Loading...
HomeMy WebLinkAboutNCG140293_COMPLETE FILE - HISTORICAL_20151012STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V / 7 DOC TYPE L4 HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ U I a YYYYM M D D ( A PLT CONCRETE SERVICES, INC. September 29, 2015 Mr. Cheng Zhang Environmental Senior Specialist N.C.D.E.N.R. 1628 Mail Service Center Raleigh NC 27699-1617 Dear Mr. Zhang, NC rD[NR Raleigh Regional Ofrice I have received your report on the Multi -Media Compliance Inspection conducted at our Wilson Plant on August 18, 2015. After review of your report, 1 see there are a few responses needed on some items of concern that you have noted and are as follows: Item #2- The S.P.P.P. has been reviewed and updated where needed and will be done so each year as required. All contact info has been updated and the plan has been reviewed with all revisions documented. The additional back storage bay on the wash pit has been added to the site plan and additional grading has been performed to ensure that any overflow reaches our detention pond. Also, a new copy of the General Permit has been placed in our book. Item #4- Our waste area for returned concrete is encompassed by an earth berm and is now completely intact with no open breaches. This area is used for only hardened and returned concrete for future crushing. I'm confident that the proper corrections have been made regarding your areas of concern and welcome any further input that would help us in the management of our Storm Water Plan. Please contact me at 252-293-0500 if you have any questions and thank you for your assistance. Sincerely, PLT Concrete Services, Inc. Rick Proctor General Manager 3214 Turnage Road • Wilson, North Carolina 27893 • Office 252-293-0500 • Fax 252-293-0838 North Carolina Pat McCrory Governor Mr. Rick Proctor General Manager PLT Concrete Services, Inc. 3214 Tumage Road Wilson, NC 27893 ,F. NCDENR Department of Environment and Natural Resources September 14, 2015 Subject: NPDES Stormwater Compliance Evaluation Inspection Certificate of Coverage No. NCG140293 PLT Concrete Services, Inc. Wilson County Dear Mr. Proctor: Donald R. van der Vaart Secretary _A 3 1 � , l NC DENR Raleigh Regional office Staff from the Department of Environmental and Natural Resources (DENR) conducted a stormwater inspection on August 18, 2015, as part of a multimedia inspection of your facility. Your assistance during the inspection was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: Certificate of Coverage (COC) No. NCG140073 under NPDES General Permit NCG140000 was issued to PLT Concrete Services, Inc. to discharge stormwater runoff and process wastewater to an unnamed tributary to Comentnea Creek, a WS-IV, NSW, CA stream, in the Neuse River Basin. 2. The facility has developed a stormwater pollution prevention plan (SPPP). A review of the plan indicated that it included most components required by the general permit. However, the plan has not been reviewed/updated annually as required by the General Permit, some contact information was outdated. Annual plan review/update must be documented. The backbay behind the wash pits needs to be added to the site map. The General Permit in the stormwater file was an expired version; please replace it with a current effective version, which is available from DENR website. Semi-annual qualitative monitoring has been conducted as required by the permit at the lone stormwater discharge outfall (SDO). You stated that no discharge had been observed at the outfall. Runoff enters the water quality pond via two forebays (connected to the pond). The water quality pond was dry at the time of inspection. NCDENR Raleigh Regional Office 1628 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 3800 Barrett Drive, Raleigh North Carolina 27609 Phone: 919-791A2001 Fax: (919) 788-7159 An Equal Opportunity 1 Affirmative Action Employer - Made in part with recycled paper Page 2 of 2 4. The SDO was observed during the inspection. It was maintained and accessible. Several breaches along the berm in the waste concrete disposal area were observed; these breaches need to be closed to prevent runoff from leaving the area. Please respond in writing regarding Items 2 and 4 within 60 days of receipt of this letter. If you have any questions regarding the attached report or any of the findings, please contact Cheng Zhang at 919-791-4200 (or email: cheng.zhang(�ncdenr.gov). Sincerely, Cheng Zhang Environmental Senior Specialist Raleigh Regional Office Enclosure: Compliance Evaluation Inspection Form cc: Central Files RRO SWP files *1 NC®ENR North Carolina Department of Environment and Natur Pat McCrory Governor Mr. Rick Proctor General Manager PLT Concrete Services, Inc. 3214 Turnage Road Wilson, NC 27893 Dear Permittee: Donald R. van der Vaart Secretary September 14, 2015 Subject: Multimedia Compliance Inspection PLT Concrete Services, Inc. Wilson County Department of Environment and Natural Resources staff conducted a multimedia compliance inspection of PLT Concrete Services, Inc. on August 18, 2015 for permitted and/or other activities administered by the following Divisions: Division of Air Division of Energy, Division of Water Division of Waste Quality(DAQ) Mineral, and Land Resources (DWR) Management (DWM) Resources EMLR We hope that you have enjoyed the benefit of our initiative to provide a single inspector capable of handling multiple areas of environmental compliance at your facility. The results of each applicable inspection area and any associated response actions or necessary corrective measures are detailed in the Division specific areas of the attached report. If there are no notes or comments under each Division header, you may assume compliance with that particular Division's rules and regulations at the time of inspection. Should violations be noted in the attached report, you may receive separate enforcement related correspondence in addition to this report. If you have any questions regarding this multimedia inspection, please contact me at Cheng Zhang (cheng.zhang@ncdenr.gov). Thank you for your cooperation. cc: DAQ RRO Files DWR RRO Files NCDENR Raleigh Regional OKoe 1628 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 3800 Barrett Drive, Raleigh North Carolina 27609 Phone: 919-79142001 Fax:(919) 788-7159 An Equal Opportunity 1 Affirmative Action Employer - Made in part with recycled paper I -tp, w NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary September 14, 2015 Mr. Rick Proctor General Manager PLT Concrete Services, Inc. 3214 Turnage Road Wilson, NC 