Loading...
HomeMy WebLinkAboutUS 13/US 158 (4)t STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR June 23, 2009 Memorandum To: File From: Olivia J. Farr Project Planning Engineer v \ 1 EUGENE A. CON. SECRETARY 'y Subject: NEPA/404 CP 2A Field Meeting Minutes for US 13 from US 158 Near Winton to US 158 in Tarheel, Gates/Hertford Counties, TIP Project R-2507A A concurrence meeting was held on March 18, 2003 at 10:00 a.m. on the project site. The following persons were in attendance: Bill Biddlecome Matthew Elliott Christopher Militscher Gary Jordan Rob Ridings Travis Wilson Jim Speer John Lansford Chris Rivenbark Amy James Jay McInnis Olivia Farr Robert Barrier US Army Corps of Engineers US Army Corps of Engineers US EPA US Fish and Wildlife Service NC Division of Water Quality NC Wildlife Resources Commission NCDOT-Roadway Design Unit NCDOT-Roadway Design Unit NCDOT-PDEA, Natural Environment Unit NCDOT- PDEA, Natural Environment Unit NCDOT-PDEA NCDOT-PDEA NCDOT-PDEA The purpose of this meeting was to discuss bridging decisions and review the alignment to be studied in detail (Concurrence Point 2A). The merger team first went to the Chowan River crossing near the beginning of the project. The existing structure is 1,121 feet in length. The hydraulic recommendation is to retain the existing bridge and build the proposed bridge beside it at the same length. Chris Militscher and Bill Biddlecome made a suggestion to narrow the median on both sides of the bridge in order to reduce impacts on the wetlands. Jim Speer said he thought the minimum spacing between the bridges would be 30 feet. Another concern with narrowing the median at the bridge was the need for a median opening at Shoups Landing Road in order to access a boat ramp. Shoups Landing Road is the only access to a boat ramp,operated by the NC Wildlife Resources Commission. Travis Wilson expressed the need for a car or boat with a trailer behind it to have enough room in the median to stop before pulling out into traffic. There was a discussion about narrowing the median at the bridge and holding the median width at Shoups Landing Road and US 13. Olivia Fafr agreed to investigate a narrower median at the Chowan River crossing. Information regarding a narrower median will be presented to the merger team at the Concurrence Point 4A meeting. The existing bridge at Buckhom Creek and the area around the bridge was looked at by the team. Dual 110-foot bridges are proposed to replace the existing 84-foot bridge. Since there are more wetlands on the south side of the Buckhom Creek crossing, Bill Biddlecome recommended the additional bridge length be provided on the south side of the creek to minimize impacts. There was agreement by the team that dual 110 foot bridges were sufficient. Team members concurred on the following bridge lengths: Chowan River - Length of the proposed bridge should be the same as the existing (1,121 feet). Buckhom Creek - Dual 110 foot bridges A concurrence form was not signed at the meeting. A form will be provided to team members for their signature and copies of the signed form will be distributed.