Loading...
HomeMy WebLinkAboutNCG020893_COMPLETE FILE - HISTORICAL_20161207STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v Cc DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ ab) ) a l7 YYYYMMDD Permit Number NCG020893 Program Category NPDES SW Permit Type Mining Activities Stormwater Discharge CDC Primary Reviewer rick.riddle Coastal SWRule Permitted Flow Facility RECEIVED Central Files: APS _ SWP 12/5/2016 Permit Tracking Slip Status Project Type In review New Project Version Permit Classification CDC Permit Contact Affiliation Facility Name DEC 07 2016 Major/Minor Region Tick Bite Pit Minor Washington Location Address CENTRAL FILESDWR SECTION Count' Tick Bite Rd Lenoir Grifton NC 28530 Owner Facility Contact Affiliation Jonathan Proctor Manager Project PO Box 1529 Tarboro NC 278861521 Owner Name Owner Type Barnhill Contracting Company Non -Government Owner Affiliation David Glover PO Box 7948 Dates/Events Rocky Mount INC 27804 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 9/3012015 Regulated Activities Requested /Received Events Mine dewatering RO staff report received 11/30/16 RO staff report requested 10/8/15 Outfall 1 Waterbody Name Streamindex Number Current Class Subbasin NEUSE RIVER 27-(75.7) C;NSW 03-04-05 �i Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Allen Barnhill Barnhill Contracting Company 800 Tiffany Boulevard, Suite 200 Rocky Mount, NC 27804 Dear Mr. Barnhill: PAT MCCRORY Gnvenmr DONALD R. VAN DER VAART Secrrmry December 4, 2016 TRACY DAVIS 1).... or Subject: General Permit No. NCG020000 Barnhill Contracting Company Tick Bite Mine COC NCG020893 Lenoir County In accordance with your application for a discharge permit received on September 30 2015, we are forwarding herewith the subject certificate of coverage to discharge under the subject state— NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143- 215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of' Energy, Mineral, and Land Resources. The Division may require modification or revocation and reissuance of the certificate of coverage. Please note that mine dewatering wastewater includes wet pit overflows caused solely by direct rainfall and groundwater seepage for this type of mining operation. Any discharge of this water (and any stormwater commingled with it) is subject to the effluent limitations in this permit. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mining, and Land Resources, or permits required by the Division of Water Resources, Coastal Area Management Act, or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Richard Riddle at telephone number (919) 807-6375. Sincerely, for Tracy E. Davis, P.E., CPM cc: Washington Regional Office Central Files Stormwater Permitting Program Files State of North Carolina I Environmental Qualm, I Energy, Mineral and Land Resnurcas 1612 Mail Survieu Center 1512 North Salisbury Sheet I Rnlcigh, NC 27699-1612 919 707 9200 '1' STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020893 STORMWATER AND MINE DEWATERING DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Barnhill Contracting Company is hereby authorized to discharge stormwater and mine dewatering from a facility located at Tick Bite Pit Tick Bite Road Grifton Lenoir County to receiving waters designated as Neuse River, a class C, NSW water in the Neuse River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, ❑, 111, and IV of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective December 5, 2016. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 5, 2016. .16r Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission NCG020893 0 Map Scale 1:24,000 Barnhill Contracting Company Tick Bite Pit Latitude: 350 21' 17" N Longitude: -770 26' 32" W County: Lenoir Receiving Stream: Neuse River Stream Class: C, NSW Index Number: 27-(75.7) (Neuse River Basin) Facility Location Division of Energy, Mineral and Land Resources / Land Quality Section - Stormwater Permitting Program 1NCDENM National Pollutant Discharge Elimination System Csvi�-r, GRo • O[m vv[xr •r,sRc.pa*R[scuc[s NCG020000 NOTICE OF INTENT C �J /� National Pollutant Discharge Elimination System application for coverage under Genera it �' " �D NCG020000: €P 0 2015 STORMWATER DISCHARGES associated with activities classified as: ftR�Ra°f A(V0 G1�LfYy SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specifJietl'Wd0,)W)jrj0p The following activities are also included: Active or inactive mining operations (including borrow pits —except for NCDOT borrow pits) that discharge stormwater contaminated with or that has come in contact with, any overburden, raw material, intermediate products, finished products, byproducts or waste products located on the site of such operations; Stormwater from vehicle maintenance activities at mining operations; Overflow from facilities that recycle process wastewater; and/or Mine dewatering (wastewater) The following activities are specifically excluded from coverage under this General Permit: Stormwater discharges associated with peat mining, coal mining, and metal mining; Stormwater discharges from mining operations which are intermixed on site with stormwater from asphalt operations and/or concrete operations; Stormwater discharges associated with oil and gas extraction operations; and Stormwater discharges associated with tourist gem mines NCDOT borrow pits are covered under NCS000150 The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000: Point source discharges of stormwater and wastewater from in -stream sand mining operations (i.e., sand dredging or dipping operations). Please contact the NPDES Wastewater Point -Source Group for more information on coverage under this permit. Please Print or tvPe all entries in this application form 1) Mailing address of ownerloperator (official address to which all permit correspondence will be mailed): Legal Owner Name I"o.