HomeMy WebLinkAboutNCG020906_COMPLETE FILE - HISTORICAL_20161219STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/v u% oa D 7 L7
DOC TYPE
19, HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
❑ a\)l la l a J g
YYYYM M DD
Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
December 13, 2016
Tildon Whitehurst, Jr.
Whitehurst Sand Company
233 Woodville Road
Hertford, NC 27944
PAT MCCRORY
cn,eMn.
DONALD R. VAN DER VAART
Srcnmry
TRACY DAVIS
oRncmr
Subject: General Permit No. NCG020000
Elliott Mine
COC NCG020906
Perquimans County
Dear Mr. Whitehurst
In accordance with your application for a discharge permit received on August 05, 2016, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES
general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-
215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection
Agency dated October 15, 2007 (or as subsequently amended).
Please take notice that this certificate of coverage is not transferable except after notice to the Division of
Energy, Mineral, and Land Resources. The Division may require modification or revocation and
reissuance of the certificate of coverage.
Please be aware that mine dewatering at your site has the potential to impact adjacent wetlands. The
specific requirements for mine dewatering at facilities near wetlands can be found in Part III, Section E of
your permit. You must have an approved Operation and Monitoring Plan before mine dewatering
discharges occur at your facility. Discharging mine dewatering wastewater without Plan approval will
be subject to enforcement action.
Please note that mine dewatering wastewater includes wet pit overflows caused solely by direct rainfall
and groundwater seepage for this type of mining operation. Any discharge of this water (and any
stormwater commingled with it) is subject to the effluent limitations in this permit.
This general permit allows the discharge of stormwater and certain types of wastewater from your facility.
In your application, you specified that only mine dewatering water would be discharged from this facility.
If separate point -source discharges of stormwater occur (i.e., stormwater nol combined with mine
SVacof North Carolina Enrimnmenml Quality J Energy, Mineral and LaW Resoumcs
1612 Mail Senicc Cenmr 1 512 N.1Ih Salisbury Street I Raleigh, NC 27699-1612
919 707 9200 1
dewatering water), you will be required to adhere to the conditions in this permit for stormwater
discharges.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Energy, Mining, and Land Resources, or permits required by the Division of Water
Resources, Coastal Area Management Act, or any other federal or local governmental permit that may be
required.
If you have any questions concerning this permit, please contact Richard Riddle at telephone number
(919) 807-63 75.
Sincerely,
for Tracy B. Davis, P.E., CPM
cc: Washington Regional Office
Central Files
Stormwater Permitting Program Files
StatedNorth CaroEm I Emimnmmtal Quality-IEnerM\Snenland Land Resoortts
16l2 %%W Sm%e Cenw 1512 forth Salisbon-Stnet I Raleigh, \C 27699-1612
919707 POO T
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020906
STORMWA"ITER AND MINE DEWATERING DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Whitehurst Sand Company
is hereby authorized to discharge stormwater and mine dewatering-from a facility located at
Elliott Mine
292 Weight Station Road
Hertford
Perquimans County
to receiving waters designated as Little River, a class C, Sw water in the Pasquotank River
Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions
set forth in Parts 1, II, 111, IV, and V of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective December 13, 2016.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day December 13, 2016.
for Tracy E. Davis, P.E., Director
Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission
NCG020906
0
Map Scale 1:24,000
Whitehurst Sand Company
Elliott Mine
Latitude: 361 14' 43" N
Longitude: -760 21' 09" W
County: Perquimans
Receiving Stream: Little River
Stream Class: C,Sw
Index Number: 30-5-1 (Pasquotank River Basin)
Facility Location
Division of Energy, Mineral and Land Resources /
Land Quality Section — Stormwater Permitting Program
National Pollutant Discharge Elimination System
NCG020000
NOTICE OF INTENT — General Permit Application
SE ONLYived
Daymerageof
a
led to
National Pollutant Discharge Elimination System application for coverage under General Permit
NCG020000:
STORMWATER AND/OR WASTEWATER DISCHARGES associated with activities classified as:
SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) and
like activities
The following activities are included: ���'���
Ai(r,.s
• Active or inactive mining operations (including borrow pits —except for NCDOT borrow pets Ith&dlscharge
stormwater contaminated with or that has come in contact with, any overburden, Prawfmaterial, intermediate
.Nrrq,, "'V U114r
products, finished products, byproducts or waste products located on the site of suchloperations; iTy
Stormwater from vehicle maintenance activities (VMA) at mining operations, cnMtTT/NG
Overflow from facilities that recycle process wastewater, and/or
Mine dewatering (wastewater)
The following activities are specifically excluded from coverage under this General Permit:
Stormwater discharges associated with peat mining, coal mining, and metal mining;
Stormwater discharges from mining operations which are intermixed on site with stormwater from concrete
operations;
Stormwater discharges associated with oil and gas extraction operations; and
Stormwater discharges associated with tourist gem mines
NCDOT borrow pits (covered under individual permit NCS000150)
The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000:
Point source discharges of stormwater and wastewater from in -stream sand mining operations (sand dredging
or dipping operations) are covered instead by NPDES General Permit NCG520000, administered by the Division
of Water Resources NPDES Wastewater Permitting Program. Please contact DWR for more information.
Please print or type all entries in this application form.
1) Mailing address of owner/operator (official address to which all permit correspondence will be mailed):
Legal Owner Name Wh:+e1.,,rs4 Sand Co,
(Attach the most recent Annual Report to the NC Secretary of State
the current legal name of the corporation or entity.
Alternatively this permit can be given to an individual or government authority. This name must be the same name as appears on the
Division of Energy, Mineral, and Land Resources' Mining Permit.)
Signee's Name (as signed for in question 41. at end) 'f )dam CJl :�pltivrsa y 7i
Street Address a33 l6,o(
City t44'd State_ ZIP Code a74HN
Telephone No. 95A 06H-SOD7 E-mail0 com
Alternate Contact Name' E-mail (if different)
Alternate Contact Telephone (if different)
`Alternate contact should be affiliated with the OwneNOperator. Consultant information can be provided
in question 5.
Page 1 of 12
SWU-NCG02-NOI Last revised 9/1012015
NCG020000 N.O.I.
2) Location of facility producing discharge:
3)
Facility Name n ,. re_
Facility Street Address a92 (✓c_rsl t .Siz4 a. 3Zci
Facility City Ner+ rd State_h&` ZIP Code P794Vy
Facility County Pcra y :,no c
Facility Contact T)ebn (aIn'.+cbUcs},Sr•
Telephone No. ds2 �6H- 3027 Fax: �1152 90_- ?7)DL
Contact E-mail �! aFr:c N @ w�: }C�vrsarrlL, rA m
Physical Location Information:
Please provide a narrative description of how to get to the facility (use street names, state road numbers, and
distance and direction from a roadway intersection). fro,., He,4Lm4 +rAL-c Hi V 17 Tlo,+�, Ao
u".1,4 S�c�;u `U. Go dog. OA19pdOX. I m;1c " '.a -n+1- ria1.G.
4) Facility Location Coordinates
5)
Latitude 5C 1 y' N3. a 1 N Longitude 9,811 W (degrees / minutes / seconds or decimal
degrees) S ' 14 5--sI 1 7 ( .35113 -
Consultant Information 1if applicable):
Consultant:
Consulting Firm:
Mailing Address:
City: -
State:
Phone: ()
E-mail:
Zip Code:
Fax: () _
Permits:
6) This NPDES Permit Application applies to which of the following:
(Optional)
Staple Business Card Here
VNew or Proposed Facility Date operation is to begin: 14 -t - ao16
❑ Existing Date began mining:
7) Standard Industrial Classification:
Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial
activity at this facility SIC Code: _ I,
8) Provide a description of the types of minerals mined at this facility: "r'oo� Set 1aurmL-)
9) Is this a PROCESSING -ONLY facility for materials mined elsewhere? R`ko ❑ Yes
10) Is this an inactive mine site?
33 No Wa: .S on Parr.'}5
❑ Yes If yes, have you certified to the Stormwater Permitting Program that all portions of the site where
clearing, grading, and/or excavation activities have occurred have been stabilized?
❑ No ❑ Yes (If yes, the site may be eligible for "Dormant Status" and reduced BMP
inspections. See the General Permit.)
Page 2 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
11) Does this facility already have a valid Mining Permit from DEMLR's Land Quality Section?
QAo If no, please indicate the status of the Mining Permit application: 5v6n )+,j g/S - aol6
❑ Yes If yes, please provide the Mining Permit number: Also provide a copy of
the DEMLR Mining Permit with this NPDES application.
12) Does this facility have any other NPDES permits?
Ltl No
❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility:
13) Are you applying for a discharge permit in the same location as a previously permitted mine?
l/ No
❑ Yes If yes, specify permit number and mine name if known:
14) Does this facility have any Non -Discharge permits from DWR (e.g., recycle permits)?
[9mNo
❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility:
15) Does total area of this mine site include ready -mixed concrete plant and/or asphalt plant areas?
ErNo
❑ Yes If yes, do they have separate NPDES stormwater permits? ❑ No ❑ Yes (provide permit
number(s) )
If not owned by the same company, who is the owner?
Development Activities and Buffers:
16) Will this mining operation precede development activities at this site?
LR No
❑ Yes
17) Is this mine located within one of the 20 Coastal Counties, and will it add more than 10,000 ft2 of
impervious surface?
❑ Yes (to both)
VNo, this mine site IS in one of the 20 Coastal Counties but will NOT add 10,000 ft2 of impervious surface.
❑ No, this mine site is NOT in any of the 20 Coastal Counties.
If this site is in one of the 20 Coastal Counties, you may be required to apply for an additional State
Stormwater Permit. Check with your local Regional Office (see contact information and checklist below).
18) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basins, or the Randleman or Jordan
Water supply Watersheds?
lvJ No
❑ Yes If yes, what size stream buffers are included on site? ft. You must show buffers on site
plans. Also include information and plans showing diffuse flow through buffers as required.
Page 3 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
Discharge Points, Receiving Waters & Wetlands:
19) Receiving waters:
What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater
and/or wastewater discharges will end up in? 4.,4lle. 9,1vcr
To find the waterbody, please see the "MAPS" tab on http://portal.ncdenr.orglweb/wq for a map of NC
Surface Waterbody Classifications.
Receiving water classification(s) for the waters: ?a.S o,w Y_ 'R•."e.
If the site will discharge to a separate storm sewer system, name the operator of the separate storm sewer
system (e.g. City of Raleigh municipal storm sewer).
Discharge of Wastewater to receiving waters classified as WS-II through WS-V, or SA, must be
approved by the Division of Water Resources (DWR) or Division of Marine Fisheries
(DMF). DEMLR cannot grant coverage under NCG020000 without that approval. Also be advised that
no new discharges of Wastewater are permitted in receiving waters classified as WS-1 or
freshwater ORW. Wastewater discharges to saltwater ORW will not be approved under General Permit
NCG02 but may be eligible for an individual permit.
20) Will this mine site discharge wastewater or stormwater to waters classified as High Quality Waters
(HQW), Primary Nursery Areas (PNA), Trout (Tr) waters, or a class with a symbol like "+" or "@" that
denotes a special management strategy is in place?
2 No ❑ Yes, HQW" ❑ Yes, includes "+" or
❑ Yes, PNA' ❑ Yes, Trout jr)
21) Will this mine site discharge wastewater or stormwater to waters classified as Shellfish (SA) waters?
YNo
❑ Yes, SA'
'For questions 19-20, be advised that the NCG02 General Permit limits the discharge volume of total combined
wastewaters to 50 percent of the receiving water in -stream flow under 7Q10 conditions in HQW waters (PNA and
SA waters are considered HQW by definition). You maybe required to contact USGS to obtain a 7Q 10 flow.
22) Will this mine site discharge wastewater or stormwater to impaired waters, or to waters with an
approved "Total Maximum Daily Load" (TMDL)?
To find impaired waters, please see the "Impaired Waters" map on the "MAPS" tab on
hftp:l/po rta I. ncden r. o rglwe b/wq.
To find approved TMDLs in North Carolina, please see DWR's Water Planning Section website:
hftp://portal.ncdenr.org/web/wq/ps/mtu/tmdl/tmdls.
R'No
❑ Yes, these waters are impaired for (list pollutants):
❑ Yes, these waters have a TMDL for (list pollutants):
Page 4 of 12
SWU-NCG02-NOI Last revised 911012M
NCG020000 N.O.I.
