Loading...
HomeMy WebLinkAbout20200199 Ver 1_Determination Letter_20200217 February 17, 2020 Meadowville Farm Plantation, LLC Attn: Benjamin C. Simmons, III 8630 Piney Woods Road Fairfield, NC 27826 DWR #20-0199 BEAUFORT County Subject: On-Site Determination for Applicability to Tar-Pamlico Riparian Buffer Rules (15A NCAC 02B .0259) Subject Property/ Project Name: Meadowville Farm Plantation, LLC – 7781 NC Hwy. 33 East Address/Location: Near 7981 NC Hwy. 33 East, Chocowinity Stream(s) Evaluated: Piney Pond Canal Determination Date: 02/05/20 Staff: Anthony Scarbraugh Determination Type: Stream Buffer Determination Buffer: Stream: Neuse (15A NCAC 02B .0233) Tar-Pamlico (15A NCAC 02B .0259) Catawba (15A NCAC 02B .0243) Jordan (15A NCAC 02B .0267) (governmental and/or interjurisdictional projects) Randleman (15A NCAC 02B .0250) Goose Creek (15A NCAC 02B .0605-.0608) Intermittent/Perennial Determination *E/I/P/NSP/MD = Ephemeral/Intermittent/Perennial/No Stream Present/Man-made Ditch The Division of Water Resources has determined that the streams listed above and included on the attached map have been located on the most recent published NRCS Soil Survey of BEAUFORT County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale and evaluated for applicability to the TAR-PAMLICO River Riparian Buffer Rules. Each stream that is checked “Not Subject” has been determined to not be at least intermittent or not present on the property. Streams that are checked “Subject” have been located on the property and possess characteristics that qualify them to be at least intermittent streams. There may be other streams or features located on the Stream E/I/P* Not Subject Subject Start@ Stop@ Soil Survey USGS Topo 20-0199 MD X Flag: 20-0199 Begin Flag: 20-0199 End X property that do not appear on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) calendar days of date of this letter to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski DWR – 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.): c/o Paul Wojoski DWR – 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 This determination is final and binding as detailed above, unless an appeal is requested within sixty (60) days. This determination only addresses the applicability to the buffer rules and does not approve any activity within the buffers. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of Engineers Washington Regulatory Field Office at (910) 251-4629. If you have questions regarding this determination, please feel free to contact Anthony Scarbraugh at (252) 948-3924. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: LASERFICHE Meadowville Farm Plantation, LLC -7981 NC Highway 33 East 2019 USGS Topographic Map Scale 1:24K for Hackney, NC Legend Beaufort County Tax Parcel Flags Marking Extent of Determination Not Subject 1 mi N➤➤N Tar-Pamlico 02/17 20