HomeMy WebLinkAboutNCG020652_COMPLETE FILE - HISTORICAL_20130725-STORMWATER-UN{SION CODING -SHEET -
RESCISSIONS .
PERMIT NO.
�V Cb v n �D
DOC TYPE ,
COMPLETE FILE -HISTORICAL
DATE OF
.RESCISSION
p of3 o-7a5
YYYYMMDD
p.�
A,A,!tw*'A&
IMCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
RBJ Associates
Attn: John W. Taylor, Partner
PO Box 12006.
New Bern, NC 28561
Division of Water Quality
Thomas A. Reeder
Actinq Director
July 25, 2013
Subject: Exemption from Monitoring During Shut -Down (Site Dormancy)
Certificate of Coverage # NCG020652
Newport Mine, Newport NC
Dear Mr. Taylor:
John E. Skvarla, III
Secretary
A Compliance Evaluation Inspection performed at the Newport Mine in Newport, NC on July 16,
2013 by Joanne Steenhuis of the Wilmington Regional Office verified that no mining activity
was taking place at the time of the inspection. Your recent request dated July 23, 2013 to keep
the NCG020652 permit, but to discontinue stormwater and wastewater monitoring is hereby
approved, based on the following conditions:
• There will be no mining activities taking place while the site is considered "dormant".
• Stockpiles of raw materials must be vegetated or stabilized such that migration off site
does not occur.
• No chemical additives or petroleum products are to be stored on the site.
• There shall be no wastewater (mine pit dewatering) from the site (either by mechanical
means or by gravity) and all wastewater treatment units shall be cleaned, stabilized, and
inactivated as to render them harmless to the environment while the site is dormant.
• Qualitative and analytical monitoring actions as described in Part III, Sections B, C, D and
E do not have to be conducted — as long as the above conditions and all other permit
conditions and limitations are met, including
o The annual permit fee must be paid. Failure to pay the annual permit fee will
be considered a violation of the subject permit.
o The Stormwater Pollution Prevention Plan (SPPP) shall be kept updated to reflect
the status of the facility. Updates and conditions of the SPPP of note are:
The BMP Summary shall be reviewed and updated annually.
• Training programs shall be developed and training provided at least one a
year for facility personnel with responsibilities for: spill response and
cleanup, preventative maintenance activities, and for any of the facility's
operations that have the potential to contaminate stormwater runoff.
5i hit)gton Reg�onai oi5oe
127 Caix�bal dive ExtenNim, Wilnungton, north Carolina 28445 One
Phase: 910795-7215 VAX 9M330-2-004 � QETIR Assistance: 1-87.7-623 6748 Nor�Ma+rofina
tr�emei: vrm,.ocvra`erquaiity.org �iL r�[ 61�
An Egsd OppDrWh41 Affur k6 a Ac5on FmplDyyer
- 50°l. Recycled i 10% Post Consvmw flew
,1 RBJ Associates
Attn: John W. Taylor, Partner
NCG 020652 Newport Mine
July 25, 2013
Page 2 of 3
All aspects of the SPPP shall be reviewed and updated on an annual basis.
The annual update shall include an updated list of significant spills or
leaks of pollutants for the previous three years, or the notation that no
spills have occurred. The annual update shall include written
recertification that all stormwater outfalls have been evaluated for the
presence of nonstormwater discharges. (Should nonstormwater
discharges be discovered, the permitee shall contact this office as soon as
possible but in no case greater than 24 hours or the next business day).
Inspections of the facility and all stormwater systems shall occur as part
of the Preventative Maintenance and Good Housekeeping Program at a
minimum on a semi-annual schedule.
• The Division of Energy, Minerals and Land Resources (DEMLR) must be notified in
writing at least 30 days prior to commencing any industrial activity on the site, even if
just temporary or short-term.
• A copy of this letter must be maintained with the facility permit and associated plans
and records for the life of the permit.
Should you have any questions, please contact Joanne Steenhuis at 910.796.7306 or by e-mail
at "oanne.steenhuis@ncdenr.gov. ov. After August 1st 2013, please contact Dan Sams with the
Division of Energy, Mineral and Land Resources (DEMLR) in Wilmington at 910.796.7215 or viz
e-mail at dan.sams@ncdenr.ov.