27893 Subject: NPDES Stormwater Compliance Evaluation Inspection Certificate of Coverage No. NCG140293 PLT Concrete Services, Inc. Wilson County Dear Mr. Proctor: Staff from the Department of Environmental and Natural Resources (DENR) conducted a stormwater inspection on August 18, 2015, as part of a multimedia inspection of your facility. Your assistance during the inspection was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: Certificate of Coverage (COC) No. NCG140073 under NPDES General Permit NCG140000 was issued to PLT Concrete Services, Inc. to discharge stormwater runoff and process wastewater to an unnamed tributary to Contentnea Creek, a WS-IV, NSW, CA stream, in the Neuse River Basin. The facility has developed a stormwater pollution prevention plan (SPPP). A review of the plan indicated that it included most components required by the general permit. However, the plan has not been reviewed/updated annually as required by the General Permit, some contact information was outdated. Annual plan review/update must be documented. The backbay behind the wash pits needs to be added to the site map. The General Permit in the stormwater file was an expired version; please replace it with a current effective version, which is available from DENR website. 3. Semi-annual qualitative monitoring has been conducted as required by the permit at the lone stormwater discharge outfall (SDO). You stated that no discharge had been observed at the outfall. Runoff enters the water quality pond via two forebays (connected to the pond). The water quality pond was dry at the time of inspection. NCDENR Raleigh Regional Office 1628 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 3800 Barrett Drive, Raleigh North Carolina 27609 Phone: 919-791-4200 1 Fax:(919) 788-7159 An Equal Opportunity 1 Affirmative Action Employer - Made in part with recycled paper Page 2 of 2 4. The SDO was observed during the inspection. It was maintained and accessible. Several breaches along the berm in the waste concrete disposal area were observed; these breaches need to be closed to prevent runoff from leaving the area. Please respond in writing regarding Items 2 and 4 within 60 days of receipt of this letter. If you have any questions regarding the attached report or any of the findings, please contact Cheng Zhang at 919-791-4200 (or email: cheng.zhang(a ncdenr.gov). Sincerely, Cheng Zhang Environmental Senior Specialist Raleigh Regional Office Enclosure: Compliance Evaluation Inspection Form cc: Central Files RRO S W P files Compliance Inspection Report Permit: NCG140293 Effective: 07/01/11 Expiration: 06/30/16 Owner: PLT Concrete Services Incorporated SOC: Effective: Expiration: Facility: PLT Concrete Services Inc County: Wilson - 3214 Tumage Rd Region: Raleigh Wilson NC 27893 Contact Person: Rick Proctor Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/18/2015 Primary Inspector: Chang Zhang Secondary Inspector(s): Title: EntryTime: 10:OOAM Certification: Phone: 252-293-0500 Phone: Exit Time: 1145AM g /! ri / ye ,d— Phone: 919-791-4200 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete StormwaterNJastewater Discharge COC Facility Status: Compliant Not Compliant Question Areas: i Storm water (See attachment summary) Page: 1 Permit: NCG140293 Owner - Facility: PLT Concrete Services Incorporated Inspection Date: 08/18/2015 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Overall, the facility was in compliance. The SPPP does need to be reviewed/updated annually, which shall be documented. Page: 2 Pe"It: NCG140293 Owner - Facility: PLT Concrete Services Incorporated Inspection Date: 08/18/2015 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE ® ❑ ❑ ❑ ®❑ ❑ ❑ ®❑❑❑ ❑❑■❑ ® ❑ ❑ ❑ s❑❑❑ r�i♦T�T�I ■❑❑❑ ■❑❑❑ E ❑ ❑ ❑ * ❑ ❑ ❑ ❑ E ❑ ❑ ■❑❑❑ s❑❑❑ Comment: The plan has not been reviewed/updated annually. Some personnel and contact information are outdated. The backbay behind the wash pits needs to be depicted on the site map. Qualitative Monitoring yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ®❑ ❑ ❑ Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Mr. Proctor stated that no flow was observed at the lone stormwater discharge outfall. At the Yes No NA NE ❑ ❑ ® ❑ ❑ ❑ E ❑ time of inspection the water quality pond was dry. Permit and Outfalls yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all outfalls observed during the inspection? E ❑ ❑ Cl # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: The permit kept on site is an expired version. Several breaches were observed along the berm in the waste concrete disposal area. Page: 3 NORTH CAROLINA DIVISION OF AIR QUALITY Inspection Report Date: 09/ 11 /2015 Facility Data PLT Concrete Services, Inc. 3214 Tonnage Road Wilson, NC 27894 Lat: 35d 41.0180m Long: 77d 57.1550m SIC: 3273 / Ready -Mixed Concrete NAICS: 32732 / Ready -Mix Concrete Manufacturing Facility Contact Rick Proctor General Manager (252) 293-0500 Comments: In Compliance Inspector's Signature: Date of Signature: Total Actual emissions Contact Data Authorized Contact Rick Proctor General Manager (252)293-0500 Technical Contact Rick Proctor General Manager (252)293-0500 PLT Concrete Services, Inc. NC Facility ID 9800207 County/FIPS: Wilson/195 Permit Data Permit 08905 / R04 Issued 4/23/2014 Expires 3/31/2022 Classification Small Permit Status Active Current Permit Application(s) None SIP Program Applicability Compliance Data Inspection Date 08/18/2015 Inspector's Name Cheng Zhang Operating Status Operating Compliance Code Compliance - inspection Action Code FCE On -Site Inspection Result Compliance TSP S02 NOX VOC CO PMIO *HAP 2013 0.4200 --- --- --- --- 0.1930 0.0100 2008 0.6130 --- --- --- --- 0.2820 --- give Year Violation History: None Date LetterTyue Rule Violated Performed Stack Tests since last FCE: None Date Test Results Test Method(s) Violation Resolution Date Source(s) Tested (1) DIRECTIONS: From the RRO, take I-440 to US-64 East. Travel and merge right onto US-264 East. Stay on US-64 East and take exit 43A US-301 North. After you get off the cloverleaf, immediately get into the left lane where you turn left onto Turnage Road (There is a red Orkin pest control sign at the beginning of this road). The facility is on the right. There is a 3214A (main office) and 3214B (plant managers office) Tonnage Road. The facility contact and the records are in 3214B. (II) FACILITY DESCRIPTION: The facility is a concrete batch plant. Recommended safety equipment includes a hard hat, blaze orange safety vest, earplugs and safety glasses for personal protective equipment. (Ill) INSPECTION