HomeMy WebLinkAboutNCC200581_ESC Approval Submitted_20200214 ROY COOPER _
Governor
MICHAEL S.REGAN ^*FC��" .
Secretary
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
July 18, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
J.H. Reaben Oil&Supply Co., Inc.
ATTN: Mr. J. Hall Waddell
PO Box 629
Hendersonville, NC 28793
RE: Project Name: TRIANGLE STOP - PENROSE, NC
Acres Approved: 2
Project ID: TRANS 2019-010
County: Transylvania
City: Penrose
Address: US 64/Crab Creek Rd.
River Basin: French Broad
Stream Classification: UT to French Broad - B
Submitted By: Mr.Will Buie, PE
Date Received by LQS: June 19, 2019
Plan Type: Commercial
Dear Mr.Waddell,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications.The Modifications Required for Approval are listed on the attached page.This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and
COC issued prior to the commencement of any land disturbing activity on the above-named
project. The NOI form may be accessed at deq.nc.gov NCG01. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr,gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
111 North Carolina Department of Environmental Quality I Division of Energy,Mineral and land Resources
e���—DffAsheville Regional Office { 2090 U.S.Highway 7O I Swannanoa,North Carolina 28778
W)FTH CAX"ua
828.296.4500
Letter of Approval with Modifications
J.H. Reaben Oil &Supply Co., Inc.
July 18, 2019
Page 2 of 3
Title 1SA NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-S 1 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition,it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Melissa J. K' g,
Assistant eg. naI Engi er
Land Quali Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCG01 Fact Sheet
cc: Mr.Will Buie, PE wbuie@wgla.com
Letter of Approval with Modifications
J.H. Reaben Oil &Supply Co., Inc.
July 18, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: TRIANGLE STOP - PENROSE, NC
Project ID: TRANS 2019-010
County: Transylvania
1. Prior to any disturbance at this site, the Certificate of Coverage for NCG01 Construction
Stormwater General Permit must have been received.
{NCG01 Construction Stormwater General Permit}
2. All surface waters must be protected from sediment-laden runoff with adequate erosion
sediment control devices and an adequate buffer. {G.S. 113A-57}{15A NCAC 04B .0106}{15A
NCAC 04B .0109}{15A NCAC 04B .0125}
o
4-0
4-4
w
�01-
v1 �
� •. O �,
w �
COO
4.1
� •� U �
o
tu
V� Aa Qy w
C� 4o L
U 4* °
° U
CaA O p, y c
[--i wul