Si cerely,
Ja H. Gregson
Regional Supervisor
Surface Water Protection Section
Enclosures
Site Inspection Report
NCG020000
Technical Bulletin
Oil Spill Information
cc: Bethany Georgoulias — Stormwater Permitting Unit
Dan Sams — DEMLR - Wilmington
Central Files
WiRO
Compliance Inspection Report
Permit: NCG020652 Effective: 01/01/10 Expiration: 12/31/14 Owner: Rbj Associates
SOC: Effective: Expiration: Facility: Newport Mine
County: Carteret Next To 8170 US Hwy 70 W
Region: Wilmington
Newport NC 28570
Contact Person: Rhett Taylor Title: Phone: 252-638-2217
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Certification: Phone:
Inspection Date: 07/05/2013 EntryTime: 10:00 AM Exit Time: 11:30 AM
Primary Inspector: Joanne H Steenhuis Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: Q Compliant Q Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit: NCGO20652 Owner - Facility: Rbj Associates
Inspection date: 07/05/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The site has not been previously inspected for the NPDES permit and the mine was in operation for only a short period.
The owner has requested that the site be place on "site dormancy" status. A letter has been generated from the WiRO
approving the dormancy status with conditions. Letter is dated July 25, 2013.
Page: 2
Permit: NCG020652 owner - Facility: Rbj Associates
Inspection Date: 0710512013 Inspection Type: Compliance Evaluation
Reason for Visit:
Routine
Stormwater Pollution Prevention Plan
Yes
No
NA
NE
Does the site have a Stormwater Pollution Prevention Plan?
❑
■
❑
❑
# Does the Plan include a General Location (USGS) map?
■
❑
Q
❑
# Does the Plan include a "Narrative Description of Practices"?
❑
■
❑
❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
■
❑
❑
❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
Y
❑
❑
# Has the facility evaluated feasible alternatives to current practices?
❑
■
❑
❑
# Does the facility provide all necessary secondary containment?
13
❑
■
❑
# Does the Plan include a BMP summary?
❑
❑
■
❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
❑
■
❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑
❑
■
❑
# Does the facility provide and document Employee Training?
Cl
❑
■
❑
# Does the Plan include a list of Responsible Party(s)?
❑
Q
■
❑
# Is the Plan reviewed and updated annually?
❑
❑
■
❑
# Does the Plan include a Stormwater Facility Inspection Program?
n
■
n
❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑
■
❑
❑
Comment: The site is being evaluated for "site dormancy" status. The owner has
been told that a SWPPP will be necessary and will need to be promptly implemented
when the mine is re -opened.
Qualitative Monitoring
Yes
No
NA
NE
Has the facility conducted its Qualitative Monitoring semi-annually?
❑
■
❑
❑
Comment: Since the pump has been removed, there is no discharge.
Analytical Monitoring
Yes
No
NA
NE
Has the facility conducted its Analytical monitoring?
❑
❑
■
❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
❑
❑
■
❑
Comment: There are no machines on -site at the time of inspection.
Permit and Outfalls
Yes
No
NA
NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
■
❑
❑
❑
# Were all outfalls observed during the inspection?
■
❑
❑
❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑
■
❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑
■
❑
❑
Page: 3
Permit: NCG020652 Owner • Facility: Rbj Associates
Inspection Date: 07105/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Comment: The ponds capture the stormwater and is not being pumped at the time of
inspection. A pump was brought into the site for that purpose. The mine has not been
worked since approximately 2006. The on -site vegetation suggests that it has been
dormant for sometime. No equipment was noted to be on -site.
Page: 4
Steenhuis, Joanne
From:
John Taylor [John@nctriplenet.com]
Sent:
Tuesday, July 23, 2013 1:02 PM
To:
Steenhuis, Joanne
Subject:
Newport Mine- site dormancy
Attachments:
RBJ mine- site dormancy 7-23-13.pdf
Hi Joanne,
Per our last conversation, please find the attached letter requesting site dormancy for the Newport
Mine discharge permit.
Thanks for all your help and please call with any questions.
Regards,
John
John W. Taylor, President
Coastal Real Estate & Management, Inc.
