HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 21865 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Friday, February 14, 2020 11:08 AM
To: MarkR@chec.coop
Cc: Morman, Alaina; MarkR@chec.coop; EddyBD@booth-assoc.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for Structures 75 & 82 Reroute-Pea Island 115kV
Transmission Line was not accepted for the following reason:
Part B8 - Cape Hatteras Electric Cooperative is a private entity, therefore the ownership type would be Non-
Government.
Please submit a new NOI with the needed correction. Contact Alaina.Morman@ncdenr.gov with questions or to
receive a PDF copy of this submission. Thank you.
Please contact The Stormwater Program Administrative Assistant for more information at(919) 707-
3640. Please reference NOI application no. 21865 and Project ID NCC-DARE-2020-Structures 75 & 82
Reroute - Pea Island I I5kV Transmission Line.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.
i