23) List discharge points (outfalls) that convey discharge from the mine site (both on -site and off -site) and
location coordinates. Attach additional sheets if necessary, or note that this information is specified
on the site plan. Include proposed maximum daily flow rate for each wastewater outfall.
You must show all discharge points clearly on the submitted site plan. Be advised
that NCDEQ may require you to apply for an individual permit, based on proposed
discharge rates and receiving stream conditions (low flows, impairments, etc.)
Stormwater
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Mine Dewatering
Mine Dewatering (Wastewater) Outfall No. �t—
Proposed maximum flow rate: ;?S Bo0 / G PPU
Latitude (degrees/minutes/seconds or decimal degrees): 4' y5.86"
N
Longitude (degrees/minutes/seconds or decimal degrees): '7b' all OG, o'f"
W
Mine Dewatering (Wastewater) Outfall No.
Proposed maximum flow rate:
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Process Wastewater
Process Wastewater Outfall No. Wastewater Description:
Proposed maximum flow rate:
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Process Wastewater Outfall No. Wastewater Description:
Proposed maximum flow rate:
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Page 5 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
24) Help us understand what will happen to the dewatering water at this mine site:
❑ N/A — this mine is not dewatering at all and will not dewater in the future.
a) Will this mine be dewatering and discharging to waters of the state? (Answer only if dewatering)
L7 No
❑ Yes If yes, where to? ❑ Surface Waters and/or Wetlands (on -site or off -site)
❑ Other (on -site or off -site) Describe:
b) Will this mine be dewatering but not discharging to waters of the state? (Answer only if dewatering)
❑ No
t3"Yes If yes, explain how you are dewatering, and where that water will be directed: Pam, P aos, w�
25) Are there wetlands or surface waters within 400' of the mine pit perimeter?
211No
❑ Yes If yes, what distance are they from the mine pit perimeter?
26) Will mining operations require dewatering near wetlands or other waterbodies, and will dewatering
potentially impact any wetlands or other waterbodies?
1IT"No, dewatering will not occur near (within 400') of wetlands or other waterbodies (e.g., streams, lake, etc.)
❑ Yes, dewatering rd atering will be near wetlands or other waterbodies (��,� arc c, ;c?:+S Pos o ro crd �ffi
5:}c Tro/" Whvc Lit hwc. m'.ned " }jt .ems},
Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that
have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and
implement a Pumping Operation and Monitoring (POM) Plan that has been approved by the
Department.
For sites that may drain wetlands — approval of a POM Plan may be required prior to coverage under
this permit. The POM Plan should be submitted to the appropriate Regional Office and in all cases must be
approved prior to operation.
The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of
pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain
surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at the end of the
application. Contact the Regional Office for questions specific to your mine.
27) Have you been required to obtain 4041401 Certification permits?
51"No
❑ Yes If yes, please briefly describe below (include information such a required mitigation, BMPs,
setbacks, and/or O&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as
necessary.
Page 6 of 12
SWU-NCG02-NOI Last revised 9/1012015
NCG020000 N.O.I.
28) Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers?
C"No ❑ Yes If yes, please attach to application submission.
Stormwater BMPs and Vehicle Maintenance:
29) Does this facility employ best management practices for stormwater control?
❑ No VYes If yes, please briefly describe:
30) Does this facility have a Stormwater Pollution Prevention Plan?
LTNo ❑ Yes If yes, when was it implemented?
31) Are vehicle maintenance activities (VMA) occurring or planned at this mine site?
US No ❑Yes, If yes, will VMA area runoff discharge into the wastewater treatment system(s)?
❑ No, VMA runoff will discharge separately through a stormwater outfall
❑ Yes, VMA runoff will drain back to the mine pit or other wastewater system
Wastewater Treatment Facilities:
32) Will mine dewatering occur? (Yes, we are asking about dewatering again.)
❑ No
R"Yes If yes, will the mine discharge this water? We will pQme L4a6x y�roT % 4-�, caearn�� � r
33) Will this facility wash mined materials? 65 5�*W^ °^ )k 10onS
Q'No
❑ Yes If yes, will the mine discharge this water?
34) Will discharges of process wastewater treatment systems occur (including possible recycle system
overflows)?
CINo
❑ Yes If yes, describe what kind of systems:
35) Will this facility employ chemical additives to flocculate suspended solids?
VNo
❑ Yes If yes, provide the name, manufacturer, and the quantity of average daily usage of the chemical
additive (if known):
Note: Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North
Carolina: http://r)ortal.nedenr.org/web/ir/construction-stormwater
36) Will any of the wastewater treatment facilities at this mine overflow only during rainfall events that
exceed the 10-yr, 24-hr rainfall event?
❑ Yes If yes, which treatment systems are those?
No, all wastewater treatment facilities will discharge more frequently (i.e., during smaller rain events)
Page 7 of 12
SWU-NCG02-NOI Last revised 911012015
NCG020000 N.O.I.
37) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain?
Ell No
❑ Yes
38) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2)
p for any new or expanding water pollution control facility discharges in North Carolina. You may
attach additional sheets. List the types of wastewater this mine site will discharge:
9"Mine Dewatering
❑ Process Wastewater (such as washing or recycle system overflows, other mining activity wastewater)
a) What wastewaters were considered for this alternatives review? VDewatering ❑ Process WW
b) Connection to a Municipal or Regional Sewer Collection System:
i) Are there existing sewer lines within a one -mile radius? ..................................... ❑ Yes C1KNo
(1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ❑ Yes ❑ No
(a) If No, please attach a letter documenting that the WWTP will not accept the wastewater.
(b) If Yes, is it feasible to connect to the WWTP? Why or why not?*
c) Closed -loop Recycle System (meets design requirements of 15A NCAC 2T .1000):
i) Are you already proposing a closed -loop recycle system (CLRS)? ......................... ❑ Yes IrNo
(1) If Yes, for what type of wastewater at this mine site? ❑ Dewatering ❑ Process WW
(2) If No, is this option technologically feasible (possible)? Why or why not?*
(3) If No, is it otherwise feasible to build a CLRS at this site? Why or why not?*
(4) What is the feasibility of building a CLRS compared to direct surface water discharge?*
d) Surface or Subsurface Disposal System (e.g., spray irrigation):
i) Is a surface or subsurface disposal technologically feasible (possible)? ..................... ❑ Yes B"'No
Why or Why not?*
ii) Is a surface or subsurface disposal system otherwise feasible to implement?*
Why or Why not?*
.......... ❑ Yes QKNo
Page 8 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct
discharge to surface waters?'
e) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound
alternative of all reasonably cost-effective options for the wastewaters being considered?`
❑ Yes E No
f) If this review included all wastewater discharge types, would excluding some types (e.g. mine
dewatering) make any of the above non -discharge options feasible for some of the wastewaters?
❑ Yes Q"No
' Feasibility should take into account initial and recurring costs. You may be asked to provide
further information to support your answers to these questions after the initial review.
Other:
39) Hazardous Waste:
a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility?
11? o ❑ Yes
b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of
hazardous waste?
C?' No ❑ Yes
c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of
hazardous waste?
EA0 ❑ Yes
d) If you answered yes to questions b. or c., please provide the following information:
Type(s) of waste:
How is material stored:
Where is material stored:
How many disposal shipments per year:
Name of transport / disposal vendor_
Vendor address:
40) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? (See
permit text for secondary containment requirements.)
CirNo None S6re0k 0, .5-.ke.
❑ Yes
41) Does your site have an active landfill within the mining permit boundary?
Y'No
❑ Yes If yes, specify type: ❑ LCID (Land Clearing and Inert Debris) ❑ Other:
Page 9 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
Final Checklist:
W' � This application will be returned as incomplete unless all of the following items have been included and
E- initialed for. Please show that the following required information has been included by initialing in each
space below.
Fee of $100 made payable to NCDEQ.
/ Completed application and all supporting documents.
✓ Copy of the valid approved mining permit (MP) for the facility or indication of MP application status.
✓' Copy of a county map or other general location map that shows the mining site and nearest major roads.
__L Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly
shows site location in relation to nearby streams, wetlands, and other waters, etc.
2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with
all outfalls, applicable buffers and wetlands clearly delineated, receiving waters, and
100-year flood plain line if applicable.
_ A copy of your US Army Corps -approved wetland delineation if you marked "yes" to question 27 above.
A line drawing of the water flow through the facility or block flow diagram. A pictorial description of the
nature of any sources of water and any collection and treatment measures.
✓ If mine site is in one of the 20 Coastal Counties:
• Applicant has checked with the appropriate regional office to verify the need for a Coastal State
Stormwater permit. Indicate the Regional Office Contact-1�4a= fd-c 5%3 ac�i6
• Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage
areas, and total drainage area.
If the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater,
include the following and contact your local regional office about a Pumping Operation and
Monitoring (POM) Plan. An approved POM plan may be required priorto NCG02 issuance.
_2 copies of detailed Full Size Plans (at least 24" x 36") delineating areas on the
plans and listing acreage (including: wetlands, ditches, well -placements, pits,
borrow areas, overburden storage, stormwater controls/BMPs, vehicle
maintenance areas, settling basins, product process (such as screening,
stockpiles, waste piles), total drainage area, impervious surface percentages (if
state SW programs apply), applicable buffers, and access and/or haul roads).
_Pump dewatering size and information on its specifications.
_Well information (design, depths, maintenance).
_Physical monitoring for the wetlands areas.
_Settling pond sizing information, if applicable.
_Level spreader design, if applicable.
_Details about dewatering method.
Cone of influence calculations.
_Description of measures to prevent erosion and flooding.
_Description and information about 401/404 permits that have been obtained.
_Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if
applicable).
I have contacted my local regional office about a POM Plan.
Regional Office Contact: Date contacted:
-OR-
I will not impact any nearby wetlands, surface waters, or groundwaters by dewatering.
Page 10 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
Certification: North Carolina General Statute 143-215.6 b (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other
document fled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false
statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly
renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
(Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to
exceed ten thousand dollars ($10,000).
41) Signatory Requirements (per40 CFR 122.22)
All applications, reports, or information submitted to the Director shall be signed and certified.
a. All notices of intent to be covered under this General Permit shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president,
secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar
policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities
employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if
authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
(2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
(3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will
constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual
permit.
I agree to abide by the following as a part of coverage under this General Permit.
1. I agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining
permit must be attached to this request.)
2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the
provisions of another NPDES permit specifically issued therefore.
3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection
so as to contain all spills on the site.
4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing
solid waste disposal.
5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not
result in contamination of the surface or ground waters.
I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as
enforceable requirements of the General Permit.
1 certify that I am familiar with the information contained in this application and that to the best of my knowledge
and belief such information is true, complete, and accurate.
Printed Name of Person Signing: T 1do G) k: ��1 ,rs� r 'Sr.
Title:
(Signature of
A-)-16
(Date Signed)
Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDEQ.
Page 11 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
Mail the entire package to:
Stormwater Permitting Program
Division of Energy, Mineral and Land Resources
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Note
The submission of this document does not guarantee coverage under the NPDES
NCG02 General Permit. Upon review of the submittal, the Division may
determine that coverage under an individual permit is more appropriate. Also be
advised that renewed and continued coverage under NCG02 may be dependent
upon the permittee's compliance success and/or status of the receiving waters.
For questions, please contact the DEMLR/Land Quality Section Regional Office for your area.
DEMLR/Land Quality Section Regional Office Contact Information:
Asheville Office ......
(828) 296-4500
Fayetteville Office ...
(910) 433-3300
Mooresville Office ...
(704) 663-1699
Raleigh Office ........
(919) 791-4200
Washington Office ...
(252) 946-6481
Wilmington Office ...
(910) 796-7215
Winston-Salem ......
(336) 776-9800
Central Office .........(919)
707-9220
Page 12 of 12
SWU-NCG02-NOI Last revised 9/10/2015
UNITED STATES
DEPARTMENT OF THE INTERIOR
GEOLOGICAL, SURVEY
76*22'30" 377000-E 378
401200mN
4011
u
1224
STATE OF N
DEPARTMENT OF
AND COMMUI
RALEIGH, N
P�
379 0KIs!0 25M 39ELIZAsLirH CITY 8 KM�
7:7 17
:c
V7 ------ #
1140
nE
t9h
Rabbit Corner
'IV Mary I
.... lllr�4
-y
go,
PO .5
1367.
(�9
WT Woo ville'-.
367 D3O;
1329
3
w
n
a
9
c
^O
_ V
Im \ �� 0
/
Energy, Mineral
and Land Resources
ENVIRONMENTAL OUALITY
December 13, 2016
Tildon Whitehurst, Jr.
