Loading...
HomeMy WebLinkAboutNCG020855_COMPLETE FILE - HISTORICAL_20151230pZo STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v U& U a b DOC TYPE C( HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ a U ) 5 1 a 3 U YYYYM M D D December 30 , 2015 Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY R M Hayes Construction Co Inc Attn: Raymond Hayes 1646 B Strickland's Crossroads Rd Four Oaks, NC 27524 PAT MCCRORY DONALD R. VAN DER VAART Subject: NPDES Stormwater Permit Coverage Renewal COC #NCG020855 Dear Permittee: s, , „-m" TRACY DAVIS PirNlur For coverage under NPDES General Permit NCG020000, the Division of Energy. Mineral and Land Resources (DEMLR) is forwarding herewith the reissued Certificate of Coverage and Stormwater/Wastewater General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended.) The following information is included with your permit package: • New Certificate of Coverage • Stormwater/Wastewater General Permit • Technical Bulletin for the General Permit • Discharge Monitoring Report (DMR) Forms • Annual Discharge Monitoring Report Forms • Qualitative Monitoring Report Forms The General Permit authorizes discharges of stormwater and/or wastewater (as applicable to your site), and it specifies your obligations with respect to discharge controls, management, monitoring and record keeping. Please review the new permit to familiarize yourself with all changes in the reissued permit. Significant changes to the General Permit are outlined in the Technical Bulletin. Your coverage under the General Permit is transferable only through the specific action of DEMLR. This permit does not affect the legal requirements to obtain other permits which may be required by the N.C. Department of Environmental Quality, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment or decree. If you have any questions regarding this permit package please contact the DEMLR Stormwater Permitting Program at 919-707-9220. Sincerely, 69sJ/ i/ �F',ryYrt� for Tracy E. Davis, P.E., C.P.M Cc: Stormwater Permitting Files Slate or Nona Carolina I liavironmemal Quality I lEacrgy, A7 incral and land Reaoumes 1612 Mail Service Center 1 512 North Salisbury Street I Raleigh, NC 27699-1612 919 707 9200 T North Carolina Divisio Tracy E. Davis, PE, CPM Director n r� NCDENR Department of Environment and Natural Resources of Energy, Mineral, and Land Resources Land Quality Section Mr. R. M. raves R. Mi. Hayes Construction, Inc. 1646 Stricklands Crossroads Rd. Pour Oaks, NC 27524 Dear Mr. Hayes: Pat McCrory, Governor John E. Skvarla, III, Secretary January 23, 2014 Subject: General Permit No, NCG020000 Stone Creek Sand & Gravel Mine COC NCG020055 Johnston County In accordance with your application for a discharge permit received on October 7, 2013, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This certificate of coverage is not transferable. If the facility changes ownership or is closed, the Division of Energy Mineral & Land Resources may require modification, revocation or reissuance of the certificate of coverage. Per the requirements of the Neuse Riparian Buffer Rule, aii storaiwater drainage to stream buffers, from portions of this site that have been constructed after July 22, 1997, must be discharged through a correctly designed level spreader or another device that meets diffuse Flow requirements per 15A NCAC 2B .0233. Diffuse Flow requirements are described in Chapter 8 of the North Carolina Stormwatei "MP Manual, available at: nttp:f/poEtaJ,r_�<Je_trar5� ✓eb/lc/bnIp-manual. This permit does not affect the leg al obligation to obtain other permits which may be required by the Divisionof Energy, Mining, and Land Resources, or any other federal, state, or local authorities. 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 • Telephone 919-707-9220 / FAX: 919-733-2876 512 North Salisbury Street, Raleigh, North Carolina 27604 - Internet: http://poital.ncdenr.org/web/ir/land-quality An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper V 4 If you have any questions concerning this permit, please contact Larry Wade PE at telephone number (919) 807-6375. Sincerely, for Tracy F, 11a.vis; P.F. cc: Raleigh Regional Office Central Files Stormwater Permitting Program Files 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 • Telephone 919-707-9220 / FAX: 919-733-2876 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal.ricdenr.org/web/Ir/land-quality An Equal'Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020855 STORN1WATr..R nl"'MARGES NATIONAL POLLIITANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, R. M. Hayes Construction, Inc. is hereby authorized to discharge stormwater from a facility located at Stone Creek Sand & Gravel Mine 7499 U. S. Hwy 70 S Four Oaks Johnston County to receiving waters designated as Mill Creek, a class WS I-IV;NSW water in the Neuse River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I,11, 111, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective January 23, 2014. This Certi:'. ate of Gaverage S!:all remain: in effect for the duration of tl:e General Permit. Signed this day January 23, 2014. for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission NCGi 20855 Map Scale 1:24, 000 R. M. Hayes Construction, Inc. Stone Creek Sand & Gravel Mine Latitude: 350 19' 52" N Longitude: -780 21' 39" W County: Johnston Receiving Stream: Mill Creek Stream Class: WSI-IV;NSW Sub -basin: 03-04-04 (Neuse River Basin) Facility Location Central Files: APS SWP 01 /23/14 Permit Number NCG020855 Permit Tracking Slip Program Category Status Project Type NPDES SW Active New Project Permit Type Version Permit Classification Mining Activities Stormwater Discharge COC 1.00 COC Primary Reviewer larry.wade Coastal SW Rule Permitted Flow Facility Name Stone Creek Sand & Gravel Mine { Permit Contact Affiliation RECE V G® J AN 2 3 Z014 CEpWQES IBOG Major/Minor Region Minor Raleigh Location Address County 7499 US Hwy 701 S Johnston Four Oaks NC 27524 Facility Contact Affiliation Raymond M. Hayes 1646 B Strickland's Crossroads Rd Four Oaks NC 27524 Owner Name R M Hayes Construction Co inc Scheduled Orig Issue App Received Draft Initiated Issuance 01/23/14 10/07/13 01/22/14 egulated Activities Mining activities - stormwater discharges Outfall 100 Waterbody Name Mill Creek Owner Type Non -Government Owner Affiliation Raymond M. Hayes 1646 B Strickland's Crossroads Rd Four Oaks NC 27524 Public Notice Issue Effective Expiration 01/23/14 01/23/14 12/31/14 Requested/Received Events RO staff report received - MGi�t fdaO r. RO staff report requested 17/13 Stream Index Number Current Class Subbasin 27-52-(8.5) WS-IV;NSW 03-04-04 r NC®ENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director January 23, 2014 Mr. R. M. Haves R. M. Hayes Construction, Inc. 1646 Stricklands Crossroads Rd. Four Oaks, NC 27524 Pat McCrory, Governor John E. Skvarla, III, Secretary Subject: General Permit No. NCG020000 Stone Creek Sand & Gravel Mine CDC NCG020855 Johnston County Dear Mr. Hayes: In accordance with your application for a discharge permit received on October 7, 2013, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This certificate of coverage is not transferable. If the facility changes ownership or is closed, the Division of Energy Mineral & Land Resources may require modification, revocation or reissuance of thecertificate of coverage. Per the requirements of the Neuse Riparian: Buffer Rule, a sto: inwater drainage to stream buffers, from portions of this site that have been constructed after July 22, 1997, must be discharged through a correctly designed level spreader or another device that meets diffuse flow requirements per 15A NCAC 2B .0233. Diffuse flow requirements are described In Chapter B of Cite North Carolina Stormwater BMP Manual, availabie at: ftG.:f ic;:rla.rcacrtl_.:�rg�wl�lr/imp mnn; J. This permit deer not affect the legal obligation to obtain other permits which may be required by the Division of Energy, Miring, and Land Resources, or any other federal, state, or local authorities. 