SUMMARY: On July 18, 2015, I (Cheng Zhang) met with Rick Proctor, General Manager, to conduct a compliance inspection of the facility (as part of a multimedia inspection). Initially, we reviewed the permit conditions and logbooks. Afterwards we toured the facility, but forecast rainfall cancelled many orders so the facility was in wait mode. Overall, the facility was operating well from an air quality standpoint on the day of the inspection. (IV) PERMITTED EMISSION SOURCES: Emission Emission Source Control Control System Source ID Description System ID Description truck mix concrete batch plant (120 cubic yards per hour maximum capacity) consisting of the following equipment: SIL-101 cement silo (4,175 cubic feet maximum capacity) COL-101 baghouse (1,433 square feet of filter area) SIL-102 flyash silo (3,506 cubic feet maximum capacity) COL-101 baghouse (1,433 square feet of filter area) BAT-101 cement weigh hatcher (12 cubic yard capacity) COL-101 baghouse (1,433 square feet of filter area) sand and aggregate weigh batcher (12 cubic yard BAT-102 capacity) N/A N/A truck loadout (120 cubic yards per hour maximum TLO-101 capacity) COL-101 baghouse (1,433 square feet of filter area) ***IN COMPLIANCE — Permitted equipment appeared to be well -maintained, but was not in operation at the time of the inspection.*** (V) SPECIFIC CONDITIONS AND LIMITATIONS: A.I Any air emission sources or control devices authorized to construct and operate above must be operated and maintained in accordance with the provisions contained herein. The Permittee shall comply with applicable' Environmental Management Commission Regulations, including Title 15A North Carolina Administrative Code (NCAC), Subchapter 2D .0202, 2D .0515, 2D .0521, 2D .0535, 2D .0540, 2D .0611 and 2D .1806. ***IN COMPLIANCE - The facility appears to be in compliance with all applicable state and federal regulations.*** A.2 PERMIT RENEWAL AND EMISSION INVENTORY REQUIREMENT - At least 90 days prior to the expiration date of this permit, the Permittee shall submit the air pollution emission inventory report in accordance with 15A NCAC 2D .0202, pursuant to N.C. General Statute 143 215.65. The report shall be submitted to the Regional Supervisor, DAQ. ***IN COMPLIANCE — During the inspection it was discussed that the permit expires March 31, 2022 and the emission inventory due will be for the 2020 calendar year. *** A.3 PARTICULATE CONTROL REQUIREMENT -As required by 15A NCAC 2D .0515 'Particulates from Miscellaneous Industrial Processes," particulate matter emissions from the emission sources shall not exceed allowable emission rates. ***fN COMPLIANCE - The facility produces less than (80 to 100 tons/hour) what is allowed in the permit (120 tons/hour). The sources that produce particulate emissions are connected to a well maintained bagfilter, which controls the particulate emissions enough to satisfy this requirement.*** AA VISIBLE EMISSIONS CONTROL REQUIREMENT - As required by 15A NCAC 2D .0521 "Control of Visible Emissions," visible emissions from the emission sources, manufactured after July 1, 1971, shall not be more than 20 percent opacity when averaged over a six -minute period, except that six -minute periods averaging not more than 87 percent opacity may occur not more than once in any hour nor more than four times in any 24-hour period. ***IN COMPLIANCE —The plant was not in production during the inspection.*** A.5 NOTIFICATION REOUIREMENT - As required by 15A NCAC 2D .0535, the Permittee of a source of excess emissions that last for more than four hours and that results from a malfunction, a breakdown of process or control equipment or any other abnormal conditions, shall notify the DAQ. ***IN COMPLIANCE — No excess emissions have been noted or reported regarding this facility.*** A.6 FUGITIVE DUST CONTROL REQUIREMENT - As required by 15A NCAC 2D .0540 "Particulates from Fugitive Dust Emission Sources," the Permittee shall not cause or allow fugitive dust emissions to cause or contribute to substantive complaints or excess visible emissions beyond the property boundary. ***IN COMPLIANCE —No fugitive dust was observed on the day of the inspection.*** A.7 BAGFILTER REQUIREMENTS - As required by 15A NCAC 2D .0611, the permittee is to maintain and inspect the fabric filters (including cartridge filters, baghouses, and other dry filter particulate collection devices) and record the results of these activities in a logbook. ***IN COMPLIANCE - The weekly bagfilter logbook/maintenance, appeared to be complete and up to date. The facility has a contract with Edwards Inc., who services the baghouse twice a year. A.8 CONTROL AND PROHIBITION OF ODOROUS EMISSIONS - As required by 15A NCAC 2D .1806 "Control and Prohibition of Odorous Emissions" the Permittee shall not operate the facility without implementing management practices or installing and operating odor control equipment sufficient to prevent odorous emissions from the facility from causing or contributing to objectionable odors beyond the facility's boundary. ***IN COMPLIANCE —No objectionable odors were observed.*** (VI) STACK TEST HISTORY: There has been no stack test in the last 5 years. (VII) COMPLIANCE HISTORY: IBEAM and DAQ files show no NODS, NOVs, or NREs for this facility. (Vlll) RECOMMENDATIONS AND CONCLUSIONS: At the time of inspection, this facility appeared to be in compliance with its current air permit. Recommend re -inspection within two years. CONCRETE SERVICES, INC. July 30, 2003 Mr. Kenneth Schuster, P.E. Regional Water Quality Supervisor 1628 Mail Service Center Raleigh, NC 27699-1628 Dear Mr. Schuster, In response to your request for stormwater sampling data during 2002 and 2003, 1 have included our most recent report dated 4/15/03 and also a report on 9/05/02 taken from our Wilson Plant. I don't have any data on our new plant in Rocky Mount, NC, but we anticipate being able to take a sample this week during these late day storms we are having. We will send you a copy of those reports when we receive them back from our testing firm and if there's anything else you feel we need to do, please let us know. Thank you and please call if I can be of further assistance. Sincerely, PLT CONCRETE SERVICES, INC. Rick Proctor General Manager 3214 Tumnoge Road • Wilson, North Carolina 27893 • Office 252-293-0500 • Fax 252-293-0838 Mr. Rick Proctor, General Manager PLT Concrete Services, Inc. 3214 Tumage Rd Wilson, NC 27893 Dear Mr. Proctor: :`.illiam G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources .:Ian W. Klimek, P.E. Director Division of Water Qualitv Vlav 15. 