S & G Prestress Concrete
c/o Vulcan Material Company
Attn: Bobby Beaman
PO Box 4667
Jacksonville, FL 32201
John E. Skvarla, III
Secretary
SUBJECT: NPDES Compliance Inspection Report
5 &'G Prestress Concrete
2295 Burnett Blvd
Permit Number NCG070185
New Hanover County
Dear Mr. Beaman:
On April 17, 2013, Joanne Steenhuis and Jean Conway from the Division of Water Quality
Wilmington Regional Office (WiRO) conducted an inspection of the S & G Prestress Concrete
facility at 92295 Burnett Blvd., Wilmington. The Division of Water Quality appreciates the
assistance provided by Mr. Mike O'Berry and Mr. Kendall Sutler during the inspection
procedures.
This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES General Permit No. NCG070185. This facility was
found to be in substantial compliance with the permit requirements. The site was almost
completely dismantled, the molds had been removed and only a few buildings (including the
concrete plant), some inert materials (sand and gravel) and concrete beams remained. The
findings and comments noted during this inspection are provided in the enclosed copy of
compliance inspection report.
There were no significant issues or findings noted during this inspection, thus a written
response to this inspection report is not required, only the pictures as requested during the site
visit and noted on the report. This can be done via e-mail. This Office will support a rescission
when requested by the applicant.
1601 Mail Service Center, Raleigh, North Carolina 27699-1601 One
Phone:919-707-8600 \ Internet: www.ncdenr.gov NorthCarolina
An Equal Opportunity \Affirmative Action Employer —50% Recycled 110% Post consumer Paper Naturally
S & G Prestress Concrete
c/o Vulcan Material Company
Attn: Bobby Beaman
NCG 070185
April 26, 2013
Page 2 of 2
Should you have any questions regarding the enclosed compliance inspection report, please
contact Joanne Steenhuis or me at 910.796.7215 or via email at Joanne.Steenhuis@ncdenr gov
or Jim.Greeson(c@ncdenr.eov. Technical assistance is available at any time by this office should
the facility staff need help understanding the permit requirements.
Sincerely,
Jim H. Gregson
Water Quality Regional Supervisor
Wilmington Regional Office
Enclosure: compliance inspection report
cc: Mike O'Berry- VMC electronic copy
Lori Sanville — VMC electronic copy
DWQ/ Raleigh Central files
NPDES General Permit Inspection Files (New Hanover County NCG070185)
Compliance Inspection Report
Permit: NCG070185 Effective: 02/12/10 Expiration: 05/31/13 Owner: S & G Prestress Concrete C/O Vulcan
Materials Cc
SOC: Effective: Expiration: Facility: Wilmington - Burnett Blvd Facility
County: New Hanover 2295 Burnett Blvd
Region: Wilmington
Wilmington INC 28402
Contact Person: Lori Sanville Title: Phone: 239-280-9156
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
On -site representative Lori Sanville Phone: 239-280-9156
Related Permits:
Inspection Date: 04/1712013 EntryTime: 11:40 AM Exit Time: 12:50 PM
Primary Inspector: Joanne H Steenhuis Phone:
Secondary Inspector(s):
Jean Conway Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater
Discharge COC
Facility Status: ■ Compliant 0 Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page:1
Permit: NCG070185 Owner - Facility: S 8 G Prestress Concrete CIO Vulcan Materials Co
Inspection Date: 04117/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The concrete trucks onsite are to be removed and the small section of berm on the SW corner adjacent to the chain link
fence will be fixed and the slit bag is to be emptied at the drop inlet in the NW corner. there was no manufacturing
occurring on the property. The site was in overall compliance and this Office will support their rescission request.
Page:2
Permit: NCG070185 Owner - Facility: S & G Prestress Concrete CIO Vulcan Materials Co
Inspection Date: 04/1712013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
■
n
n
n
# Does the Plan include a Generallocation (USGS) map?
■
n
n
n
# Does the Plan include a "Narrative Description of Practices"?
■
n
Cl
n
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
n
n
n
# Does the Plan include a list of significant spills occurring during the past 3 years?
n
■
n
n
# Has the facility evaluated feasible alternatives to current practices?
■
n
n
n
# Does the facility provide all necessary secondary containment?
n
n
■
n
# Does the Plan include a BMP summary?
■
❑
[l
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■
n
n
n
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
■
n
n
n
# Does the facility provide and document Employee Training?
Q
❑
■
Q
# Does the Plan include a list of Responsible Party(s)?
■
n
n
n
# Is the Plan reviewed and updated annually?
0
0
■
D
# Does the Plan include a Stormwater Facility Inspection Program?
■
❑
Q
D
Has the Stormwater Pollution Prevention Plan been implemented?
■
Q
Comment: The Employee training list is at the home office and they are looking to see
if they can find it. The site has been closed, the molds have been removed as well as
several buildings. There still needs to be some clean up of some trash and the removal
of concrete waste. There are several concrete trucks on site that have been sold that
also need to be removed.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ■ fl 0 ❑
Comment: The site has done it's monitoring and it's the understanding of this Office
that they will be requesting a rescission for the site as no manufactoring of the product
is possible.
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
■
n
n
n
# Were all oudalls observed during the inspection?
■
n
n
n
# If the facility has representative outfall status, is it properly documented by the Division?
fl
❑
■
# Has the facility evaluated all illicit (non stormwater) discharges?
■
n
n
n
Page:3
Permit: NCG070185 Owner - Facility: S & G Prestress Concrete C/O Vulcan Materials Co
Inspection Date: 04/17/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Comment: There is a small area where water could possible leave the site and it was
recommended by the inspectors to be repaired and the site representative agreed it
would be done. The silt bag on one of the the drop inlets at the NE corner of the
property needs to be cleaned out and the site representative has agreed to do so and
send pictures of the site after these two repairs have been done.
