HomeMy WebLinkAboutNCG020030_COMPLETE FILE - HISTORICAL_20160826STORMWATER DIVISION COOING SHEET
NCG PERMITS
PERMIT NO.
NCGW ()aQOc3U
DOC TYPE
2/HISTORICAL FILE
DOC DATE
❑ &MU(.0
YYYYMMDD
3r �r PAT MCCRORY
DONALD R. VAN DER V AART
Environmental
Quality
August 26, 2016
Mr. Theodore Bratton, CEO
Wake Stone Corporation
P.O. Box 190
Knightdale, NC 27545
Subject: Multimedia Compliance Inspection
Wake Stone Corporation — Knightdale Quarry
Wake County
Dear Permittee:
seaeary
Department of Environment and Natural Resources staff conducted a multimedia compliance inspection of
Wake Stone Corporation — Knightdale Quarry on August 1, 2016 for permitted and/or other activities
administered by the following Divisions:
Division of Air
Division of Energy,
Division of Water
Division of Waste
Quality(DAQ)
Mineral, and Land
Resources (DWR)
Management (DWM)
Resources DEMLR
We hope that you have enjoyed the benefit of our initiative to provide a single inspector capable of handling
multiple areas of environmental compliance at your facility. The results of each applicable inspection area
and any associated response actions or necessary corrective measures are detailed in the Division specific
areas of the attached report. (Air Quality Inspection was not included in this multimedia inspection, because
DAQ staff inspected the facility in July 2016). If there are no -notes or comments under each Division
header, you may assume compliance with that particular Division's rules and regulations at the time of
inspection. Should violations be noted in the attached report, you may receive,separate enforcement related
correspondence in addition to this report.
If you have any questions regarding this multimedia inspection, please contact me at Cheng Zhang
(cheng.zhang@ncdenr.gov). Thank you for your cooperation.
cc:
DAQ RRO Files
DEMLR RRO Stormwater Files
DEMLR RRO Mining Permit Files
Department of Environmental Quality, Raleigh Regional Office httpJ1deq.nc govl
1628 Mail Service Center, Raleigh, NC 27699.1628 Phone: (919) 791.4200
Location: 3800 Barreft Drive, Raleigh, NC 27609 Fax: (919) 571-4718
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
Environmental
Quality
August 26, 2016
Mr. Theodore Bratton, CEO
Wake Stone Corporation
P.O. Box 190
Knightdale, NC 27545
Subject: NPDES Stormwater Compliance Evaluation Inspection
Certificate of Coverage No. NCG020030
Wake Stone Corporation — Knightdale Quarry
Wake County
Dear Mr. Bratton:
Staff from the Department of Environmental and Natural Resources conducted a stormwater inspection
on August 1, 2016, as part of a multimedia inspection of your facility. The assistance provided by Mr.
David Lee, Mr. Cole Atkins, and Mr. Al Parker during the inspection was greatly appreciated. The
inspection report is attached. Findings during the inspection were as follows:
Certificate of Coverage (COC) No. NCG020033 under NPDES General Permit NCG020000
was issued to Wake Stone Corporation — Knightdale Quarry to discharge stormwater runoff
and process wastewater to Beaverdam Creek, a Class C, NSW stream, in the Neuse River
Basin.
2. The stormwater pollution prevention plan (SPPP) has been updated since the last inspection.
A review of the plan indicated that the it contained all components required by the General
Permit. It is recommended that a separate BMP-summary be created to include brief
description of all structural BMPs as well as non-structural BMPs.
3. Semi-annual qualitative monitoring has been conducted as required by the permit at the all
five stormwater discharge outfalls (SDOs). Stormwater Best Management Practices (BMPs)
has been inspected weekly.
4. Analytic monitoring samples were conducted semi-annually. It was noted that a new
stormwater detention pond with forebays and discharge pipe was constructed in
January 2016. The pond collects runoff from former SDOs 06 an 07 and provides
further treatment. With the addition of the pond, the facility currently has two SDOs (#I,
and #2). Pit dewatering monitoring had been conducted quarterly as required by the permit
and no limit exceedances were noted.
Raleigh Regional Officel628 Mail Service Center, Raleigh, North Carolina 27699-1628
Phone: 919-791-42001 FAX: 919-571-4718 / Internet: http://portal.ncdenr.org/web/lr/
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
Page 2 of 2
5. Both SDOs and the pit dewatering discharge outfall were observed during the inspection and
found maintained and accessible.
If you have any questions regarding the attached report or any of the findings, please contact Cheng
Zhang at 919-791-4200 (or email: chen .zhan 7 ncdenr. 7ov).
Sincerely,
Cheng Zhang
Environmental Senior Specialist
Raleigh Regional Office
Enclosure: Compliance Evaluation Inspection Form
cc: Central Files
RRO SWP files
Compliance Inspection Report
Permit: NCG020030
Effective: 05/09/16
Expiration: 09/30/20 Owner:
Wake Stone Corp
SOC:
Effective:
Expiration: Facility:
Knightdale Quarry
County: Wake
6811 Knightdale Blvd
Region: Raleigh
Knightdale NC 27545
17o,,v: d
Lee-,
Contact Person: T
Title: .(;ten ✓ rpr/'t�rtta�
Phone: 919-266-1100
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site• Representative(s): /'
Related Permits:
Inspection Date: 08/01/2016
Primary Inspector: Cheng Zhang
Secondary Inspector(s):
Certification:
/Oark e-r-
Phone:
Entry Time: 09:OOAM Exit Time: 11:30AM
Phone: 919-791-420O
Eric Swope
Thomas McKinney
Reason for Inspection: Routine ' inspection Type: Compliance Evaluation
Permit Inspection Type: Mining Activities Stormwater Discharge COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
® Storm Water
(See attachment summary)
Page: 1
Permit; NCG020030 Owner • Facility; Wake Stone Corp
Inspection Date; 0W0112016 Inspection Type: Compliance Evaluation Reason for Visit; Routine
Inspection Summary
The SPPP was updated after the last inspection and had all required components. It is recommended that a separate BMP
summary be created to include brief description of all structural BMPs as well as non-structural BMPs.