2003 R'<«/z� a3o6( � Subject: Stormwater Compliance Inspection PLT Concrete Services. Inc. NPDES Stormwater Permit NCG 140293 Wilson. NC Wilson County On May 6, 2003 Mr. Myrl Nisely of the Raleigh Regional Office of the Division of Water Quality made a compliance inspection at the Wilson facility. A copy of the inspection checklist is attached. The help you provided. and the late, discussion with Mr. Paul Strickland was appreciated. Observations were as follows: 1. The Stormwater Pollution Prevention Plan manual (SP3) contained all of the required data and was well organized. 2. Inspections of the facility were documented monthly, going bevond the permit requirement of semi-annuai inspections. Concrete disposal, if any, is done by pouring blocks. Drum washouts are done into spcciail.: cesiencd cells from which the washout water is reused for other drum washouts. out is not used in mrakins more concrete. [n a hen "y rait:. this water may overflow that recycle system and travel to the detention pond. There are ')Fans :o ouiid ano[hr: ceii behind the three existing cells to take this overflow. That cell is not expected to o1"e:flo%%. 'cu: %%ill evaooratc. 4. Songs accumulated in the washout cells are removed and air U : next to the %�ashoui cclis.:'...:'ate: piac� oil, a utie of broken concrete nearby. This storage area will soon un&7,zo improvement'o': ,n:nine=ic:::. "ails around t'arce sides. Tice pile is periodically hauled away for use as fill. 5. Summertime wetting of aggregate travels to the Detention Pond. 6. Vehicle washing is done near the entrance gate. This runoff travels through three check dams and then flows onto a large grassy area. pH checks are made on a monthly basis and logged. 7. Secondary containment structures for fuels and for admixture chemicals were clean and the drain handles were locked. Observation records were in order for each time a containment was drained. 8. Housekeeping was excellent, and the concrete surfaces in the plant were clean and well kept. N. C. Division of Water Quality 1626 Mail Service Center Raleigh, IJC 27699-1626 (919) 571-4700 Raleigh Regional Office NI:D[ii;t Customer Service 1 800 623-774II PLT Concrete Services, Inc. 5/6/03 Paee 2 Vehicle Maintenance reportedly uses 200 to 300 gallons of ne%y motor oil per month. so falis under Par II(B)(2). However, all work is done inside the building and rainwater runs off as sheettlow to the side of the propem, so sampling is not required. The used oil is stored inside and penodicalh, removed by Noble Oil. Thank you for your attention to the stormwater permit for this facility;. If you have comments or questions, please contact me at 919 571-4700. Sincerely, Y OIL Nlyrl A. Nisely Environmental Specialist II cc: NPDES Compliance Unit Central Files Umtet Staves cnvircnmentai Prctem:on Agency Fen Aoeroved. Wasninglon, O.C. 20460 EPA cl.ls I:o. 2e40-0657 Water Compliance Inspection Report Appr :a expires 6-31 o6 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 20I 1 I l 2 I,.I 31 I11 12I 03/05/06 117 18I„I 19 LS NCG140'_93 u L LJ L'J 1 J Remarks 21l1111111111111111111111111111IIIII11166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 OA ----------'--''^eserved------------ 67 1 69 70 LI �J LJ 71 L 72 73 174 7 5I I I I 180 l 1 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW. also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) Fit Concrete services :--_crperaced Exit T ime�Dale Fenn Expiration Caret 3719 T.uznaae Rd Wilscn NC 37893 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Pick Proctor/// Rick Proctor;// Name. Address of Responsible Offidal/iitle/Phone and Fax Number Contacted Ricky Proctcr,3219 Turnace Rd Wilson NC '<7993!i:5'_-.53-0500/ ❑c Section C: Areas Evaluated During Inspection (Check only those areas evaluated eccrds/Retorts Facv!ty Site Reviex stcrm ,:aces Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessar., sae :.c cached i.ett=_r Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers _are Signature of Management Q A Reviewer Agency/OffcelPhone and Fax Numbers Este EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Readymix Concrete Stormwater Inspection Checklist Type of Visit Compliance Inspection/Program Audit Tech Assistance or Re: on Location PLSConcrete;Servlces, Inc Wilson, NC Facility Number NCG14020Date 5/6/03 Time In9:30 AM Time Out 10:50 AM People Interviewed, and Titles: Rick Procto Gen Mg , Paul Sfnckland, Analyst SPPP Documentation (Site Plan Part II (A)(1) 1. CoLmy of Certificate of Coverage ®Yes pNo Copy of Permit ®Yes pNo Requested but not required 2. General Location (USGS) Map shows plant ®Yes pNO, lines of discharge Part II(A)(1)(a) to water of State ®Yes `pNo, Stream labeled ®Yes pNo, Latitude and longitude ©Yes [],No Comments P.ondrdtschu -es as sheet flow to wetlandd, nn,llnes of dts hazge or stream_ labeling tieeded 3. Narrative Descnption of Practices ®Yes pNo r� Part II(A)(1)(b) 4. Site map ®Yes pNo Shows flows & areas served with arrows and Part II(A)(1)(c) % impervious surface ®_Yes pNo, buildings ®_Yes pNo, process areas ®Yes []No. disposal areas ®Yes _No, drainage structures ®Yes []No, existing BMPs- such as secondary containment ®Yes pNo, list of potential pollutants ®Yes pNo Comments:. 5. List of significant spills in last') years or certif if none ®Yes pNo Nonesmce start PartII(A)(1)(d) RRO called? pYes pNo 6. SW curtails have been evaluated for process water pYes 0No outfalldi from pond Part II(A)(1)(e) 7. Feasibility of Changing Practices pYes ®No E1antwas`desitmedT6]riightprac6ces Part II(A)(2)(a) 8. Secondary Containment ®Yes pNo ':''-. _`ti Schedule needed? ❑Yes ®No Part II(A)(2)(b) Records of Draining Containment, Observations Made ®Yes pNo Ckd every big rain 9. BMP Summary ®Yes pNo Part II(A)(2)(c) 10. SPRP Plan ®Yes pNo, Responsible personnel still employed here? ®Yes ❑No Pan II(.A)(3) 11. PM and Housekeeping Plan pYes ❑No -',' :} j Record of Inspections? pYes iiXo Part II(A)(4) 12. Employee training _®Yes ❑No — for everybody ❑Yes ❑No 4/9/03 by Inco, Inc. Part II(A)(5 ) 13. Responsible parties, chain of command page pYes ❑No Part II(A)(6) 14. Plan updated/reviewed annually pYes pNo Part ll(A)(7 ) 15. Stormwater Facility Inspection Program pYes pNo Good records Part II(A)(S) 16. This Plan Has Been Implemented (documents in manual. . Part II(A)(9) eninloyees show awareness ©Yes ❑No Comments Sampling and Analytical Data Part II(C) All Stormwater and Process Water is Recycled (TIC(3)) ❑Yes ®No Rain Gauge on site (not required) pYes pNo if <10 yr storm and overflows, sample. if>10 yr storm, sampling not required. How do thcy know if 10 pr storm or not! Record of an overflow ®Yes pNo Details If not all recycled, what is allowed to discharge? Vehicle Cleaning (HC2) N Recycle overflow (IIC3 above) [2 Wetting of Aggregate (IIC4)® Mixing drum cleanout (IICS) 4t` Analytical data present ❑Yes []No. Compliant.'