F.E. 20&30 Rjw TOP 107.90 t 105. C4 ;D 0 • C) 211 z 8V -a;p INV. = 203.2 SLAB ELEV. 209.76 TRoL ELEV. w 100 Id> OS - TOP EQUIP. SLAB ELEV, 208.55 d 3 0 a 41 ±, - — �, CON OGOL t F.F.E. 209.60 Al :Ile w di o WOODSLINE TOP SLAB Do z J ELEV. 20&88,yCAI* WATER I [PIE .. ... ... ... .. ... ... .... ................ a 207 ..... .... I 2 .... ........ 206',- 40-r-T 0'57- 206 .0 X x x— —'A— X CHAIN LINK FENCE Y, 'A X 'A STANDARD PRODUCTS CO. D.B. 1054 P. 44 R/4e Ol. o 30 0 30 60 90 P1\02PROJ\4063\4063-LDDT\dwg\4063A-SITEAM 04/05/2002 10,18.50 AM EST Revi qi nn Date B Date: April 2002 Scale: Map No. Herring —Sutton & Associates,GRADING A14 1) P.A. PLT CONCRETE SERVICES EROSION CO)ITROL 1" = 30' 02-4O63A `1 Engineers -Surveyors -Planners No Sheet of 2406 West Nash Street Wilson, North Carolina 27896 (252) 291-8887 Rocky Mount, N.C. PLAN 8pp 1 4 4 1 000.00 ACRES / BOUNDARY 000000 IF