Page: 4
Permit: NCG070185 Owner • Facility: S & G Prestress Concrete C/O Vulcan Materials Co
Inspection Date: 04/17/2013 Inspection Type: Compliance Evaluation
Reason for Visit: Routine
•
Stormwater Pollution Prevention Plan
Yes No NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
Ef❑ ❑
❑
# Does the Plan include a General Location (USGS) map?
0 ❑ ❑
❑
# Does the Plan include a "Narrative Description of Practices'?
.�❑1' ❑ ❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
�+
,❑ ❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
Cl ❑ Fdr
❑
# Has the facility evaluated feasible alternatives to current practices?
'0,11 ❑
❑
# Does the facility provide all necessary secondary containment?
❑ ❑ Cl
❑ !i^'r1
# Does the Plan include a BMP summary?
R) ❑ ❑
Cl
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
'd ❑ ❑
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0 ❑
❑
# Does the facility provide and document Employee Training?
r0
J�y�❑ ❑
❑ N 04
# Does the Plan include a list of Responsible Pady(s)?
"'n ❑ ❑
❑
# Is the Plan reviewed and updated annually?
❑ ❑ Z� ❑
®
# Does the Plan include a Stormwater Facility Inspection Program?
)a ❑ ❑
❑
Has the Stormwater Pollution Prevention Plan been implemented?
id❑ ❑
❑
Comment:
Qualitative Monitoring
Yes No NA
NE
❑ ❑
❑
Has the facility conducted its Qualitative Monitoring semi-annually?
9
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
I►�
Yes No NA NE
Yes No NA NE
r
,e❑ 0 ❑
,0❑❑❑
❑❑❑0
❑ ❑ ❑ ❑
Page: 3
Permit: NCG070185 Owner - Facility: S & G Prestress Concrete C/O Vulcan Materials Co
Inspection Date: 04/17/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
•
A( -VW` 7 20
76
Page: 2
Stormwater Pollution Prevention Plan (SWPPP)
for:
S&G Pretress Concrete Company — Wilmington Plant
2295 Burnett Boulevard
Wilmington, North Carolina 28402
910-763-7950
Operator:
S&G Prestress Concrete Company
Vulcan Materials Company — Florida Rock Division
P.O. Box 4667
Jacksonville, Florida 32201
SWPPP Contact(s):
S&G Prestress Concrete Company
Michael J. Means, P.E.
2295 Burnett Boulevard
Wilmington, North Carolina 28402
910-763-7950
meansm(7a vcmmail.com
SWPPP Preparation Date:
August 31, 2011
Prepared by:
Highlands Environmental Solutions, Inc.
8410-D Falls of Neuse Road
Raleigh, North Carolina 27615
919-848-3155
Highlands
Environmental
Solutions, Inc.
GENERAL PERMIT ACTION ITEM SUMMARY
This summary sheet is provided for quick reference by those responsible for permit compliance activities.
More detailed discussions of these items are in the body of the plan.
ACTION ITEMS
✓ Check rain gauge daily. Empty after rain events. Record rain events on precipitation log
- Appendix C.
✓ Inspect Best Management Practices (BMPs) and stormwater discharge points monthly
and after each rain event. Record on Stormwater Site Inspection Report - Appendix I.
✓ Assure that corrective actions to inspections are promptly completed and recorded on the
Corrective Action Log - Appendix I.
✓ Conduct visual monitoring of stormwater oufalls at least twice per year — once during the
period January through June, and again during the period July through December. Visual
representative outfalls. Record results of visual monitoring on Semi -Annual Visual
Assessment Form provided in Appendix D.
✓ Comply with SPCC plan; record monthly tank inspections. (See Section 5.0)
✓ Employee training on SWPPP Plan and SPCC Plan is required at least annually. See
Section 7.3.
SAMPLING NOTES
✓ The collection of representative samples in accordance with the NPDES Permit will be
performed by a representative of Highlands Environmental Solutions, Inc. (HES). HES
will forward a copy of the sampling report containing site specific sampling information to
include, but not be limited to: the date and time of sample collection; rainfall amount; and
analytical data results. S&G will receive a copy of the report and should maintain all
reports on file at the site for possible review by NCDENR or by personnel with the City of
Wilmington - Stormwater Management Department.
Table of Contents
SECTION 1: INTRODUCTION AND SITE SPECIFIC INFORMATION 3
1.1
Site Information 3
1.2
Contact Information/Responsible Parties 3
1.3
Site Background and Nature of Site Activities 4
1.4
Soils, Slopes, Vegetation, Current Drainage Patterns and Groundwater 4
1.5
Receiving Waters 5
1.6
Potential Sources of Pollution 6
1.7
Figures (Site Maps and Diagrams) 6
SECTION 2: PERMIT REQUIREMENTS/COMPLIANCE ACTIVITIES
SECTION 3: DISCHARGE SAMPLING AND ANALYSIS
SECTION 4: BEST MANAGEMENT PRACTICES (BMPs)
9
4.1
Good Housekeeping BMP
9
4.2
Liquid Storage in Aboveground Containers BMP
9
4.3
Materials Staging Area BMP
9
4.4
On -site Mobile Fueling Operations BMP
9
4.5
Vehicle and Equipment Maintenance and Washing BMP
10
4.6
Personnel Training and Record Keeping BMP
10
SECTION 5: SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN 11
SECTION 6: INSPECTIONS
6.1 Inspections
6.2 Delegation of Authority
6.3 Corrective Action Log
SECTION 7: RECORDKEEPING AND TRAINING
7.1 Recordkeeping
7.2 Log of Changes to SWPPP
7.3 Training
SECTION 8: CERTIFICATION AND NOTIFICATION
SWPPP APPENDICIES
Appendix A - Tables
Appendix B - Figures
Appendix C - Precipitation Log
Appendix D - Semi -Annual Visual Assessment Form
Appendix E - Best Management Practices (BMPs)
Appendix F - Employee Training Log
Appendix G - Significant Spills, Leaks and Other Releases Form
Appendix H - Stormwater Site Inspection Report
Appendix I - Corrective Action Log
Appendix J - SWPPP Amendment Log
12
12
12
12
13
13
13
13
14
SECTION 1.0 INTRODUCTION AND SITE SPECIFIC INFORMATION
This plan has been prepared in accordance with the requirements of a Stormwater Pollution Prevention
Plan (SWPPP) for facilities authorized to discharge stormwater to the surface waters of North Carolina.
The plan is designed to fulfill these requirements for the S&G Prestress Concrete Company (S&G) plant
located at 2295 Burnett Boulevard, Wilmington, New Hanover, North Carolina. This facility is covered
under NPDES General Permit No. NCG070000 and the Certificate of Coverage No. NCG070185 dated
February 12, 2010.
1.1 Site Information
Site Name: S&G Prestress Concrete Company
Project Street/Location: 2295 Burnett Boulevard
City/State/Zip Code: Wilmington, NC 28402
County or Similar Subdivision: New Hanover County
Latitude: 34 ° 11 43.5" N (degrees, minutes, seconds)
Longitude: 77 ° 56' 47.4" W (degrees, minutes, seconds)
Method for determining latitude/longitude: Wilmington 7.5 Minute Topographic Quadrangle
NPDES permit tracking number: NCG070000 (existing plant General Permit)
1.2 Contact Information/Responsible Parties
Operator(s):
S&G Prestress Concrete Company
2295 Burnett Boulevard
Wilmington, NC 28402
910-763-7950
Plant Manager: Mr. Michael J. Means, P.E.
meansm@vmcmail.com
SWPPP was prepared by:
Highlands Environmental Solutions, Inc.