❑Yes ❑No sformwater pond system that occasionally discharges to a ch achvtty required as would normally be expected at a Total precip pYes pNo, Storm duration ❑Yes ❑No. Total flow Est. ❑Yes ON--o,Field pH ❑Yes ❑No. Chain of custody pYes pNo Qualitative Monitoring performed semiannually ®Yes pNo Wet 0 Dry ® Pan II(F) Stormwater not combined with process wastewater— general runoff PartII(C)(I) Analytical data ®_Yes pNo, Chain of Custody pYes pNo. Qualitative Monitoring performed semiannually (Section F) ®Yes pNo. Wet 0 Dry If using cutoff policy, how many sample rounds Cutoff Concentrations met dYes ❑No '. -`' °Ever have a Bypass" ❑Yes ❑No (III (C)(4)a1 &21 Notification given? pYes pNo Outdoor Inspection I located all discharge points ®Yes pNo No. of areas served 1 Sample points appropriate ®Yes pNo Location if different from discharge point Housekeeping: Trash pYes pNo Dust ❑Yes ®No Clean;iX,611 kept site Take pH pYes pNo Value(s) Pond pH checked, acid occasionally added. Take photos ❑Yes 0No Containment Area satisfactory ®Yes ❑No. Loose drums pYes ❑No. Locked drain 11"es 7N.1 Concrete disposal pile comments Use left -over for blocks or paving. Solids iron, %asl.oui cri!s ,e place in a pile that will soon have blocks walls on three sides. Comments nwater.from the beginning..:Several innovative techniques are ugh solids impacts Ope"additional cellds planned as final Recommendations: Increase pH checks on the first Vehicle Wash checkdam to weekly. Requirements: 0.1. Letter is to go to: Name RiEIRR c i Title JPyv'(Y S F9 � L o m a � 4 FAIR QPv Southern Testing & Research Laboratories 3809 Airport Drive NW, Wilson, NC 27896-8649 • 252-237-4175 • FAX: 252-237-9341 www.SotithernTesting.com R. E P O R T of A N A L Y S I S Paul Strickland PLT Concrete Services 3214 Turnage Road Wilson NC 27893 SAMPLE No.: M6109-002 Date Reported: 04/15/03 Phone:(252)293-0909 X Fax: (252)293-0838 P. O.: 1280 Client Sample ID: //wm /v cl_1 /va` s Marks: 'truck Wash �/ r Collected: 04/07/03 11:05 Matrix: STORM WATER Received: 04/07/03 13:32 Classification: ENV CAT No. ANALYSES METHOD ANALYZED by PQL RESULT UNITS EW-040.1 Solids: Total Suspended EPA 160.2 04/08/03 PEB 10 24 mg/L, EW-040.4 Solids: Settleable EPA 160.5 04/07/03 MAW 0.1 <0.1 mL/1, COMMENTS: Laboratory Contact(s): Reviewed and Approved by: 9je vremy IIrown Environmental Manager Page 2 of 2 M6109R.310 (LJL:V2R08.2) 04/15/103 15:20 Chemical and Microbiological Analyses: Environmental • Agrochemical • Foods • Pharmaceuticals 0 Anolder Company R E P O R T of Southern Testing & Research Laboratories 3809 Airport Drive NW, Willson, NC 27896-8649 • 252-237-4175 • FAX: 252.237.9341 www. Sou the rnTest i ng.co m A N A L Y S I S Paul Strickland PLT Concrete Services 3214 Turnage Road Wilson NC 27893 SAMPLE No.: M6109-001 Date Reported: 04/15/03 Phone:(252)2.93-0909 X Fax: (2.52)293-0838 P. 0.: 1280 Client Sample ID: Marks: Detention Pond Collected: 04/07/03 11:50 I Matrix: STORM WATER Received: 04/07/03 13:32 Classification: ENV CAT No. ANALYSES METHOD ANALYZED by PQL RESULT UNITS EW-040.1 Solids: Total Suspended EPA 160.2. 04/10/03 PEB 10 EW-040.4 Solids: Settleable EPA 160.5 04/07/03 MAW 0.1 COMMENTS: Laboratory Contact(s): Reviewed and Approved by: Jerem Brown Environmental Manager 30 mg/L <0.1 mL/L Page 1. of. 2 M6109R.310 (LJL:V2R08.2) 04/15/103 15:20 Chemical and Microbiological Analyses: Environmental • Agrochemical • Foods • pharmaceuticals G Another 40=0 Company ;X DATE/TiIIE :JUL-30'05(WED) 1331 252 293 0838 ,_JUL-30-2003 14:21 PLT CONCRETE SER. ?.00! 252 293 0E38 P.01 PL1' CONCRETE SERVICES, INC.. FAX COVER SHEET DATE / 3� o PAGES /() TO UCH n U l FAX v 6 4- FROM g�( Y'/L%'� FAX 252-293-0838 KE CO L: NTS: M -- C)S�� -oiOS- j32 i RS UP.i /T'ip�!E �JUL. �0' 03(INE�) !3.3! ?8? ?93 OS38 JUL-30-2003 14 21 PLT CONCRETE SER. P Ou? 252 293 063E P.G2 PLT CONCRETE SERVICES, INC. July 30, 2003 Mr. Kenneth Schuster, P.E. Regional Water Quality Supervisor 1628 Mail Service Center Raleigh, NC 27699-1628 Dear Mr. Schuster, In response to your request for stermwater sampIlng data during 2002 and 2003, 1 have included our most recent report dated 4/15/03 and also a report on 9/05/02 taken from our Wilson Plant. I don't have any data on our new plant in Rocky Mount, NC, but we anticipate being able to take a sample this week during these late day storms we are having. We will send you a copy of those reports when we receive them back from our testing firm and if there's anything else you feel we need to do, please let us know. Thank you and please call if I can be of further assistance. Sincerely, PLT CONCRETE SERVICES, INC. Rick Proctor General Manager it Dp,T /ripl6 JUL.-70'03(W D( 13.0 15t t93 06 S ?,007 JUL-30-2003 14:21 PLT CONCRETE SER. 252 293 C939 F.23 JP``�Y SfH i Southern Testing & Research Laboratories 3809Ai Airport Drive NW, WiLson, NC 27896-9649 252-237.4-�.,..... 52 v w rP � � � 17S FAX: 252-257-9341 r Po www.SoolhernTesting.com FAIR C SAMPLE No.: M61.09-002 1 E P 0 R T of A N A L Y S I S Date Repor--ed: 04/1.=/03 Paul Strickland LT Concrete Services 3214 Turnage Road Phone:(252)293-0909 X Wilson NC 27893 Fax: (252.)293-0838 P. O.: 1280 Client Sample Wash Mark'i' s : ruck Wash Collected: 04/07/03 11:05 Matrix: STORM WATER Received: 04/07/03 13:32 Classification: ENV CAT No. ANALYSES METHOD ANALYZED by PQ, RESULT UN[TS W-(140.1 Solids: Total Suspended EPA 160.2 04/08/03 PRE 10 24 mg/L E';;-040.4 Solids: Settleable EPA 160.5 04/07/03 MAW 0.1 •:0.1 mL;L COMMENTS: Laboratory Contact(s); Reviewed an�d�Apnroved bv: Jcrerr, Brown Environmental Manage: page 2 of 2 146109R.31Q (LJL:V2R08.2) 04/15/1.G3 15:20 Chemical and Microhiolopieal AnalYses: Environmental • Agrochemical • Foods • Pharmaceutica Ls nl U:AIE/.I r, :jUL, -50' 05(WEID 1a 3i ?i? -,j OSaS JUL- 30-2003 14:21 PLT CONCRETE SER. 252 293 0838 F.04 R E P O R T of Southern Testing & Research Laboratories 3809 Airport Drne NW, :Nilson, NC 27896-8649 • 252-237.4175 • FAX: 252.237-93,111 w .SoutbernTeslingxom A N A L Y S I S SAMPLE No.: MG':.09 GCi Date Rcoorter_' 04/iS/03 =aui Strickland P,T Concrete Services 3214 Turnage Road Phone:(252;2c3-0909 X Wiason NC 27893 Fax (252)253-0538 P. 0.: „,280 Client Sample ID: nn /+/CS/(/O marks: Detention Pond r �3 Collected: 04/07/03 11:50 I Matrix: STORM WATER Received: 04/07;03 13:32 Classification: ENV CAT No. ANALYSSS METHOD ANALYZED by PQi., ??ESUL'i' UV"'TS EW-040.1. Solids: Total Suspended EPA 160.2 04/10/03 PEB 10 EW-040.4 solids: Settleable LPA 160.5 04/07/03 MAW 0.1 CCNLMENTS : Laboratory Contact (s) : 1Fe,,:""4-e""w,e'd and Approved by: Jerem Brown Environmental Manager 30 ng/ <0.1 Page 1 of 2 M6109R.310 (i,Jt:V2R02.2i 04/15/ I 0= ";5,20 Chemical and Microbiological Analyses: Environmental • Agrochemical • FoOds • Pharmaceuticals n1 a?.TtI� �UL.00'O��RD) !