Whitehurst Sand Company
233 Woodville Road
Hertford, NC 27944
PAT MCCRORY
DONALD R. VAN DER VAART
'C"ro '
TRACY DAVIS
D,,,rn,
JAN 1 1 2011
Subject: General'Permit No.,NCG020000 —
Elliott Mine
COC NCG020906
Perquimans County
Dear Mr. Whitehurst:
In accordance with your application for a discharge permit received on August 05, 2016, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state —NPDES
general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-
215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection
Agency dated October 15, 2007 (or as subsequently amended).
Please take notice that this certificate of coverage is not transferable except after notice to the Division of
Energy, Mineral, and Land Resources. The Division may require modification or revocation and
reissuance of the certificate of coverage.
Please be aware that mine dewatering at your site has the potential to impact adjacent wetlands. The
specific requirements for mine dewatering at facilities near wetlands can be found in Part 111, Section E of
your permit. You must have an approved Operation and Monitoring Plan before mine dewatering
discharges occur at your facility. Discharging mine dewatering wastewater without Plan approval will
be subject to enforcement action.
Please note that mine dewatering wastewater includes wet pit overflows caused solely by direct rainfall
and groundwater seepage for this type of mining operation. Any discharge of this water (and any
stormwater commingled with it) is subject to the effluent limitations in this permit.
This general permit allows the discharge of stormwater and certain types of wastewater from your facility.
In your application, you specified that only mine dewatering water would be discharged from this facility.
If separate point -source discharges of stormwater occur (i.e., stormwater not combined with mine
Slate or North Carolina I Environmental Quality I Energy, Mineral and land Resources
1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699-1612
919 707 9200 T
dewatering water), you will be required to adhere to the conditions in this permit for stormwater
discharges.
This permit does not affect the legal requirements to obtain.other permits which may be required by the
Division of Energy, Mining, and Land Resources, or permits required by the Division of Water
Resources, Coastal Area Management Act, or any other federal or local governmental permit that may be
required.
If you have any questions concerning this permit, please contact Richard Riddle at telephone number
(919)807-6375.
Sincere[ ,
ORIGINAL SIGNED BY
IMICHEAL F RANDALL
for Tracy E. Davis, P.E., CPM
cc: Washington Regional Office
Central Files
Stormwater Permitting Program Files
State of Nurt6 Carolim I Emitoomental "ty l Eoenp. \Snenl andLmd Resources
1612 \fail Smue Center 1512'vort6Sili%",Sweet I Raleidt, \i J699d612
919 707 9:00 7
J
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020906
STORMWATER AND MINE DEWATERING DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1. other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Whitehurst Sand Company
is hereby authorized to discharge stormwater and mine dewatering-from a facility located at
Elliott Mine
292 Weight Station Road
Hertford
Perquimans County
to receiving waters designated as Little River, a class C, Sw water in the Pasquotank River
Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions
set forth in Parts 1, II, III, IV, and V of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective December 13, 2016.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day December 13, 2016. JftIGINALSIGNED 81(
WCHEAL F RANDALL
for Tracy E. Davis, P.E., Director
Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission
NCG020906
Map Scale 1:24,000
Whitehurst Sand Company
Elliott Mine
Latitude: 360 14' 43" N
Longitude: -760 21' 09" W
County: Perquimans
Receiving Stream: Little River
Stream Class: C,Sw
Index Number: 30-5-1 (Pasquotank River Basin)
Facility Location
Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
Mr. Samir Dumpor, P.E.
Washington Regional Office
943 Washington Square Mall
Washington, North Carolina 27889
PAT MCCRORY
Gnvemnr
DONALD R. VAN DER VAART
seer,/, ,
TRACY DAVIS
August 11, 2016 Director
Subject: General Permit No. NCG020000
W hitehurst
COC No. NCG020906
Perquimans County
Dear Mr. Dumpor:
Enclosed is a copy of the site plan for the above NOI Mine application for your review. I
previously sent you the NOI and location map via email. If you need any more information, please give
me a call at telephone number (919) 807-6375 or email at rick.riddle@ncdenr.gov.
Thanks,
Richard Riddle, Jr.
Stormwater Engineer
NC Division of Energy, Mineral and Land Resources
Attachments
AUG 1 6 2016 UI
.. I`
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699-1612
919 707 9200 T
Division of Energy, Mineral and Land Resources /
Land Quality Section — Stormwater Permitting Program
National Pollutant Discharge Elimination System
NCG020000
NOTICE OF INTENT — General Permit Application
FOR AGENCY USE ONLY
Date Received
Year
Month
Day
Certificate
orCovemge
#
o t
Pe. tt Awjoed to
, c
National Pollutant Discharge Elimination System application for coverage under General Permit
NCG020000:
STORMWATER AND/OR WASTEWATER DISCHARGES associated with activities classified as:
SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) and
like activities &CCEI VE The following activities are included:
AIIG
• Active or inactive mining operations (including borrow pits —except for NCDOT borrow pit4aQScharge
stormwater contaminated with or that has come in contact with, any overburd�tyatufmaterial., intermediate
rial
products, finished products, byproducts or waste products located on the site of labmtgperatiA i.? IrY
Stormwater from vehicle maintenance activities (VMA) at mining operations; ca"N,l11?IVG
Overflow from facilities that recycle process wastewater; and/or
Mine dewatering (wastewater)
The following activities are specifically excluded from coverage under this General Permit:
Stormwater discharges associated with peat mining, coal mining, and metal mining;
Stormwater discharges from mining operations which are intermixed on site with stormwater from concrete
operations;
Stormwater discharges associated with oil and gas extraction operations; and
Stormwater discharges associated with tourist gem mines
NCDOT borrow pits (covered under individual permit NCS000150)
The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000:
Point source discharges of stormwater and wastewater from in -stream sand mining operations (sand dredging
or dipping operations) are covered instead by NPDES General Permit NCG520000, administered by the Division
of Water Resources NPDES Wastewater Permitting Program. Please contact DWR for more information.
Please print or type all entries in this application form.
1) Mailing address of owner/operator (official address to which all permit correspondence will be mailed):
Legal Owner Name Wh ; }e),,, rs4 Sand Car
(Attach the most recent Annual Report to the NO Secretary of State
the current legal name of the corporation or entity.
Alternatively this permit can be given to an individual or government authority. This name must be the same name as appears on the
Division of Energy, Mineral, and Land Resources' Mining Permit.)
Signee's Name (assigned for in question 41_at end) '( )dam., (J1.,.�e)Avr�r 7,,
Street Address a 33 G
City Ai er c
Telephone No. 9SA
Alternate Contact Name'
State_ P(_ ZIP Code n7P4/4/
E-mail pc}r f,t CDm
E-maif (if different)
Alternate Contact Telephone (if different)
'Alternate contact should be affiliated with the Owner/Operator. Consultant information can be provided
in question 5.
Page 1 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
2) Location of facility producing discharge:
Facility Name
Facility Street Addre
Facility City
Facility County
Facility Contact 71abn
Telephone No. XS 2
Fax: 9Sa
Contact E-mail �aFr;cr P QV, •FG1Sarj (o a,
3) Physical Location Information:
Please provide a narrative description of how to get to the facility (use street names, state road numbers, and
distance and direction from a roadway intersection). Fr Hera.�,mll +oVe Hw, t7 t l r4_l. -io
we,*A S 44 `U (o A o(-aAo02Co2( I r i. o, 1 V
4) Facility Location Coordinates:
Latitude IH qIl N Longitude °W
degrees) '� l/P 35
5) Consultant Information (if applicable):
Consultant: _
Consulting Firm:
Mailing Address:
City: -
State:
Phone:(_)
E-mail:
Zip Code:
Fax: (_)
Permits:
(degrees / minutes / seconds or decimal
6) This NPDES Permit Application applies to which of the following:
(Optional)
Staple Business Card Here
67"New or Proposed Facility Date operation is to begin: IQ -1- 9o16
❑ Existing Date began mining:
7) Standard Industrial Classification:
Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial
activity at this facility SIC Code: _ I �L_ rh;(';,,
8) Provide a description of the types of minerals mined at this facility: looso. I �a al 3urry .
9) Is this a PROCESSING -ONLY facility for materials mined elsewhere? 2"N�o ❑ Yes
10) Is this an inactive mine site?
0?"No Wa:i.S on
❑ Yes If yes, have you certified to the Stormwater Permitting Program that all portions of the site where
clearing, grading, and/or excavation activities have occurred have been stabilized?
❑ No ❑ Yes (If yes, the site may be eligible for "Dormant Status" and reduced BMP
inspections. See the General Permit.)
Page 2 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
11) Does this facility already have a valid Mining Permit from DEMLR's Land Quality Section?
[eNo If no, please indicate the status of the Mining Permit application: 5v6o„�til g/5 - -to16
❑ Yes If yes, please provide the Mining Permit number: Also provide a copy of
the DEMLR Mining Permit with this NPDES application.
12) Does this facility have any other NPDES permits?
LKNo
❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility:
13) Are you applying for a discharge permit in the same location as a previously permitted mine?
R(No
❑ Yes If yes, specify permit number and mine name if known:
14) Does this facility have any Non -Discharge permits from DWR (e.g., recycle permits)?
l' No
❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility:
15) Does total area of this mine site include ready -mixed concrete plant and/or asphalt plant areas?
I?rNo
❑ Yes If yes, do they have separate NPDES stormwater permits? ❑ No ❑ Yes (provide permit
number(s) )
If not owned by the same company, who is the owner?
Development Activities and Buffers:
16) Will this mining operation precede development activities at this site?
Lvl No
❑ Yes
17) Is this mine located within one of the 20 Coastal Counties, and will it add more than 10,000 ft' of
impervious surface?
❑ Yes (to both)
VNo, this mine site IS in one of the 20 Coastal Counties but will NOT add 10,000 ft2 of impervious surface.
❑ No, this mine site is NOT in any of the 20 Coastal Counties.
If this site is in one of the 20 Coastal Counties, you may be required to apply for an additional State
Stormwater Permit. Check with your local Regional Office (see contact information and checklist below).
18) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basins, or the Randleman or Jordan
Water supply Watersheds?
C/ No
❑ Yes If yes, what size stream buffers are included on site? ft. You must show buffers on site
plans. Also include information and plans showing diffuse flow through buffers as required.
Page 3 of 12
SWU-NCG02-NOI Last revised 9/1012015
NCG020000 N.O.I.
Discharge Points, Receiving Waters & Wetlands:
19) Receiving waters:
What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater
and/or wastewater discharges will end up in? �: }(�_ Rj ,,,r,
To find the waterbody, please see the "MAPS" tab on hftp://portal.ncdenr.org/web/wci for a map of NC
Surface Waterbody Classifications.
Receiving water classification(s) for the waters:
If the site will discharge to a separate storm sewer system, name the operator of the separate storm sewer
system (e.g. City of Raleigh municipal storm sewer).
Discharge of wastewater to receiving waters classified as WS-11 through WS-V, or SA, must be
approved by the Division of Water Resources (DWR) or Division of Marine Fisheries
(DMF). DEMLR cannot grant coverage under NCG020000 without that approval. Also be advised that
no new discharges of wastewater are permitted in receiving waters classified as WS-1 or
freshwater ORW. Wastewater discharges to saltwater ORW will not be approved under General Permit
NCG02 but may be eligible for an individual permit.
20) Will this mine site discharge wastewater or stormwater to waters classified as High Quality Waters
(HQW), Primary Nursery Areas (PNA), Trout (Tr) waters, or a class with a symbol like "+" or "@" that
denotes a special management strategy is in place?
2 No ❑ Yes, HQW` ❑ Yes, includes "+" or
❑ Yes, PNA* ❑ Yes, Trout (Tr)
21) Will this mine site discharge wastewater or stormwater to waters classified as Shellfish (SA) waters?
(INO
❑ Yes, SA*
*For questions 19-20, be advised that the NCG02 General Permit limits the discharge volume of total combined
wastewaters to 50 percent of the receiving water in -stream flow under 7Q10 conditions in HQW waters (PNA and
SA waters are considered HQW by definition). You maybe required to contact USGS to obtain a 7Q10 flow.
22) Will this mine site discharge wastewater or stormwater to impaired waters, or to waters with an
approved "Total Maximum Daily Load" (TMDL)?
To find impaired waters, please see the "Impaired Waters" map on the "MAPS" tab on
hftp: //porta I. ncden r.o rg/web/wq.