3117 Lantern Way
Wilmington, NC 28409
Mr. Kendall Sutler
910-795-8262
ksutler@hesnc.com
24-Hour Emergency Response — 919-414-7081
Site Specific SWPPP Contact(s):
Chris Arca, P.E.
910-465-4692
3
Emergency 24-Hour Contact(s):
S&G Prestress Concrete Company
Chris Arca, P.E.- 910-465-4692
Highlands Environmental Solutions, Inc.
Joe Beaman, P.G., RSM, HMFIC - 919-414-7081
Kendall Sutler - 910-795-8262
1.3 Site Background and Nature of Site Activities
The subject property encompasses approximately 11.44 contiguous acres, and is situated within the
municipal bounds of the City of Wilmington, located in the Western portion of New Hanover County,
approximately 0.3 miles East of the Cape Fear River. The site is developed and utilized for industrial land
uses, and has been utilized as a ready mix concrete plant and manufacturing facility for prestressed
concrete forms since the mid to late 1950s.
The site is situated in an area of mixed industrial, commercial, and residential land uses. The property
receives potable water to the warehouse (located in the eastern portion of the site) via the City of
Wilmington municipal water system. In addition, a private water supply well is used to deliver potable
water for use in the office and bathrooms as well as used for process water in the manufacturing of the
concrete beams. Sanitary wastewater is discharged via a connection with the municipal sewer system.
Surrounding properties receive water via public water supplies provided by the City of Wilmington
The property is developed for use as a manufacturing facility for the production of prestressed concrete
forms. Three fixed structures are currently located on the property, and are used for office space, a
QA/QC laboratory, equipment maintenance and as a warehouse. A small concrete plant is located in the
Southern portion of the property. Seven form lines are located in the Northern portion of the property.
The remaining areas of the property are used for vehicle parking, material storage, for the storage of
scrap materials and for the storage of recycled concrete.
1.4 Soils, Slopes, Vegetation, Current Drainage Patterns and Groundwater
Geology and Soils: This area is situated in the Coastal Plain Piedmont Physiographic Province of North
Carolina. Topographic relief in this province is low. Swamps, marshes and meandering streams
characterize this region.
Surficially, this region is dominated by unconsolidated Pleistocene sedimentary deposits. Underlying the
surficial deposits is unconsolidated to poorly consolidated sediments comprised of layers of clay,
limestone and sand, varying in age from Cretaceous to Tertiary. Regionally, these sediments thicken
toward East, and dip gently in an Easterly direction. Based on a review of the Geologic Map of North
Carolina (1985), the subject site is underlain by sediments of the Pee Dee Formation. This formation is of
Cretaceous Age, and is comprised of interlayered sand, clayey sand, and greenish clay, with local areas
of molluscan limestone.
Based on information obtained from the Natural Resource Conservation Service Web Soil Survey, the soil
types on the property consist primarily of Kureb-Urban Land series soils. These soils are found in areas
of 1 to eight percent slope, are excessively drained, and have moderate to high hydraulic conductivity.
These soils are derived of Eolian sands and fluviomarine terrace deposits. Generally, these soils are
composed of sand to depths greater than 89 inches.
Slopes: The topography of the site and surrounding area is generally flat, with an approximate mean site
elevation being approximately 30 feet MSL. The ground surface of the site slopes is essentially flat, with
shallow divide. The site has a slight slope toward the South near the concrete plant and to the West -
Northwest across the remainder of the site.
Vegetation: The plant site currently has little to no vegetation in and around the buildings and beam
manufacturing platforms located within the plant site. The site is surrounded on all sides by a chain -
linked fence with vegetation present in right-of-ways and along residential areas to the East and
Southeast of the plant.
Drainage Patterns: Stormwater is controlled at the site by a concrete curb and gutter system with a series
of drop inlets and baffle boxes that allow for the discharge of stormwateifo he plant site to the City of
Wilmington's municipal stormwater main that runs parallel to the plant site along the North (Virginia
Avenue and Southern Boulevard) and West (Burnett Boulevard). In addition, stormwater collects in a
drop inlet located in an asphalt area near the warehouse on the East side of the property, and discharges
to the City of Wilmington municipal stormwater main that runs parallel to the plant site along Louisiana
Street.
The main channel of the Cape Fear River is situated approximately 0.3 miles to the West of the property,
and the elevation of the river at this location is approximately five feet MSL. The Cape Fear River is a
tidally influenced river. Given the site topography and elevation difference between the subject property
and mean high water level of the Cape Fear River, the flood potential for this site is considered to be low.
However, given the general flat topography of the property, it is reasonable to conclude that short-term
flooding of the property may occur during extreme precipitation events.
Groundwater. In the Coastal Plain, the mode of groundwater storage within the unconsolidated
sediments is between intergranular pore spaces and within solution cavities. The more permeable sand
and limestone units form aquifers. Generally, the major aquifer units are (with increasing depth): The
surficial aquifer, the Yorktown Aquifer System, the Peedee Aquifer, the Black Creek Aquifer, and the
Cape Fear Aquifer. The aquifers are separated by low -permeability layers that form confining units (or
aquitards), resulting in generally lateral water movement. Regionally, groundwater flow is generally,
toward the East, in the confined systems. Groundwater flow within the unconfined (or surficial aquifer)
system varies locally, and is often influenced by topography, local streams and/or surface water features
and local tidal influences near the coast.
Groundwater recharge to the surficial aquifer of Coastal Plain is via infiltration of precipitation, and
contributions by surface water bodies. Generally, surplus precipitation conditions begin in the autumn and
continue through the winter. Groundwater recharge to the confined aquifers of the Coastal Plain is via
infiltration of precipitation or surface water contributions along their respective "up -dip" limits (Upper
Coastal Plain), and via vertical leakage from overlying aquifers. Hydraulic conductivity values for
unconsolidated aquifers can range from less than one to several feet per day, while values for fractured
rock or limestone aquifers may vary greatly. Discharge of stored groundwater from the surficial aquifer
occurs as baseflow to surface water bodies, and/or discharge from "springs."
Based on experience obtained from environmental assessment activities previously conducted on the site
and in the surrounding area of the property, the average depth to groundwater varies between
approximately seven and 10 feet below grade. Given the proximity of the property to the Cape Fear
River, it is reasonable to assume that groundwater in the surficial aquifer beneath the site may be locally
tidal influenced.