+T,'La C-C a. Ce (Attach the most recent Annual Report to the NC Secretary of State showing the current legal name of the corporation or entity. Alternatively this permit can be given to an individual or government authority. This name must be the same name as appears on the Division of Land Resources' Mining Permit.) Signee's Name (as signed for in permit signature at bottom) ALA-C- AG`,atLV Street Address " Wt e LOO City MeuNc State plc. ZIP Code Telephone No. ZS't RLl- Email Alternate Contact Name Jo jPkr sA -> Email (if different) _ Alternate Contact Telephone (if different) MG020000 N.O.I. 2) Location of facility producing discharge: Facility Name hC.1; DtTZ Pi'S Facility Street Address Teti .Z' UAn Facility City �yLyfy.N State Nr- ZIP Code Z85 3p Facility County ei/L 57 Facility Contact JD.J -T1. , h0cyoc- Telephone No. 2Y+ $73- t021 ` Fax: 251 "-I l5iz Contact E-mail (.on, vl j 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street namesFstate road numbers, and distance and direction from a roadway intersection). T-Vt u,3 11.5 out ufC (,r, �. k..- 1n;F� s� 151'� MA U. _[V, ytki- GF � CA of Sew W`il yu Q,�, jj. P 4 0.1 A"'L .F 4) Latitude 3S� 21 &.15 Longitude *11 O2(o' 32.3I (degrees, minutes, seconds) q o,3 77. qy 03 d7 Permits: 5) This NPDES Permit Application applies to which of the following: ❑l New or Proposed Facility Date operation is to begin: I Existing Date began mining: Jung. 1DO9 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: ) H Li 2 7) Provide a narrative description of the types of minerals mined at this facility: SArjlr\ 8) Is this mine an inactive mine site? K No ❑ Yes If yes, do you posses an "Inactive Renewal' from DEMLR and notified the Regional Office Stormwater Permitting Program (SPP) or have you certified to the SPP that the site has been stabilized? ❑ No ❑ Yes Ia7. 9) Does this facility already have a valid Mining Permit from the Division of Energy, Mineral and Land Resources (DEMLR) [formerly DLR]? ❑ No E/Yes If No, please indicate the status of the Mining Permit application: If yes, please provide the Mining Permit number: SA - 55 copy of your DEMLR Mining Permit with this application. Please also provide a 10) Does this facility have any other NPDES permits? 2(No 0 Yes If yes, list the permit numbers for all current NPDES permits for this facility: NCG020000 N.O.I. 11) Are you applying for a mining permit in the same location as a previously permitted mine? ❑ No NoY L2f es If yes, specify permit number and name if known: 5q 12) Does this facility have any Non -Discharge permits (ex: recycle permits)? Id" No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 13) Does total area of this mine site include ready -mix and asphalt areas? O No ❑ Yes If yes, do they have NPDES stormwater permits (if owned by the same company)? ❑ No ❑ Yes (provide permit number ) If not owned by the same company, who is the owner? 14) Will this mining operation precede development activities at this site? ❑ Yes 15) Is this mine located within one of the 20 Coastal Counties and will it add more than 10,000 ft2 of impervious surface? ®'No ❑ Yes If yes, you may be required to apply for an additional state stormwater permit. Check with your local Regional Office. See contact information and checklist.below. 16) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basins, or the Randleman or Jordan Water supply Watersheds? El Id'Yes If yes, what size stream buffers are included on site? 60. ft. Please show buffers in site plans. If yes, please include information and plans showing diffuse flow through buffers as required. Discharge Points, Receiving Waters & Wetlands: 17) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? S&IA910lZiVn_- If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Receiving water classification (if known): Note: Discharge of industrial wastewater to receiving waters classified as WS-11 to WS-V, or SA, must be approved by the Div. of Water Resources, or Div. of Marine Fisheries. If DWR or DMF does not approve, coverage under NCG020000 cannot be granted. No new discharges of wastewater are permitted in receiving waters classified as WS-1 or freshwater ORW. Wastewater discharges to Saltwater ORW will not be approved under the NCG02 General Permit. 18) If your facility has wastewater discharges and they are to HWQ and/or PNA waters (Primary Nursery Areas) waters, what is the proposed flow rate? /A (See http1/www ncdmf.net/maps/FNA maps/index.html, for map) Page 3 of 8 SWU-NCG02-NOI Last revised 6/24/14 NCG020000 N.O.I. 19) Discharge Points: Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Onsite: Stormwater: Mine dewatering: i Process Wastewater Overflow: Offsite: Stormwater: Mine dewatering: Process Wastewater Overflow: Discharge points should be clearly marked on the submitted site plan. Please provide short narrative description of discharges: a) Is your mine dewatering and discharging? (Answer only if you are dewatering) ❑ No 2-Yes If yes, where to? _ Surface Waters and/or Wetlands (on -site or off -site) 1Cther (on -site or off -site) Describe: Ern S�rnrn Afrno 'I,n1� b) Are you dewatering but not discharging? (Answeronly if you are dewatering) P_90 ❑ Yes If Yes, please explain how you are dewatering, and where that water will be directed: 20) Will mining operations require dewatering near wetlands or impact any stream, groundwater, or wetlands? ❑ Yes Note: Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (O&M) Plan that has been approved by the Division. For sites that may drain wetlands - approval of a Pumping O&M plan may be required prior to coverage under this general permit. The Pumping 0&M Plan should be submitted to the appropriate Regional Office and must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at end of document. Contact your local Regional Office for questions specific to your mine. 21) If you are dewatering, are there wetlands or surface waters within 400' of the mine pit perimeter? ❑ Now 2'Yes If yes, what distance are they from the mine pit perimeter? .50 feet. 22) Have you been required to obtain a 404/401 Certification permits? Elko ❑ Yes /f yes, please briefly describe below (include information such a required mitigation, BMPs, setbacks, and/or 0&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as necessary: Page 4 of 8 SWU-NCG02-NOI Last revised 6/24114 NCG020000 N.O.I. 23) Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers? VveNo ❑ Yes If yes, please attach to application submission. Stormwater BMPs: 24) Does this facility ploy any best management practices for stormwater control? ❑ No Yes If yes, please briefly describe: !NV&r(i,in dAtke S "A� 25) Does this facility have a Stormwater Pollution Prevention Plan? No ❑ Yes If yes, when was it implemented? 