Loading...
HomeMy WebLinkAboutNCC200581_NOI Application_20200214 Action History (UTC-05:00)Eastern Time(US&Canada) Subrrit by Anonymous User 2/13/2020 4:55:05 PM(NCG01 NOI Submission) Approve by Clark, Paul 2/14/2020 8:06:02 AM(Review-Construction NOI 21907) • The task was assigned to Clark, Paul by round robin distribution 2/13/2020 4:55 PM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: February 17,2020 5:00 PM 2/13/2020 4:55 PM Submit by Garcia, Lauren V 2/14/2020 3:50:09 PM(Payment Verification for NCC200581) * A Beau Waddell • Garcia, Lauren V assigned the task to Garcia, Lauren V 2/14/2020 3:49 PM • The task was assigned to DEMLR NCG01 Payment Team.The due date is: March 27,2020 5:00 PM 2/14/2020 8:06 AM �ThF1 1Construction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System 'D application for•• - .•-under NorthCarolina's General Permit 1 1111:STORIMATER DISCHARGES associated with construction activities(or NORTH CAROLINA Enrlrnnmenfu�Qr�arlry A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* Triangle Stop-Penrose, NC 2.County* Transylvania 3. Highway or Street US 64 and Crab Creek Road Address* Street nacre only is acceptable if no address number assigned yet 4. City or Township* Penrose 5.State* NC 6.Zip Code* 28766 7. Latitude* Enter the latitude in decimal degrees 35.2729 8. Longitude* Enter the longitude in decimal degrees(M.ST be negative) -82.6413 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/24/2020 Estimated Construction Project Start Date 10. Date to End* 01/29/2021 Estimated Construction Project End Cute 11.SIC(Primary)* Commercial(1542) Standard Industrial aassification for Development 12.Acres to be 2.00 disturbed* (including off-site borrow and waste areas) 13.Total site area 2.14 (acres)* 14. Post- 1.00 construction (Estimated) impervious area (acres)* NCC Project NCC-TRANS-2020-Triangle Stop-Penrose, NC Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving French Broad River Wate rbody* Klarre of waterbody into which storrrwater runoff will discharge 15b.Waterbody 6-(27) Index No.* NCWaterbody Index N.irrber Stormwater V No discharges will flow r Yes to additional wate rs* 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration-Legally Fbsponsible Entity and Individual Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization J.H. Reaben Oil&Supply Co., Inc. Name* 2. First Name* Hall ff Corporation,enter Pegistered Agent First Barre 3. Last Name* Waddell ff Corporation,enter Faegistered Agent Last%rre 3b.Title President 4. Permitee E-mail hall.waddell@trianglestop.com Address* 5. Permittee 8286920246 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box629 Address Line 2 City State/Frovince/Faegion Hendersonville NC Fbstal/Zip Code Country 28793 USA Check box if the r Yes street address the same as mailing address 7. Permittee Street Street Address Address* 753 Ashe Street Address Line 2 aty State/Frovince/Fbgion Hendersonville NC Fbstal/Zip Code Country 28792 US 8.Type of Non-Government Ownership* C. Site Contact Information Part C. ^ Roject Site Contact Inforrration ....................................................................................................................................................................................................................................................................................................................................................................................... 1. Primary Site Hall Contact-First Name* 2. Primary Site Waddell Contact-Last Name* 3.Title President 4.Site Contact E- hall.waddell@trianglestop.com mail Address* 5.Site Contact 828-692-0246 Telephone No.* 6.Organization J.H. Reaben Oil&Supply Co., Inc. Name 7.Site Contact Street Address Mailing Address* PO Box629 Address Line 2 City State/Rovince/Region Hendersonville NC Fbstal/Zip Code Country 28793 USA 8. Consultant Name (Optional) William R. Buie, P.E.-WGLA Engineering First and Last narre 9. Consultant E-mail wbuie@vvgla.com This person will be copied on all correspondence. 10. Consultant 828-687-7177 ext 302 Telephone No. D. E&SC Plan Part D. ^ Erosion&Sediment Control(E&SC)Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 07/18/2019 Approved* 2. E&SC Plan Project TRANS 2019-010 Number/ID* Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4.State DEQ Office* Asheville(ARO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project. 5. E&SC Plan LOAwM COPA 7-18-2019.docx.pdf 117.64KB Approval Wst be FDFformat letter/documentation Notes(Optional) Frovide any additional information that might help the reviewer better understand how uploaded documents support the application. 6. NOI Certification NOI.pdf 69.33KB Form Mist be RDFforrrat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E(i) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Artcle;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature Type Name* Hall Waddell Title President Organization J.H. Reaben Oil&Supply Co., Inc. Date* 02/13/2020 F. Tracking and COC Info NOI Tracking No. 21907 NC Reference No. NCG01-2020-0581 Uses'count_nurrber'variable(increrrented by SP) Certificate of NCC200581 Coverage (COC) Uses'count number'variable(increrrented by SP) No.* Count Number 581 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed(used to assign YY digits after"NOC'in COCno.)