1.5 Receiving Waters
Controlled stormwater at the plant site drains surface water toward the North and West to the site
stormwater collection system. Stormwater flow in the Southern portion of the property flows via sheet
flow and discharges off -site to the South. Surface waters from the site ultimately discharge into the Cape
Fear River basin. The main channel of the Cape Fear River is situated approximately 0.3 miles to the
West of the property. The Cape Fear River is a tidally influenced river.
The following impaired waters are within one mile of the project site, and are subject to Total Maximum
Daily Load (TMDL) limitations:
• Cape Fear River for mercury
The S&G plant currently has an existing General NPDES Permit No. NCG070000, with qualitative
monitoring requirements as described in Table 1 (Appendix A). A copy of the General NPDES permit is
available at the site (reference Environmental Permit Book).
1.6 Potential Sources of Pollution
Site activities will generate potential pollutants to include the following:
• Concrete dust;
• Fuels;
• Oil and Greases;
• Lubricants;
• Hydraulic Oils;
• Antifreeze;
• Sediments; and,
• Miscellaneous trash and debris.
1.7 Figures
The site is depicted on the following Figures included in Appendix B:
• Figure 1 - Topographic Diagram;
• Figure 2 - Site Location Diagram;
• Figure 3 - Site Aerial Photograph; and
• Figure 4 — As -Built Site Stormwater Drainage Diagram.
6
SECTION 2.0 PERMIT REQUIREMENTS/COMPLIANCE ACTIVITIES
The General Permit for stormwater discharges requires the following activities to assure compliance.
• Preparation of this Stormwater Pollution Prevention Plan and implementation of the Plan.
• Vehicles and equipment must be operated and maintained in a manner which prevents pollution
of surface or ground waters.
• Secondary containment for above ground bulk storage tanks for petroleum products to include
waste oil and other materials currently stored at the site.
• Discharge sampling and analysis as described in this plan.
• Monitoring and reporting as follows:
✓ Maintaining a log of daily precipitation (Precipitation Log is included in Appendix C);
✓ Monthly and pre-, during and post -rain event inspections of all erosion and sedimentation
control measures associated with the curb and gutter system, drop inlets and baffle
boxes;
✓ Monthly and pre-, during and post -rain event inspections of all stormwater discharge
points;
✓ Maintaining a record of the above inspections;
✓ Maintaining a log of sampling activities; and
✓ Collection of discharge samples in accordance with the NPDES permit on a semi-annual
basis by designated site personnel. HES personnel will conduct semi-annual NPDES
required sampling activities.
SECTION 3.0 DISCHARGE SAMPLING AND ANALYSIS
The General Permit requires ongoing sampling to be completed on a semi-annual basis of stormwater
discharging from the plant stormwater collection system to the City of Wilmington municipal stormwater
system. The current monitoring schedule will include the collection of samples discharging from the site
during a representative storm event that meets the criteria as set forth by NCDENR. Samples will be
collected on a semi-annual basis with Event #1 being conducted during the monitoring period defined as
January 1 to June 30, and Event #2 being conducted during the monitoring period defined as July 1 to
December 31. Semi-annual monitoring requirements will include evaluating stormwater samples from
three separate discharge points for qualitative discharge characteristics as required in the General
NPDES permit. This evaluation should be completed by visually inspecting the stormwater for the
characteristics as described in Table 1 (Appendix A) . A copy of the Semi -Annual Visual Assessment
Form that includes a record of the sampling event is included in Appendix D.
The sample collection points will be the discharge points from the three drop inlets/baffle boxes that
discharge directly to the existing City of Wilmington stormwater main system located along Virginia
Avenue, Southern Boulevard and Burnett Boulevard. The sample locations are depicted on Figure 4
(Appendix B).
SECTION 4.0 BEST MANAGEMENT PRACTICES (BMPs)
This section contains a description of the BMPs which are designed to control or minimize the exposure
of significant materials to stormwater, including structural and nonstructural measures. All BMPs
referenced in Section 4 are included in Appendix E.
4.1 Good Housekeeping BMP
The site should be kept clean of debris and other waste materials that should be routinely collected for
proper disposal. Waste collection drums should be placed in areas where waste and debris are
generated as a condition of the manufacturing process. In addition, recycling containers should be
staged and properly identified for segregation of materials to be recycled.
Protection of storm drain inlets is required to be maintained at all times. It is the responsibility of all site
personnel to make sure that all applicable BMPs relating to the protection of the storm drain inlets are
adhered to. Protection may include, but are not limited to:
• The utilization of inlet filters; and
• Structural BMPs to include rock berms and concrete beams to divert and/or filter sediments from
stormwater flow prior to directly discharging into the storm drain inlets.
From time to time dust suppression may be required due to dry site conditions. Since the site is primarily
unpaved with exposed soils and crushed stone at the surface, it may be necessary to use water to
suppress dust near the entrance of the site and in high traffic areas. Dust suppression can be
accomplished using site equipment (existing water truck with an equipped spray system).
4.2 Liquid Storage in Aboveground Containers BMP
Site personnel should take precautions when dispensing oils, lubricants and other materials stored in
aboveground containers or drums. Aboveground containers should be equipped with a secondary
containment system or otherwise contained to prevent spills from directly entering the storm or sanitary
sewer system. Spill prevention awareness signs should be visible and spill kits readily accessible where
oils and lubricants are stored or used. Drip pans, pads, and/or absorbents should be used to control
minor leaks and drips.
4.3 Materials Staging Area BMP
Various sand and other aggregates are staged at the site and utilized for the manufacturing of concrete
forms. These materials are staged in bulk near the concrete plant and, if exposed to precipitation, will
contribute to the runoff of sediments from the site. These materials should be contained in a manner to
reduce the exposure to precipitation and sediment runoff potential.
4.4 On -Site Mobile Fueling Operations BMP
Fueling of S&G owned and operated equipment will be performed by outside contractors. These
contractors shall fuel vehicles and equipment at various points across the property. In addition, it is
assumed that routine maintenance (e.g. oil changes, lubrication) shall be conducted by plant personnel
on equipment while working at the site. These operations shall be conducted in such a manner that all
petroleum waste material is captured and containerized for proper disposal. Contractors shall also
adhere to the On -Site Mobile Fueling Operations BMP. Should a release of petroleum (motor fuel,
lubricant, etc.), the contractor shall immediately implement measures to contain and remediate the
release, notify the site manager of the release, and conduct additional federal or state reporting as
necessary depending on the volume of the release.