P.O. Box 12006
New Bern, NC 28561
252-633-5106 Main
252-671-3400 Cell
252-633-2836 Fax
lohn@nctriplenetcom
T)w
RBJ Associates
P O Box 12006
New Bern, NC 28561
252-633-5106
July 23, 2013
Joanne Steenhuis (via email: joanne steenhuis4ncdenr_gov)
NC Dept of Environment & Natural Resources - DWQ
127 Cardinal Drive Ext.
Wilmington, NC 28405
Re: Newport Mine discharge permit ffNCG020652, 'Hwy. 70, Newport, NC
Dear Ms. Steenhuis:
In reference to our recent conversation, I am hereby requesting "site dormancy" for the
above referenced mine permit. It is my understanding that -before we start.mining again,
we need to give your office 30-days notice. 1 also understand that we do not need to
perform monitoring during this dormant period, nor,are we required(to perform a
Stormwater Prevention Polution Plan (SPPP) until we start mining again.
When should I expect you to notify me of your granting of "site dormancy" status?
Thank you for all your help in this.matter and please feel free to leurne know if you need
anything further.
Sin rely,
Jo n W. Taylor, Partner
Steenhuis, Joanne
From:
John Taylor Bohn@nctriplenet.com]
Sent:
Tuesday, July 23, 2013 1:02 PM
To:
Steenhuis, Joanne
Subject:
Newport Mine- site dormancy
Attachments:
RBJ mine- site dormancy 7-23-13.pdf
Hi Joanne,
Per our last conversation, please find the attached letter requesting site dormancy for the Newport
Mine discharge permit.
Thanks for all your help and please call with any questions.
Regards,
John
John W. Taylor, President
Coastal Real Estate & Management, Inc.
P.O. Box 12006
New Bern, NC 28561
252-633-5106 Main
252-671-3400 Cell
252-633-2836 Fax
iohn(&-ncWplenetcom
RBJ Associates
P O Box 12006
New Bern, NC 28561
252-633-5106
July 23, 2013
Joanne'Steenhuis (via email: joanne.steenhuis4ncdenr.gov)
NC Dept of Environment & Natural Resources - DWQ
127 Cardinal Drive�Ext.
Wilmington, NC 28405
Re: Newport Mine discharge permit #NCG020652, Hwy. 70, Newport, NC
Dear Ms. Steenhuis:
In reference to our recent conversation, I am hereby; requesting "site 'dormancy" for the
above referenced mine permit. It is my understanding that before we start mining again,
we need to give your office 30-days notice. I also understand that we do not need to
perform monitoring, during this dormant period, nor are we required1to perform a
Stormwater Prevention Polution Plan (SPPP) until we start mining again.
When should I expect you to notify me of your granting of "site dormancy" status?
Thank yciu for all your help in this matter and please feel free to let,rne'know if you need
anything further.
SiTnW.
,
Jaylor, Partner
71A.
mu e "'!"i::.a�1A3;�. q�ooei
9
_..4
.-� Vr -�. � ``fit. -; iJ•.. f• y�' ��.�.� ti�; 17,i, �. ..� .y �
I.:L:; .x'191:� 9�F�5 ,'�-N "�]3� �� � _•''K`.1N^x'ttln�� _ � i�Ca r��
Comniianc Inspection Report sa t c.J
Permit: NCG020652 Effective: 01/01/10 Expiration: 12/31/14 Owner: Rbj Associates
SOC: Effective: Expiration: Facility: Newport Mine
County: Carteret Next Tc 8170,1JS Hwy 70 W
Region: Wilmington
a�41
Contact Person. 4Title:
OU
Directions to Facility:
System Classifications: `_✓ "
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 07/0512013 EntryTime: 10:00 AM
Primary Inspector: Joanne H Steenhuis
Secondary Inspector(s):
Certification:
7"
NC 28570
Phone:2ZI�-
Phone:
Exit Time: 11:30 AM
Phone:
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
Storm Water
aQ?
(See attachment summary)
2
Page: 1
Permit: NCG020652 Owner -Facility; Rbj Associates
Inspection Date: 07/05/2013 Inspection Type: Compliance Evaluation Reason far Visit: Routine
Inspection Summary:
Page: 2
Permit: NCG020652 Owner - Facility: Rbj Associates
Inspection Date: 07105/2013 Inspection Type: Compliance Evaluation
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
1
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Analytical Monitoring
Has the facility conducted its Analytical monitoring?