26) Will icle maintenance activities occur at this facility? No ❑ Yes Wastewater Treatment Facilities: 27) Will mine dewatering discharges occur? ❑ No Yes 28) Will discharges of overflows from process wastewater treatment systems occur? rNo ❑ Yes If yes, a. Does this facility employ chemical additives to flocculate suspended solids? ❑ No ❑ Yes If yes, please state the name, manufacturer and the quantity of average daily usage of the chemical additive Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North Carolina: b. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No ❑ Yes 29) Are was water treatment facilities (including recycle systems) planned in the 100-year flood plain? No ❑ Yes 30) Is your acility washing mined materials? No ❑ Yes If Yes, are you discharging this water? Page 5 of 8 SWU-NCG02-NOI Last revised 6/24/14 NCG020000 N.O.I. Other: 31) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? L1 No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? a<0 ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: _ Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: _ Vendor address: 32) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? See permit textforsecondary containment requirements. B No Tkere- wi be A0 `I'VkdS S�dre_d 6r1- SrJ�e ❑ Yes 33) Does your site have an active landfill within the mining permit boundary? ❑ No ❑ Yes If yes, specify type: ❑ LCID ❑ Other: Final Checklist: This application will be returned as incomplete unless all of the following items have been included and initialed for. Please show that the following required information has been included by initialing in each space below. A, Fee of $100 made payable to NCDENR. A Completed application and all supporting documents. A Copy of the valid approved mining permit (MP) for the facility or indication of MP application status. A(3 Copy of a county map or other general location map that shows the mining site and nearest major roads. A B Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. A3 2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with all outfalls, applicable buffers and wetlands clearly delineated, and 100-year flood plain line if applicable. /fig A copy of your DEMLR mining permit. NTA A copy of your US Army Corps -approved wetland delineation if you marked "yes' to question 23 above. Apt, A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any ���� sources of water and any collection and treatment measures. NIA If mine site is in one of the 20 Coastal Counties: • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Regional Office Contact: Page 6 of 8 SWU-NCG02-NOI Last revised 6/24/14 NCG020000 N.O.I. Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage area$ and total drainage area: If the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a Pumping O&M Plan (see below for contact information). You may be required to provide an approved Pumping O&M plan prior to NCG02 issuance. _2 copies of detailed Full Size Plans (at least 24" x 36") delineating areas on the plans and listing acrea a (including: wetlands, ditches, well -placements, pits, borrow areas, overburden storage, stormwater controls/BMPs, vehicle maintenance areas, settling basins, product process (such as screening, stockpiles, waste piles), total drainage area, impervious surface percentages (if state sw programs apply), applicable buffers, and access and/or haul roads). _Pump dewatering size and information on its specifications. _Well information (design, depths, maintenance). _Physical monitoring for the wetlands areas. _Settling pond sizing information, if applicable. _Level spreader design, if applicable. _Details about dewatering method. _Cone of influence calculations. _Description of measures to prevent erosion' and flooding. _Description & information about 401/404 permits that have been obtained. _Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if applicable). _I have contacted my local regional office about a Pumping O&M Plan. Regional Office Contact: Date contacted: -OR- I will not any impact nearby wetlands, surface waters or groundwater by dewatering. Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false - statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the (Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 33) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or,having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as a part of coverage under this General Permit: 1. 1 agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining permit must be attached to this request. Page 7 of 8 SWU-NCG02-NOI Last revised 6124/14 NCG020000 N.O.I. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. 5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: 4� �tn 0.