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 • Telephone 919-707-92201 FAX: 919-733-2876 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://poital.ncdenr.org/web/Ir/land-quality An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper If you have any questions concerning this permit, please contact Larry Wade PE at telephone number (919) 807-637S. Sincerely, for Tracy E. Davis, P.E. cc: Raleigh Regional Office Central Files Stormwater Permitting Program Files 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 • Telephone 919-707-9220 / FAX: 919-733-2876 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal.ncdenr.org/web/ir/land-quality An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020855 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, R. M. Hayes Construction, Inc. is hereby authorized to discharge stormwater from a facility located at Stone Creek Sand & Gravel Mine 7499 U. S. Hwy 70 S Four Oaks Johnston County to receiving waters designated as Mill Creek, a class WS I-IV;NSW water in the Neuse River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, 111, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective January 23, 2014. This Certific Ce of Coverage shall rernain in effect for the d : atim: of the General Permit. Signed this day January 23, 2014. for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission NCG02 855 0 ` Map Scale 1:24, 000 R. M. Hayes Construction, Inc. Stone Creek Sand & Gravel Mine Latitude: 350 19' 52" N Longitude: -780 21' 39" W County: Johnston Receiving Stream: Mill Creek Stream Class: WSI-IV;NSW Sub -basin: 03-04-04 (Neuse River Basin) 1Q - Facility Location Division of Water Quality / Surface Water Protection NC®ENR National Pollutant Discharge Elimination System Nonni U Dvnrxort on EnvinOxn[xi u0 NMnLL RpWFCC9 NCG020000 NOTICE OF INTENT FOR AGENCY USF ONLY Dme Recened Year Month I0 r1 '1 Certificate of Coverage NC )0fa Check N 1 Amonnt 23 too Permit Assigned to National Pollutant Discharge Elimination System application for coverage under General Permit NCG020000: STORMWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) The following activities are also included: Active or inactive mining operations (including borrow pits —except for NCDOT borrow pits) that discharge stormwater contaminated with or that has come in contact with, any overburden, raw material, intermediate products, finished products, byproducts or waste products located on the site of such operations; Stormwater from vehicle maintenance activities at mining operations, Overflow from facilities that recycle process wastewater; and/or Mine dewatering (wastewater) The following activities are specifically excluded from coverage under this General Permit: Stormwater discharges associated with peat mining, coal mining, and metal mining, Stormwater discharges from mining operations which are intermixed on site with stormwater from asphalt operations and/or concrete operations, Stormwater discharges associated with oil and gas extraction operations; and Stormwater discharges associated with tourist gem mines NCDOT borrow pits are covered under NCS000150 The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000: Point source discharges of stormwater and wastewater from in -stream sand mining operations (i.e., sand dredging or dipping operations). Please contact the NPDES Wastewater Point -Source Group for more information on coverage under this Please print or tvne all entries in this aoolication form 1) Mailing address of owner/operator (official address to which all permit correspondence will be mailed): Legal Owner Name R.M. Haves Construction Inc. (Attach the most recent Annual Report to the NC Secretary of State showing the current legal name of the corporation or entity. Alternatively this permit can be given to an individual or government authority. This name must be the same name as appears on the Division of Land Resources' Mining Permit.) Signee's Name (as signed for in permit signature at bottom) R.M. Haves Street Address 1646 Stricklands Crossroads Rd. City Four Oaks State NC_ ZIP Code 27524 Telephone No. 919-934-0106 Email Alternate Contact Name Alternate Contact Telephone (if different) Email (if different) ISV�U V L5 OCT - 7 2013 Page 1 of 8 SWU-NCG02-NOI NCG020000 N.O.I. 2) Location of facility producing discharge: Facility Name Stone Creek Sand & Gravel Mine Facility Street Address 7499 US Hwy 701 S. Facility City Four Oaks State NC ZIP Code 27524 Facility County Johnston Facility Contact R.M. Haves Telephone No. 919-934-0106 Fax: Contact E-mail 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From 1-95, take HWY701 South. The mine is on the right about 10 miles from the intersection. 4) Latitude 35* 19' 52" Longitude 78* 21' 39" (degrees, minutes, seconds) Permits: 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin: X Existing Date began mining: 2006 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility l yya SIC Code: 0 0 1 4 7) Provide a narrative description of the types of minerals mined at this facility: Fill dirt, sand, and gravel. 8) Is this mine an inactive mine site? X No ❑ Yes If yes, do you posses an "Inactive Renewal" from DEMLR and notified the DWQ Regional Office or have you certified to the DWQ that the site has been stabilized? ❑ No ❑ Yes 9) Does this facility already have a valid Mining Permit from the Division of Energy, Mineral and Land Resources (DEMLR) [formerly DLR]? ❑ No X Yes If No, please indicate the status of the Mining Permit application: If yes, please provide the Mining Permit number: 51-45 Please also provide a copy of your DEMLR Mining Permit with this DWQ application. Note: DWQ cannot issue a COC for the NCG020000 General Permit until a Mining Permit is issued or renewed by the DEMLR. 