To find approved TMDLs in North Carolina, please see DWR's Water Planning Section website:
li]'No
❑ Yes, these waters are impaired for (list pollutants):
❑ Yes, these waters have a TMDL for (list pollutants):
Page 4 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
23) List discharge points (ouffalls) that convey discharge from the mine site (both on -site and offsite) and
location coordinates. Attach additional sheets if necessary, or note that this information is specified
on the site plan. Include proposed maximum daily flow rate for each wastewater outfall.
You must show all discharge points clearly on the submitted site plan. Be advised
that NCDEQ may require you to apply for an individual permit, based on proposed
discharge rates and receiving stream conditions (low flows, impairments, etc.)
Stormwater
Stormwater Outfall No
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degreeslminutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
-N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Stormwater Outfall No.
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Mine Dewatering
Mine Dewatering (Wastewater) Outfall No. I —
Proposed maximum flow rate: rZ 6od / G P'D
Latitude (degrees/minutes/seconds or decimal degrees): 34 4NS•86'
N
Longitude (degrees/minutes/seconds or decimal degrees): 760 at 1' 66.
all W
Mine Dewatering (Wastewater) Outfali No.
Proposed maximum flow rate:
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Process Wastewater
Process Wastewater Outfall No. Wastewater Description:
Proposed maximum flow rate:
Latitude (deg reeslminutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Process Wastewater Outfall No. Wastewater Description:
Proposed maximum flow rate:
Latitude (degrees/minutes/seconds or decimal degrees):
N
Longitude (degrees/minutes/seconds or decimal degrees):
W
Page 5 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
24) Help us understand what will happen to the dewatering water at this mine site:
❑ N/A — this mine is not dewatering at all and will not dewater in the future.
a) Will this mine be dewatering and discharging to waters of the state? (Answer only if dewatering)
L7 No
❑ Yes If yes, where to? ❑ Surface Waters and/or Wetlands (on -site or off -site)
❑ Other (on -site or off -site) Describe:
b) Will this mine be dewatering but not discharging to waters of the state? (Answer only if dewatering)
❑ No
I"Yes If yes, explain how you are dewatering, and where that water will be directed: a, Rk,,,s, we
25) Are there wetlands or surface waters within 400' of the mine pit perimeter?
C"No
❑ Yes If yes, what distance are they from the mine pit perimeter?
26) Will mining operations require dewatering near wetlands or other waterbodies, and will dewatering
potentially impact any wetlands or other waterbodies?
Q"No, dewatering will not occur near (within 400') of wetlands or other waterbodies (e.g., streams, lake, etc.)
❑ Yes, dewatering will be near wetlands or other waterbodies -rhcro orc e,1c}:.S pords ato vrd i1As
. S: }c � rorw (y),v� G,c h"vc m'.rroi - }k fKs}l
Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that
have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and
implement a Pumping Operation and Monitoring (POM) Plan that has been approved by the
Department.
For sites that may drain wetlands — approval of a POM Plan may be required prior to coverage under
this permit. The POM Plan should be submitted to the appropriate Regional Office and in all cases must be
approved prior to operation.
The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of
pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain
surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at the end of the
application. Contact the Regional Office for questions specific to your mine.
27) Have you been required to obtain 404/401 Certification permits?
VINO
❑ Yes If yes, please briefly describe below (include information such a required mitigation, BMPs,
setbacks, and/or O&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as
necessary:
Page 6 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
28) Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers?
2'*No ❑ Yes If yes, please attach to application submission.
Stormwater BMPs and Vehicle Maintenance:
29) Does this facility employ best management practices for stormwater control?
❑ No OeYes If yes, please briefly describe:
30) Does this facility have a Stormwater Pollution Prevention Plan?
2<o ❑ Yes If yes, when was it implemented?
31) Are vehicle maintenance activities (VMA) occurring or planned at this mine site?
20No El Yes, If yes, will VMA area runoff discharge into the wastewater treatment system(s)?
❑ No, VMA runoff will discharge separately through a stormwater outfall
❑ Yes, VMA runoff will drain back to the mine pit or other wastewater system
Wastewater Treatment Facilities:
32) Will mine dewatering occur? (Yes, we are asking about dewatering again.)
❑ No r�
IsKYes If yes, will the mine discharge this water? toe w III PvnP Oa6x dram m�nc % 4 c ac
33) Will this facility wash mined materials?
0?"No
❑ Yes If yes, will the mine discharge this water?
65' Vlaw^ 0n +1k IP6nS
34) Will discharges of process wastewater treatment systems occur (including possible recycle system
overflows)?
BIN
❑ Yes If yes, describe what kind of systems:
35) Will this facility employ chemical additives to flocculate suspended solids?
INo
❑ Yes If yes, provide the name, manufacturer, and the quantity of average daily usage of the chemical
additive (if known):
Note: Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North
Carolina: http://portal.ncdenr.org/web/Ir/construction-stormwater
36) Will any of the wastewater treatment facilities at this mine overflow only during rainfall events that
exceed the 10-yr, 24-hr rainfall event?
❑ Yes If yes, which treatment systems are those?
2 No, all wastewater treatment facilities will discharge more frequently (i.e., during smaller rain events)
Page 7 of 12
SWU-NCG02-NOI Last revised 9/1012015
NCG020000 N.O.I.
37) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain?
19No
❑ Yes
W��l 38) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2)
t for any new or expanding water pollution control facility discharges in North Carolina. You may
attach additional sheets. List the types of wastewater this mine site will discharge:
13"Mine Dewatering
❑ Process Wastewater (such as washing or recycle system overflows, other mining activity wastewater)
a) What wastewaters were considered for this alternatives review? VDewatering ❑ Process WW
b) Connection to a Municipal or Regional Sewer Collection System:
i) Are there existing sewer lines within a one -mile radius? ..................................... ❑ Yes tJKNo
(1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ❑ Yes ❑ No
(a) If No, please attach a letter documenting that the WWTP will not accept the wastewater.
(b) If Yes, is it feasible to connect to the WWTP? Why or why not?*
c) Closed -loop Recycle System (meets design requirements of 15A NCAC 2T .1000):
i) Are you already proposing a closed -loop recycle system (CLRS)? ......................... ❑ Yes Q'No
(1) If Yes, for what type of wastewater at this mine site? ❑ Dewatering ❑ Process WW
(2) If No, is this option technologically feasible (possible)? Why or why not?*
(3) If No, is it otherwise feasible to build a CLRS at this site? Why or why not?*
(4) What is the feasibility of building a CLRS compared to direct surface water discharge?*
d) Surface or Subsurface Disposal System (e.g., spray irrigation):
i) Is a surface or subsurface disposal technologically feasible (possible)? ..................... ❑ Yes B"'No
Why or Why not?*
ii) Is a surface or subsurface disposal system otherwise feasible to implement?*......
Why or Why not?*
❑ Yes ZNo
Page 8 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.t.
iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct
discharge to surface waters?*
e) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound
alternative of all reasonably cost-effective options for the wastewaters being considered?*
❑ Yes I/No
f) If this review included all wastewater discharge types, would excluding some types (e.g. mine
dewatering) make any of the above non -discharge options feasible for some of the wastewaters?
❑ Yes Q'No
* Feasibility should take into account initial and recurring costs. You may be asked to provide
further information to support your answers to these questions after the initial review.
Other:
39) Hazardous Waste:
a) Is this
� facility a Hazardous Waste Treatment, Storage, or Disposal Facility?
3 No ❑ Yes
b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of
hazardous waste?
tN No ❑ Yes
c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of
hazardous waste?
EA0 ❑ Yes
d) If you answered yes to questions b. or c., please provide the following information:
Type(s) of waste:
How is material stored:
Where is material stored:
How many disposal shipments per year:
Name of transport / disposal vendor:_
Vendor address:
40) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? (See
permit text for secondary containment requirements.)
Q'No Wont s6,j 0, s.}¢
❑ Yes
41) Does your site have an active landfill within the mining permit boundary?
E No
❑ Yes If yes, specify type: ❑ LCID (Land Clearing and Inert Debris) ❑ Other:
Page 9 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
Final Checklist:
This application will be returned as incomplete unless all of the following items have been included and
1 - initialed for. Please show that the following required information has been included by initialing in each
space below.
✓ Fee of $100 made payable to NCDEQ.
Completed application and all supporting documents.
✓ Copy of the valid approved mining permit (MP) for the facility or indication of MP application status.
✓ Copy of a county map or other general location map that shows the mining site and nearest major roads.
Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly
shows site location in relation to nearby streams, wetlands, and other waters, etc.
2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with
all outfalls, applicable buffers and wetlands clearly delineated, receiving waters, and
100-year flood plain line if applicable.
_ A copy of your US Army Corps -approved wetland delineation if you marked "yes" to question 27 above.
A line drawing of the water flow through the facility or block flow diagram. A pictorial description of the
nature of any sources of water and any collection and treatment measures.
V If mine site is in one of the 20 Coastal Counties:
• Applicant has checked with the appropriate regional office to verify the need for a Coastal State
Stormwater permit. Indicate the Regional Office Contact:"r"a., Gel_+21-1 b -
• Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage
areas, and total drainage area.
If the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater,
include the following and contact your local regional office about a Pumping Operation and
Monitoring (POM) Plan. An approved POM plan may be required prior to NCG02 issuance.
_2 copies of detailed Full Size Plans (at least 24" x 36") delineating areas on the
plans and listing acreage (including: wetlands, ditches, well -placements, pits,
borrow areas, overburden storage, stormwater controls/BMPs, vehicle
maintenance areas, settling basins, product process (such as screening,
stockpiles, waste piles), total drainage area, impervious surface percentages (if
state SW programs apply), applicable buffers, and access and/or haul roads).
_Pump dewatering size and information on its specifications.
_Well information (design, depths, maintenance).
Physical monitoring for the wetlands areas.
_Settling pond sizing information, if applicable.
_Level spreader design, if applicable.
Details about dewatering method.
Cone of influence calculations.
_Description of measures to prevent erosion and flooding.
_Description and information about 401/404 permits that have been obtained.
_Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if
applicable).
_I have contacted my local regional office about a POM Plan.
Regional Office Contact: . Date contacted:
-OR-
1 will not impact any nearby wetlands, surface waters, or groundwaters by dewatering.
Page 10 of 12
SWU-NCG02-NOI Last revised 9/10/2015
NCG020000 N.O.I.
Certification: North Carolina General Statute 143-215.6 b (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false
statement of a material fad in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly
renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
[Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to
exceed ten thousand dollars ($10,000).
41) Signatory Requirements (per 40 CFR 122.22)
All applications, reports, or information submitted to the Director shall be signed and certified.
a. All notices of intent to be covered under this General Permit shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president,
secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar
policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities
employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if
authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
(2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
(3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will
constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual
permit.
I agree to abide by the following as a part of coverage under this General Permit:
1. I agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining
permit must be attached to this request.)
2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the
provisions of another NPDES permit specifically issued therefore.
3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection
so as to contain all spills on the site.
4. , I agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing
solid waste disposal.
5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not
result in contamination of the surface or ground waters.
I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as
enforceable requirements of the General Permit.
I certify that I am familiar with the information contained in this application and that to the best of my knowledge
and belief such information is true, complete, and accurate.
Printed Name of Person Signing: ? Ij.. Lj )j:4t'kvf0 sr.
Title:
(Signature of
A-1-Ib
(Date Signed)
Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDEQ.
Page 11 of 12
SWU-NCG02-NOI Last revised 9/1012015
NCG020000 N.O.I.
Mail the entire package to:
Stormwater Permitting Program
Division of Energy, Mineral and Land Resources
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Note
The submission of this document does not guarantee coverage under the NPDES
NCG02 General Permit. Upon review of the submittal, the Division may
determine that coverage under an individual permit is more appropriate. Also be
advised that renewed and continued coverage under NCG02 may be dependent
upon the permittee's compliance success and/or status of the receiving waters.
For questions, please contact the DEMLR/Land Quality Section Regional Office for your area.
DEMLR/Land Quality Section Regional Office Contact Information:
Asheville Office ......
(828) 296-4500
Fayetteville Office ...
(910) 433-3300
Mooresville Office ...
(704) 663-1699
Raleigh Office ........
(919) 791-4200
Washington Office ...
(252) 946-6481
Wilmington Office ...
(910) 796-7215
Winston-Salem ......