(ftkt Title: of (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Mail the entire package to: Stormwater Permitting Program bivision of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DEMLR Regional Office for your area. DEMLR Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ... (252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 707-9200 Page 8 of 8 SWU-NCG02-NOI Last revised 6/24/14 Tick Bite Pit-Topo Grifton, NC Tick Bite Pit Grifton, NC ❑ BARNHILL CONTRACTING ❑ COMPANY 800 Tiffany Blvd., Suite 200 PO Box 7948 Rocky Mount, North Carolina 27804 252-823 1021 Fax: 252-823-0137 w .barnhillcontracting.corn September 24, 2015 Mr. Bradley Bennett Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Mr. Bennett, RECEIVED SEP 3 01015 DEWL.AN, 9 (N 01 ITY 816RMWAiinf'oVt4;ti41 o Re: Tick Bite Pit NPDES Permit Application I am respectfully submitting an application for an NPDES discharge permit for a borrow pit in Lenoir County. An on -site determination of potential jurisdictional features was performed by HDR, Inc. which determined that a blue line ditch is located within the proposed permitted area along the most northern property line. The location of the blue line ditch and the proposed buffer is also shown on the enclosed site plan. Barnhill Contracting Company proposes to pump water from a rim ditch into the existing pond as shown on the mine map during the excavation. Water will be pumped into the pond utilizing a 6" submersible pump (Thompson Pump Model 46HST) at an average rate of approximately 650 gallons per minute. This pit will be operated for Barnhill Contracting projects only and will not be run on a continual basis. Use will be determined by demand for sand for local projects. Because of the nature of this work, withdrawal rates and discharge will vary greatly from month to month. We intend to dewater only when we are actively mining sand and not on a continuous basis. During times of mining we will typically work 12 hour days and pump for 24 hours during mining. We have also applied for a CCPCUA withdrawal permit through division of Water Resources since this site is within Lenoir County. Erosion control measures will be installed onsite prior to any land disturbance taking place. Please reference the site plan for a more detailed depiction of these measures. Any water within the mining area will be directed to drain towards the pit. There are also diversion ditches with check dams along both sides of the haul road to control runoff from this area. Please find enclosed one (1) original and two (2) copies of the NPDES Notice of Intent Permit Application and supporting documents. Should you have any questions, please do not hesitate to contact us. Yours Very Truly, Barnhill Contracting Company .70� Jonathan Proctor Project Manager Enclosures ®BARNHILL CONTRACTING BRANCH BANKING 8 TRUST 800 TIFFANY BLVD.,'SUITE 200' 'P.O. BOX 7948 ROCKY MOUNT, N627804 728/15 845371 PAY "ONE HUNDRED AND XX / 100 $ "100.00 TO THE NCDEMLR-STORM WATER ORDER OF ATTN: STORMWATER BILLING 1612 MAIL SERVICE CENTER ' 01 -RALEIGH, NC 276991612 g311184S3?: 0 1'1 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY Allen Barnhill Barnhill Contracting Company 800 Tiffany Boulevard, Suite 200 Rocky Mount, NC 27804 Dear Mr. Barnhill: PAT MCCRORY co",on. DONALD R. VAN DER VAART Sccretnry December 4, 2016 TRACY DAVIS Uireamr Subject: General Permit No. NCG020000 Barnhill Contracting Company Tick Bite Mine COC NCG020893 Lenoir County In accordance with your application for a discharge permit received on September 30 2015, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143- 215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral, and Land Resources. The Division may require modification or revocation and reissuance of the certificate of coverage. Please note that mine dewatering wastewater includes wet pit overflows caused solely y direct rainfall and groundwater seepage for this type of mining operation. Any discharge of this water (and any stormwater commingled with it) is subject to the effluent limitations in this permit. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mining, and Land Resources, or permits required by the Division of Water Resources, Coastal Area Management Act, or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Richard Riddle at telephone number (919)807-6375. Sincerely, ORIGINALSIGNED BY MICHEAL F RANDALL for Tracy E. Davis, P.E., CPM cc: Washington Regional Office Central Files Stormwater Permitting Program Files State of North Carolina I Envkonnoental Quality I Energy, Mine.] and Land Resources 1612 Mail Service Center 1512 North Salisbury Street I Raleigh, NC 27699-1612 919 707 9200 T STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020893 STORMWATER AND MINE DEWATERING DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Barnhill Contracting Company is hereby authorized to discharge stormwater and mine dewatering from a facility located at Tick Bite Pit Tick Bite Road Grifton Lenoir County to receiving waters designated as Neuse River, a class C, NSW water in the Neuse River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, III, and IV of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective December 5, 2016. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 5, 2016. ORIGINAL SIGNED BY NIICHEAL F RANDALI- for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission NCG020893 Map Scale 1:24,000 Barnhill Contracting Company Tick Bite Pit Latitude: 350 21' 17" N Longitude: -770 26' 32" W County: Lenoir Receiving Stream: Neuse River Stream Class: C, NSW Index Number: 27-(75.7) (Neuse River Basin) 0A 4 � t,�wdl7�Vl�I"�J� o'Mj� Facility Location Energy, Mineral and Land Resources ENVIRONMENTAL OUALITV Allen Barnhill Barnhill Contracting Company 800 Tiffany Boulevard, Suite 200 Rocky Mount, NC 27804 Dear Mr. Barnhill: PAT MCCRORY o"eertn,. DONALD R. VAN DER VAART Secreon- December 4, 2016 TRACY DAVIS Direct" Subject: General Permit No. NCG020000 Barnhill Contracting Company Tick Bite Mine COC NCG020893 Lenoir County In accordance with your application for a discharge permit received on September 30 2015, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143- 215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral, and Land Resources. The Division may require modification or revocation and reissuance of the certificate of coverage. Please note that mine dewatering wastewater includes wet pit overflows caused solely by direct rainfall and groundwater seepage for this type of mining operation. Any discharge of this water (and any stormwater commingled with it) is subject to the effluent limitations in this permit. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mining, and Land Resources, or permits required by the Division of Water Resources, Coastal Area Management Act, or any other federal or local governmental permit that may be required. If you have any questions concerning this permit, please contact Richard Riddle at telephone number (919) 807-6375. Sincerely, ORIGINALSIGNED BY MICHEAL F RANDALL for Tracy E. Davis, P.E., CPM cc: Washington Regional Office Central Files Stormwater Permitting Program Files State of Nonh Carolina I Environmental Quality I Energy, Mineral and land Resources 1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699-1612 919 707 9200 T STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020893 STORMWATER AND MINE DEWATERING DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Barnhill Contracting Company is hereby authorized to discharge stormwater and mine dewatering from a facility located at Tick Bite Pit Tick Bite Road Grifton Lenoir County to receiving waters designated as Neuse River, a class C, NSW water in the Neuse River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, 11, Ill, and IV of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective December 5, 2016. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 5, 2016. GIGINAL SIGNED BY VKHEAL F RANDALL for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission NCG020893 Map Scale 1:24,000 Barnhill Contracting Company Tick Bite Pit Latitude: 350 21' 17" N Longitude: -770 26' 32" W County: Lenoir Receiving Stream: Neuse River Stream Class: C, NSW Index Number: 27-(75.7) (Neuse River Basin) Facility Location To: Riddle, Rick L <rick.riddle(c)ncdenr.eov> Subject: RE: question See below. Let me know if you need anything else. Janet S. Boyer, PE State Mining Specialist Division of Energy, Mineral and Land Resources Department of Environmental Quality 919-707-9220 office Janet. bover(a)ncdenr.gov 512 N. Salisbury Street -Archdale Building 1612 Mail Service Center Raleigh, NC 27699 -5>'Nothing Compares%. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Riddle, Rick L Sent: Tuesday, November 29, 2016 3:49 PM To: Boyer, Janet <janet.boyerna ncdenr.gov> Subject: RE: question Janet, Thanks for your help. 1 thought a table would be easier than writing it out. The third column is for the mining permit status. greatly appreciate it. NCG020896 Richmond Road Quarry Pending 19-31 NGG020897 Two Chips Draft 19-33 NCG020902 Mary L Sawyer Mine Active 70-34 NCG020903 Blount Pit Pending 74-95 NCG020904 River Farms Mine New today 72-28 NCG020905 S&K Sand Mine Pending 06-71 NCG020906 Whitehurst Sand we have 4 2 in Pit and 2 in Perquimans Which one? NCG020907 Otter Creek Holdings Draft 19-35 NCG020909 Massengill Mine Pending 51-52 NCG02091 1 Moore Town Pit Pending 46-15 NCG020912 Duplin Minerals Active 31-23 NCG020893 Tick Bite Pit Active 54-55 NCG020889 Robert D White Sand Mine Active 70-33 2 Riddle, Rick L From: Bennett, Bradley Sent: Thursday, October 08, 2015 8:11 AM To: Riddle, Rick L Subject: FW: Tick Bite Pit, Permit No. 54-55 Attachments: 54-55 DWR REVIEW SHEET 2013.doc Rick, See attached DWR sheet on this one. They indicate a stream determination and buffer determination are needed. 12 Bradley Bennett Stormwater Permitting Program I Phone: (919) 807-6378 NC Division of Energy, Mineral and Land Resources I Fax: (919) 907-6494 1612 Mail Service Center I Email: bradley.bennett(ancdenr.gov Raleigh, NC 27699-1612 Web: http://portal.ncdenr.org/web/Ir/stormwater Email correspondence to and from this address may be subject to public records lows From: Tankard, Robert Sent: Thursday, October 08, 2015 7:57 AM To: Wehner, Judy <judy.wehner@ncdenr.gov>; Bennett, Bradley <bradley. ben nett@ ncdenr.gov>; Mcclain, Pat <pat.mcclain@ ncdenr.gov> Cc: Novak, Gary <gary.novak@ncdenr.gov>; Edgerton, Thom <thom.edgerton@ncdenr.gov> Subject: Tick Bite Pit, Permit No. 54-55 Please find our comments attached. Thanks! Robert Tankard Assistant Regional Supervisor Division of Water Resources Water Quality Regional Operations Section 943 Washington Square Mall Washington, NC 27889 Phone: 252-948-3921 Fax: 252-975-3716 E-mail: robert.tankord@ncdenr.gov http://www.ncwater.org/ E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 4 : �Division of Energy, Mineral and Land Resources VA / ILand Quality Section — Stormwater Permitting Program NCDENR National Pollutant Discharge Elimination System NCIrtH C1VQ„u rxn Tr M Gv ONM[ u V NMLa R[•Ounss NCG020000 NOTICE OF INTENT RECEIVED National Pollutant Discharge Elimination System application for coverage under General Refit NCG020000: �J[[ JJ O 2015 R-LASTORMWATER DISCHARGES associated with activities classified as: DEn'VAT, ' CU STALJTy CRMbgTF pr rn;; SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specifiedU'zOwW 1 TlNC The following activities are also included: Active or inactive mining operations (including borrow pits —except for NCDOT borrow pits) that discharge stormwater coritaminated with or that has come in contact with, any overburden, raw material, intermediate products, finished products, byproducts or waste products located on the site of such operations; Stormwater from vehicle maintenance activities at mining operations; Overflow from facilities that recycle process wastewater; and/or Mine dewatering (wastewater) The following activities are specifically excluded from coverage under this General Permit: Stormwater discharges associated with peat mining, coal mining, and metal mining; Stormwater discharges from mining operations which are intermixed on site with stormwater from asphalt operations and/or concrete operations; Stormwater