10) Does this facility have any other NPDES permits? X No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: Page 2 of 8 SWU-NCG02-NOI Last revised 9/5/2012 t NCG020000 N.O.I. 11) Are you applying for a mining permit in the same location as a previously permitted mine? X No ❑ Yes If yes, specify permit number and name if known: 12) Does this facility have any Non -Discharge permits (ex: recycle permits)? X No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 13) Does total area of this mine site include ready -mix and asphalt areas? X No ❑ Yes If yes, do they have DWQ stormwater permits (if owned by the same company)? ❑ No (provide permit number ) If not owned by the same company, who is the owner? 14) Will this mining operation precede development activities at this site? X No ❑ Yes ❑ Yes 15) Is this mine located within one of the 20 Coastal Counties and will it add more than 10,000 ft2 of impervious surface? X No ❑ Yes If yes, you may be required to apply for an additional state stormwater permit. Check with your local Regional Office. See contact information and checklist below. 16) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basins, or the Randleman or Jordan Water supply Watersheds? ❑ No X Yes If yes, what size stream buffers are included on site? No stream is within 1500' of mining area Please show buffers in site plans. If yes, please include information and plans showing diffuse flow through buffers as required. Discharge Points, Receiving Waters & Wetlands: 17) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? Mill Creek If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). N/A Receiving water classification (if known) Note: Discharge of industrial wastewater to receiving waters classified as WS-II to WS-V, or SA, must be approved by the Div. of Water Resources, or Div. of Marine Fisheries. If DWR or DMF does not approve, coverage under NCG020000 cannot be granted. No new discharges of wastewater are permitted in receiving waters classified as WS-1 or freshwater ORW. Wastewater discharges to Saltwater ORW will not be approved under the NCG02 General Permit. 18) If your facility has wastewater discharges and they are to HWQ and/or PNA waters (Primary Nursery Areas) waters, what is the proposed flow rate? (See http://www.ncdmf.net/maps/FNA maps/index.html, for map) Page 3 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. 19) Discharge Points: Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Onsite: Stormwater: 5 Mine dewatering: 0 Process Wastewater Overflow: 0 Offsite: Stormwater: 0 Mine dewatering: 0 Process Wastewater Overflow: 0 Discharge points should be clearly marked on the submitted site plan. Please provide short narrative description of discharges: Stormwater runoff through sediment basins. Only three basins will be discharging at any given time. a) Is your mine dewatering and discharging? (Answer only if you are dewatering) X No ❑ Yes If yes, where to? _ Surface Waters and/or Wetlands (on -site or off -site) _ Other (on -site or off -site) Describe: b) Are you dewatering but not discharging? (Answer only if you are dewatering) INNER ❑ Yes If Yes, please explain how you are dewatering, and where that water will be directed: 20) Will mining operations require dewatering near wetlands or impact any stream, groundwater, or wetlands? X No ❑ Yes Note: Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (O&M) Plan that has been approved by the Division. For sites that may drain wetlands — approval of a Pumping O&M plan may be required prior to coverage under this general permit. The Pumping O&M Plan should be submitted to the appropriate Regional Office and must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at end of document. Contact your local Regional Office for questions specific to your mine. 21) If you are dewatering, are there wetlands or surface waters within 400' of the mine pit perimeter? ❑ No ❑ Yes If yes, what distance are they from the mine pit perimeter? 22) Have you been required to obtain a 4041401 Certification permits? X No ❑ Yes If yes, please briefly describe below (include information such a required mitigation, BMPs, setbacks, and/or O&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as necessary: Page 4 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. 23) Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers? X No ❑ Yes If yes, please attach to application submission. Stormwater BMPs: 24) Does this facility employ any best management practices for stormwater control? ❑ No X Yes If yes, please briefly describe: Retention and Wet Detention Basins for stormwater runoff. 25) Does this facility have a Stormwater Pollution Prevention Plan? X No ❑ Yes If yes, when was it implemented? 26) Will vehicle maintenance activities occur at this facility? X No ❑ Yes Wastewater Treatment Facilities: 27) Will mine dewatering discharges occur? X No ❑ Yes 28) Will discharges of overflows from process wastewater treatment systems occur? X No ❑ Yes If yes, a. Does this facility employ chemical additives to flocculate suspended solids? ❑ No ❑ Yes If yes, please state the name, manufacturer and the quantity of average daily usage of the chemical additive Note: Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North Carolina: http://portal.ncdenr.org/web/wq/ws/su/npdessw b. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No ❑ Yes 29) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? X No ❑ Yes 30) Is your facility washing mined materials? ❑ No X Yes If Yes, are you discharging this water? No there will be a re -circulation system Page 5 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. Other: 31) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? X No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? X No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? X No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: _ Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: 32) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? See permit text for secondary containment requirements. X No ❑ Yes 33) Does your site have an active landfill within the mining permit boundary? X No ❑ Yes If yes, specify type: ❑ LCID ❑ Other: Final Checklist: This application will be returned as incomplete unless all of the following items have been included and initialed for. Please show that the following required information has been included by initialing in each space below. Fee of $100 made payable to NCDENR. Completed application and all supporting documents. Copy of the valid approved mining permit (MP) for the facility or indication of MP application status. Copy of a county map or other general location map that shows the mining site and nearest major roads. Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. 