(336) 776-9800
Central Office .........(919)
707-9220
Page 12 of 12
SWU-NCG02-NOI Last revised 9/10/2015
STATE OF r
UNITED STATES DEPARTMENT OF
°y9q�L DEPARTMENT OF THE INTERIOR AND COMMU
9z°F� GEOLOGICAL SURVEY RALE►GH, r
76°22'30" 377ON-E 376 379 OKISKO 2.1 KM 390 20' 391 ELIZA8 ffH LYTY 8 KM_,-t� If
36°16': - r1 )� i - r.� _.,fir b - \-. : \.. `'—"���✓ z / - / '�`� 17 •° V
_._•Sr ubsta ,:/ -6
1/J
1012oanmN'— O� .' �. � 1 M1fi.. '..✓( � I'I'r`%� � � �b Ili —. �/ r� � 4• .Ev gelleal I
1 a ,�i - t ¢ i -� Rabbit Corner
a l_
`\x25
- (7' pGOT�" r•' / i� rf \ r�.e r �^'' 7 �, zs
a1224
rr
/3-�\ ,-P' a. NS`�.�GOF/
sa iL rr n..33s7
'rye /:� �� � ( \ �r < �l \\ 4�� ,yl�-`..#,% \\"�� /l� •• t• ` / n�\ V \d
i.WWOOdV1��8- ai /�i
\ \\\ \:- \\�..-� .ice/ \5•a.5 a1367:a _ 1330
\ aolp h� 4 <305
s -
qo / ,� Whit hurst
ip
\ 1
17.Ifs r/ Airs r
2 I'm( >-
If
p9 .�yX3.5�
INN✓"+ /,% A
L f "�"'F•iY .�"tt ._s;..> :. _ aS^ •.5=:�e,�-*�:L' ,..��__ �I •.:.^�_ . _.�f _ _� ) —i-: `� .rh .a
Riddle, Rick L
From: Riddle, Rick L
Sent: Thursday, August 11, 2016 3:54 PM
To: Dumpor, Samir; Thom Edgerton (thom.edgerton@ncdenr.gov)
Subject: Review of NOI for Whitehurst Sand
Attachments: NCG020906 Whitehurst Sand Co_NOI.pdf
Samir or Thom,
Hope you all are doing well!
Please review the attached NOI application and respond with any recommendations for issuance of the permit. Your
recommendation to issue the permit serves as your acknowledgement that (1) the facility is located in your region, (2) that
there are no current complaints outstanding about the facility, and (3) that the facility may ultimately be inspected by the
regional staff. I also have plans that 1 will mail out separately for your files and review.
COC #
Facility
Location
City/County
NCG020906
Whitehurst Sand Co.
292 Weight Station Road
Hertford/Perquimans
If you need any more info, please send a carrier hound, call or email. I look forward to your review or recommendation to
issue the permit by 9/12/2016.
Thanks
Rick
Richard L. Riddle, Jr.
Stormwater Engineer
North Carolina Department Enviromental Quality
North Carolina Division Energy Mineral Land Resources
919 807-6375 office
rick. riddleiUncdenr.pov
512 North Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
^Nothing Compares,..
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
PAYTOTHE NCDEQ $; "100.00
ORDER OF _�_._ �.- .._ _ ..
�1
One Hundred and 00/100....................................................................................................
°
y. ,__� �._f.[�i :��..•.._. r..-�_. �. ___. _. '.__ __.<, ._..': s s. a:. R.1•+hS.Ty.�1Y:511:S.1'L.l_i.�.l��,, e:"L 1'_.
.`
GRAPHIC SCALE
50 0 25 50
( IN FEET )
1 inch = 50 ft.
JAU 1 1 �011
N/F
W.W. & CAROLYN H. CARTWRIGHT
D.B.135, PAGE 642
5-0035-0021
no
R
*0
9
m
G)
D
O
z
00
N
N
Tildon & Pattie Whitehurst
D.B. 449, PG. 711
5-0035-0023
N/F
VANCE MEADS & SONS
D.B. 133, PG. 787
M.B. 3, PG. 213
5-0035-0024
EXISTING HOUSE
S42010108'IW
DATA GIVEN ON THIS PLAN IS BELIEVED TO BE
:ORATE, BUT THE ACCURACY IS NOT
,RANTEED. THE CONTRACTOR IS
PONSIBLE FOR THE VERIFICATION OF ALL
-NSIONS, CONDITIONS, TYPES AND LOCATIONS
>R TO CONSTRUCTION. THE CONTRACTOR IS
.Y RESPONSIBLE FOR ADHERING TO ALL
rE AND LOCAL BUILDING CODES.
.STAL CONCEPTS & CONSULTING, INC. IS
JED OF ANY LIABILITY AT THE TIME THE
.DING PERMIT IS ISSUED. CONTRACTOR AND
IER SHALL SEEK THE ADVICE OF A
FESSIONAL ENGINEER OR ARCHITECT IF
DED. COASTAL CONCEPTS & CONSULTING,
IS A DESIGNICONSULTING COMPANY ONLY
MAKES NO WARRANTIES ON THIS DOCUMENT.
EXISTING SHED
PROPOSED KECLAMA TION PLAN
FOR
COA JAL WHITEHURST SAND COMPANY
ELLIOTT MINE
DATE: JULY 29, 2016 PROJECT.16 WSC
CONCEPTS & CONSULTING SCALE: 1' = 50' DRAWING: ELLIOTT MINE
INC. DRAWNBY. JPW BUILDER: WSC
.O Box 213 - Hertford - NC - 27944 * (252) 312-7999 * patrick@nccoastalconcepts.com * www.nccoastalconcepts.com
+C ft 7,
y
. _ n.., bJ 4.:f�.. e.. �l .: i.� .t_.._.e , 4 e.'L._
I
I
I
I N/F
PATRICK COOPER
I D.B 430, PG. 420
I D.B. 197, PG. 370
5-0035-0022D
25.00'
25' UNEXCAVATED BUFFER
pFgM�T o
B ?S
UN�gRy
NFxCgvgT�o mm
\ BU,cFFR
\
N 48004'37" E
PERMIT BOUNDARY
1475.00'
25' UNEXCAVATED BUFFER
25.00'
N/F
PATRICK COOPER
D.B 430, PG. 420
5-0035-0022C
PERMIT BOUNDARY
I
I
I
I
I
I
I
I
I
N 42 04 37 E 200.001
° , 11
25.00 PERMIT BOUNDARY
25' UNEXCAVATED BUFF
N/F
PATRICK COOPER
D.B 430, PG. 420
P.C. 2, SL. 42, M. 4
5-0035-0022B
N46019'37"E
67.82' —
cn
I�
O
N
...._ ..___ .»__..__..�..:::».mom_.__.____.._._.....^_...:__.� ...__..._.._.......-._ _ _ _ __ \ �. .: .pe :. ; �S. _,....��'"==gin= �i.r.._.....�» .
_.._....__.,___. .a_._.x..m_. _.._._......»»__ .».-xv.—.r..= r.._._m ___ ......_.......»_... .m ».._»». _ sdv. _ ... s-_..__.,.__ ._.._.._. .__..m..m._.. .m:....�..___. ._. .__..._.__ _.__._..._ - _ _
....__.__ .�__.... _.�_..»__. .._,._.._»_._..�..__.._._.._.._..._.__....___»_.._x._............rn.....^^.._s.,...—xc.:�-_v_.__�:cv.___Wm. �,._v._-ar._.c»__._... zxR"»___.va ___._m.._m ..__ _..-_ _' w-__ __ ([�
.Vn..__..r a._....__.m _^...acc.»..__m»_a m.___________m_____________________...._..__... ._v.___.. .._. .._. __ _. .. ._.._.__...___.._.._..._.._.. __...... - _sn,�. M__:.
:»xx -. ........::.. _ ..._ T _� _._._» is :::
..__.v..._ __...» ._»..."+w_»_.. �_. .__m...____»___ _-......_.__»»^v_....__..r..a.....^.._......_..._»._..m.._,.__.. ,.._...a-e�:._ay. »»_«..,_..._r.__,.c..Ta .._»....,. _.. ._.....__. __.. .....::..W. .:....:...m �:�� _ e»_______:3:,.. _ _ ^ .. __. _.L`: F .�.���-5
...._.__._. ._ .._mom.-__... _ _. .... �._. .__ __ __ r _..v., .._. .. _ ._» v.� t ._ `' ___ -v. -:: mam ...._
vvVV=
\ ___ .^ _.m..._...... _ __ ..._...__. c
.._._ _.0 .. __.._.__... r ___._._ .___.-......». ___..m_.__m_......._..^... _.«_^�:�_ ..__ .__......_�.... ».. m_. ____m__c_... n..... __-^mac....-...__ -m m _a,.�s`....c:»,
..._.___.. ....rs..a`. ..m_m_.._, r_ _.rr.� __ ._.. ....._ _...._...__m........_... ____...._ ._.» .._.._ _ .._ _ _ x ._ __..._. __.-s.__.. _.... .... __... ..s..__.._. _ ._ ...._._ v:�-..a„ . 4.._ _ _
VV
w __m____»_m _. __ _ _.__» ___ __ _____. _�__.____.m___.__
_ _ ___ _.. __.. __ __ ._ _ __ __. _ w_. __mr =.vim:
r __ ,__. _ __. ______.._. _. _., _ _
.._ m.,__._...__.. ...._ .zr.. ............r_,....» _ .c. _ _«...........e£�»__..mms_._...,__._. _.rs.a_ =»:__s.:3»____ s_..»_.......m..»__m.._._m__......_..�•_ s.
'.=c»_....__._....«i..c». ...._. _sa�_..._.» _n -..»_ .» _....w.9_._ .__»_»»__.._»__.__.. __.._-v._.....«_..«..«...^�c_._..._._..__.._.__.._.__._._._..._._»_._..:i_''.sc.-...,,.!c..m_sa:»._c"u».® ` ,
__,..:.. ....vm.=_.-_..._._._..m..... ___.._ .. ..:A.'a:::xrc":»ca.: «:-x:v.- -m^^ .. ^-msa u',.�a .. _ _ ,:_rs"'nnn
_ m ._« ._ � _._ ». _m.. __-.. z_ . _.___,�___u, ._...... _.,_._____»__..... _.__,_�... _ .. ate__...»_»__.»__ ��
_ ..
~
_ .. _.. _.._...._ z
I 2
M.
w
_ .. 177
___..___.._..�___»._.. .-.-._fie»x._.___..� .... .« _. ......,.... _ ............__ ... ......._ ._._ .. __ .-_...». _ .a_e....P �"::: _ .._......... ._.___ : .ar:x .. __..c._.v.. :.......__.. _ _ ....a:�
� T1
' .._..mom.. __.._:.'.s �. :,.G_.....:� �_ "':::....»_x__m_ .._. gym... , ...._ .._.. _._. ,-:....._-r.__:..
__..____.._..« «s__..mm. _..___... _.__.. ....u.....v:_ _:_» � ,.__... _,. .:. _ __._.� . � y.-.:_. ..___...P__ ..xu. » »... _:.;_.:�.�. .. ':.. -.iu , � L .m__m » - v'
w \ .�_. _ �v:. .. __`_`..___.-cs�» cu-:_..__. ... ...u:: i "-:.__
m..___ . ... ..
__ _.._»_
CD
\ ._...„.�.:m>s_ `._. =_e,-_=._..c:.. •__..»._....._•___.. _..__`..__._. ».....:.._..�___x. ...._...._..__._ ems._.. _:..:_::: _._v__.. ,= - ._.. r_�.._... » .....�.. »__a_= .... .... ............ .. u:_. -a' .. / �
cn
.__-:_::_»_._,. ...__...."'_�.__-. ....._..... :..___ ...»..._. ..m_._5.. .:-_- _. -r ..::. m -;._.. __ .r -z-:
V.
xn
w
-� _.vim.. __..___» ._..._a__.__._.._._ n-_,v. _ _ _.___ ____».. _ _ : __ _w _ »»_ _ r
' ..,_._.r..c'_c.�s»_.a__ __...u�.v:::._ ..._......__ _. ....,.. _V__vm »._::::_.: � _m»,.. ...v_:..»»»._..... ._ _»_...__ _...v_» __.. __. m..._»_ ._..._.::.._!._.. .__£_�'S^i-'.°j-=-.= •.:c8-
2 __ .._._. __..._w. _..__x,:.uv»._ . .... ...._ _._.___'"`_____..._. ::..._.._.._�.`__:� _.......xx_.._`_._.:a:—a:!a- : _-:,..._._... .....k ..._.:.c... .::.. :+ _...._ ;.._ v... "_...m-"---s. _ ._.:m�.».,m....._,._.. ..:x-,' _ p "D
-., m -
p� ®. ».._... _. v..