discharges associated with oil and gas extraction operations; and Stormwater discharges associated with tourist gem mines NCDOT borrow pits are covered under NCS000150 The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000: Point source discharges of stormwater and wastewater from in -stream sand mining operations (i.e., sand dredging or dipping operations). Please contact the NPDES Wastewater Point -Source Group for more information on coverage under this Please print or type all entries in this application form. 1) Mailing address of owner/operator (official address to which all permit correspondence will be mailed): Legal Owner Name TAO )kuU_ CvWTJA CT',,& C b 7rrA (Attach the most recent Annual Report to the NC Secretary of State showing the cu4ent legal name or the corporation or entity. Alternatively this permit can be given to an individual or government authority. This name must be the same name as appears on the Division of Land Resources' Mining Permit.) Qp Signee's Name (as signed for in permit signature at bottom) ALL - 6A4+a\LL• Street Address 6D6 -ry-AL u RLyin 5�rm Zoo City 'acxv iAco'T State rJc. ZIP Code Telephone No. 2511 $"L3_ tnLI Email Alternate Contact Name JoaATHr,.' �nsc.T .N Email (if different) _ Alternate Contact Telephone (if different) NCG020000 N.O.I. 2) Location of facility producing discharge: Facility Name _ Facility Street Address Facility City _ Facility County _ State Nl- ZIP Code Facility Contact 30PP Tuo, P(tocTo6 Telephone No. 2S2 1 611- 1021 Fax: 25L q'11 151-- Contact E-mail 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names state road numbers, and distance and direction from a roadway intersection). T.`,e qwy 11.5 ouF uE l�r; � Sew AAA U. Ty,1a- cA 4�.. r„A 4 4_�� MAn YL&' nc(., •F JJi. 4) Latitude 36� Z I I ._W Longitude 11 02(o+ 32.31 (degrees, minutes, seconds) Permits: 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin: Existing Date began mining: juts . 2009 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: I H Li 2 7) Provide a narrative description of the types of minerals mined at this facility: 5A+jr�� 8) Is this mine an inactive mine site? e No ❑ Yes If yes, do you posses an "Inactive Renewal' from DEMLR and notified the Regional Office Stormwater Permitting Program (SPP) or have you certified to the SPP that the site has been stabilized? ❑ No ❑ Yes 9) Does this facility already have a valid Mining Permit from the Division of Energy, Mineral and Land Resources (DEMLR) [formerly DLR]? ❑ No dYes If No, please indicate the status of the Mining Permit application: If yes, please provide the Mining Permit number: SA - 5S Please also provide a copy of your DEMLR Mining Permit with this application. 10) Does this facility have any other NPDES permits? Do L� No 0 Yes If yes, list the permit numbers for all current NPDES permits for this facility: NCG020000 N.O.I. 11) Are you applying for a mining permit in the same location as a previously permitted mine? ❑ No Yes If yes, specify permit number and name if known: Sq - SS 12) Does this facility have any Non -Discharge permits (ex: recycle permits)? Id- No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 13) Does total area of this mine site include ready -mix and asphalt areas? No ❑ Yes If yes, do they have NPDES stormwater permits (if owned by the same company)? ❑ No ❑ Yes (provide permit number ) If not owned by the same company, who is the owner? 14) Will this mining operation precede development activities at this site? Ir1 No ❑ Yes 15) Is this mine located within one of the 20 Coastal Counties and will it add more than 10,000 ft2 of impervious surface? ®'No ❑ Yes If yes, you may be required to apply for an additional state stormwater permit. Check with your local Regional Office. See contact information and checklist below. 16) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basins, or the Randleman or Jordan Water supply Watersheds? No ❑Id es If yes, what size stream buffers are included on site? _60 Please show buffers in site plans. If yes, please include information and plans showing diffuse flow through buffers as required. Discharge Points, Receiving Waters & Wetlands: 17) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? /iy c RI If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Receiving water classification (if known): Note: Discharge of industrial wastewater to receiving waters classified as WS-II to WS-V, or SA, must be approved by the Div. of Water Resources, or Div. of Marine Fisheries. If DWR or DMF does not approve, coverage under NCG020000 cannot be granted. No new discharges of wastewater are permitted in receiving waters classified as WS-1 or freshwater ORW. Wastewater discharges to Saltwater ORW will not be approved under the NCG02 General Permit. 18) If your facility has wastewater discharges and they are to HWO and/or PNA waters (Primary Nursery Areas) waters, what is the proposed flow rate? ;r7A (See http'//www.ncdmf.net/maps/FNA maps/index html, for map) Page 3 of 8 SWU-NCG02-N0I Last revised 6/24/14 NCG020000 N.O.I. 19) Discharge Points: Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Onsite: Stormwater: Mine dewatering: It Process Wastewater Overflow: Offsite: Stormwater: Mine dewatering: Process Wastewater Overflow: Discharge points should be clearly marked on the submitted site plan. Please provide short narrative description of discharges: a) Is your mine dewatering and discharging? (Answer only if you are dewatering) ❑ No H"Yes If yes, where to? _ Surface Waters and/or Wetlands (on -site or off -site) lCther (on -site or off -site) Describe: E1n Inrn b) Are you dewatering but not discharging? (Answer only if you are dewatering) "o ❑ Yes If Yes, please explain how you are dewatering, and where that water will be directed: 20) Will mining operations require dewatering near wetlands or impact any stream, groundwater, or wetlands? ❑ Yes Note: Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (O&M) Plan that has been approved by the Division. For sites that may drain wetlands — approval of a Pumping O&M plan may be required prior to coverage under this general permit. The Pumping O&M Plan should be submitted to the appropriate Regional Office and must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at end of document. Contact yourlocal Regional Office for questions specific to your mine. 21) If you are dewatering, are there wetlands or surface waters within 400' of the mine pit perimeter? ❑ Now 12'Yes If yes, what distance are they from the mine pit perimeter? 