2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with all outfalls, applicable buffers and wetlands clearly delineated, and 100-year flood plain line if applicable. A copy of your DEMLR mining permit. A copy of your US Army Corps -approved wetland delineation if you marked "yes' to question 23 above. A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. _ If mine site is in one of the 20 Coastal Counties: • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Regional Office Contact: Page 6 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage areas and total drainage area. If the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a Pumping O&M Plan (see below for contact information). You may be required to provide an approved Pumping O&M plan priorto NCG02 issuance. _2 copies of detailed Full Size Plans (at least 24" x 36") delineating areas on the plans and listing acreage (including: wetlands, ditches, well -placements, pits, borrow areas, overburden storage, stormwater controls/BMPs, vehicle maintenance areas, settling basins, product process (such as screening, stockpiles, waste piles), total drainage area, impervious surface percentages (if state sw programs apply), applicable buffers, and access and/or haul roads). _Pump dewatering size and information on its specifications. _Well information (design, depths, maintenance). _Physical monitoring for the wetlands areas. _Settling pond sizing information, if applicable. _Level spreader design, if applicable. _Details about dewatering method. _Cone of influence calculations. _Description of measures to prevent erosion and flooding. _Description & information about 401/404 permits that have been obtained. _Copy of US Army Corps of Engineers wetland delineations or approved wetland delineation (if applicable). _I have contacted my local regional office about a Pumping O&M Plan. Regional Office Contact: Date contacted: -OR- X I will not any impact nearby wetlands, surface waters or groundwater by dewatering. Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document fled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 33) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as a part of coverage under this General Permit: 1. 1 agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining permit must be attached to this request. Page 7 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. 5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: R.M. Haves Title: President i 2V 4 /L 9-2--7- aC'U (Signature of Applica (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Mail the entire package to: Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWQ Regional Office for your area. DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 8 of 8 SWU-NCG02-NOI Last revised 9/5/2012 Scale: 1 "=1 500' (Approx.) 1187 I O 1194 8 0 1136 1°° o �Q Bentonville 143 Battlefield e M 0 p 1185 ! 1190 0 r mds B Minle A ea r 1189 J 118f; e I'Harper 1144 ;a Pre d 1 Mine Aaea v Overshot _ 88 Q r-� P d 'e f 1r ` 1137 , /1 r 1135 1135 rg 1136 ` s a 1132 / 8 .61 I 1 .6 / u 1 1136 e1138 f 1008 .`� 11 2 1� ` s. Ca 13°9' 113( -:1 'fi 1136 32� P 11R� 1122 Scale: V=4000' (Approx.) PAYTOTHE NCDENR $ '*100.00 ORDER OF One Hundred and 00/100,,,,,,,,,,,,,,,,,,,,,,,,,»..,,.,.......,.,.,,,.,,......,,..,.,»,..,..,..,,.,,.....,.....,..,.., DOLLARS A TAMPER RESISTANT TONER AREA Wade, Larry From: Parnell, David Sent: Friday, November 08, 2013 10:15 AM To: Wade, Larry Subject: Stormwater Permits Larry It is permissible with RRO — DEMLR — DLR — Stormwater, to go forward with approval of the following facility's permits: • NCG020855 - R. M. Hayes Const — Stone Creek Sand and Gravel Mine • NCG140431 - Morgan Corp Roxboro Pugmill • NCG020854—General Shale, Colon Mine Thanks, Dave Parnell Environmental Senior Specialist North Carolina Department of Environment & Natural Resources Division of Energy, Minerals, and Land Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 0: (919) 791-4200 F: (919) 571-4718 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Wade, Larry From: Wade, Larry Sent: Thursday, October 17, 2013 1:34 PM To: Parnell, David Subject: NCG020855 R. M. Hayes Const. - Stone Creek Sand & Gravel Mine Attachments: Hayes NOI.pdf Hello David, Find attached the N01 for the subject facility. I am sending you a map through courier. Please review these documents and let me know If you have any concerns, prior to issuing a permit for this facility. If I do not receive a response from you within 30 days from the date of this email, I will proceed with issuing the permit contingent upon central office review and approval. If you have any questions, or require additional information please let me know. Thanks, Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Permitting Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service 9425 Raleigh, NC 27699-1612 Physical Address - 512 N. Salisbury St. Room Raleigh, NC 27604 ************************This is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ Division of Water Quality / Surface Water Protection A"FA NC®ENu/ R National Pollutant Discharge Elimination System No— Ww—Dwu .ev of '.vR N En u0 NU Rn R[CWn<e] NCG020000 NOTICE OF INTENT FOR AGENCY USE ONLY Date Received Year Month Day IO I h Certificate of Coverage 2043 Check Amount 1 ]3 lop Permit Assigned to National Pollutant Discharge Elimination System application for coverage under General Permit NCG020000: STORMWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) The following activities are also included: Active or inactive mining operations (including borrow pits —except for NCDOT borrow pits) that discharge stormwater contaminated with or that has come in contact with, any overburden, raw material, intermediate products, finished products, byproducts of waste products iocated on tile site of such operations; Stormwater from vehicle maintenance activities at mining operations; Overflow from facilities that recycle process wastewater; and/or Mine dewatering (wastewater) The following activities are specifically excluded from coverage under this General Permit: Stormwater discharges associated with peat mining, coal mining, and metal mining; Stgrmv✓ater discharges from mining operations which are intermixed on site with stormwater from asphalt operations and/or concrete operations; Stormwater discharges associated with oil and gas extraction operations; and Stormwater discharges associated with tourist gem mines NCDOT borrow pits are covered under NCS000150 The following discharges are covered by NPDES general permit NCG520000 instead of NCG020000: Point source discharges of stormwater and wastewater from in -stream sand mining operations (i.e., sand dredging or dipping operations). Please contact the NPDES Wastewater Point -Source Group for more information on coverage under this Please print or tvpe all entries in this application form 1) Mailing address of owner/operator (official address to which all permit correspondence will be mailedl: Legal Owner Name R.M. Haves Construction, Inc. (Attach, the most recent Annual Report to the NC Secretary of State showing the current legal name of the corporation or entity. Alternatively this permit can be given to an individual or government authority. This name must be the same name as appears on the Division of Land Resources' Mining Permit.) Signee's Name (as signed for in permit signature at bottom) R.M. Haves Street Address 1646 Stricklands Crossroads Rd. City Four Oaks State NC _ ZIP Code 27524 Telephone No. 919-934-0106 Email Alternate Contact Name Alternate Contact Telephone (if different) Email (if different) cc r NO OCT - 12013 Page 1 of 8 SWU-NCG02-NOI --"—"-Cos `f'rev"'eJise-gt/2012 NCG020000 N.O.I. 2) Location of facility producing discharge: Facility Name Stone Creek Sand & Gravel Mine Facility Street Address 7499 US Hwy 701 S. Facility City Four Oaks State NC ZIP Code 27524 Facility County Johnston Facility Contact R.M. Haves Telephone No. 919-934-0106 Fax: Contact E-mai! 3) Physical Location !nformati^n: Please provide a narrative de.scriotion of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). From 1-95, take HWY701 South. The mine is on the right, about 10 miles from the Intersection. 