��! 93 OSSMa-,- P.00S iUL-30-2003 14 22 PLT CONCRETE SEP. 252 253 093E P.05 DISCHARGE OUTFALL MONITORR NG REPORT NCDENR GENERA, PERMIT NCG140000 (All s=ple data shall be reported no later than 30 days at= receipt of lab renilts) CcrtificateofCuverage NCG14�®©© Facility Nam` x=ty ; 'hone Number. Cered I A"tory # tifiI II Pcrsoa:Conwfing Samplc(s) /2q,,,I- rTJPi: �.�i✓O Sample Inf lion fermi[ Term Yctr Year Sta vT/ d Dares Place chew mark-tio. indiCB<L :applicable sampling pro Discharge Type (check as appropriate) Strimwater Wastrwalm I August 1, 1999 to July 31, 2000 ❑ ❑© ❑:< ❑ ❑ ❑. ❑ ❑ . ❑ ❑ ❑ . 2 I August 1, 2000 to July 31, 2001 3 Au 1, 2001 to Jul 31, 2002 _ 4 Au 1, 2002 w Jul 31. 2003 5 August 1, 2003 to Jul 31, 2004 r -i A: Stormwater Discharge Monitoring'Data (Foi sto"water not combined with prices wastewater) Storm Event (hmuctenstics Pate Total Event precivitatiom inches Eves Duration Stonnwater Discharge Monitoring . Outfall .. ... Date swnpic Total Flow I .Total Event Event Dmmtion ,�:pH -Total No collected Precipttatioa Snspeudad ' Solids (mddd/vr) G + in hes o us) (Siii 1Jntts .:< m 1) / _% -or iO G . Z �G dG/ Does this facility perform Vehicle Maintenance Activities tiling on average more than 55 gaDons of new motor oil per month? O Yes OlNo 'Tf yes, complete information below- Stor,mmater Discharge Mooit_afmg from Vehicle Maintenance Angers' beali Date Sample Total Flow Total Event' Event ` .,.New pH Total Oa and No. Collected. PcocitntaaOn=Dnrantm'{'-�rOil Suss ,e.fitratie ;; Dsage Solids (mdtld! r) Cr) Goebel) $ mo SuL Units m D. c "I I., ..—. PAOG lof 7. nX J?,'i'5/TiM- A. -00' 00�� EN j3:. ! -I- ?9 OS S 006 JUL-30-2033 14 22 PLT CONCRETE SER. 252 293 Qe36 F.06 Part B; Process wastewater discharge monitoring data Sample # Effluent Source(s) for this sample Vehicle / Eouipment Cleaning ❑ Raw Material Stock -pile Wetti Mixin Drum Clean -out Rec cle, stem Overflow Pruameter.',. Unit Data . . Collection Date mo/dd/yr Total Flow MG E Event Duration hours pH Std. units Y 'TSS. mg(l Settleable Solids mill C G, Sample # 2 urtent source(s) for this le ' Vehicle TEmezl Cl_e-anm [r] Raw Material Stock -pile Wettin ❑ `zin Dr zn Clean -out Q -'aCycle.System Overflow ❑ -.Parameter !Unit Collection Date mo/dd/yr D3 Total Flow MG 00/� EvcntDuntion hours l7 PH . Std. units. r TSS'. mgA Settleable Solids mill G O, ' Mail original and one copy to: Attu: Central Files . Division of Water Quality DFr�-R 1617 Mail Service Center Raleigh, NC 27699-1617 Sample # Effluent Source(s) for this sam le / Vehicle / Equipment Cleanin ❑ Raw Material Stock -pile Wettiu CJ Mixin Drum Clean out [] Recycle System Overflow ❑ J Parameter Unit .. Data Collection Date mo/dd/yr Total Flow MG Event Duration hours pH Std. units TSS mg/l Settleable Solids ml/1 Sample # . Mffluent Somre(s for this.satuple Vehicle / i meet Cleaning ❑ Raw Material Stock -pile Wettin ❑ Mixing Dtum,Clean-oat. ❑. Recycle System Overflow ❑ Pan iinieter Umt , Data Collection Date mo/dd/yr Total Flow MG Event Duration hours. pH .. Std. units TSS Setleable Solids ImIA -1 crstify; under pesky of, law, that this document and all arrachments were prepared under my direction or snperywon in accordance with a system designed to assure That qualified prlsannel properly garb" and evaluate the information sub=ttcxL Based on my inquiry of the person or persons who manage the system, or those persons ;dhrzdy responsible for gather* the information, the information submitted is, io the.best of my knowledge and bclid, true, accurate, and complete_ .I am aware that there are significant penalties fur submitting false udormadon, including tbc,pnsMbility of fines and imptisorttaeot for knowing vidatioas.' !J` / I ::REoz igrt ) 'T/' /03 (Signature of Per=rme or Designee) �—(Date) Sad) -.'a t -Oaor 99 /Ti''iE Ri -b0' 03(WE D) i3:31 232 2 17 0838 JUL-30-2003 14:23 PLT CONCRETE SER. o `m Southern Testi V 2 3809 Airport Drive NW, Wilson, NC 27896-8649 S 0 0 252-?37-4175 0 FA\:252-237-9341 9 F AiR PPw .SouthernTcstingxom R E P O R T of A N A L Y S I S ? 00i 252 293 0939 R.07 & Research Laboratories, Inc. SAMPLE No.: M0780-002 Date Reported: 09/05/02 Paul Strickland PLT Concrete Services 3214 Turnage Road Wilson Phone:(252)293-0909 X NC 27893 Fax: (252)1.93-0838 P. 0.. 637 Client Sample ID: Marks: Truck Wash -Grab ryUl Collected: 08/27/02 08:50 I Matrix: Received: 08/27/02 12:25 STORMWATER Classification: ENV CAT No. ANALYSES METHOD ANALYZED by PQL EW-040.1 Solids: Total Suspended FFA 160.2 08/27/02 PEB 10 EW-040.4 Solids: Settleable EPA 160.5 08/27/02 AMF 0.1 COMMENTS: Laboratory Contact(s); Page 2 of 2 M0780R.245 Reviewed and Approved by: Jer y Br E ronm tal Manager RESULT UNI''I'S 26 mg/I, <0.1 mL/L (1-TL:V2RO8.2) 09/05/102 .13:30 Chemical and Nlicro biological Analyses: Environmental • Agrochemical • Foods • Pharmaceuticals y\; Dc,T7'/TNll JOWL. -30' 03(HD) j: j1 252 293 OS38 P. 00S JUL-30-2303 14 23 PLT CONCRETE SER. 252 253 0939 P.BS M Southern Testing & Research Laboratories, Inc. V m 3809 Airport Drive N-W, Wilson, NC 27896-8649 • 252-237-4175 • FAX: 25.. 237-9341 q F pv-1 AiR www.SouthernTesting.com R E P O R T of A N A L Y S I S Paul Strickland PLT Concrete Services 3214 Turnage Road Wilson NC 27893 Client Sample ID: Marks: Detention Pond -Grab Collected: 08/27/02 08:35 Received: 08/27/02 12;25 CAT No. ANALYSES SAMPLE No.: M0780-001 Date Reported: 09/05/02 P;,0ne:(252)293-0909 X Fax: (252)293-0838 P. 0.: 637 mi N CG/ �oc) q� Matrix: STORMWATER Classification: ENV METHOD ANALYZED by PQL EW-040.1 Solids: Total Suspended EPA 160.2 08/27/02 PEB 10 EW-040.4 Solids: Settleable EPA 160.5 08/27/02 AMF 0.1 COMMENTS: RESULT UNITS 42 mg/L <0.1 mL/L Laboratory Contact(s): Reviewed and Approved by: I Je y' B own En ronmental Manager Page 1 of 2 M0780R.245 -- (LJL:V2R08.2) 09/05/1.02 13:30 Chemical and Microbiological Analyses; Environmental • Agrochemical • Foods • Pharmaceuticals n.