50 feet. 22) Have you been required to obtain a 404/401 Certification permits? P-No ❑ Yes If yes, please briefly describe below (include information such a required mitigation, BMPs, setbacks, and/or O&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as necessary: Page 4 of 8 SWU-NCG02-NOI Last revised 6/24/14 NCG020000 N.O.I. 23) Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers? Q No ❑ Yes If yes, please attach to application submission. Stormwater BMPs: 24) Does this facility ploy any best management practices for stormwater control? El No Yes If yes, please briefly describe: biv&<4:jn 6 < s I ( irla Wake 25) Does this facility have a Stormwater Pollution Prevention Plan? No ❑ Yes If yes, when was it implemented? 26) Will icle maintenance activities occur at this facility? No ❑ Yes Wastewater Treatment Facilities: 27) Will mine dewatering discharges occur? ❑ No Yes 28) Will discharges of overflows from process wastewater treatment systems occur? 0'No ❑ Yes If yes, a. Does this facility employ chemical additives to flocculate suspended solids? ❑ No ❑ Yes If yes, please state the name, manufacturer and the quantity of average daily usage of the chemical additive Note: Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North Carolina: b. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No ❑ Yes 29) Are was water treatment facilities (including recycle systems) planned in the 100-year flood plain? No ❑ Yes 30) Is your acility washing mined materials? N ❑ Yes If Yes, are you discharging this water? Page 5 of 8 SWU-NCG02-NOI Last revised 6124/14 NCG020000 N.O.I. Other: 31) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? 1�1 No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 2/N-o ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg, or more of hazardous waste generated per month) of hazardous waste? p'No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: _ Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: 32) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? See permit text for secondary containment requirements. O'No There well 6e Ao �iV,'Js '56-e-d on-C;+e. ❑ Yes 33) Does your site have an active landfill within the mining permit boundary? ❑ No ❑ Yes If yes, specify type: ❑ LCID ❑ Other: Final Checklist: This application will be returned as incomplete unless all of the following items have been included and initialed for. Please show that the following required information has been included by initialing in each space below. Fee of $100 made payable to NCDENR. Completed application and all supporting documents. A5 Copy of the valid approved mining permit (MP) for the facility or indication of MP application status. A�3 Copy of a county map or other general location map that shows the mining site and nearest major roads. A B Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. t,5 2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with all outfalls, applicable buffers and wetlands clearly delineated, and 100-year flood plain line if applicable. TAB A copy of your DEMLR mining permit. NTA A copy of your US Army Corps -approved wetland delineation if you marked "yes" to question 23 above. Ars A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. .'IA If mine site is in one of the 20 Coastal Counties: • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Regional Office Contact: Page 6 of S SWU-NCG02-NOI Last revised 6/24/14 NCG020000 N.O.I. Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage areas and total drainage area; _ If the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a Pumping O&M Plan (see below for contact information). You may be required to provide an approved Pumping O&M plan priorto NCG02 issuance. _2 copies of detailed Full Size Plans (at least 24" x 36") delineating areas on the plans and listing acreage (including: wetlands, ditches, well -placements, pits, borrow areas, overburden storage, stormwater controls/BMPs, vehicle maintenance areas, settling basins, product process (such as screening, stockpiles, waste piles), total drainage area, impervious surface percentages (if state sw programs apply), applicable buffers, and access and/or haul roads). _Pump dewatering size and information on its specifications. _Well information (design, depths, maintenance). _Physical monitoring for the wetlands areas. _Settling pond sizing information, if applicable. _Level spreader design, if applicable. _Details about dewatering method. _Cone of influence calculations. _Description of measures to prevent erosion and flooding. _Description & information about 401/404 permits that have been obtained. _Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if applicable). _I have contacted my local regional office about a Pumping O&M Plan. Regional Office Contact: Date contacted: -OR- I will not any impact nearby wetlands, surface waters or groundwater by dewatering. Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document fled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 33) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as a part of coverage under this General Permit: 1. 1 agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining permit must be attached to this request. Page 7 of 6 SWU-NCG02-NOI Last revised 6/24114 NCG020000 N.O.I. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. 