4.5 Vehicle and Equipment Maintenance and Washing BMP
During routine operations, it may be necessary for equipment and other vehicles to be washed of dusts
and otherwise kept clean of oil and greases that could be released to the ground surface, and potentially
flow into an NPDES outfall and/or offsite during a storm event. While on location, equipment should be
kept clean and in good working order at all times. Equipment identified as having leaks and spills (that
may be indicated by staining on the ground surface beneath the equipment) shall be repaired immediately
or taken out of service and/or removed from the site. Contractor's vehicle and equipment entering the
site shall also adhere to the Vehicle and Equipment Maintenance and Washing BMP.
4.6 Personnel Training and Record Keeping BMP
Training schedules shall be developed and employee training provided at a minimum on an annual basis.
Training should provide an overview of all current BMPs and any changes that have been implemented
since the previous training session. A discussion regarding any releases that have occurred since the
previous meeting should be discussed. The discussion should include the type of material released, the
spill response actions taken and how the release could have been prevented. A copy of the Employee
Training Log is included in Appendix F.
10
SECTION 5.0 SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
Due to the fact that the S&G facility currently does not store large quantities of bulk fuel oil or other oils at
the site, there is a very low likelihood of any spills leaving the property. However, as part of Vulcan
Construction Materials (parent company of S&G) commitment to the environment they have elected to
prepare Spill Prevention Control and Countermeasure (SPCC) Plans for all of its facilities in spite of the
fact that their regulatory requirement to do so is not entirely clear.
Plant personnel and contractors shall take precautions at all times to prevent the spill of petroleum -based
materials while operating at the site. As previously discussed in Section 4.4, it is assumed that on -site
mobile fueling operations will be provided by a fuel contractor that fuel equipment at the site as needed.
In addition, equipment will be serviced (as needed), and used oils, greases and lubricants will be
generated during these activities. Currently one 500-gallon aboveground storage tank (AST) is located
on the property and is used to contain used oil generated from equipment being serviced. The AST is
located in an area with secondary containment and is properly identified.
A copy of the SPCC Plan is available for review at the site.
A copy of the Significant Spills, leaks or other Releases Form is included in Appendix G.
SECTION 6.0 INSPECTIONS
6.1 Inspections
Inspections of the site stormwater collection system shall be completed at a minimum on a monthly basis.
Inspections of pre-, during and post -storm events shall be completed to determine if BMP's are
adequately controlling sediment/solids that could potentially discharge to the site stormwater collection
system. Corrective action should taken whenever it is visually identified that sediments/solids are
discharging into the stormwater system.
The Stormwater Site Inspection Report form is included as Appendix H. Copies of the blank forms shall
be readily available at the site at all times. Completed reports shall be reviewed by appropriate personnel
and corrective action items (as identified from the inspection) shall be addressed immediately. In
addition, the corrective action items should be noted on the Corrective Action Log (in Appendix 1) and a
responsible person designated to complete the action.
Corrective action items shall be considered as topics for discussion during management and/or health
and safety meetings. Care shall be taken to address corrective action items and to utilize the information
to make changes as needed to the SWPPP. All changes made to the SWPPP shall be documented and
a record of the changes should be incorporated to the SWPPP document located at the site.
6.2 Delegation of Authority
Those persons who have been identified as being responsible for implementing the SWPPP are the Plant
Manager and the Site Specific SWPPP contact, and who have authority for all matters relating to the
SWPPP, are listed in Section 1.2. Only those persons shall have authority to make changes to the
SWPPP, as well as, shut -down site activities until the appropriate BMP is in place and/or an identified
corrective action items has been corrected. At no time will delegation of authority be transferred without
consent by the Plant Manager.
6.3 Corrective Action Log
All corrective action measures taken during site activities shall be documented within the Corrective
Action Log. As previously discussed in Section 6.1, corrective action issues should be considered as
topics for discussion during daily management and/or health and safety meetings. Care shall be taken to
address corrective issues and to make changes to the SWPPP as needed. All changes made to the
SWPPP should be documented and a record of the changes shall be incorporated to the SWPPP
document located at the site. The Corrective Action Log is included in Appendix I and the SWPPP
Amendment Log is included in Appendix J.
m
SECTION 7.0 RECORD KEEPING AND TRAINING
7.1 Record Keeping
All records relating to the SWPPP shall be kept in a designated location at the site. Blank copies of all
forms identified within the SWPPP shall be readily available at the site. Completed forms shall be kept in
a three-ring binder in accordance with a manner to be determined by the designated site supervisor (e.g.
date). All inspection reports shall be signed -off by the person completing the inspection.
7.2 Log of Changes to the SWPPP
During the course of site operations, changes may be made to the SWPPP. All changes shall be
documented and a log of the changes needs to be kept in a three-ring binder as previously discussed in
Section 7.1. A copy of SWPPP Amendment Log is included in Appendix J.
All site personnel shall be notified of the changes and affected site specific BMPs shall be updated with
the obsolete forms taken out of circulation.
7.3 Training
All site personnel shall be trained prior to working at the site with regards to the SWPPP and all other site
specific training requirements as deemed necessary by the Plant Manager. The Personnel Training and
Record Keeping BMP is provided in Appendix E. A copy of the Employee Training Log is provided in
Appendix F.
13
SECTION 8.0 CERTIFICATION AND NOTIFICATION
This plan supersedes all previous site Stormwater Pollution Prevention Plans (SWPPP) and Best
Management Practices (BMPs) and shall be maintained at the plant site. The plan shall be made
available to any representative of the U.S. Environmental Protection Agency (EPA), the North Carolina
Department of Environment and Natural Resources (NCDENR) and/or the City of Wilmington, for on -site
review during normal working hours. Inspection and maintenance logs are required to be kept with the
plan for a minimum of three years. S&G will implement this plan and amend it as needed due to
expansion, modifications and improvements at the facility.
I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered
and evaluated the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is,
to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment for
knowing violations.
Name: Title:
14
Table 1 - Qualitative Monitoring Requirements
�Dfsch rgetCharecterlatica , ;3„
MF[eguenc
Mdhito'dngl-mtio
Color
Semi -Annual
SDO
Odor
Semi -Annual
SOO
Clarity
Semi -Annual
SDO
Floating Solids
Semi -Annual
SDO
Suspended Solids
Semi -Annual
SDO
Foam
Semi -Annual
SDO
Oil Sheen
j Semi -Annual
j SDO
Erosion or deposition at the ouffall
I Semi -Annual
SDO
Other obvious indicators of stormwater pollution
I Semi -Annual
SDO
Footnotes:
1 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge
outfall (SDO). This includes the flow discharging to the Inlet side of each of the three baffle boxes
that discharge directing Into the City of Wilmington Stormwater Main. Sample locations are
identified as SW-1, SW-2 and SW-3.
