Loading...
HomeMy WebLinkAbout20191252 Ver 2_B-4635 Revised Impact Summary Sheet February 12 2020 (2)_20200112WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) WB L 15+85 TO 19+20 LT ROADWAY FILL 0.10 0.07 WA L 20+40 TO 23+53 LT ROADWAY FILL 0.08 0.07 WE L 14+09 TO 19+17 RT ROADWAY FILL 0.20 0.03 0.15 WE DETL 11+67 TO 16+66 RT TEMPORARY FILL 0.08 0.02 0.07 WF L 21+19 TO 23+37 RT ROADWAY FILL 0.02 WF DETL 20+00 TO 21+08 RT TEMPORARY FILL 0.06 0.03 WB L 19+20 LT/RT IMPERVIOUS DIKE 0.02 100 WA L 20+19 LT/RT IMPERVIOUS DIKE 0.02 86 TOTALS*: 0.41 0.14 0.03 0.31 0.10 0.04 0 186 0 *Rounded totals are sum of actual impacts NOTES: * Impervious dikes included due to the request of roadside environmental There will be 0.03ac of temporary fill in hand clearing areas for erosion control devices Revised 2/12/2020 Revised 2018 Feb WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) WB L 15+85 TO 19+20 LT ROADWAY FILL 0.10 0.07 WA L 20+40 TO 23+53 LT ROADWAY FILL 0.08 0.07 WE L 14+09 TO 19+17 RT ROADWAY FILL 0.20 0.03 0.15 WE DETL 11+67 TO 16+66 RT TEMPORARY FILL 0.08 0.02 0.07 WF L 21+19 TO 23+37 RT ROADWAY FILL 0.02 WF DETL 20+00 TO 21+08 RT TEMPORARY FILL 0.06 0.03 WB L 19+20 LT/RT IMPERVIOUS DIKE 0.02 100 WA L 20+19 LT/RT IMPERVIOUS DIKE 0.02 86 TOTALS*: 0.41 0.14 0.03 0.31 0.10 0.04 0 186 0 *Rounded totals are sum of actual impacts NOTES: * Impervious dikes included due to the request of roadside environmental There will be 0.03ac of temporary fill in hand clearing areas for erosion control devices Revised 2/12/2020 Revised 2018 Feb