HomeMy WebLinkAbout540032_30-Day POA_20200214PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (3 0) DAY DRAW DOWN PERIOD State University
A&T State University
NCCOOPERATIVE
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION Solutions
ErnpPeople
1. Structure Name/Identifier (ID): 54-32 Date: 2/14/2020
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker 1 24 inches
b. Designed 25 yr/24 hr. storm & structural freeboard 25.5 inches
c. Line b - line a (inches in red zone) 1.5 inches
d. Top of dike surface area according to design 79200 ft2
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft) 74052.0 gallons
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural design 180 days
g. Volume of waste produced according to design 1 388800 ft3
h. Actual waste produced
current herd #/certified herd # x line g 259200 ft3
current herd: 2400 certified herdr 3600
i. Volume of wash water according to structural design 0 ft3
j. Excess rainfall over evaporation according to design 46200 ft3
k. (line h + line i +line j) x 7.48 x (30 days/line f) = 380732 gallons
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated 2.82 Ib/1000 gal
MM/DD/YYYY 10/21/2019
m. (lines e + k)/1000 x (line 1) = F1-282.49088 lb PAN
REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE
II. TOTAL POUNDS o1#*kRFYKTk(FbF9ft'X gFfflfP�TLAAkftFf6�WjTIES
AND/OR 25 YR./24 HR. STORM STORTaC��YE�t�,�1�1�1YS4�i'�LGt�,��fRi�TURES FOR FACILITY
1.
structure ID:
line m=
I 1282.49088 Ib PAN
2.
structure ID:
line m=
ilb PAN
3.
structure ID:
line m=
ilb PAN
4.
structure ID:
line m=
ilb PAN
5.
structure ID:
line m=
ilb PAN
6.
structure ID:
line m=
ilb PAN
n.
lines 1 + 2 + 3 + 4 + 5 + 6
1 1282.49088 total lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract # p. field # q. crop r. acres s. PAN balance t. total PAN u. application
(lb/acre) column r x s window
2589
1 through 36
overseed
1
1
1500
oct-mar
loct-mar
2589
2589
oct-mar
2589
oct-mar
more fields are available- plenty of PAN
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.)
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II)
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III)
Y. OVERALL PAN BALANCE (W-X)
1500
1282.49088
1500
-217.50912
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on
new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN
hnlnnro tnhlo nnA rornlriilnto tho nxiornll DAKI hnlnnro If nnimnl 1n1ncto is to ho hnidnA to nnnthor normittorl fnrility
UdldllUlf IdIJIIf dlIU [If UdIUUIdIC LIIC UVCIdII r-MINI UdIdlILlf. 11 dlIIIIIdI WdJIC IJ LU Ulf IIdUIIfU LU dlIUIIICI plfI IIIILLUU ICILIIILY
provide information regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Waiting on lab for results of new sample.
PERSON COMPLETING THIS DOCUMENT.
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 2/14/2020