\' D".T-I/TIM7 JUL. -30,03(WED ) !3:31 232 293 OSOS P,00, JUL- 30-2003 14:23 PLT CONCRETE SER. 252 253 203E P.05 DISCHARGE OUTFALL MONHORD G REPORT NCDENR GENERAL, PEWNUT NCG140000 (Alt sample data shall be rcpoRc�d no later than 30 days after :- pt of l ab icsutta) CertifrcateofCovcrage NCG14©0©© Facility Name c""my Gi✓ Pb,c=Numba Same Information Pc=t Term Year Year StatuEnd Dates .'. Place check mark.to�indicate applicablcsamplmgpeaiod . Discharge Type (check as te) 5towater im Wastewater 1 August 1, 1999 to July 31, 2000 LI❑' ❑ Q ❑ ❑ ❑ Q ❑ ❑- ❑ ❑ . ❑ ❑. ❑ 2 AugLw 1, 2000 to July 31, 2001 3 August 1, 2001 to July 31, 2002 4 August 12002 to JuJX 31,2003 5 Au 1, 2003 to July 31, 2004 ' -t A. Sinrniwater Discharge Monitoring Data (Fuesortawater om combiocd with pmems wastewater) Storm Event Characteristics Stormwat Disch e M n Durfall .. Date Sample.'. .Total Event - Evrni DurationTotal vent No .. Collected Picilatauon Suspended Solids (mddd/ ) (MG , Ares ms Std Units „• m .o �- ..3 Does this facility perform Vehicle Maintenance Activities using on average more than 55 gallons of new motor oil prr month? 0 Yes 9'i4o If yes, complete information below. Stormwater DiscbgMe Monitoring from Vehicle Maintenance Areas DutfallDate Sample Total Flow : Total Eve No Collected Prtcipitati r.....rAAr..A r►ern ...i'..;.r:�l peat New pH � Total Gil and atroq +140tor Ul'' Strsjrmdcd Grease +Usage Solids mrd '("Iftnnl (Std Units) tmrdl) .(inPlp P. , t�f'7 R:i DP.TE/TiMi UUL -30' 03(WE D) !3'3! 23% %93 0838 JUL-30-2223 14:24 PLT C0h'CETE SER. P.010 252 293 CE3e P.10 Part B: Process wastewater discharge monitoring data Sample # L__ Effluent Sources for this saale ,I yt:hicle / ui meat Cleanjne . (� Raw Material Stock -pile Wemm Mixing Drum Clean -out 2r Recycle System Overflow ❑ F'alameter .. - Unit ...:Data Collection Date mo/dd/yr. -t7-04 Total Flow MG Event Duration hours pH Std_ units 51 0 TSS . mg/l 1 Settleable Solids MIA � Sample # — IrITI I■ ■ Overflow Unrt zata nDumrattion mddd/yr [Event MG, horns PH Std. units TSS mg/1 Settleable Solids ttil/l Mail original and one copy to: Attn: Central Files Division of Water Quality DENR 1617 Mail Service Center Raleigh, NC 27699-1617 Sample.# 2.. Effluent Source(s) for this' le Vehicle / Equipment Cleanin J Raw Material Stock- ile Wettin ❑ MLXinz Drum Clean -out ❑ Recycle System Overflow ❑ Paratnetes Unit .. ..Data Collection Dale. mo/dd/yr 1 6L Total Flow MG Event Duration hours pH Std. units TSS Settleable Solids tttUl Sample * Effluent. s for this k Vehicle / Equipment Cleaning' ]EH3 Raw Material Stock -pile Mixin Dr=m Cleanout:R cle S stem Overflow f :i'aiameter _77— Utut•Data Collection Date mo/dd/yr Total Flow MG Event Duration hours. pH Std. [nits TSS mg/1 Settleable Solids ml/1 'I certify,, tinder penalty of. law, that this doctmieut.and all anachments Woe.prepared tinder my direction of supervision in accordance with a system desigcd to assure that qualified personnel properiy gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, of those. persons :directly responsible for : gathering the information, the information submitted is, to the best of my knowledge and belief, true, accw-ate- and corupicte. I am aware that there are significant penaldes for submitting false information, inch g the 'bility of fines and imprisonment for knowing violations." (Print Name of Btanittee or tU'U-241-0E0199 Of Pornime or Designee) n...-e a ..r I ICI IF ' .Feb 27 02 04:30p p.7 A�A Division of Water Quality / Water Quality Section era NCDENRNational Pollutant Discharge Elimination System NCG140000 NOTICE OF INTENT ------------ 10RAGI NCY DSEONLY Yvr Mach Ihv I CutiGca�c ofCuvcntt - :-D�- Pc 'LW:fn<tb National Pollutant Discharge Elimination System application for coverage under General Permit 1 NCG 140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: - SIC 3273 Ready Mixed Concrete Standard Industrial Classiticabon Code (Please print or type) a 1) Mailing address of ownedoperalor. Name _Rr COlICA2MCb Street Address �,a)�'7uy.uNge RcAO city �et��.fGN State ZIP Code _ Telephone No. _Sd a93. OSOO Fax: c)Sa cD9.4 • n `.? . 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. 3) Physical Location Information: Please provide a narrative description of how to get to the distance and direction from a roadway intersection). Al Adttress'o whiU a0 pemi; mrtcsporxlenre vi'dbe matic{I ; V l � Jr (A copy of a county map or USG QuarsI"evWfac airy deafly loafed on the map is roqured to be sub evtb24' h Ws appbmton) 4) This DES Permit Application applies to which of the following New or Proposed Facility Date operation is to begin ❑ Existing 5) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: R 6) Provide a brief description of the types of industrial activities and products produced at this facility (Include a site process diagram with this submittal): Page t of 4 NJU-2:9A8e199 RD. J Rtc tm y? OZ 04:30p P.8 NCG140000 N.O.I. 7) Discharge points / Receiving waters: l� 1. How many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property? SN(e 1 VAJO W What is the name of the body or bodies of water creek, stream, river, lake, etc.) that the facility stormwater discharges end up in? '51 OIUe q 5..ym _ If the site stormwater discharges to a separate storm sewer system name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). No _ Receiving water classification (if known): Q N 5,/j�__ Note: Discharge of process wastewater to receiving waters classified as WS-II to WS-V or SA must be approved by the N.C. Dept of Environmental Health. If DEH does not approve, coverage under NCG140000 cannot be granted. No new discharges of process wastewater arc permitted in receiving waters classified as WS-I or freshwater ORW 8) Does this facility have any other NPDES permits? If ye�the penumbers for cu t NPDES permits for this fad 9) DoQa'this facility have any Non -Discharge permits fox: recycle permits)? s If yes, list the permit numbers for all current Non -Discharge permits for this facility 10) Does this facility employ any best management practices for stormwater control? eye If yes, please briefly 11) �Dthis facility have a Stormwater Pollution Prevention Plan? 5d o -quk(., c��RMb1R?P�—�lJ�l1 tuiu fit tlt)p�1llv�uie0 �J11t�i22 G�u1�9. ❑ Yes If yes, when was it implemented? 