HomeMy WebLinkAboutNCC200631_ESC Approval Submitted_20200218Engineering Services Department
Terry Kuneff, P.E.
INTERIM DIRECTOR
NORTH CAROLINNS INTERNATIONAL CITY'
February 14, 2020
Owner/Financially Responsible Party
West Wendover Land Development, LLC
5826 Samet Drive
Suite 105
High Point, N.C. 27265
RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN
Project: Shops 3 and 02 Fitness Site
Location: 4109 - 4113 Brian Jordan Lane, High Point, NC 27265
Land -Disturbing Permit # EN2000152296
Dear Sir or Madame:
The Engineering Services Department has completed the review process for the Soil Erosion
Sedimentation Control Plan submitted on 2/10/2020 for the project referenced above. Based
on our review, the plan is hereby approved.
This plan approval will specifically cover the Erosion and Sediment Control measures
required for both the Grading Phase and the Building Phase. If a different identity (from
the Grading Phase) executes the Building Phase, this approved Erosion and Sediment
Control Plan (E&SCP) may be transferred to the firm/person executing the Building Phase.
Prior to transferring the plan, written authorization and a Financial Responsibility Form must
be submitted to our office for review. The terms and conditions of the approved plan shall
remain in place unless otherwise noted.
The Erosion Control Measures shown on the plan(s) are approximate. Some field adjustment
may be required to make the measures work correctly.
An Erosion Control Financial Guarantee (Surety) will not be required.
This letter will serve notice that:
As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND
INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be
carried out by the staff of Department of Environmental Quality or other qualified
persons authorized by the Commission or Department of Environmental as necessary
to carry out its duties under the Act and no person shall refuse entry or access to any
representative of the Commission or any representative of a local government who
requests entry for purposes of inspection.
• As per High Point Development Ordinance 2.5. 10. 6.1 and 2, the Land -Disturbing
Permit will become null and void one (1) year from the date of issuance. You may
request in writing, 180-day permit extension 30 days prior to the expiration date, for
good cause.
• The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing
Permit issued by the City of High Point is conditional based on the applicant's
compliance with Federal and State water quality laws, regulations, and rules.
• The approval of the draft Erosion and Sediment Control Plan is based in part on the
accuracy of the information provided on the submitted Financial Responsibility Form.
If any changes to the submitted Financial Responsibility Form (e.g. ownership,
address, company name) occur, then you are required to submit an amended form
showing such changes.
• The approval of the draft Erosion and Sediment Control Plan does not supersede any
other permit or approval.
• Approval of the draft Erosion and Sediment Control Plan authorizes the permittee to
discharge stormwater in accordance with the standard and regulations of current
General Permit NCGO 10 and the National Pollutant Elimination System (NPDES).
• This Letter of Approval must be posted at the site of the land disturbing activity along
with the Land -Disturbing Permit, the approved Erosion and Sediment Control Plan, a
copy of the NPDES/NCG0 10 Permit, and a copy of the Certificate of Coverage
(COC).
• Records of Inspections must be kept on site for twelve (12) months.
• All data used to complete the e-NOI and all Inspection Records must be maintained
for a period of three (3) years and available upon request (40 CFR 122.41).
• Construction site pollutants must be maintained on -site and not allowed to reach the
state's waters. Any spent fluids from construction traffic must be cleaned up and
disposed of properly. Any herbicide, pesticide and fertilizer must be used in
accordance to the label restrictions. All wastes composed of building materials shall
be disposed of in accordance with North Carolina General Statues, Chapter 130A,
Article 9 — Solid Waste Management, and rules governing the disposal of solid waste
(NC Administrative Code Section 15A NCAC 1313). No dumping of paint and other
liquid building material waste in storm drains. Concrete materials onsite, including
excess concrete, must be controlled and managed to avoid contact with surface
waters, wetlands or buffers. No concrete slurry shall be discharged from the site.
• Only minor deviation from the approved plan can be approved by the Erosion Control
Inspector. Deviations are limited to the following deficiencies:
o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam,
rolled erosion control practices, etc.).
o Relocation of E&SC Measures that improve the overall stormwater and
sediment control.
• Erosion Control Measures must be maintained until site is stabilized with sufficient
ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS I I 3A-51
through 66) is performance -oriented, requiring protection of existing natural resources
and adjoining properties. If following the commencement of this project, the
N
approved E&SCP is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973, revisions to the plan may be required by the Erosion
Control Inspector.
• A condition of this approval is that the streets in this phase must be kept free of
sediment.
Erosion Control Measures to prevent construction traffic from tracking sediment onto
the streets must be maintained. Any debris or sediment shall be cleaned from the
street surface immediately.
All applicable fees must be paid prior to the issuance of the Land -Disturbing Permit.
When you are ready for the Land -Disturbing Permit to be issued, please notify my office to
arrange for a pre -construction meeting.
Site Data:
Project Name: Shops 3 and 02 Fitness Site
Land -Disturbing Permit (CHP Project Tracking ID): EN2000152296
Limits of Disturbance (in acres) approved: 2.56 acre per FR/OF
Address: 4109 - 4113 Brian Jordan Lane
City: High Point
State: NC
Zip Code: 27265
County: Guilford
Latitude (in decimal degrees): 36.035 degrees
Longitude (in decimal degrees): -79.957 degrees
River Basin: Cape Fear
Receiving Water -Body: East Fork Deep River (High Point Lake)
Draft E&SCP submitted by: Steven T. Webb, PE, CPT Engineering and Surveying,
Incorporated.
Date(s) draft E&SCP Received: February 10, 2020
Plan Type: E&SCP
Is this site part of a project covered under a common plan of development: No
Additional Information:
Important Notice:
Per NCGO 10000 Construction Stormwater General Permit effective April 1, 2019:
• An owner, developer or builder conducting construction activities that includes
clearing, grading, or excavation activities that results in the disturbance of land
greater or equal to one acre which requires a common plan of development
(a.k.a. Site Plan).
No
• An owner, developer or builder conducting construction activities that includes
clearing, grading, or excavation activities on a site that is regulated by a
common plan of development (a.k.a. Site Plan).
You are required to complete and submit an electronic Notice of Intent (NOI) form
requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit from the Department of Environmental Quality (DEQ). This form MUST be
submitted prior to the commencement of any land disturbing activity on the above -named
project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days.
DEQ will charge a fee ($100) for coverage under the NCGO 1 permit. This fee is not part of
the City of High Point submittal and is to be sent to the DEMLR Stormwater Central Office
staff in Raleigh.
Upon completion of project, the Financial Responsibility Person shall request a close-out
inspection by CHP Staff. Once the report is obtained from CUP Staff, an electronic Notice of
Termination (e-NOT) with a copy of the closeout inspect must be uploaded to DEMLR. The
e-NOT is available at htt sp .//deq.nc.gov/NCGO 1. DEMLR will email confirmation of the
close-out of the COC within three (3) business days after the submittal of a complete and
correct e-NOT.
Information on the NCGO 10/NPDES Permit, e-NOI, COC, and e-NOT, can be found at the
following link https://deq.ne.gov/about/divisions/energy-mineral-land-resources/eneMy-
mineral-land-permits/stormwater-permits/construction-sw
The NCGOI O/NPDES permittee must comply with all conditions of the NCGO 10 Permit.
Any noncompliance constitutes a violation of the Clean Water Act (CWA) and is grounds for
enforcement action: for permit termination, revocation, or modification: or denial of a permit
upon renewal application. [40 CFR 122.41].
Please call me if you have any questions or comments.
Sincerely,
Scott E. Ford
Engineering Services Department
(336) 883-3194
cc: File