';;;� ;?.
��,•: ;
111Y: " � '
�. I p
Y.�
Base diagram from Microsoft Streets
and Tilps Plus
Highlands
environmental
\ Solutions, Inc.
1111!�
Property Location Diagram
Project Name -
Stormwater Pollution Prevention Plan
Client
S&G Prestress Company
Project # Drawn by
11095 TD
Scale Date Fig. #
Not to Scale 1 08/11/2011 1
N,
e, �� ♦,` \ \- vu a- ar..w,
® Slom�walel SamWa Lma4on
�s
SW-3
anvec mwv��sa ewu.�wn
¢ truxi'
-------------------------
------------------------
____________.� ,
_________
TE
J ♦
L tl'/
rr.� r-?J L-`----J
_uw____________________________
.w_o-...�r
�y
_______
r_---__ _1
sm-----___________—______________
Are
-------------- - - - --------- �(
-- - - -
--- a ... Sw-I
1 &s
w
4
Hi "'ands
AS -BUILT SURVEY
BURNETT BOULEVARD,
TOWN OF WILAUNOTON,
NEW HANOVER COUNTY, NC
--�
As BuJfl SBe Slanawater
D'a
raMage Diagram
sT ��
NYY7jI CEOMATICS
----�--- - - "—
i-----' - --
��- i
_
Vulran Nalulais Company
�aua;w+x.. s>FseTaaaw 2
uc xq
„�.
re v�
Qy u
110s5
TO
�' Augusl 25, Z011
KS E
Precipitation Log
Month:
Day
Precipitation
Event
Precipitation Amount
(tenths of an inch)
Comments
No
Yes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Semi -Annual Visual Assessment Form
(Complete a separate form for each ouffall you assess)
Name of Facility: S&G Prestress —Wilmington, NC NPDES Tracking No. NCG070000
Outfall Name: SW-2 'Substantially Identical Ouffall"? ❑ No ❑ Yes (identify substantially identical ouffalls):
Person(s)MUe(s) collecting sample:
Person(s)rTitle(s) examining sample:
Date & Time Discharge Began: Date & Time Sample Collected: Date & Time Sample Examined
Substitute Sample? ❑ No ❑ Yes
Nature of Discharge: ❑ Rainfall ❑ Snowmelt
If rainfall: Rainfall Amounhvinches Previous Storm Ended > 72 hours ❑ Yes ❑ No' (explain):
Before Start of This Storm?
Parameter
Color ❑ None ❑ Other (describe):
Odor ❑ None ❑ Musty ❑ Sewage ❑ Sulfur ❑ Sour ❑ Petroleum/Gas
❑ Solvents ❑ Other (describe):
Clarity ❑ Clear ❑ Slightly Cloudy ❑ Cloudy ❑ Opaque ❑ Other
Floating Solids ❑ No ❑ Yes (describe):
Settled Solids" ❑ No ❑ Yes (describe):
Suspended Solids ❑ No ❑ Yes (describe):
Foam (gently shake sample) ❑ No ❑ Yes (describe):
Oil Sheen ❑ None ❑ Flecks ❑ Globs ❑ Sheen ❑ Slick
❑ Other (describe):
Other Obvious Indicators ❑ No ❑ Yes (describe):
of Stormwater Pollution
The 72-hour interval can be waived when the previous storm did not yield a measurable discharge or if you are able to document (attach applicable documentation)
at less than a 72-hour interval is representative of local star events during the sampling period.
Observe for settled solids alter allowing the sample to sit for approximately one -hall hour.
any concerns, additional comments, descriptions of pictures taken, and any corrective actions taken below (attach additional
as necessary).
Cer ifrca0on by Facility Responsible Official (Refer to MSGP Subpart 11 Appendix B for Signatory Requirements)
I cer ily under penally of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
that qualified personnel property gathered and evaluated the Information submitted. Based on my inquiry of the person or persons who manage the system, or those
persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, We, accurate, and complete. I am
aware that there are significant penalties for submitting false information, Including the possibility of fine and imprisonment for knowing violations.
A. Name: B. Title:
C. Signature: D. Date Signed:
Semi -Annual Visual Assessment Form
(Complete a separate form for each outfall you assess)
of Facility: S&G Prestress —Wilmington, NC NPDESTracking No. NCGO70000
Name: SW-3 "Substantially Identical Outfall"? ❑ No ❑ Yes (identify substantially identical outfalls):
collecting sample:
I Person(s)/TIOe(s) examining sample:
Date & Time Discharge Began: Dale & Time Sample Collected: Dale & Time Sample Examined:
Substitute Sample? ❑ No ❑ Yes
Nature of Discharge: ❑ Rainfall ❑ Snowmen
If rainfall: Rainfall Amount: —inches Previous Storm Ended > 72 hours ❑ Yes ❑ No' (explain):
Before Start of This Storm?
Parameter
Color ❑ None ❑ Other (describe):
Odor ❑ None ❑ Musty ❑ Sewage ❑ Sulfur ❑ Sour ❑ Petroleum/Gas
❑ Solvents ❑ Other (describe):
Clarity ❑ Clear ❑ Slightly Cloudy ❑ Cloudy ❑ Opaque ❑ Other
Floating Solids ❑ No ❑ Yes (describe):
Settled Solids" ❑ No ❑ Yes (describe):
Suspended Solids ❑ No ❑ Yes (describe):
Foam (gently shake sample) ❑ No ❑ Yes (describe):
Oil Sheen ❑ None ❑ Flecks ❑ Globs ❑ Sheen ❑ Slick
❑ Other (describe):
Other Obvious Indicators ❑ No ❑ Yes (describe):
of Slormwater Pollution
The 72-hour interval can be waived when the previous storm did not yield a measurable discharge or if you are able to document (attach applicable documentation)
that less than a 72-hour Interval Is representative of local storm events during the sampling period.
"Observe for settled solids after allowing the sample to sit for approximately one-half hour.
Detail any concerns, additional comments, descriptions of pictures taken, and any corrective actions taken below (attach additional
sheets as necessary).
