Loading...
HomeMy WebLinkAboutNCG020072_Inspection Report_20140325Compliance Inspection Report Permit: NCG020072 SOC: County: Granville Region: Raleigh Contact Person: Matt Burgess Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 01/01/10 Expiration: 12/31/14 owner: Carolina Sunrock LLC Effective: Expiration: Facility: Butner Mining and Concrete Facility 100 Sunrock Dr Inspection Date: 03/25/2014 Primary Inspector: David R Parnell Secondary Inspector(s): Title: Entry Time: 10:30AM Certification: Butner NC 27509 Phone: 919-747-6384 Phone: Exit Time: 12:30PM Phone: 919-791-4260 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG020072 Owner - Facility: Carolina Sunrock LLC Inspection Date: 03/25/2014 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page 2 of 3 Permit: NCG020072 Owner - Facility: Carolina Sunrock LLC Inspection Date: 03/25/2014 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: A review of the facility's plan was done on line in the Sunrock Office on 3/28/14. Field inspection was conducted on 3/25/14. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: Qualitative Monitoring is not being done. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑ Comment: Analytical Monitoring is not being done. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: Page 3 of 3