\ \ A S ry —
w Mi 2 - w
\ \ C S S - _ D� �A 0
S S/p UNF
N/F ~ \ \ \ \ 794/NF XCgVgT =� s
Tildon & Pattie Whitehurst ~ ~ ` \ \ \ \ \ MgpNoSFM� Foe�FFF Vu
� 2
N
D.B. 449, PG. 711 _ ~ \ \ \ \ \ 6 T
5-0035-0023
_HER
IN I70
nV mg.VnRIV
VVV
V
Vnn
VnV
nm
\ a W
\ \ MT
v
\ \ B
~ \ \ \ UNOgRy - m
my
\ ._.
25 UNEXCAVATED BUFFER
\ \ PERMIT BOUNDARY 25.00'
93.401
34Q I
d
°5
\ \ W _
~ w \\ \ \\ r?SST
~
1165-00 /_NAI
~
S42°20'08"W ~ \ \ \ \ A 2, &4S ON ` ~
~ \ \ 9 �
�4�
N .
F
97 00� N/F gANO sFMFN w w
s3s°1'� VANCE MEADS & SONS
w
- - D.B. 133, PG. 787
THE DATA GIVEN H THIS PLAN IS BELIEVED TO BE P! LOIOSGD Z7 n/�rJ A tl .7 A TIONPLA AT
5-0035-0024 ACCURATE, BUT THE ACCURACY IS NOT / L GLl I LG I LIllY111 ! ! 1
GUARANTEED. THE CONTRACTOR IS ]�� T C FCOR %� %� jj A V
RESPONSIBLE FOR THE VERIFICATION LOCATIONS ALL WHI T�l l VR T UANL l.� OMPAN1
GRAPHIC SCALE DIMENSIONS, STRUCTION.THECONYPES RACTOSCOA TAL
� ' PRIOR TO CONSTRUCTION. THE CONTRACTOR IS
FULLY RESPONSIBLE FOR ADHERING TO ALL ELLIOTT MINE
^ - _ STATE AND LOCAL BUILDING CODES.
,' COASTAL CONCEPTS & CONSULTING, INC. IS DATE.' JULY 29, 2016 PROJECT.' 16 WSC
50 0 25 50 TD° 400 - - - WAIVED OFANY LIABILITYATTHE TIME THE
BUIOWNER SHALL EIS ISSUED. CONTRACTOR AND CONCEPTS & CONSULTING
OWLDINGP PERMIT
IS ISSUTHE ED.
CONTRACTOR
ICE A SCALE: 1" = 50• DRAWING: ELLIOTT MINE
PROFESSIONAL ENGINEER OR ARCHITECT IF INC
( IN FEET) NEEDED. COASTAL CONCEPTS & CONSULTING, DRAWNBY.' JPW BUILDER: WSC
1 inch = 50 ft. IS A DESIGN/CONSULTING MAKES NO WARRANTIES ON THIS COMPANY
OCUMA DENT. VO Box 213 - Hertford - NC - 27944 * (252) 312-7999 * patrick@nccoastalconcepts.com * www.nccoastalconcepts.com
5
i1 7 I � �, sir )r� .,'j Tom_.,-�-.
ilr �, it
_ ._i L2
SEEDING SCHEDULE
NOTES:
GENERAL NOTES: (EROSION CONTROL)
A. ROAD DITCHES AND SHOULDERS TO BE SEEDED WITH THE FOLLOWING PROPOSED SEEDING DATA.
MLYTURE
RATE PLANTING DATE
1. KENTUCKY 31 TALL FESCUE
5LBS11000 SF
MAR 15-MAY Ol
2. RYE GRAIN
40LBSIACRE
SPRING/FALL
3. COMMON BERMUDA GRASS
2LBSII000 SF
MAY014LIW 30
TOP OF BANK
4. FESCUE
5LBS11000 SF
OCT 15-MAR 15
f6" MIN.
5. GERMAN MILLET
IOLBS/ACRES
SUMMER
q ae !y DIRECTION
_o�c .drb'B�^r%,'4„<FLOW
B. AREA TO BE SEEDED SHALL BE FERTILIZED AT A RATE OF 25 LBSII000 SF WITH 10-10-10 ANALYSIS FERTILIZER.
C. LIME TO BE APPLIED AT A RAT OF 1000 LBS/ACRE OR AS SOIL TEST REQUIRE.
D. NO DITCHES OR SWALES TO HAVE SIDE SLOPES GREATER THAN 3: 1.
E. SURFACE AREAS TO BE ROUGHENED PRIOR TO APPLICATION.
F MULCH SHALL BE APPLIED AT 4000 LBS/ACRE AND ROLL DISKED TO HOLD IN PLACE.
G. ALL SURFACE RUNOOF SHALL BE DIRECTED TOWARDS PIT.
"0" ` I
NOTES: �I
1. D.O.T. WASHED STONE SHALL BE USED. ENTRANCE PAD TO BE A MINIMUM OF
50'L. x20'W. x6"D.
2. ENTRANCE PAD SHALL BE PLACED IN APPROPRIATE LOCATION TO PROVIDE
MAXIMUM UTILITY FOR ALL CONSTRUCTION TRAFFIC.
3. A TURNING RADIUS SUFFICIENT TO ACCOMODATE LARGE CONSTRUCTION
TRUCKS SHALL BE PROVIDED.
4. ENTRANCE PAD MUST BE MAINTAINED IN SUCH A MANNER AS TO PREVENT
DIRECT FLOW OR TRACKING OF MUD ONTO ADJACENT STREET. TOPDRESSING
WITH NEW STONE WILL BE NECESSARY. ANY MATERIAL THAT IS TRACKED OR
WASHED ONTO ADJACENT ROAD SHALL BE REMOVED IMMEDIATLY.
TEMPORARY CONSTRUCTION ENTRANCE
SCALE: 1" = 217 HORIZONTAL
SCALE: 1" = 5' VERTICAL
NOTE
1.) STOCKPILE AREA NOT SHOWN ONMINE MAP BECAUSE THE STOCKPILE WILL
MOVE AS THE MINE IS DUG OUT.
2' TOP WIDTH
30' BOTTOM WIDTH
'B' RIP -RAP
NOTES:
1. WHEN SEDIMENT REACHESY2 HEIGHT OF CHECK DAM IT
SHALL BE REMOVED TO ORIGINAL INVERT.
2. CHECK DAM SHALL REMAIN IN PLACE UNTIL SUFFICENT
VEGITATION IS ESTABLISHED TO PREVENT EROSION.
STONE CHECK DAA4
SCALE: NOT TO SCALE
DETENTION POND 2 DETENTION PONJD 1 MINE
SEE
NOTE 4
10' TOP - ELV. = 11.00'
SEE INV. OUT = 8.90'
10' TOP - ELV. = 11.00'
INV. [N = 9.00'
3.1 $LOP E
INV IN = 8.90' NOTE 3
SEE
PROPOSED DOUBLE 18"HDPE NOTE 2
PROPOSED INV OUT = 4.00'
j I SLOAE 3.1 $LOPE
I SLOAE
HECK DAM
pROPOSED DOUBLE 18"HDPE
EXISTING GRADE 5.00'
STING GRADE 5.0 '
— —
1-III-III-III-III-III-III-III-III-i
I I_I_, I-III-1 I I
� —1
i-
11-III-III I I-III-111_! I-
'-I�111�
NOTES
-III -III -III -III -III
-I _III-111-111=
I 11ffiI I� e I I I� �I I I� �I I I� �I I I� �I I I� �I I !I I I�
1.) WATER WILL BE PUMPED FROMMINE INTO DETENTIONPOND 1.
2.) WATER FROM THIS POND WILL OVERFLOW THROUGHPROPOSED
PIPES INTO DETENTION POND 2.
3.) WATER FROMDETENTION POND 2 WILL OVERFLOW THROUGH
PROPOSED OUTFLOW STRUCTURE. DETENTION PONDS DETAIL
NOT TO SCALE
4.) WATER WILL THEN DRAIN INTO EMSTIN , DITCH.
PROPOSED MINE CROSS SECETION
PROPOSED STOCKPILE
NOT TO SCALE
NOT TO SCALE
10, TOP -
FF
3:1 $
SEE
NOTE 1
EXISTING GRADE - ELEVATION = 5.50'
WATER LEVEL @ RECLAMATION - ELEVATION = 1, 00'
PROPOSED BOTTOM OF MINE - ELEVATION =-19.50'
ZI *jL�Aj'' 1�1, d�lr I lr 1, II, IL d�L 11 �Ir IyIIr d�lr d�lr kll, 1 Ir '01, 1� 1� Ilr d lr 1� �Ir d�lr \Ilr 1 Ir 1\11Ir kllr 1Li d�lr 1� llr 1� Ilr ,III, 1L dllr \I Ll 1, Ilr I1li JIIr 1II1 I1, d�lr d�lr \k1l, ,III, \Ilr J\L 1� 1Ir
25' GRASS B UFFER DETAIL
NOT TO SCALE
DATA URATE, BUT
H ACCUTHIS RACY
ISBELIEVED TO BE 7 ROPOSLE71 MINE
E DE AILS
URATE, BUT THE ACCURACY IS NOT (! L 11JGLl 1 Y! L YG
RANTEED. THE CONTRACTOR IS COA
/� jJ% %%� c ICVRjj /'� JJ A Tj.NSION , THE YPES N LOCA 1 WHITE//VII�AJT SA ND (�OMPANL
:NSIONS, CONDITIONS, TYPES AND LOCATIONS I
R TO CONSTRUCTION. THE CONTRACTOR IS
.V RESPONSIBLE FOR ADHERING TO ALL ELLIOTT MINE
TE AND LOCAL BUILDING CODES.
STAL CONCEPTS & CONSULTING, INC. IS DATE: JULY 29, 2016 PROJECT.' 16 WSC
/ED OF ANY LIABILITY AT THE TIME THE
DING PERMIT ISSUED. CONTRACTOR AND
TER SHALLLSESEEK THE ADVICE OF q CONCEPTS & CONSULTING SCALE: 1" = 50' DRAWING.' ELUOTT MINE
FESSIONAL ENGINEER OR ARCHITECT IF INC
DED. COASTAL CONCEPTS & CONSULTING, DRAWNBY.JPW BUILDER: WSC
IS A DESIGN/CONSUL I MU COMPANY ONLY
MAKES NO WARRANTIES ON THIS DOCUMENT. P.O Box 213 - Hertford - NC - 27944 * (252) 312-7999 * patrick@nccoastalconcepts.com * W Ww.nccoastalconcepts.com
5
5
1.
i.
#
.. ..:.
I,.
�4�:.� �tfll
T`._-- _.!J. 11___. i _-_ .._..._L. y.r_..r..1:•!t51.i4iv uz�.a .�d i���:1:__�1, , Ibci',�,
I I I
I I I
I i I
//N/F
PATRICK COOPER I PATRICK COOPER I
PATRICK COOPER
I D.B 430, PG. 420 I D.B 430, PG. 420 I
D.13 430, I G. 420
D.B. 197, PG. 370 I 5-0035-0022C IP.C.2, SLP 2, M 4
I 5-0035-0022D I I
5-0035-00226
X 3.70
- -1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -�- - - - - - - - - - - - - - - - - - - - - - - - - - - - __j two
X 5.40 X 5.00 X 2.90 340 X 2.90 3 XO
X4.10 x3.90 X3.40 X3.30 X X3.20
X 4.50 --� 1 N46°19'37"E
4.60 4.X60 X 4.20 X 4.20 _ X 3.80 X 3.40 x 3.40 N 4200413711E -200__ _ - - _ I - - - - -
X 4.70 x N 48°04'3711 t 1 X 2.90 _ x 2.40 _
7�� 30. X 2.90 67.82( 2. x 3.70
2- X 5.40 X 4.60 ��9U X - - - - - - - 25.00' - - X 3.10 x 3.00 � 3:20---25.00' PERMIT OUN BUF ER
PERMIT BOUNDARYPERMIT BOUNDARY 25 UNEXCAVATE I m 4.00 x 3.90
25' UNEXCAVATED BUFFER X 5.80 X 4.50 251 UNEXCAVATED BUFFER X 4.10 X 4.0bx 3.70 10X Op P. SEE DIET I
X 4.70_
-' X 4.70
3511, X 6.60 X 6.40 EDGE OF EXCAVATION X 4.70 X 4.00 EDGE OF E ATION 4.50 4 Wo ROAD X 5.50 X 5.60 X 4.60 x 4. 0
X6.10 x5.80 X5.90 x5.80 X4.00 x4.80 X4.90 X4.70 0 o I z
X 5.40 X 4.40
0 X 6.40 X 6.50 X 5.60 X 5.00 X 5.10 C) 4X0 I 4.30 X 4.30
X6.10 X5.10 o -0
pFR ?SL X 6.10 X 5.10 x 6.10 x 5.50 X 4.90 x 5.30 x 5.20 x 5.30 o m o Z DOUBLE 40 L.F.