Unification by Facility Responsible Official (Refer to MSGP Subpart 11 Appendix B for Signatory Requirements)
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
that qualified personnel propedy gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those
persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Name: B. Title:
C. Signature: D. Date Signed:
Significant Spills, Leaks or Other Releases
Date of incident:
Location of incident:
Description of incident:
Circumstances leading to release:
Actions taken in response to release:
Measures taken to prevent recurrence:
Date of incident:
Location of Incident:
Description of incident:
Circumstances leading to release:
Actions taken in response to release:
Measures taken to prevent recurrence:
Date of incident:
Location of incident:
Description of Incident:
Circumstances leading to release:
Actions taken in response to release:
Measures taken to prevent recurrence:
Corrective Action Log
S&G Prestress - Wilmington, NC
SWPPP Contact:
RE
PE
pso p ig1, RMM
8)Ow
MM M
MIN i on,WjSMMa
n "aTdrkewfilgftripfiglbl
MMMN-2"2-1'0IQAM-00EUd2
�
8 C
SWPPP Amendment Log
�ro uu+ sv+ i � .rT
Dried ortoTthegmondmertt ��Dato
Soup
� �X"/$ti 's
of�
3TY`�MKbFa""YfES%fzx'S 5
Amendmortt P rod
, o erid reiTitle
ama ffi...
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
-.z-
Highlands
Environmental
Solutions, Inc. 8410-D Falls of Neuse Road, Raleigh, NC 27615
Phone: 919-848-3155/Fax: 919-848-42651w .highlandsenvimnmenlatcom
November 13, 2009
North Carolina Department of Environment and Natural Resources
Stormwater and General Permits Unit
Division of Water Quality
1617 Mail Service Center
Raleigh, North Carolina 27699-1617--
j� a� z
Subject: Submittal of NPDES Notice of Intent
S&G Prestress Concrete; 2295 Burnett Boulevard; Wilmington, NC
HES Project #11081
;
Dear Madam/Sir:
On behalf of our client S&G Prestress Company (S&G) and Vulcan Materials Company (Vulcartj-please
find attached an NPDES Notice of Intent for Coverage under General Permit NCG070000. The S&G site
is a manufacturing site for prestressed concrete beams. The SIC code for the site is 3272. In addition to
the NOI, a portion of the 7.5 Minute Topographic Quadrangle for the site and a check for $100 are
included.
Highlands Environmental Solutions, Inc. (HES) is currently assisting S&G with stormwater system design
modifications at the site. It is anticipated that excess stormwater from the site will be captured and
discharged to the City of Wilmington municipal stormwater system. HES has contacted the City of
Wilmington and will be submitting plans and specifications for the proposed stormwater modifications,
and will submit all necessary information to the City of Wilmington to obtain a permit to discharge
stormwater from the site to their municipal system.
Please review the attached documentation and contact me with questions or concerns.
Sincerely,
High nds Environmental Solutions, Inc.
Joe Beaman, P.G., RSM
Principal Geologist
Attachment
cc: Mr. Michael O'Berry, CFEA, LEP
File
ARA
NCDENR
rrv. n'J�rin uin�M nnVr'fbr0.l: eS
Division of Water Quality / Water Quality Section
National Pollutant Discharge Elimination System
NCG070000
FOR AGI NCr USL ONLY
-Date Rcccived
Year
Monlh
Uuv
Ceniticate nt co..era e
Cheri N
Anuunt
Pvnnil nss • stl le
q
NOTICE OF INTENT
National Pollutant Discharge Elimination System application for coverage under General Permit
NCG070000:
STORMWATER DISCHARGES associated with activities classified as:
SIC• 32 Stone, Clay, Glass, and Concrete Products (except as specified below)
SIC' N/A Like activities deemed by DWO to be similar in the process and/or the exposure of raw
materials, products, by-products, or waste materials
The following activities are specifically excluded from coverage under this General Permit:
SIC•3273 Ready -Mixed Concrete
Standard Industrial Classification Code
(Please print or type)
1) Mailing address of owner/operator (address to which all permit correspondence will be mailed):
Name
Street Address
City
Telephone No.
E-mail Address
S&G Prestress Concrete; c/o Vulcan Materials Company
Flonda Rock Dlvlston; P.O. Box 4667
904-355-1781
2) Location of facility producing discharge:
Facility Name
Facility Contact
Contact E-mail
Street Address
City
County
Telephone No.
S&G Prestress Concrete
Mr. Michael Means, P.E.
meansm@vmcmail.com
2295 Bumede Blvd.
State FL ZIP Cade 32201
Fax; 904-355 (1469
Wilmington State NC ZIP Code 28401
New Hanover
910-763-7702 Fax; 910-763.2064
3) Physical Location Information:
Please provide a narrative description of how to get to the facility (use street names, state road numbers, and
distance and direction from a roadway intersection). From No 132 South, turh RICHTon shipyn,d Blvd to Burnett Blvd. Turn R,GHTel punt,
Blvd. The entrance to the site is on the RIGHT approximately 0.20 mile from the intersection of Burnett Blvd and Shipyard Blvd,
(A copy of a county map or USGS quad sheet with facility clearly located an the map is required to be submitted with this application)
4) Latitude 34 dog 11 min 44.89 sac Longitude -Trdeg 55min 49.33one (degrees, minutes, seconds)
5) This NPDES Permit Application applies to which of the following
eNew or Proposed Facility Date operation is to begin
Existing
S W U-222.071408
Page 1 of 4
Last Revised 7/14/2008
NCG070000 N.O.I.
6) Standard Industrial Classification:
Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial
activity at this facility
SIC Cade: 3 2 7 2
7) Provide a brief narrative description of the types of industrial activities and products manufactured at
this facllfly: The facility manufactures prestressed concrete beams for construction applications.
6) Discharge points / Receiving waters:
How many discharge points (ditches, pipes, channels, etc.) convey stormwater from the property?
9) Receiving waters:
What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater
discharges end up in? C +p v /-, ,,
If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm
sewer system (e.g. City of Raleigh municipal storm sewer). city of Wilmington
10) Does this facility have any other NPDES permits?
ZNo
❑ Yes
If yes, list the permit numbers for all current NPDES permits for this facility:
11) Does this facility have any Non -Discharge permits (ex: recycle permits)?
❑ No
Z 'es
If yes, list the permit numbers for all current Non -Discharge permits for this facility: woo00e661
12) Does this facility employ any best management practices for stormwater control?
❑ No
Eyes
If yes, please briefly describe: Silt fencing to minimize sediment discharges from the property due to sheet flow.
13) Does this facility have a Stormwater Pollution Prevention Plan?
ZNc
❑ Yes
If yes, when was it implemented?
14) Are vehicle maintenance activities occurring at this facility?
