HomeMy WebLinkAboutNCG020072_Inspection Report_20140325Compliance Inspection Report
Permit: NCG020072
SOC:
County: Granville
Region: Raleigh
Contact Person: Matt Burgess
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Effective: 01/01/10 Expiration: 12/31/14 owner: Carolina Sunrock LLC
Effective: Expiration: Facility: Butner Mining and Concrete Facility
100 Sunrock Dr
Inspection Date: 03/25/2014
Primary Inspector: David R Parnell
Secondary Inspector(s):
Title:
Entry Time: 10:30AM
Certification:
Butner NC 27509
Phone: 919-747-6384
Phone:
Exit Time: 12:30PM
Phone: 919-791-4260
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG020072 Owner - Facility: Carolina Sunrock LLC
Inspection Date: 03/25/2014 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Page 2 of 3
Permit: NCG020072 Owner - Facility: Carolina Sunrock LLC
Inspection Date: 03/25/2014 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑ ❑ ❑
Comment: A review of the facility's plan was done on line in the Sunrock Office on 3/28/14.
Field inspection
was conducted on 3/25/14.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑
Comment: Qualitative Monitoring is not being done.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑
Comment: Analytical Monitoring is not being done.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑
Comment:
Page 3 of 3