Qualitative and analytical monitoring at two SDOs and pit dewater discharge monitoring were conducted as required.
It should be noted that a new detention pond with forebays was constructed after the last inspection. The pond collects
runoff from former SDOs 06 an 07 and provides further treatment. The stormwater ditch upstream the newly constructed
detention pond was maintained and stabilized with rip rap.
Page: 2
Permit: NCG020030 owner - Facility: Wake Stone Corp
Inspection Date: 08101/2016 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Analytical Monitorinq ygs No NA NE
Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ®❑ ❑ ❑
Comment: Quarterly sampling for Dit dewatering and semi-annual sampling at two SDOs were conducted
as required by the permit. A new detention pond with forebays was constructed after the last
inspection and provide further treatment of runoff from the former S0006 and SDO07.
Perms and Qutfalls . Yee No NA N
# Is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑
Al Were all outfalls observed during the inspection? ®❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? M ❑ ❑ ❑
Comment:
Qualitative Monitoring Yes _No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: Semi-annual Qualitative monitoring was conducted as required.
Stormwater Pollution Prevention Plan
yes No NA NE
Does the site have a Stormwater Pcllution Prevention Plan?
M ❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
®❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
®❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
S ❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
®❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide aft necessary secondary containment?
®❑ ❑ ❑
# Does the Plan include a BMP summary?
S ❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
■ ❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
®❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
S ❑ ❑ []
# Is the Plan reviewed and updated annually?
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
®❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
®❑ ❑ ❑
Page: 3
. perrnh; NCG020030 Owner - Facility: Wake Stone Corp
Inspection Date: 0810112010 Inspection Type: Compliance Evaluation Reason for Vlslt: Routine
Stormwater Pollution Prevention Plan Yes No Na NE
Comment: Site map was'modified with up-to-date SDO locations.
BMP summary is included in the narritive description, and needs to be revised withbrief
decription of newly constructed detention pond and the eight structural BMPs.
Weekly BMP inspections were conducted and documented.
Page: 4
North Carolina Department of Environment and Natural Resources,
Division of Land Resources, Land Quality Section
MINE INSPECTION REPORT
® PERMITTED MINE SITE ❑ UNPERMITTED MINE SITE
1. MINE NAME: Knigi tdaleQuaM 2. MINE LOCATION: US 64
3. COUNTY: Wake 4. RIVER BASIN: Neuse 5. CASE: NA
6. OPERATOR: Wake Stone Corporation
7. ADDRESS: P.O.Box 190 Knightdale, NC 27545
8. MINING PERMIT #: 92-06 - 9. PERMIT EXPIRATION DATE: 09/20/2023
10. PERSON(S) CONTACTED AT SITE: David Lee, Cole Atkins, Al Parker
I L PICTURES? ❑ Yes ®No TAKEN BY:
12. TYPE OF INSPECTION:
❑ A. Initial Inspection (Unpermitted Mine Sites)
1. Size of affected land: ac. (attach sketch map)
2. How was this area measured? Measured by:
B. Routine Inspection (Permitted Mine Sites)
C: Follow-up Inspection
13. Date of last inspection: 05/14/2015
14. Any mining since that date? ® Yes ❑ No If yes, cite evidence of such mining activity: Mine
oneratine during inspection
15. Was mine operating at time of inspection? ® Yes ❑ No If yes, explain:. Mine_ operating during
inspection
16. Is the mine in compliance with the Operating Conditions of the Permit? ®'Yes - ❑ No ❑ NIA
If no, explain:
17. Is the mine in compliance with the Reclamation Conditions of the Permit? ® Yes ❑ No ❑ NIA
If no, explain:
18. Is there any off -site damage? A. ❑ Yes B. ® No C. ❑ None observed
If A, describe the type and severity of the damage:
If B or C, is there potential for offsite damage? ® Yes ❑ No Explain: Minor potential at main entrance
due to fugitive dust and tracking onto paved road. The area is addressed by the o_ Aerator regularly.
19. Corrective measures needed and/or taken:
20. Other recommendations and comments: A new detention pond with forebays was constructed after.the last
inspection. The pond collects runoff from former SDOs 06 an 07 and provides further treatment. The stormwater
ditch upstream the newly constructed detention pond was maintained and stabilized with rip rap. _
21. Is the Annual Reclamation Report +1- map accurate? Z Yes ❑ No (Explain) ❑ Not Reviewed ❑
22. Follow-up inspection needed? ❑ Yes ® No Proposed date
23. No. of additional pages of Inspection Report 0 24. Copy of Report sent to operator
INSPECTED BY: -CheLigZhang, Eric Swoop, Thomas McKinney —Date 08/01/2016
Telephone No: (919)791-4200_
Copy to file Copy to operator Copy to Mining Specialist
NCDENR-DWQ-RRO
Surface Water Protection
Meeting Attendance Roster
Date: 014� (10 Time: I -O PM
Subject:
Name
Organization
Phone Number
�d
�v
1-LJ
b '] 7,
30-7 - & 3-71
rl
1
S (
!2
GN Pt t' l7
ss(.r v �u
_ -6
0�, Z,)Egv 6d L�=
-�-3