12) Are vehicle maintenance activities occurring at this facility? VYeOs 1311 Are discharges occurring from any of the following pF er generating activities? Vehicle and equipment cleaning Wetting of raw materialstockpilesMixing drum cleaning If yes to any of the above, please describe the type of process used to treat and/or recycle the process wastewater. Give design specifics (i.e. d•�esiign1 volume, retention time, surface area, etc.). [Use separate sheet(s), See_ �fl fTc11t7 Wv�� Note: Construction of any wastewater treatment facilities require submission of three (3) sets of plans and specifications along with this application. Design of treatment facilities must comply with requirements 15A NCAC 2H -0138. Page 2 of 4 swU-229-036199 p7 02 04:30p P-9 / NCG140000 N.O.I. 14) Does the facility use a recycle system? O Yes If yes, does the system overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ Yes ❑ No Ives, provide plans, calculations, and supporting documentation. 15) Hazardous Waste: a) Is t s facility a Hazardous Waste Treatment, Storage, or Disposal Facility? No O Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per calendar Ve of hazardous waste? No ❑ Yes c) Is this cility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per calendar ve of hazardous waste? No O Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste:_ How is material stored: Where is material store How many disposal shipments per year. Name of transport I disposal vendor:_ Vendor address: 16) Certification: North Carolina General Statute 143-215.6 b (i) provides that: Ar y person who Y makes any falso sonement, rcpr� tatan. or c r5fitation many appGcadon, record. report Plan or other document filed cr required b be maintained under Article 21 or regrdatiorn of the Environmental Management Commission implemercing that Article, or WM f )sifieS, WnVers with or ivlmirgly renders ina rate any recording or morvt rig device or method required to be.operawd or maintained under Article 21 or regiAalions of the Envirormental 6lanagemertt Corrsn'ssion anplementing that Article, shall be gully of a mstlememor pu shabte by a fine not to exceed S10,000, or by imprisonment not to exceed six monda, or by both. (18 U.S.C. Section 1001 provides a pun'sknmt by a ere of not more than 510.000 or irnprsonrnent not mom than 5 years, or both, for a similar offense.) I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such informationis true, complete, and accurate. Printed Name of Person o7Appficani) Page 3 of 4 SWU-229-080199 . A� AP, I I A, PAPI. I I.— I P;Y —;A PP., IAA� RED OAK 2 --------------- ----- ----- -- - -- 3 A DORT E A P., xM A TPAA 43 A, i Pl 6 P060 jo X, 4i, "AP A A, �C STA. k*, L-1 ��...... I ---- - ----- ATE .1 I xYmei IF Tq V ILL F Y T nPULF A IIPII '44; P— ?-�� 64 ' 2 7 3 P, 64 el�l LIP 11 A, A IP .L"A PAPA �A t. ---------------- -------- .... --- LL xw PS 1A -Vo "loll" A V� I -- , PAP ADDENDUM TO PLT CONTRETE'S NOTICE OF INTENT STORMWATER PERMIT APPLICATION RESPONSE TO QUESTION No. 13 AS PART OF THE OVERALL SITE DEVELOPMENT PLAN FOR THIS PROJECT A WATER QUALITY POND DESIGNED TO OBTAIN 85% REMOVAL OF TOTAL SUSPEND SOLIDS IS PROPOSED TO BE CONSTRUCTED. THIS FACILITY HAS A SURFACE AREA AT NORMAL POOL OF 4600 SF AND IS SIZED TO HANDLE THE TOTAL FLOW FROM THE FACILITY. ALSO THE WATER QUALITY POND HAS THE ABILITY TO CAPTURE THE FIRST INCH OF RUNOFF FROM THE SITE AND RELEASE IT OVER A 2 TO 4 DAY PERIOD OF TIME. ALSO DIVERSION SWALES ARE PROPOSED FOR THE SIDES OF THE FACILITY TO CAPTURE SURFACE RUN-OFF FROM THE FACILITY AND DIVERT SAID RUNOFF TO THE WATER QUALITY POND. ALL RUNOFF FROM THE TRUCK LOAD INSPECTION AREA AND THE MATERIAL STOCKPILE AREA IS DIVERTED TO THE DIVERSION SWALES AND THEN IS ROUTED INTO THE WATER QUALITY POND FOR TREATMENT. LOCATED ON THE SITE IS A DRUM WASH BASIN TO BE ULITIZED IN CLEANING THE CONCRETE TRUCKS ONCE DAILY. THE EXCESS WASH MATERIAL FROM THE DRUMS IS WASHED INTO A CONCRETE BASIN WHICH FILTERS OUT SOLIDS BY PASSING THE WASH WATER BY GRAVITY AND HEAD THROUGH A SERIES OF THREE SCREENS. SETTLED MATERIAL IS DEPOSITED ON A DAILY BASIS ONTO A CONRETE DRYING SLAB TO ALLOW FOR DEWATERING. THE WATER FROM THIS PROCESS FLOWS BY GRAVITY BACK INTO THE BASIN. WATER STORED IN THE CONCRETE BASIN IS USED TO WASH THE INSIDE OF THE TRUCK DRUMS OUT. WELL WATER IS UTILITIZED TO WASH OFF THE BACK OF THE TRUCKS AND DRUMS IN THE FINAL STAGE OF THE CLEANING PROCESS. THE CONCRETE BASIN IS DESIGNED WITH ADEQUATED STORAGE TO STORE THE TOTAL RUNOFF FROM A 10-YEAR STORM WITHOUT DISCHARGE. ANY DISCHARGE THAT SHOULD IN ANY STORM WILL BE DIVERTED IN TO WATER QUALITY POND FOR TREATMENT. OUR RECORDS INDICATE THAT IT TAKES 10 GALLONS OF WELL WATER TO PERFORM THE FINAL TRUCK WASH, THE ANNUAL EVAPORATION RATE FOR THIS AREA OF THE STATE IS 40 INCHES ACCORDING TO THE SOIL CONVERSATION SERVICE. THIS AMOUNTS TO APPROXIMATELY 0.009 FEET A DAY OR 90 GALLONS PER DAY. WITH 8 CONCRETE TRUCKS IN OPERATION THE ANTICIPATED ADDITIONAL WATER FROM OUTSIDE SOURCES INTO THE BASIN IS APPROXIMATELY 80 GALLONS PER DAY. A COPY OF THE SITE PLAN IS ALSO ATTACHED SHOWING THE SITE LAYOUT AND SIZE OF FACILITIES. COPIES OF THE DRUM WASH BASIN CALCULATIONS AND WATER QUALITY POND ROUTINGS ARE ATTACHED FOR ADDITIONAL SUPPORTING INFORMATION. R. R. HERRING & ASSOCIATES, INC. 2406 West Nash Street WILSON, NORTH CAROLINA 27896 (252) 291.8887 ?C = Z 0Z C, 2,L?7.i:;''. snv. 20Z.u' JOB_ ELT G�JNGitiElcL 444AFlr! AL/,,7- /N."• Z SHEET NO. _ OF CALCULATED BY •� �"S DATE Q L CHECKED BY DATE SCALE /ram e-�- �, wn-aov = Z(5(.-7S w l way.,. . Tc _ Z07,o "„Ua11tU/� e.... SRO`/ •�. AAA , F U:rvx•; L SU u 11101" -MC \Z�11J }ytiL\LO R. R. HERRING & ASSOCIATES, INC. 2406 West Nash Street WILSON, NORTH CAROLINA 27896 (252) 291.8887 JOB_- 7� CuN �ECYjr�,t.( SHEET NO. OF CALCULATED BY �! DATE CHECKED BY DATE SCALE 1�EST-6-�3 GgN-t'c« L-A �'j I!,.�2 btu ... c�.�PCs k► C*+z-l;*j fitAZ'•"cc hy-, _ -7Z1 k-7�5' _ o S u ti ©- 17- PC- -tSS�.,. 723-711 C�-- VUL4.�,-.-= 1..,�� W Pam•` - ��RArtc f�VM-• i1'�. �°t � \��-Pr�.'a..�- 'f,.�' 'J � �tl nc'.? � �P(C.. l7(��.:L-(' �'�: 1l�a«i ��"G�•_t - �E � � 3C. i >. '2. -� _ O. U�� v=•i f D lDA-13L6.y - (!2'lc l' ` x 3 -- (PY X t o�`-`m vary oy �„ _, 1Uay e JOB R. R. HERRING & ASSOCIATES, INC. SHEET NO. OF 3 2406 West Nash Street CALCULATEO BY ice% DATE WILSON, NORTH CAROLINA 27896 (252) 291-8887 CHECKED BY DATE SCALE i,`�vq-�, � ram, :s�DrL..o iL !�'•_�'_!L Q-f�;-'x to k 4- Z7-okfL")c s y� ��SrZo kTZr)— C. Sm clleoSD c- VQ-<pc—t ';;?' 23-7) cl-- [ :,z Y4Z 5,Tia4 � N'[-;., 16\ 43mj� .-Zj ;aydrograph Plot / Hyd. No. 4 10-YR DRUM WASH STRUCTURE Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 0.12 ac = 0.0 % = LAG = 5.70 in = 24 hrs English Peak discharge = 0.67 cfs Time interval = 2 min Curve number = 98, Hydraulic length = 72 ft Time of conc. (Tc) = 18.3 min Distribution = Type II Shape factor = 484 Total Volume = 2,379 cult 4 - SCS Runoff -10 Yr - Qp = 0.67 cfs 0.s 0.s w O 0.4 0.2 0.0 0 5 10 15 20 25 Time (hrs) / Hyd. 4