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas?
Comment:
Permit and Outfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Reason for Visit: Routine
Yes No NA NE
Yes No NA NE
❑ ❑ ❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑
❑❑❑
❑❑❑—N9
❑ ❑ fin
❑ ❑� ❑
Page: 3
RBJ Associates
Rhett Taylor
PO Box 12172
New Bern, NC 28561
Dear Mr. Taylor:
Michael F. Easley, Governer
William G Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
July 29, 2005
F
IVE
D
0 2005
Alan W. Klimek. P.E. Director
Division of Water Quality
ECEI !9 EI
AUG 0 2 2005
Subject: General Permit No. NCG020000
Newport Mine
COC NCG020652
Carteret County
In accordance with your application for a discharge permit received on February 24, 2005
we are forwarding herewith the subject certificate of coverage to discharge under the subject
state — NPDES general permit. This permit is issued pursuant to the requirements of North
Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina
and the US Environmental Protection Agency dated May 9, 1994 (or as subsequently amended).
Please take notice that this certificate of coverage is not transferable except after notice to
the Division of Water Quality. The Division of Water Quality may require modification or
revocation and reissuance of the certificate of coverage.
In addition, please be aware that mine dewatering at your site has the potential to impact
adjacent wetlands. The specific requirements for mine dewatering at facilities near wetlands can
be found in Section C, Part l of your permit (Part III Page 5 of 9). Your Operation and
Maintenance Plan has been conditionally approved. There are a few outstanding issues with the
Plan and you should contact Ed Beck in the Wilmington Regional Office to resolve these issues
at (910) 395-3900.
This permit does not affect the legal requirements to obtain other permits which may be
required by the Division of Water Quality or permits required by the Division of Land
Resources, Coastal Area Management Act or any other federal or local governmental permit that
may be required.
Non`hCarofina
Aalitra!!J
Wetlands and Stormwater Branch 16 17 Mail Service Center Raleigh, NC 27699-1017 Phone (919) 733-5083
Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612
An Equal OpportunitylAifirmative Actior. Employer — 50% Recycled110% Post Consumer Paper
a
If you have any questions concerning this permit, please contact Jonathan Diggs at
telephone number (919) 733-5083 ext. 537.
Sincerely,
ORIGINAL SIGNED BY
KEN PICKLE
Alan W. Klimek, P.E.
cc: Washington Regional Office
Central piles
Stormwater Permitting Unit Files
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE NO. NCG020652
STORMWATER, MINE DEWATERING, AND/OR OVERFLOW FROM
PROCESS WATER RECYCLE SYSTEMS DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
RBJ Associates
is hereby authorized to discharge stormwater and to operate or continue operation of treatment systems and
discharges associated with mine dewatering and process wastewater recycling overflow from a facility located at
Newport Mine
Next to 8170 US Hwy 70W
Newport
Carteret County
to receiving waters designated as an unnamed tributary to Shoe Branch, a class C water in the White Oak River
Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1,
11, I11, IV, V, VI and VII of General Permit No. NCG020000 as attached.
This Certificate of Coverage shall become effective July 29, 2005.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day July 29, 2005.
ORIGINAL SIGNED BY
KEN PICKLE
Alan W. Klimek, Director
Division of Water Quality
By Authority of the Environmental Management Commission
. . . . . . . . . .
"'o:
"A
16
m V A A
-Tlrl� -,-,4
�T M. 1,
'N'
WAX IN
ff-A
Al,
1-11 , YFI
7" Wo
t}vhip-
-:47= IV:%
............
�;T
yy%j 714115.1�
N,
y4
Q
. 41
05*'
A45
VIA
1. -4,
j
V-;g 4'- 'R
N:
no
Lv:1
Lw
got
. . . . . . . . ......
q.11
A MA
r
Coov6qht (C) 1998, Maptech. Inc
Markers
Name: Newport Mine - RBJ Associates
Short Name: NwprtM
Coordinates: 034° 49' 45.36" N, 076' 53' 00.90" W
Comment: Newport Mine - RBJ Associates NCG020652 subbasin 03-05-03, White Oak River
Basin, Carteret County, UT to Shoe Branch, Class C, USGS quad Masontown