Loading...
HomeMy WebLinkAbout20191189 Ver 1_More Info Requested_20191009Strickland, Bev From: Annino, Amy M Sent: Wednesday, October 9, 2019 9:28 AM To: Craig Wyant; Johnson Jr, Tony Cc: Brandee.C.Boggs@usace.army.mil; Fuemmeler, Amanda J CIV (US) Subject: DWR 20190089 Vulcan Materials Company Lenoir Quarry - Additional Information Request The Division of Water Resources (Division) has performed a preliminary review of a 401 Water Quality Certification application submitted for the above referenced project dated July 12, 2019 and received on September 4, 2019. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Please provide a site plan showing the boundary of the proposed overburden in relation to Impact S1. [15A NCAC 02H .0502(g)] 2. Please locate all wetlands, streams, and other waters of the State as overlays on the site plan. [15A NCAC 02B (b)] 3. Please provide more details regarding avoidance and minimization of the proposed 122 linear feet of intermittent stream impacts for this project. [15A NCAC 02H .0506(f) and (g)] • This Office believes that the proposed overburden can be moved or reconfigured to avoid and minimize the impacts to the intermittent stream. Please revise the plans to minimize the impacts or provide a detailed explanation of why this plan for the activity cannot be practically accomplished, reduced or reconfigured to better minimize disturbance to the intermittent stream. • This should include alternative designs and layouts for the disposal of overburden. 4. Please provide a site plan with details regarding the proposal to create 53 linear feet of new stream channel to redirect perennial waters (UT to Lower Creek) away from the sediment basin and into Lower Creek. Please provide written verification that US Army Corps of Engineers is not requiring a permit for this work, and whether project activities to create 53 linear feet of new stream channel is considered exempt or non -notifying by USACE. Pursuant to Title 15A NCAC 02H .0502, the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received within 45 calendar days of receipt of this email, the DWR will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the DWR for approval, including a complete application package and the appropriate fee. Please contact me if you have any questions or concerns. Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office amy.annino(cDncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties