HomeMy WebLinkAbout20191252 Ver 2_B-4635 Revised Impact Summary Sheet February 12 2020 (2)_20200112WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
WB
L 15+85 TO 19+20 LT
ROADWAY FILL
0.10
0.07
WA
L 20+40 TO 23+53 LT
ROADWAY FILL
0.08
0.07
WE
L 14+09 TO 19+17 RT
ROADWAY FILL
0.20
0.03
0.15
WE
DETL 11+67 TO 16+66 RT
TEMPORARY FILL
0.08
0.02
0.07
WF
L 21+19 TO 23+37 RT
ROADWAY FILL
0.02
WF
DETL 20+00 TO 21+08 RT
TEMPORARY FILL
0.06
0.03
WB
L 19+20 LT/RT
IMPERVIOUS DIKE
0.02
100
WA
L 20+19 LT/RT
IMPERVIOUS DIKE
0.02
86
TOTALS*:
0.41
0.14
0.03
0.31
0.10
0.04
0
186
0
*Rounded totals are sum of actual impacts
NOTES:
* Impervious dikes included due to the request of roadside environmental
There will be 0.03ac of temporary fill in hand clearing areas for
erosion control devices
Revised 2/12/2020
Revised 2018 Feb
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
WB
L 15+85 TO 19+20 LT
ROADWAY FILL
0.10
0.07
WA
L 20+40 TO 23+53 LT
ROADWAY FILL
0.08
0.07
WE
L 14+09 TO 19+17 RT
ROADWAY FILL
0.20
0.03
0.15
WE
DETL 11+67 TO 16+66 RT
TEMPORARY FILL
0.08
0.02
0.07
WF
L 21+19 TO 23+37 RT
ROADWAY FILL
0.02
WF
DETL 20+00 TO 21+08 RT
TEMPORARY FILL
0.06
0.03
WB
L 19+20 LT/RT
IMPERVIOUS DIKE
0.02
100
WA
L 20+19 LT/RT
IMPERVIOUS DIKE
0.02
86
TOTALS*:
0.41
0.14
0.03
0.31
0.10
0.04
0
186
0
*Rounded totals are sum of actual impacts
NOTES:
* Impervious dikes included due to the request of roadside environmental
There will be 0.03ac of temporary fill in hand clearing areas for
erosion control devices
Revised 2/12/2020