5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: f `� 1Z arnkt Title: of 9z'Q • Z�Y5 (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Mail the entire package to: Stormwater Permitting Program bivision of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DEMLR Regional Office for your area. DEMLR Regional Office Contact Information: Asheville Office ... Fayetteville Office Mooresville Office Raleigh Office ..... Washington Office Wilmington Office Winston-Salem ... Central Office ..... ... (828) 296-4500 ... (910) 433-3300 ... (704) 663-1699 ... (919) 791-4200 ...(252) 946-6481 ... (910) 796-7215 ... (336) 771-5000 .(919)707-9200 Page 8 of 8 SWU-NCG02-NOI Last revised 6/24/14 Tick Bite Pit-Topo Grifton, NC Print this form to PDF Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. MINING PERMIT APPLICATION REVIEW FORM forthe DIVISION OF WATER RESOURCES Project Name Tick Bite Pit DEMLR Permit # 54-55 jproctor@barnhilicontracting.com PERMIT ACTION TYPE: Modification and Transfer Fl rt YES County: Lenoir Applicant's Email: NO Date Commencing Have land disturbing activities started? Date? r t r t Latitude: 35.3537 Longitude:-77.4425 Please return comments to (at DEMLR CO): Judy Wehner Comments due by: October 23, 2015 SECTION BELOW TO BE FILLED OUT BY DWR: 2007 Is the RO concerned that the operation, as proposed, would violate standards of water quality? Yes Comments: The proposed mine is shown to dig through a blue line stream. The project should be put on hold until a stream delineation has been determined by the permittee. Watershed/Stream Name & Classification: Neuse River Basin, UT to Neuse River DWR Compliance Status of Mine: No active permit Does this mine (or previous owner) have DWR back fees to pay? No If yes, amount: Is this mine an active permit in BIMS? Not an active permit. Application is under review. YES NO 401.Wetland Cert. required? r t r t 401 Wetland Cert. existing? C t Permit # IT i Does DWR RO have enough information to determine if a 401 certification is required? r t r_ t Is an O & M Plan needed? YES NO Are wetlands disturbed at this site? Does DWR RO suspect or know of nearby wetlands to the site? r t F t Is a wetland delineation required prior to DWR issuing the permit? C tJD r'tConsultant t Rnv Can .a h.r 9010 Print this form to PDF Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Onsite? r (Offsite? Stream Determination Needed? r ( r ( Stream Determination Completed? C' P ( Does DWR RO need a statement that no wetlands/streams are disturbed F ( r' for this project from applicant? Buffer Determination Needed? r ( EL - Buffer Determination Completed? r ( r Recycle system permit existing? r (Permit # , New Recycle System permit required?* r ( r Enough information to determine? Non -discharge permit existing? r (Permit # Vol r'Unknown. Will wastewaters discharge to HQW waters r ( r (7Q10 Permittee must with a 7Q10=0? Flow: determine. r' ( Has Violation C ( O&M Requirements G ( HQW/7Q10 Concerns Pay back fees or renew DWR permit P ( Other. Does DWR require DEMLR to hold the DWR it further Please describe the reason to r' permit (e.g. so can review or hold the permit: Stream because DWR requires more information? determination must be performed. prior to issuance of permit since they are proposing to mine through stream. RO contact: r' ( Hold Until Mine must wait to dewater until an O&M plan is( — approved? Reviewed by: DWR RO Surface Water: R. Tankard Regional Office: WaRO Date: 10/7/2015 RO Aquifer Protection Section: Regional Office: Date: Roy Confomhor 9010 N, 4„ Iror l -iPm _ J P,,C �.kPlla o r c n , L< .n Si cng . I�a Inluy P I seJ. I nlasLn{] In r= o-io b_ sll pe V '.T L I I aat-_ 61 I, e Ic 1 h d Rye I _ r, or_a 11 1L, L,-,! u r P'a Llc llt .. 1 M1 =I-y Vllr to to, iaii ei rr 11ey w11 Le (an31 It o— =I I nil nod. Y i n 'III be 11 .. , o 1 i o r r. r II r L vat F PII i+ .I be Y n t;::arj ..it1n, P I ert n, r,rt,l�_m y I'_ y,e. P . bttJ Lt c_r , r,- ,. Lti_ L C Ln- 3i t nr T ._i� Seeding Schedule for Borrow Pit Seeding Schedule for Borrow Pit March I -August 31 September 1- February 28 (Per Acre) (Per Acre) 50# Tall Fescue 50# Tall Fescue 25# Betmudagmss (hulled) 25# Bermudagmss (unbolted) 500# Fertilizer 500# Fertilizer 4000# Limestone 4000# Limestone LEGEND PERMIT BOUNDARY - -- — - PROPERTY LINE — _- SILT FENCE - -- WOODED AREA FARM DITCH — -- BLUE LINE DITCH -- - TEMP. ROCK SILT CHECK'A" STOCKPILE DETAIL 40'_ TICK BITE MINE i \ I t I r O I _t I- 'I GRADE T OD - _ N I TOWARDS PIT-- , IL I — i _ I t 'f'-.I• �f L I I ---._ -. II I T I - - r-, 1 - I lu I I I F� �I -- - L I L _ l'�- — — - -- -0-- — ------ Jr a ti 1 E..I'i — .I _ t — — - -- --- -- — -- t t It -r 4'of Water (Minimum after eacavatron) It' . Water Table Existing Smunn Ju: � Itil LICI I 1 I II I fir Y?J. `W Nf II L pM1 .F il % 9e .- �- - �¢� t12' Excavahon -. �✓ v it1,- ii v II FI IIlllllulll Section AA (NTS) Borrow Pit -t 7'-T �,;� - � � I--T'-j,-,; I r------ — ------ I ��; (lli I 1%1t �I�1 t `L.._'; :1 `_1'1ii�1_.1.11._,.1ii�L - - - - - - a-- - — -- - - -- -- -- --_—,-__- ` I Lf a i I II , f l I I _ -'r. III = I.,. � II,I I i II I� I -- a - �I � I ,�:: _ _ 1 _ I I� I II .I-1 ;j rj.ix J I - --- lfd SONVM01 `•.. �I'I N1VZJ00130Vao -------- �- t y 1[d tl�9 00 r jj 1 1 L \ Y o1b o� 5 \a oy y �p I r r i � v � - — _. - J '1 2 i I � I < r - , I r; FIJ S3bo`d 99mov 3NIN 3118 NOIl -11VAG adou lnVH `z I li I r.I V. M09H011IS N00M'dW31 ----- - ---.-._-- H01103NI13[ll9 H0110 WNVd ICI _ V38V 03000M _ -- 30N3d 1lIS - 3NIl ,UM3dOiJd - A8VON0o911WN3d GN3031 aaolsamrI #OOOb avolsamrI #Owj, iamJwad #Oo5 �[?irad #005 -- (pol[n4nn) sse,Sepnwoq #SZ (paling) smigvpnwog #SZ _ _ _ anasad Ilsl #05 anasad 1191 #OS I ---------. _- -- _. ---- - (Q"v lad) (waV lad) -- 8Z ti--9a3 -[ iaq=gdaS [ £ lsanV-[ g—NJ 11d —q jo; olnpagoS 8mpaaS 3!d mouog io; a[npayaS F¢1paaS -L I I � I li 4 1 C D ' I r d j, r ,au�jjrq J Is, 1'- F'I I F ro Lw 'I I ; I i I 1 r. l i 1 'r �I i.'�r