4) Latitude 35" 19' S2" Longitude 78' 21' 39" (degrees, minutes, seconds) Permits: 5) This NPDES Permit Application applies to which of the following: ❑ New or Proposed Facility Date operation is to begin: X Existing Date began mining: 2006 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility l 4ya SIC Code: 0 0 1 4 7) Provide a narrative description of the types of minerals mined at this facility: Fill dirt, sand, and gravel. 8) Is this mine an inactive mine site? :LC ❑ Yes If yes, do you posses an "Inactive Renewal" from DEMLR and notified the DWQ Regional Office or have you certified to the DWQ that the site has been stabilized? ❑ No ❑ Yes 9) Does this facility already have a valid Mining Permit from the Division of Energy, Mineral and Land Resources (DEMLR) [formerly DLR]? ❑ No X Yes If No, please indicate the status of the Mining Permit application: If yes, please provide the Mining Permit number: 51-45 provide a copy of your DEMLR Mining Permit with this DWQ application. Please also Note: DWQ cannot issue a CDC for the NCG020000 General Permit until a Mining Permit is issued,or renewed by the DEMLR. 10) Does this facility have any other NPDES permits? X No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: Page 2 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.0.1. 11) Are you applying for a mining permit in the same location as a previously permitted mine? X No ❑ Yes If yes, specify permit number and name if known: 12) Does this facility have any Non -Discharge permits (ex: recycle permits)? X No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permiis for this facility: 13) Does total area of this mine site include ready -mix and asphalt areas? X No ❑ Yes If ves, do thev have DWO stormwater permits (if owned by the same company)? f.] No (provide permit number ) If not owned by the same company, who is the owner? 14) Will this mining operation precede development activities at this site? X No ❑ Yes ❑ Yes 15) Is this mine located within one of the 20 Coastal Counties and will it add more than 10,000 ftZ of impervious surface? X No ❑ Yes If yes, you may be required to apply for an additional state slormwater permit. Check with your local Regional Office. See contact information and checklist below. 16) Is this mine located the Neuse, Tar -Pamlico, or Catawba River Basins, or the Randleman or Jordan Water supply Watersheds? ❑ No X Yes If yes, what size stream buffers are included on site? No stream is within 1500' of minina area Please show buffers in site plans. If yes, please include information and plans showing diffuse flow through buffers as required. Discharge Points, Receiving Waters Sr Wetlands: 17) Receiving waters: What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? Mill Creek If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). N/A Receiving water classification (if known) WSI-IV:NSW Note: Discharge of industrial wastewater to receiving waters classified as WS-II to WS-V, or SA, must be approved by the Div. of Water Resources, or Div. of Marine Fisheries. If DWR or DMF does not approve, coverage under NCG020000 cannot be granted. No new discharges of wastewater are permitted in receiving waters classified as WS-1 or freshwater DIRK Wastewater discharges to Saltwater ORW will not be approved under the NCG02 General Permit. 18) If your facility has wastewater discharges and they are to HWQ and/or PNA waters (Primary Nursery Areas) waters, what is the proposed flow rate? (See http://www,ncdmm=.net/mps/index.html, for map) Page 3 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. 19) Discharge Points: Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Onsite: Stormwater: 5 Mine dewatering: 0 Process Wastewater Overflow: 0 Offsite: Stormwater: 0 Mine dewatering: 0 Process Wastewater Overflow: 0 Discharge points should be clearly marked on the submitted site plan. Please provide short narrative description of discharges: Stormwater runoff through sediment basins. On!v three basins will be discharging at anyg ven tare. a) Is your mine dewatering and discharging? (Anwar o„ly if you are dewatering) X No ❑ Yes If yes, where to? _ Surface Waters and/or Wetlands (on -site or off -site) Other (on -site or off -site) Describe: b) Are you dewatering but not discharging? (Answer only if you are dewatering) ❑ No ❑ Yes If Yes, please explain how you are dewatering, and where that water will be directed: 20) Will mining operations require dewatering near wetlands or impact any stream, groundwater, or wetlands? X No ❑ Yes Note: Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement a Pumping Operation and Monitoring (0&M) Plan that has been approved by the Division. For sites that may drain wetlands — approval of a Pumping O&M plan may be required prior to coverage under this general permit. The Pumping O&M Plan should be submitted to the appropriate Regional Office and must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance. See checklist at end of document. Contact your local Regional Office for questions specific to your mine. 21) If you are dewatering, are there wetlands or surface waters within 400' of the mine pit perimeter? ❑ No ❑ Yes If yes, what distance are they from the mine pit perimeter? feet. 22) Have you been required to obtain a 404/401 Certification permits? 0U1. ❑ Yes If yes, please briefly des6ribe below (include information such a required mitigation, BMPs, setbacks, and/or O&M plans for on or off -site wetlands or other pertinent information). Attach other sheets as necessary: Page 4 of 8 SWU-NCG02-NOI Last revised 9/5I2012 NCG020000 N.O.I. 23) Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers? X No ❑ Yes If yes, please attach to application submission. Stormwater BMPs: 24) Does this facility employ any best management practices for stormwater control? I_1 No X Yes If yes, please briefly describe: Retention and Wet Detention Basins for stormwater runoff. 25; Poes this facility have a Stormwater Poilution Prevention Tian-, X Nc ❑ Yes If yes, when was it implemented? 26) Will vehicle maintenance activities occur at this facility? X No ❑ Yes Wastewater Treatment Facilities: 27) Will mine dewatering discharges occur? X No ❑ Yes 28) Will discharges of overflows from process wastewater treatment systems occur? X No ❑ Yes If yes, a. Does this facility employ chemical additives to flocculate suspended solids? ❑ No ❑ Yes If yes, please state the name, manufacturer and the quantity of average daily usage of the chemical additive Note: Please see our website for a list of evaluated polyacrylamide (PAMS) products for use in North Carolina: b. