Loading...
HomeMy WebLinkAbout20200100 Ver 1_USACE Email_20200124Moore, Andrew W From: Brown, David W CIV USARMY CESAW (US) <David.W.Brown@usace.army.mil> Sent: Friday, January 24, 2020 9:05 AM To: tealleneng@comporium.net Cc: Moore, Andrew W; Leslie, Andrea J Subject: [External] No Army Corps of Engineers Notification Required for Use of NWP 3 and No Permit Required - Selmensberger Residence Lakeshore Wall Replacement and Boathouse and Dock Renovations (UNCLASSIFIED) Attachments: 2017NWP03.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED T.E. Allen Engineering, P.C. Rosman, NC Terry Allen, Reference is made to your recently submitted (January 15, 2020) pre -construction notification (PCN), with attachments, about utilizing Nationwide Permit 3 and 18 which authorizes activities in waters of the U.S. (WoUS) associated with maintenance and small discharges. The work you described includes replacement of any existing timber lakeshore wall with a boulder wall, extending an existing boathouse, and renovating an existing dock in Lake Toxaway at the Selmensberger Residence on North Club Boulevard (PIN 8513-71-7363-000) in Lake Toxaway, Transylvania County, North Carolina. Coordinates are 35.14531 N, 82.95589 W. As described, the proposed project would involve approximately (2 cubic yards) of new impacts to open water beyond the original fill footprint of the existing dock. The proposed impacts to WoUS for the dock renovation can be authorized under NWP 3. On March 19, 2017, the regional conditions of NWP 3 pertaining to notification requirements changed. These changes affect the requirements for submittal of PCN for work conducted in the western counties of North Carolina. Based upon details provided for your project, you did not need to submit the pre -construction notification to our office. You may proceed with your work for the dock renovation as proposed provided it is accomplished in accordance with all the conditions of the attached NWP 3. Your project is located in a North Carolina Wildlife Resources Commission (NCWRC) designated trout watershed. Per regional condition 1.2, no work in waters at this location can be conducted between October 15 and April 15 during the trout waters moratorium. However, NCWRC typically waives the trout waters moratorium for activities you have proposed in Lake Toxaway. If NCWRC removes the trout moratorium requirements for your work, then you may conduct work in waters at the site during the trout moratorium. Also, your project is within the FEMA 100-year floodplain, therefore it must meet the requirements of general condition 10 for fills within the 100-year floodplain and comply with applicable FEMA approved state and local floodplain management requirements. This statement does not preclude the need to obtain other applicable federal, state, or local authorizations for your project. The changes to NWP 3 may not affect the pre -construction notification requirements to receive the required corresponding Clean Water Act Section 401 Water Quality Certification from North Carolina Division of Water Resources (DWR). Please contact Andrew Moore, at 828-296-4500, to determine the required pre -construction notification/permit application submittal process for DWR. You propose to replace the existing timber shoreline wall with an new boulder wall. The new wall would be within the same footprint of the timber wall. This work would involve placement of fill in jurisdictional waters at the property. Based upon the information provided, evaluation of aerial photos, and review of appropriate maps, the Corps has determined the above described work would be exempt from Department of Army regulation. As noted in our regulations, the discharge of fill material/work in WoUS is not prohibited by or otherwise subject to regulation under Section 404 of the Clean Water Act (i.e., it is exempt from regulation under Section 404 of the CWA and you do not need a permit from this office). CFR Part 323 - Permits For Discharges Of Dredged or Fill Material Into Waters of The United States, paragraph 323.4 - Discharges not requiring permits, (2) "Maintenance .... maintenance does not include any modification that changes the character, scope, or size of the original fill design. Also, based upon the information provided, evaluation of aerial photos, and review of appropriate maps, the Corps has determined the proposed extension of the existing boathouse will not require authorization from the Department of Army. The extension would be constructed in uplands with no placement of fill below the ordinary high watermark of Lake Toxaway. If you have any questions regarding this information, you may contact me at 828-271-7980 x. 4232. Sincerely, David Brown, PG Regulatory Specialist/Geologist USACE Wilmington District -Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980, ext. 4232 david.w.brown@usace.army.mil CLASSIFICATION: UNCLASSIFIED