F1/]No ❑ Yes
15) Hazardous Waste:
a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility?
❑✓ No ❑ Yes
b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of
hazardous waste?
Page 2 of 4
SWU-222-071406 Last Revised 7/14/2006
r
NCG070000 N.O.I.
�✓ No ❑ Yes
c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of
hazardous waste?
0✓ No ❑ Yes
d) If you answered yes to questions b. or c., please provide the following information:
Type(s) of waste:
How is material stored:_
Where is material stored:
How many disposal shipments per year:
Name of transport / disposal vendor: _
Vendor address:
16) Certification:
North Carolina General Statute 143-215.6 b (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article of a rule implementing this Article; or who knowingly makes a false
statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsities, tampers with, or knowingly
renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
[Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may Include a fine not to
exceed ten thousand dollars ($10,000).
I hereby request coverage under the referenced General Permit. I understand that coverage under this permit
will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
I certify that 1 am familiar with the information contained in this application and that to the best of my
knowledge and belief such information is true, complete, and accurate.
of
of Person Signing
P<sl_ss C°o spa..\
ItI13IOct
(Date Signed)
Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR
Final Checklist
This application will be returned as incomplete unless all of the following items have been included:
Check for $100 made payable to NCDENR
❑� This completed application and all supporting documents
0✓ Copy of county map or USGS quad sheet with location of facility clearly marked on map
Mail the entire package to:
Stormwater and General Permits Unit
Division of Water Quality
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
S W U-222-071408
Page 3 of 4
Last Revised 7/14/2008
��/��ppyyr` � I � IIr1�YR}rRRYA`Dwin
ps ���,���reps 7a���p Ap �+ 1A
Ilex.
���i ' ®� r lr� _ r it ei9M•blR RxtlnYgtlN �IYYI I C
yy Y.. rsTx ie RbCeRRNq•�
P� �` �.�. , ITt i9xxQ•PLVRRP RYp.��'��p
ynbstlTe<e.<aA>t�s.�=�tF��,Q
yy1
.11999 1
`� OA•bi AaCRI ��Ali1101.�A � 'C••w • r Ir
� • • I IARf {..t��a9a]4A'4:: ��� l
y •/i 4KRlR]LA9Y RIe x.l...a T..1�. S� p
`• ! � l:<r•.w•e�wI.... a ��•g.�'44'q�'r�l■i'�`x�D
Jim
��„ va Aarmvvv�=e..rtl lf..�
MEW
_ as S:ikiirr RoC� �I 0
t" � iii ire:: ^} rf ieie _ w®��t • �Y.��
v
I .
TIMN
Ol
11+
Approximate Scale
e
miles
Base
diagram from USGS 7.5 Minute
•••e . • •A Topographic Diagram
Pmject Name
Highlands
Client E
• • • •.
Solutions, A:
AA:
-09-09
MC ER R
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
Mr. Bobby J. Beaman, HES
C/o Vulcan Materials Company
Florida Rock Division
P.O.Box 4667
Jacksonville, FL 32201
Dear Mr. Beaman:
February 12, 2010
Subject: General Permit No. NCG070000
S&G Prestress Concrete
COC No. NCG070185
New Hanover County
Dee Freeman
Secretary
In accordance with your application for a discharge permit received on November 17, 2009, we are
forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state — NPDES
general pennit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1
and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency
dated October 15, 2007 (or as subsequently amended)
If any parts, measurement frequencies, or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take Notice that this certificate of coverage is not transferable except after notice to the Division
of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the
certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be
required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area
Management Act orany other federal or local governmental permit that may be required.
If you have any questions concerning this permit, please contact Bill Diubmid at telephone number
(919) 807-6369.
cc: ;Wilmington Regional Office
Central Files
Stormwater Permitting Unit Files
Attachments
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807 6300 \ FAR: 919.807,6492 \ Customer Service: 1 877 623-6748
Internet: www.ncwaterquality.org
An Equal Opportunity \ Affirmative Action Employer
Sincerely, ORIGINAL SIGNED6V
KEN PICKLE
Colcen 14. Sullins
MARp1n"
NorthCarolina
Amorally
.� N
0
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG070000
CERTIFICATE OF COVERAGE No NCG070185
STORMWATER DISCHARGES
NATIONAL POLLUTANT' DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
S&G Prestress Concrete; c/o Vulcan Materials Company
is hereby authorized to discharge stonnwater from a facility located at
S&G Prestress Concrete
2295 Burnette Blvd.
Wilmington
New I lanover County
to receiving waters designated as the Cape Fear River, a Class SA, I-IQW river, Cape Fear River Basin; in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, III, IV,
V and VI of General Permit No. NCG070000, as attached.
This Certificate of Coverage shall become effective February 12, 2010.
This Certificate of Coverage shall remain in effect for the duration of the General Permit ,
Signed this day February 12, 2010.
ORIGINAL SIGNED BY
KEN PICKLE
Coleen 11. Sullins, Director
Division of Water Quality
By Authority of the Enviromnental Management Commission
9i
Compliance Inspection Report
Permit: NCG070185 Effective: 02/12/10 Expiration: 05/31/13 Owner: S & G Prestress Concrete C/O Vulcan
• Materials Co
SOC: Effective: Expiration: Facility: Wilmington -Burnett Blvd Facility
County: New Hanover ,Aa35!BurmV:BM — LeL,R /JD
Region: Wilmington
Wilmington NC 28401
Contact Person: Michael J Means Title: Phone: 910-763-7702
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
100
Inspection Date: 04117/2013 Entry Time: 14i7KAM Exit Time: 42Ad PM
Primary Inspector: Joanne H Steenhuis Phone:
Secondary Inspector(s):
eReason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater
Discharge CDC
Facility Status: ■ Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
6PO
�0 L"*
le,
Page: 1
f
Permit: NCG070185 Owner • Facility: S 8 G Prestress Concrete C/O Vulcan Materials Cc
Inspection Date: 04/17/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
• Inspection Summary:
•
Page: 2
a
E7
Permit: NCG070185 Owner - Facility: S & G Prestress Concrete C/O Vulcan Materials Co
Inspection Date: 04/17/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? f) ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
e # Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all oulfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non slormwater) discharges?
Comment:
r 1
U
MEM
Yes No NA NE
0❑❑❑
Yes No NA NE
❑❑CI❑
❑ ❑ ❑
Yes No NA NE
tom. .(ILIA
Page: 3
ha'N
L A
P
r.
6t-
MEW
r`Y
Y :'�
•N
. •.,. 1.
,f
.7.7
mot
e
J00",
9
I
0
v