Loading...
HomeMy WebLinkAbout20191693 Ver 1_CAMA Major Permit No. 23-20_20200214-.-.--.-.-,-,..................... ----------------- Permit Class Permit Number NEW 23-20 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission r Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Kevin and Kelly Campbell,127 Tuscarora Trail, Hertford, NC 27944 Authorizing development in Perquimans County at adj to the Little River, at 100-A Rivershore Dr., in - Hertford , as requested in the permittee's application dated 11/25/19, incl att workplan drawings (4), Page 1 of 4 dated "Revised 12/5/19", Page 2 of 4 dated "Revised 12/6/19", Page 3 of 4 dated 11/21/19 & Page 4 of 4 dated 11/25/19. This permit, issued on February 14, 2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subiect to fines. imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization - Bulkhead 1) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. 2) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved bulkhead alignment. 3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site ' to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2023 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of UhQ ana the unair of the Coastal Resources Commission. - �, , Z,-/- /I loi�, — Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Kevin and Kelly Campbell Permit No. 23-20 Page 2 of 3 ADDITIONAL CONDITIONS 4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. 5) The bulkhead shall be constructed prior to any backfilling activities. 6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 7) The fill material shall be clean and free of any pollutants except in trace quantities. 8) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 9) No backfill material is to be placed within 30 feet of the normal water level, except that which will be used to backfill the area behind the permitted bulkhead. 10) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. Sedimentation and Erosion Control 11) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Docking Facility 12) This permit authorizes only the piers, 4 tie pilings, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over Public Trust waters without permit modification. 13) In accordance with commitments made by the permittee, the remnant pier located within the riparian setback of the property to the east shall be removed. 14) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 15) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 16) This permit authorizes a maximum of 1 formalized boat slip. Kevin and Kelly Campbell Permit No. 23-20 Page 3 of 3 ADDITIONAL CONDITIONS 17) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Upland Development 18) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the uncovered deck and repair and maintenance of the existing non -conforming structure in accordance with 15A NCAC .07J .0210, all as expressly and specifically set forth in the attached permit application and workplan drawings. 19) No development or land disturbing activity that is considered non -water dependent shall occur within 30 feet of the normal water level unless altered herein. Any other work or development proposed in an Area of Environmental Concern (AEC), including but not limited to the Estuarine Shoreline AEC and located within the applicant's property, shall require a review and authorization from the Division of Coastal Management prior to work commencing. General 20) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 21) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 22) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2019-02366) issued 2/3/20. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 19-1693. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.