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No ❑ Yes 29) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? X No ❑ Yes 30) Is your facility washing mined materials? ❑ No X Yes If Yes, are you discharging this water? No there will be a re -circulation system Page 5 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. Other: 31) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? X No ❑ Yes b) Is this facility a Small Quantity Generator (less than 4000 kg. of hazardous waste generated per month) of hazardous waste? X No ❑ Yes cj IS tl"Iis facility a Large Quantity KO. Or mare Of ..^.aZ3:2:OL'S waste generated per mcnrh, of hazardous waste? X No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Tyke(,) of waste: How is material stored: _ Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: _ Vendor address: 32) Is your facility providing appropriate secondary containment for bulk storage of liquid materials? See permit text for secondary containment requirements. X No ❑ Yes 33) Does your site have an active landfill within the mining permit boundary? X No ❑ Yes If yes, specify type: ❑ LCID ❑ Other: Final Checklist: This application will be returned as incomplete unless all of the following items have been included and initialed for. Please show that the following required information has been included by initialing in each space below. Fee of $100 made payable to NCDENR. Completed application and all supporting documents. Copy of the valid approved mining permit (MP) for the facility or indication of MP application status. Copy of a county map or other general location map that shows the mining site and nearest major roads. Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. 2 copies of large-scale (minimum 24" x 36") site plan with topographical lines with all outfalls, applicable buffers and wetlands clearly delineated, and 100-year flood plain line if applicable. _ A copy of your DEMLR mining permit. A copy of your US Army Corps -approved wetland delineation if you marked "yes" to question 23 above. A line drawing of the water flow through the facility. A pictorial description of the nature and amount of any sources of water and any collection and treatment measures. _ If mine site is in one of the 20 Coastal Counties: • Applicant has checked with the appropriate regional office to verify the need for a Coastal State Stormwater permit. Regional Office Contact: Page 6 of 8 SWU-NCG02-NOI Last revised 9/5/2012 NCG020000 N.O.I. • Applicant has included a detailed list of impervious surface areas and percentages, sub -drainage areas and total drainage area. _ If the mine is dewatering and near wetlands, or may otherwise impact surface waters or groundwater, include the following and contact your local regional office about a Pumping O&M Plan (see below for contact information). You may be required to provide an approved Pumping O&M plan priorto NCG02 issuance. _2 copies of detailed Full Size P!ans (at !east 24" x 36") delineating areas on the plans and listing ac.aaaa Qndudcg: wetlands, ditches, well -placements, pits, borrow areas, over storage, stormwater controls/BMPs, vehicle maintenance areas, settling basins, product process (such as screening. stuck,:Aes, waste plies), total drainage aiva, impervious surface uercantaaes (if state sw p:-3gran15 app;c aGp lGatiiB buffers, and access aiid/or liFul roads). _Pump dewatering size and information on its specifications. —Well information (design, depths, maintenance). ---__Physical monitoring for the wetlands areas. _Settling pond sizing information, if applicable. _Level spreader design, if applicable. _Details about dewatering method. Cone of influence calculations. _Description of measures to prevent erosion and flooding. _Description & information about 401/404 permits that have been obtained. _Copy of US Army Corps of Engineers wetland delineations or approved wetland. delineation (if applicable). _I have contacted my local regional office about a Pumping O&M Plan. Regional Office Contact. Date contacted: -OR- X I will not any impact nearby wetlands, surface waters or groundwater by dewatering. Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemakirg proceeding or contested case under this Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). 33) Signatory Requirements (per 40 CFR 122.22) All applications, reports, or information submitted to the Director shall be signed and certified. a. All notices of intent to be covered under this General Permit shall be signed as follows: (1) For a corporation: by a responsible corporate officer. For the purpose of this permit, a responsible corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation, or (b) the manager of one or more manufacturing production or operating facilities employing more than 250 persons or having gross annual sales or expenditures exceeding 25 million (in serond quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or (3) For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as a part of coverage under this General Permit: 1. I agree to abide by the approved Mining Permit, for this mining activity. (A copy of the valid mining permit must be attached to this request. Page 7 of 8 SWU-NCG02-N01 Last revised 9/5/2012 NCG020000 N.O.I. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. 5. 1 agree that maintenance activities for vehicles and heavy equipment wiil be performed so as to not result in contamination of the surface or ground waters. I agree'o abide by the piuvlsions as fisted above and recognize ti fat the provisions are to be Considered as enforceablo requircmentc of tho General Permit. I certify that 1 arr familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: R M Haves Title: President Y 7 - z (i3 (Signature ofApplica (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Mail the entire package to: Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWQ Regional Office for your area. DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office ......... (919) 807-6300 Page 8 of 8 SWU-NCG02-NOI Last revised 9/5/2012 Scale: 1 '=1500' (Approx.) 1187 w 1 �4 O 1194 o i 4'a 1 -6 ® a 1136' 1• 1143 °� o Bentonville � f� Bottlefield y 1190 t �t ` i B Active 1189 r / 11188 Ids Mine Ar'ea�Q , .8 .B ` 'Harper n� v 4 ;k j er 1 1144 ,4 Pro d Min e Ada ry ,4�I a �JYAnhot . 88 Q ` b �— \- 1137 ? �{ 1135 1135 rg i 138 1132 1 8 1136 �1138 1�2 IOUs 1133 ) 113( - I .S A . 1132 1122 ]�- Scale: 1 "=4000' (Approx.) PnYTOTHE �1CDEfJti *'100.UU ORDER OF r•..._ nn*�xxs:xxaxvw++a+xxr++x*+xa+++axx+++xx+xxxmxxr+sxrxw+x�.eo+xxwxxw+.x+x+x:rxxxrx.x+.+x+.x...+xx.*a x. One nu Kl eii �;,d ,«/10o n-._U C3 C3F"- ••U7]-MU 7U.