Loading...
HomeMy WebLinkAbout20191668 Ver 1_RE_DWR 20191668_Approval Letter - Condition 7_20200211Carpenter, Kristi From: Thompson, Larry B Sent: Tuesday, February 11, 2020 3:58 PM To: Hood, Donna Cc: Chapman, Amy; Haywood, Luther G; Howard, Joel M; Carpenter,Kristi Subject: RE: DWR 20191668, Approval Letter - Condition 7 Attachments: Mauney Road - Bridge 292 Soil Report.pdf Follow Up Flag: Follow up Flag Status: Flagged Donna, Attached you will find a custom soil resources report for the Mauney Road bridge replacement job. Have requested KCI to prepare an overlay showing our project limits and impact areas in relation to WA and WB. Larry Larry Thompson Division PDEA Engineer North Carolina Department of Transportation 704-983-4437 office 704-301-4881 mobile Ithompson(cDncdot.aov 716 W. Main Street Albemarle, NC 28001 µ 3* Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hood, Donna <donna.hood@ncdenr.gov> Sent: Tuesday, February 11, 2020 3:42 PM To: Thompson, Larry B <Ihompson@ncdot.gov> Cc: Chapman, Amy <amy.chapman@ncdenr.gov>; Haywood, Luther G <ghaywood@ncdot.gov>; Howard, Joel M <jmhoward@ncdot.gov>; Carpenter, Kristi <kristilynn.carpenter@ncdenr.gov> Subject: RE: DWR 20191668, Approval Letter - Condition 7 Larry, So, no parts of that area will be impacted by the project and no part of the wetland will be drained by the proposed roadside ditch? Also, if I could get the correct soils map. Regards, Donna From: Thompson, Larry B Sent: Tuesday, February 11, 2020 3:39 PM To: Hood, Donna <donna.hood@ncdenr.gov> Cc: Chapman, Amy <amy.chapman@ncdenr.gov>; Haywood, Luther G <ghaywood@ncdot.gov>; Howard, Joel M <imhoward@ncdot.gov>; Carpenter, Kristi <kristilynn.carpenter@ncdenr.gov> Subject: DWR 20191668, Approval Letter - Condition 7 Donna, At your request, wetland areas adjacent to the R.108 bridge replacement project (Bridge 292 on SR 2625) have been re - delineated. I had checked the soils in the area where you hung the single flag and found them to be non-hydric. We requested Joe Sullivan with KCI in Raleigh to re -delineate the wetland areas and provide an updated map (see attached). Joe has confirmed that the soils in the area of your flag are non-hydric and the design team has informed us that the delineated areas are outside of our project impact area and will not be affected. Please let us know if you need anything further related to Condition 7 in DWR 20191668. Larry Larry Thompson Division PDEA Engineer North Carolina Department of Transportation 704-983-4437 office 704-301-4881 mobile Ithompson(cDncdot.aov 716 W. Main Street Albemarle, NC 28001 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Joe Sullivan <Joe.Sullivan@kci.com> Sent: Tuesday, February 11, 2020 9:24 AM To: Thompson, Larry B <Ihompson@ncdot.gov>; Haywood, Luther G <ghaywood@ncdot.gov> Cc: Howard, Joel M <]mhoward@ncdot.gov>; Ron Allen <Ron.Allen@kci.com> Subject: [External] RE: Replace Bridge 292 on SR 2625, DWR 20191668, Approval Letter External email. Do not click In s or open attachments unless you verity. Send all susplclous email as an attachment to en r snamna n . any Larry, I have attached an updated map showing the wetland areas that I found as well as a USACE form for WB. WA measures 0.004 acre and is the roadside ditch where we found Juncus and hydric soils. I was not finding hydric soils in the ditch east of that point where Donna's flag was. The pond was breached by the foresters and has drained into the floodplain. WB measures 0.07 acre and contains the drained pond as well as the wetland area that has formed from the added water. Please let me know if there is anything else you need from me to get things moving. Thanks, Joe Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3