MIT U X 6.40 X 6.30 X 4.40 m m 1s° H.D.P.E.
X 6.80 CUNpq 6.'�'Cq�gT 6.60 X 5.70 x 6.20 x 5.70 x 4.90 X 5.10 x m N Z o .30 4' SEE DETAIL
X 5.60 X 5.60 x 5.10 5.40 N T Z n cn
Y FOB�FF X 6.40 X 4.80 x 5.40 X 4.80 x 5.70 N X 4.80 x 5.20
X 6.60 X 4.80
X5.60 X5.10 X5.40
\ \ X 6.90 x 6' X 5.50 x 4.00 x 5.80 x X 5.80 x 5.20 5X00
\ X 5.50 X 5•00 X 6.20 CHECKDAMS
\ \ \ \ X 6.70 6.60 x 6.50 X 5.40 X 5.10 X 4.80 x 5.50 X 4 c, X SEE DETAIL x 5.9
X 5.20 x 5.20 x 5.40 X 5.10 x 51 5. 3 5.30
\ \ \ X 6.4 CFF'rCq� X 5.90 X 5.10 x 5.10 X 6.10 x 6.30 x 5.70 10 TOP P. SEE DETAIL N
oo
X 5.10 X 5.40 PRO�ED MINE EXCAVATION X 5.00 x 5.00 5.30
X 6.00
X5.40 x4.90 x5.10 X5.50 x4.90 z m
5.50 X 5.20 470,445 S.F. X 6.10 X 6.20 m
\ X 5.50 10.80 ACRES X 5.30 " I X 6.40 =
~ \\\ \ X5.30 X5.10 x5.20 x5.30 X4.90 X4.60 x4.804 -I
\ X 5.30 X 5.70 x 5.60 v M
\ \ \ X5.6Rtijj x5.20 X5.40 X5.50 ml =
X5.10 X5.10 x5.40 x5.70 X4.60 X4.60 W x15.40 C
~ \ \ \ \ qRY 5.00 x 4.50 X 5.60 x 5.40 X 5.50 x 5.00 x 4.80 T I o
\ T7
X 5.00 x 5.20 x 5.30 x 5.90 X 4.70 �' o "' �
X4.10 X5.20 X5.00 rn ao
\ \ \\ X5.10 x5.30 X5.60 X5.30 X5.30 L (n � (nz
X 5.10 X 5.40 x 5.90 c 5.40 C) -° D T
x 5.10 X 5.20 X 4.70 x 4.80 w 00 G) Z
pC?S/SS/GN X5.00 x5.50 x5.90 x5.40 x5.40 x5.30 m DF. - 0
N/F ~ ` \\ \\ \1g4MNFFq X4.80?s X5.10 X5.10 X4.60 m X4. 0 v O
X 4.80
Tildon &Pattie Whitehurst ~ \ \ \ \ gpNoSFMFNr �NF.�Cgv X 5.10 x 5.50 X 6.00 x 5.55 x 5.50 0
D.B. 449, PG. 711 ` ~ ~ \ \ \ \ \ _ 6 X 4TF� 10 X 4.40 X 4 X 5.60 -p
5-0035-0023 ` ~ \ \ \ \ \ BUFFER X 5.20 x 5.80 x 5.80 x 5.40 x 5.20 x 4.80 D I Z
X5.20 x5.10 X5.30 x4.60 x4.60 z X Im "<
\ \ X 4.80
40 x 5.90 x 5.50 �
_ \ X 5.20 x FD
~ \ \ \ \ \ �FCFF�"C X 5.20 X 4.80 X 4.60 x 4.60 x 4.7 15.40
\ \ \ X 5.20 x 5.60 '9VgC5.70 I c
\ \ \ N \ EDGE OF EXCAVATION x 4.80 X
X 4.50
\ \ \ \ X 40 X 4.90 �o
25' UNEXCAVATED BUFFER �X 5.40
\ \ \ Y 2. 0p 10
\ \ \ \ \ X 5.50 x RMIT BO 77 93.40,
\ \ ~ X �5�P55, 0
~ \ 8° W
\ X5.30 x5.00-, x5.10 x5.00 _ 0
------ ---- d
74
X 4.80
1165-00
- -
S420200'8"W
1
\ \\94MpF'� F `
97.00N/F ~ ~ \ \ \ NO 6 MFNT ~
S3a°1 VANCE MEADS & SONS \ \\ \\
D.B. 133, PG. 787 \ \ \ \
- - " M.B. 3, PG. 213
5-0035-0024 THE DATA GIVEN ON THIS PLAN IS BELIEVED TO BE npOPOSED MINE
CONSTRUCTION
ONSTDI CTIOA7
ACCURATE, BUT THE ACCURACY IS NOT `/ L l Y l� / ! L V 1. ! ! L Y
GUARANTEED. THE CONTRACTOR IS FOR
RESPONSIBLE FOR THE VERIFICATION OF ALL WHI TEHURST SAND COMPANY
GRAPHIC SCALE DIMENSIONS, CONDITIONS. TYPES AND LOCATIONS
PRIOR TO CONSTRUCTION. THE CONTRACTOR IS %
FULLY RESPONSIBLE FOR ADHERING TO ALL JAL ELLIOTTMINE L�
STATE AND LOCAL BUILDING CODES. COA ,
COASTAL CONCEPTS & CONSULTING, INC. IS DATE: JULY 29, 2016 PROJECT.' 16 WSC
50 0 25 50 700 - - - - WAIVED OF ANY LIABILITY AT THE TIME THEBUIT h'r
OWNER SHALL EIS ISSUED. CONTRACTOR AND CONCEPTS & CONSULTING OWLDINGP PERMIT
IS ISSUTHE ED.
CONTICE A l.1/iV 1. (' J CX 1. IY.J SCALE: 1' = 50 DRAWING: ELLIOTT MINE
IN FEET PROFESSIONAL ENGINEER OR ARCHITECT IF INC.
' INC. NEEDED.
S A COASTAL
C014CEPTNSULTING COMPANY ONLY DRAWNBY JPW BUILDER: WSC
5
1 inch = 50 ft AND MAKES NO WARRANTIES ON THIS DOCUMENT. P.O BOX 213 - Hertford - NC - 27944 * (252) 312-7999 * patrick@nccoastalconcepts.com * www.nccoastalconcepts.com
� r 1
'l -1.. e.. 1. i1.
N/F
W.W. & CAROLYN H. CARTWRIGHT
D.B. 135, PAGE 642
5-0035-0021
GRAPHIC SCALE
100
( IN FEET )
1 inch = 50 fL
.p
a
R
0
0
0
n
1
N
U)
r-
rn
R
m
G)
D
O
z
X
O
0
1
Cn
N
N
F.
0
IV
4
F
00
N
-P
N
CD
N/F
TILDON WHITEHURST JR
D.B 311, PG. 522
\ C \ �S 5-0035-0022E
\ ? 84. SRO 41*
/�,gSFA ` PATRICK COOPER
\ \ \ \ ' {�O C '✓/�5 D.B 430, PG. 420
N/F \ V Ni-iI
PATRICK COOPER 4 \ \ P.C. 2, 5- 42, M.4
r D.B 430, PG. 420 \ \ V 5-0035-0022B
' P.C. 2, SL. 42. M. 4
5-0035-0022B 750.00' -�- -
_ - T - - _ - _ - - _ - -'� \ \ - �- 25.00' ' - - - 25.00'
N 44057'37" F
\ PERMIT BOUNDARY
_ - - - - _ PERMIT BOUNDARY
\ \ PERMIT BOUNDARY \
N� \ \ \
84. 4
` 94
F \ \
No s MFNT\ \
A,
' O
r O
pp F
O 4��
� I
N/F
Tildon & Pattie Whitehurst
D.B. 449, PG. 711
5-0035-0023
N/F
VANCE MEADS & SONS
D.B. 133, PG. 787
M.B. 3, PG. 213
5-0035-0024
EXISTING HOUSE
S42°10108"W
THE DATA GIVEN ON THIS PLAN IS BELIEVED TO BE
ACCURATE, BUT THE ACCURACY IS NOT
GUARANTEED. THE CONTRACTOR IS
RESPONSIBLE FOR THE VERIFICATION OF ALL
DIMENSIONS, CONDITIONS, TYPES AND LOCATIONS
PRIOR TO CONSTRUCTION. THE CONTRACTOR IS
FULLY RESPONSIBLE FOR ADHERING TO ALL
STATE AND LOCAL BUILDING CODES.
COASTAL CONCEPTS & CONSULTING, INC. IS
WAIVED OF ANY LIABILITY AT THE TIME THE
BUILDING PERMIT IS ISSUED. CONTRACTOR AND
OWNER SHALL SEEK THE ADVICE OF A
PROFESSIONAL ENGINEER OR ARCHITECT IF
NEEDED. COASTAL CONCEPTS & CONSULTING,
NC. IS A DESIGWCONSULTING COMPANY ONLY
AND MAKES NO WARRANTIES ON THIS DOCUMENT.
EXISTING SHED
1146.001
PROPOSED RECLAMA TIONPLAN
FOR
COJ WHITEHMSTSAND COMPANY
L ELLIOTT MINE
3
DATE: JULY 29, 2016 PROJECT. 16 WSC
CONCEPTS & CONSULTING IscALL 1" = 50' DRAWING.' ELLIOTT MINE
INC. DRAWNBP: JPW BUILDER- I WSC
.O Box 213 - Hertford - NC - 27944 * (252) 312-7999 * patrick@nccoastalconcepts.com * www.necoastalconcepts.com
6 01
' Ir '7 It T-
I1.
I
. d,r �. ,. rrt�J 11, f, t.'.... �... .. I: .. .•.,I .. 11.1, r. ,lLu,.;.
:.iL I,'(IL_'1! 1 L�IL_ 1� _-- �.1 __ _. ,� .t — .. _. ._ d.�''' __ ..-. ��.._�t..
N 48004'37" E
25.00'
25' UNEXCAVATED BUFFER
PF
OgRy F,�-�gvgTFo.
\ BUFFFA
I
I
I
N/F I
PATRICK COOPER
D.B 430, PG. 420 I
D.B. 197, PG. 370 I
5-0035-0022D
I
I
IlrMRMlT M^l IR IM A MI
1'l l l ■ olvivi1` I UiGI
1475.00'
25' UNEXCAVATED BUFFER
25.00'
N/F
PATRICK COOPER
D.B 430, PG. 420
5-0035-0022C
PERMIT BI
I
I
I
I
I
I
I
I
N 42°04'3�_ 200,001 =-
25.00 PERMIT BOUNDARY
RY
25' UNE)(CAVATED BUFFER
N/F
PATRICK COOPER
D.B 430, PG. 420
P.C. 2, SL. 42, M. 4
5-0035-0022B
N46019'37"E
67.82'
--------1
cn
I �
0
-
__��
.ems•___ -: �_ __,_e .. ._ _..n-�_.« ____�. -__ _...�._ _'__.m_._ �.- ._ m_m__.,..,.,�-.�: _:. _..'`-"_ -'
I
,...'3-
\
M - _
-
\
m
� __.a cv,_.ac.m� v^'- max,.. '.a L: 'x'ric•. = _ _ .. _ _ ::':: � F }_..x—_mx.:-.- sc ..=sai..r. v.�.::. « __: __^` _ _ .._._ _. ..__. .._'..-r„x .. i __ =„r' _._..u_.x��.. _.__..� _ _ _ .«.c-m?._=^_-s_-^�" -. _-wi:.�-®.:-c.._•z..m m�-a_-�.a�."