�.7•• u'•�r �v JJ.J '� - Wade, Larry From: Parnell, David Sent: Friday, November 08, 2013 10:15 AM To: Wade, Larry Subject: Stormwater Permits Larry, It is permissible with Mho — DEMLR — DLR — Stormwater, to go forward oral) approval of the following facilitv's permit:;: o NCG0200055 - R. PA. t-layes Const - Stone Creek Sand and Gravel P lira a NCG140431 - Morgan Corp Roxboro Pugmill Y NCG020854 — General Shale, Colon Mine shanks, Dave Parnell Environmental Senior Specialist North Carolina Department of Environment & Natural Resources Division of Energy, Minerals, and Land Resources Raleigh Reainnai Office 3800 Barrett Drive Raleigh, INC 27609 0: (919) 791-420C F: (9191 571-4718 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Wade, Larry From: Wade, Larry Sent: Thursday, October 17, 2013 1:34 PM To: Parnell, David Subject: NCG020855 R. M. Hayes Const. - Stone Creek Sand & Gravel Mine Attachments: Hayes NOI.pdf Hello David, Find attached the NO! for the subject facility. I am sending you a map through courier. Please review these documents and let me know If you have any concerns, prior to issuing a permit for this facility. If I do not receive a response from you within 30 days from the date of this email, I will proceed with issuing the permit contingent upon central office review and approval. If you gave any questions, ur require additional information please let me know. Thanks, Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Permitting Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service Physical Address - 512 N. Salisbury St. Room 942S Raleigh, INC 27699-1612 Raleigh, NC 27604 is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ .. �-a f�.- Y. 1`a la .. I':_ - .. _ 11. ....._ -_., l� ....�it _-� _ .. ..e ♦ .21.[4- GENERAL PROJECT INFORMATION The Stone Creek Sand & Gravel Mine (Permit No. 51-45) is located approximately 10 miles south of Smithfield on Hwy 701 in Johnston County. Currently approximately 10.09 acres of land is within the mine permit boundary with 8.7 acres to be disturbed within the next 10 years. The proposed modification will add 21.5 acres to the permitted acreage, with 18.9 acres to be disturbed within the next 10 years. The mine areas are connected by an existing road with an easement agreement. Total land disturbance within the next 10-years will be 27.6 acres and includes the access road within the easement agreement. Total permitted land area will be 31.59 acres. The proposed mine expansion area will use wet detention ponds for erosion control runoff. The existing mining operation uses front end loaders to excavate for fill dirt, sand, and gravel. The proposed mine expansion area will be conducted in a similar fashion. Mined material may be washed and screened periodically at the mine. A recirculation system will be installed for use in the screening process. There will be no structures except the screen at the proposed plant area. Water usage will be approximately 400 gallon Is per minute (0.89 cfs). The water will be pumped to the recirculation system from the wet detention pond for makeup water. The recirculation system will not discharge to the wet detention pond. HydroCAD was used to evaluate the runoff volumes and peak flow rates for a 1-inch rainfall, as well as the 10-year and 25-year rain events. Erosion control for the proposed mining area will consist of wet detention basins with perimeter berms to divert the stormwater runoff to the basins. The proposed basins will have corrugated metal riser pipes with two (2) holes (2" diameter) drilled in each riser to slowly drain the basin when the water level goes above normal pool. A trash rack which covers the top of the riser m well as the 2" holes is provided for each riser. The system will allow the water to slowly drain out of the structure for a rainfall event greater than I -inch. The CMP riser pipe inverts will be placed 6" above the drilled holes. Based on the pipe elevations, watersheds, and basin storage data, the maximum rainfall depth before the CMP risers begin to discharge is 2.24" for Basin 4 and 2.12" for Basin 5. The basins can pass the 25-year rain event with one foot of freeboard. The recirculation system is designed to settle the 0.017 millimeter particle size. Both basins will have a surface area of 2,000 sf. An 8" Schedule 40 PVC pipe will connect the two basins. Upon completion of mining, two (2) lakes will be formed. Basin 3 will be formed into an approximately 0.9 acre lake. Basin 5 will be an approximately 3.0 acre lake. The perimeter berms will be removed. Along the perimeter of the mine, ground will be cut to 3:1 (H: V) or flatter slopes. AM areas will be sloped for positive sheet water flow to the lakes. Shed Existing I Exist. r PUMP RE -CIRCULATION BASIN DETAILS (NTS) TYPICAL CROSS-SECTION PLAN VIEW 5' MIN. 50' 50, �� PUMP JT BASIN/ POND SCREEN Over Land Flow 40' ')SLOPE CLEAR WATER BASIN SETTLEMENT BASIN Minimum Recirculation Basin System Requirements Volume Retention Time Surface Area Clear Pond 10,000 fta 187 min. 2000 ft2 Settlement Basin 10,000 fta 187 min. 2000 ft2 Recirculation Basin Construction Specifications 1. Basin system shall be constructed according to the dimensions on the approved plans. 2. Soil backfill for construction of the berths shall be compacted to at least 95 % of the materials standard Proctor maximum dry density as detemined by ASTM D-698. 3. The basin perimeter and embankment slopes shall be vegitatied as per the approved plans within 15 days of construction. Watershed Information Watershed No. Total Area Acres fI Exposed Ground (Acres) Impervious Surface (Acres) _ _ % Impervous Surtace possible Pollutants 1 a 3.58 3.58 0 0.00% I Soil particulate 1 b 10.9 8.09 0 0,00% Soil particulate 2 5.01 ! 2.19 0 0.00% Soil particulate 3a 21.5 ! 8.7 0 i 0.00% Soil particulate 3b 45.4 10.2 0 0.00% Soil particulate (1) Exposed ground acreage will vary over time due to mining and reclamation activities. Note: Only three discharge points will be actively discharging at any point in time. Discharge Point 1 b will not begin discharging until Discharge Point 1 a has been removed. This is also true for Discharge Pants 3a and 3b. LEGEND Property Line -- Adjacent Property Line - - - - Mine Permit Limits - - 10-Yr Limits of Disturbance Buffer Limits Streams Building 120 Topographic Lines Soil/Gravel Road (Existing) Tree Line PROPOSED BASIN DETAILS (BASINS 4 & 5) 51-I Il� {CUTOFF TRENCH) SEDIMENT BASIN SCHED 1 �nITI�S�y� 7 Vicinity Map (NTS) See Outlet Protection Details �r Total Wooded' Grass Disturbed' Q10 Q10 Q25 Q25 Re aired q (1) Provided Re�aired sed'Imem Provided Sediment Storage, Maximum Watershed; (ac) Weighted �t Inflow Outflow (ac) Cx Inflow Outflow Area Area Storage volume Volume Adjacent Berm Heigh Basm'I (ac)� -- - - ac ( ) (cfs) (cfs) -- (cfs ) cfs ( ) (sfl .. {I (s8 {� - -- (� �' _ f 4 21.5 3.0 9.8 8.7 69 55.11 5.87 78.13 6.37 23,973 37,819 1115 660 37,819 1 7.5' 11 5 45.4 8 1 27.1 10.2 73 58.28 22.81 ! 82.63 25.41 25,352 83,740 18,360 83,740 6.75' (1) Required Surface Area is based on Q10"435 Outlet Pipe PROPOSED PRIMARY SPILLWAY DETAILS (BASINS 4 & 5) Cross -Section (NTS) Drain Valve Trash Rack + Top of Riser ) 4 in. r 6 in.� �-" Bin. Normal Pool , • � f . Basin 4: 24" Dia. CMP Riser Basin 5: 36" Dia. CMP Rise£ 3 ft. (2) 2 inch holes 6" CMP C DETAILS of Berm Water Level for 25-Yr Rain Event 1 Embankment Basin 4: 8" Dia. CMP Basin 5: 24" Dia. CMP Note: Embed Riser Pipe and Valve Stem Support into Concrete 3000 psi Concrete at 28 days NOTE: 0.46 CUBIC YARDS OF CONCRETE REQUIRED FOR BASIN 4 1.04 CUBIC YARDS OF CONCRETE REQUIRED FOR BASIN 5 Basin 4: 3' � � �' 0 1 Basin 5: 6' 0 C J G 0 0 1� `' , L) C r � o �< C) % 5" C q Basin 4: 11' dnw Basin 4: r6� C ) Basin 5: 16' o � � Era 5:`43:55 , `\ \ 0 V Basin 4: 10' Basin 5: 14' BASIN OUTLET DETAILS (BASIN 1-3) Cross -Section (NTS) 5 FT 2 - MIN/Front View (NTS) � \ 1' FREEBOARD i.ri II \ of'I 7.0�7 �i � i �° f 79 min �2:1SIDE 3F7 it�g, 3' S=g ° j r SLOPEMAX �� So FILTEIDE SLOPE FABRIC -3 FT 1 Try � ,.�" lard, ,<_ 5t •;� I i 2 C ENGINEERING & ENVIRONMENTAL DATE: SCIENCE COMPANY 09/27) 3008 Anderson Drive DRAWN: Raleigh, NC 27609 (919) 781-7798 RW Stormwater Plan REVISED: Scale: V= 100' _-Altuttn..- _ _ _ _ - f • 1, i I 11 1 f' ' 1 i.1•. •, GENERAL PROJECT INFORMATION The Stone Creek Sand & Gravel Mine (Pemut No. 51-45) is located approximately 10 miles south of Smithfield on Hwy 701 in Johnston County. Currently approximately 10.09 acres of land is within the mine permit boundary with 8.7 acres to be disturbed within the next 10 years. The proposed modification will add 21.5 acres to the permitted acreage, with 18.9 acres to be disturbed within the next 10 years. The mine areas are connected by an existing road with an easement agreement. Total land disturbance within the next 10-years will be 27.6 acres and includes the access road within the easement agreement. Total permitted land area will be 31.59 acres. The proposed mine expansion area will use wet detention ponds for erosion control runoff. The existing mining operation uses front end loaders to excavate for fill dirt, sand, and gravel. The proposed mine expansion area will be conducted in a similar fashion. Mined material may be washed and screened periodically ar the mine. A recirculation system will be installed for use in the screening process. There will he no structures except the screen at the proposed plant area. Water usage will be approximately 400 gallon s per minute (0.89 cfs). The water will be pumped to the recirculation system from the wet detention pond for makeup water. The recirculation system will not discharge to the wet detention pond. HydroCAD was used to evaluate the runoff volumes and peak flow rates for a 1-inch rainfall, as well as the 10-year and 25 -year rain events. Erosion control for the proposed mining area will consist of wet detention basins with perimeter berms to divert the stormwater runoff to the basins. The proposed basins will have corrugated meta) riser pipes with two (2) holes (2" diameter) drilled in each riser to slowly drain the basin when the water level goes above normal pool. A trash rack which covers the top of the riser as well as the 2" holes is provided for each riser. The system will allow the water to slowly drain out of the structure for a rainfall event greater than 1 -inch. The CMP riser pipe inverts will be placed 6" above the drilled holes . Based on the pipe elevations, watershed s, and basin storage data, the maximum rainfall depth before the CMP risers begin to discharge is 2.24" for Basin 4 and 2.12" for Basin 5. The basins can pass the 25-year rain event with one foot of freeboard. The recirculation system is designed to settle the 0.017 millimeter particle size. Both basins will have a surface area of 2,000 sf An 8" Schedule 40 PVC pipe will connect the two basins. Upon completion of mining, two (2) lakes will be formed. Basin 3 will be formed into an approximately 0.9 acre lake. Basin 5 will be an approximately 3.0 acre lake. The perimeter berms will be removed. Along the perimeter of the mine, ground will be cut to 3:1 (H:V) or flatter slopes. All areas will be sloped for positive sheet water flow to the lakes. �X�Sti�n� PUMP 50, RE -CIRCULATION BASIN DETAILS (NTS) IJF-@\V/I�rirj 4o, ENT BAS 1 50' Over Land Flow TYPICAL CROSS-SECTION 5' MIN. ) SLOPE CLEAR WATER BASIN SETTLEMENT BASIN Minimum Recirculation Basin System Requirements Volume Retention Time Surface Area Clear Pond 10,000 fta 187 min. 2000 ft2 Settlement Basin 10,000 fta 187 min. 2000 ft2 Recirculation Basin Construction Specifications 1. Basin system shall be constructed according to the dimensions on the approved plans. 2. Soil backfill for construction of the berms shall be compacted to at least 95 % of the materials standard Proctor maximum dry density as detemined by ASTM D-698. 3. The basin perimeter and embankment slopes shall be vegitafied as per the approved plans within 15 days of construction. Watershed Information Watershed Total Area i11 Exposed Ground Impervious Surface % Impervious Possible Pollutants No. 1 ai Acres Acrea 3.58 3.58 Acres) Surface 0 0.00% 1 Soil particulate 1 b 10.9 li 8.09 0 0.00% Soil particulate 2 5.01 li 2.19 0 0.00% I Soil particulate 3a 21.5 8.7 0 0.00% Soil particulate 3b 45.4 10.2 0 0,00% Soil particulate (1) Exposed ground acreage will vary over time due to mining and reclamation activities. Note: Only three discharge points will be actively discharging at any point in time. Discharge Point 1 b will not begin discharging until Discharge Point 1 a has been removed. This is also true for Discharge Points 3a and 3b. LEGEND Property Line - Adjacent Property Line - - - - Mine Permit Limits - 10-Yr Limits of Disturbance Buffer Limits Streams Building lzo Topographic Lines Soil/Gravel Road (Existing) Tree Line PROPOSED BASIN DETAILS (BASINS 4 & 5) 5'--- - 1, 5' 2 {CUTOFF TRENCH} SEDIMENT BASIN SCHEDULE Vicinity Map (NTS) See Outlet Protection Details i Basin Total Wooded Grass Disturbed Watershed (ac) ac) (ac) ( CN Q10 Q10 Inflow Q10 utflowl Q25 Inflow Q25 Outflo (1) Required Area Provided Area Req�^ Provided sediment sediment storage stoage volume volume Maximum Adjacent Berm Height ; (ac) (cfs) (cfs) (�) (cfs) (s0 (sf) m + (� y4 4 21.5 3.0 9.8 8.7�6955.11 --- 5.87 78.13 - 6.37 23,973 37,819 � 15,669 37, 7.5' 5 45.4 8.1 27.1 10.2 - 58.28 22.81 82.63 25.41 25,352 83,740 _I 18,360 83,740 76 5 (1) Required Surface Area is based on Q10*435 PROPOSED PRIMARY SPILLWAY DETAILS (BASINS 4 & 5) Cross -Section (NTS) Shed \! j � ..-,/ ��., � Drain Valve Water Level for 26-Yr Rain Event 1T Trash Rack i TOP of Riser 4 in. 6in� Normal Poor Bin �1 Embankment Existing Drive Basin 4: 24"36" 1 CMP Riser 2 L Basin 5: 36' Dla. CMP Ri i J - a fl (2) 2 inch holes 1, / Basin 4: 18" Dia. CMP Basin 5: 24" Dia. CMP k Note: Embed Riser Pipe and Valve Stem Support into Concrete \ _ 6" CMP Drain aipe� PP _.i � 3000 psi Concrete at 28 days N, NOTE: 0.46 CUBIC YARDS OF CONCRETE REQUIRED FOR BASIN 4 1.04 CUBIC YARDS OF CONCRETE REQUIRED FOR BASIN 5 EXigt� Outlet Pipe F Scale: V= 100' OUTLET PROTECTION DETAILS BASIN OUTLET DETAILS (BASIN 1-3) Basin 4: 3' 1 Basin 5: 6' ��' 0 �✓ 0 I-) C n " 5 I� i \- C C Basin 4: 11' (-)drr ate: Basin 4:6", s-. Basin 5: 16' &a in :13:5�) 1 CD 1 Basin 4: 10' _ Basin 5: 14' Cross -Section (NTS) 5 FT 24" MIN 3 FT FILTER FABRIC Front View (NTS) 1'FREEBOARO 2:1 SIDE SLOPE MAX 1:1 SIDE SLOPE MAX ' ^9.'➢:: r:,.:: L �,�:.' 1:: -:,. .... cim ... :. -.-..; r. :-nr :..-...-..r ".. :-...- -- ..-rT.(.aP'�ir. n; c=tutu i _. o.F., m: �..i