�/ ..._._ - _ v� s• : .... __._ _ _. 'C. ,^__... .___.._.. _.3 .._«...__..__a...... .. .... _ __-.t-,. .. "_c..v.. _ _ _�..._e.- . ___.:m.:r::ec..e_.__.. arssec8.-...__...___._
\ ' • _... __. -_ ®.,u ,_.s,..:- ".ti v. _...._-Tv`.m-- _ .. .....___._...as _x£v-.ee.:sv--'_hce:.m--r._ - __ «..--,. ..,___.. _:: -3 'r'm-'P^:
Ss m
®--.,..._.._.. « :tea mar s'_ :�,®.::;_ '�--_-nmm:-....:.''.____' `______«���._`�-.-.=.-m�:=:s _ _ _ _ _�;.a:-=_., m®�_..:.._.,-•
,_...,._.�•.:� . _ _$vim .. -: ... ... � _ .__.._.__.. � ..:.: � _" _'._ __..__ .� .,_..._-�..._ ._._.. _..___.__.�___"'__'.__"" . _ - - _�"" -
--'� _ " _ _ __ _ ...::. .d' - _: .. ' _�- ._::�,r.-o•_...a �:,::.r.:_. -__ _ __.-.x.'_�:_—ate?«. _..___s_ ...._. __.. �._:.._____.__-_`"_.:,-.�._._ - TI
a- z_
m- =Er
..
\ __x^._._- t __.,..._�....s_.-i"__... ....._m._,c.^_....mvs ..._.-__...._._ ...m.._.__.mm_..__-v__.__r ..__..c._ �__«,. •..>• .vv_xs_..... ^;:: -:tx s^`- .. _. n:vx:w••..«».. .. �' `::`___m_ �-^�'�'-=.K. s`-''..Yv:�?_
\ _ _ �.,�. _ _-w.m.:.•�.._... « ._.:,v. _.....__v __ _ a__._.._ _ « ._«v...._ ... _.._ _ .m_. ....c.. � c..n_____®_�+a. __..._._ _ �c:w_ __ .:-_....._.._...v. --3r �s _.'_ "_-w=.'-- �::. -?i _ _ - - _ _
_-
m .« _ _ . �_...�._� ._ :.._ _x�:---- m-.. __:.._.. ter._..__-__�'..._.___. _ .._ __ ' S.'-�'-e:� ".:-:ms;�✓:-- _ _ �;;'' _ CJ7
_ __ m ®vim _ ._
_.._,� _. ___ _-______.__ .._...- _____._ _ ..._.. _ _ �- _._a-_...�_�, :-s_._..__ .....__ _:gym-.: __ w<- _ v .
_,-.... _; ._ __. �:.:�-:.�_.__.ins �- _>_,� ��_ � � :
� __ _-__ ._....�:®x,:�� --_ �____-_.�.��_ ........_«_.-=-gym; ••��,®
.,.�mm
/1 � r_
Stin'�-
;;
fN
\ 4_..._. Tildon &Pattie Whitehurst NO iV �. —_ '_�,,•___'x__..w:e��= �°:m5e-.cr:__._ - _�...m�-_=,-_.;.—.��xv a:v--�?-v��m�.."a.=u :�:.- �. _z::me._ _. ...
-
I
D.B. 449, PG. 711 \ \ �-�-
5-0035-0023MEN
` � \ \ \ \ � --� � �=__•_ .��. = � '-v-- . --E.�,-,.ems � '�- � � ��.. ,, �� �.. �., r : �: - m.si` �' �-�
CD
x
TB
r
\ I
\ \ \ \ \ ~v25' UNEXCAVATED BUFFER
\ \ \ \ PER BOUNDARY 25.00'
\ \ \ 93 40 I
°5 \ \ \ S 58 5�0JQu
vv
\\ \ \\ 12S.A ` e
1165-00
°2o'oe°w -- 't � ~ v \ \ \ \ p � 2, M/S o
S42 \\ \ S4 �/ N4N
94 /
�\
M F
97 00� N/F \ \ �9pNOq 6 MFNT
S3a°1 VANCE MEADS & SONS
D.B. 133, PG. 787
M.B. 3, PG. 213 � � \
THE DATA GIVEN ON THIS PLAN IS BELIEVED TO BE WO f7OSLD D D+j LA n ,TA TIO ATPLA � T
5-0035-0024 GUARANTEED. TTHE ACCURACY HECONRACTOSNOT rlGl/lllJ /LGI IY! IY rV
GUARANTEED. THE CONTRACTOR IS FOR
RESPONSIBLE FOR THE
IONS. TFICATI N LOCATIONS
T r THT �-rEMRSTSA D COMPA Y
GRAPHIC SCALE DIMENSIONS, CONDITIONS, TYPES ANRACTO IONS TAL�� 1` U Jr 1`l 1
PRIOR TO CONSTRUCTION. THE CONTRACTOR IS
FULLY RESPONSIBLE FOR ADHERING TO ALL ]� j j jO m�j'+r rT
r STATE AND LOCAL BUILDING CODES. COA GLL 1 [ I YC
i
COASTAL CONCEPTS & CONSULTING, INC. IS DATE: JULY 29, 2016 PROJECT: 16 WSC
50 0 25 50 100 WAIVED OF ANY LIABILITY AT THE TIME THE
BUIOWNER SHALL EIS ISSUED. CONTRACTOR AND CONCEPTS & CONSULTING
OWLDINGP PERMIT
IS THE ISSUED.
CONTRACTOR
CE A SCALE: 1" = 50' DRAWING.' ELLIOTT MINE
(
IN FEET PROFESSIONAL ENGINEER OR ARCHITECT IF INC ) NEEDED. COASTAL CONCEPTS& CONSULTING, DRAWNBY.' JPW BUILDER: WSC
INC. IS A DESIGWCONSULTING COMPANY ONLY
1 inch = 50 ft. AND MAKES NO WARRANTIES ON THIS DOCUMENT. IRO Box 213 - Hertford - NC - 27944 • (252) 312-7999 " patrick@nccoastalconcepts.com • W Ww.nccoastalconcepts.com
G
m
v70
OJ
V -
O
O -
QD
W (n
r
(D
V J Z
o
O O
N D
.
Z
w
rn
I
O
D
FA
17 1 F
`e id: �h III{11+I, i•il, rk (� '' 1° Li,
SEEDING SCHEDULE
NOTES:
GENERAL NOTES. (EROSION CONTROL)
A. ROAD DITCHES AND SHOULDERS TO BE SEEDED WITH THE FOLLOWING PROPOSED SEEDING DATA.
MLYTURE RATE PLANTING DATE
1. KENTUCKY 31 TALL FESCUE 5LBSII000 SF MAR 15-MAY 01
2. RYE GRAIN 40LBSIACRE SPRING/FALL
3. COMMON BERMUDA GRASS 2LBS11000 SF MAY 01-JUN 30
4. FESCUE 5LBS11000 SF OCT 15-MAR 15
5. GERMANMILLET IOLBS/ACRES SUMMER
B. AREA TO BE SEEDED SHALL BE FERTILIZED AT A RATE OF 25 LBSIIOOO SF WITH 10-10-10 ANALYSIS FERTILIZER.
C. LIME TO BE APPLIED AT A RAT OF 1000 LBS/ACRE OR AS SOIL TEST REQUIRE.
D. NO DITCHES OR SWALES TO HAVE SIDE SLOPES GREATER TITAN 3:1.
E. SURFACE AREAS TO BE ROUGHENED PRIOR TO APPLICATION.
F MULCH SHALL BE APPLIED AT 4000 LBS/ACRE AND ROLL DISKED TO HOLD IN PLACE.
G. ALL SURFACE R UNOOF SHALL BE DIRECTED TOWARDS PIT.
2p MIN
NOTES:
1. D.O.T. WASHED STONE SHALL BE USED. ENTRANCE PAD TO BE A MINIMUM OF
50'L. x 20'W. x6"D.
2. ENTRANCE PAD SHALL BE PLACED IN APPROPRIATE LOCATION TO PROVIDE
MAXIMUM UTILITY FOR ALL CONSTRUCTION TRAFFIC.
3. A TURNING RADIUS SUFFICIENT TO ACCOMODATE LARGE CONSTRUCTION
TRUCKS SHALL BE PROVIDED.
4. ENTRANCE PAD MUST BE MAINTAINED IN SUCH A MANNER AS TO PREVENT
DIRECT FLOW OR TRACKING OF MUD ONTO ADJACENT STREET. TOPDRESSING
WITH NEW STONE WILL BE NECESSARY. ANY MATERIAL THAT IS TRACKED OR
WASHED ONTO ADJACENT ROAD SHALL BE REMOVED IMMEDIATLY.
TEMPORARY CONSTRUCTION ENTRANCE
SCALE: 1"= 20 HORIZONTAL
SCALE: 1" = V VERTICAL
NOTE
1.) STOCKPILE AREA NOT SHOWN ON MINE MAP BECAUSE THE STOCKPILE WILL
MOVE AS THE MINE IS DUG OUT.
2'TOP WIDTH
30' BOTTOM WIDTH
SEE
NOTE 4
PROPOSED INV. OUT = 4.00'
:HECKDAM� F_
10,
-I�IIiI"Illil�lllll�llll
NOTES
TOP OF BANK
. r 6" MIN.
< FLOW DIRECTION
"B" RIP -RAP
NOTES:
1. WHEN SEDIMENT REACHESY HEIGHT OF CHECK DAM IT
SHALL BE REMOVED TO ORIGINAL INVERT.
2. CHECK DAM SHALL REMAIN IN PLACE UNTIL SUFFICIENT
VEGITATION IS ESTABLISHED TO PREVENT EROSION.
STONE CHECK DAM
SCALE: NOT TO SCALE
DETENTION POND 2
DETENTION POND I
- ELV. = 11.00' SEE INV. OUT = 8.90' 10' TOP - ELV. = 11.00' INV. IN = 9.00' SEE
INV. IN = 8.90' NOTE 3 PROPOSED DOUBLE 18"HDPE NOTE 2
18"HDPE 3ISLOpE EXISTING GRADE 5. 31SLOPE 3ISLOpE
_ STING GRADE 5.0
IIIIIIIIIIIIIIfIIIIIIII�IIIIIIIIIIIIIIIIIiIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
1.) WATER WILL BE PUMPED FROM MINE INTO DETENTION POND 1.
2.) WATER FROM THIS POND WILL OVERFLOW THROUGH PROPOSED
PIPES INTO DETENTION POND 2.
3.) WATER FROMDETENTIONPOND 2 WILL OVERFLOW THROUGH DETENTION PONDS DETAIL
PROPOSED OUTFLOWSTRUCTURE.
4.) WATER WILL THEN DRAIN INTO EMSTINL DITCH.
PROPOSED MINE CR OSS TION
PROPOSED STOCKPILE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
I all, 1 L all, A�I, dill LI
- ,III, 1, Ill all, 1, II, all, ill;
25' GRASS B UFFER DETAIL
NOT TO SCALE
3;1
10,
MINE
SEE
NOTE I
EXISTING GRADE - ELEVATION = 5.50'
WATER LEVEL @ RECLAMATION - ELEVATION = 1.00'
PROPOSED BOTTOM OF MINE - ELEVATION =-19.50'
L \III, 1iL 1� 1111, 1 I 1111,
1L 11I1, IL 1L Li
THE DATA GIVEN ON THIS PLAN IS BELIEVED TO BE
ACCURATE, BUT THE ACCURACY IS NOT
PROPOSED
PROPOSED MINEDETAILS
GUARANTEED. THE CONTRACTOR IS
RESPONSIBLE FORT IONS. TFICATI N LOCATIONS
DIMENSIONS, CONDITIONS, TYPES AND LOCATIONS
' r HITEHURSTSANDCOMPANYmR
Wxl ULFII
PRIOR TO CONSTRUCTION. THE CONTRACTOR IS
CUA JAL
FULLY RESPONSIBLE FOR ADHERING TO ALL
� LL TOTT 7 ,/r 7L
STATE AND LOCAL BUILDING CODES.
�+L r 1 [ 1 i/rrl VL+
E
COASTAL CONCEPTS & CONSULTING, INC. IS
WAIVED OF ANY LIABILITY AT THE TIME THE
DATE: DULY 29, 2016
PROJECT.' 16 WSC
OWNER SHALLBUILDING EIS ISSUED. CONTRACTOR AND
OWNER SHALL SEEK THE ADVICE OF
J t% .J iY
CONCEPTS 4 CONSULTING
SCALE 1" 50'
DRAWING: ELLIOTT MINE
PROFESSIONAL ENGINEER OR ARCHITECT IF
INC
NEEDED. COASTAL CONCEPTS &CONSULTING, Ill
DRAWNBY' JPW
BUILDER: WSC
INC. IS A DESIGW ONSULARRAN 1ES COMPANY ONLY
AND MAKES NO WARRANTIES ON THIS DOCUMENT.
p O Box 213 - Hertford - NC - 27944 * (252) 312-7999 * patrick@nccoastalconcepts.com * W W W.n000astalconcepts.com
5
0