Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC200507_ESC Approval Submitted_20200214
ROX COOPER a Governor MICHAEL S.REGAN Secretary "" FEB 0 4 l}0 0 S.©ANIEL SMITH Director NORTH CAROLINA Environmental Quality January 29, 2020 LETTER OF APPROVAL Horne Brothers Construction, Inc. ATTN: C.Jackson Horne, President 1662 Middle River Loop Fayetteville, NC 28312 RE: Project Name: Pilot Mountain Solar, LLC Acres Approved: 53 Project ID: STOKE-2019-005 County: Stokes City: King Address: Old Meadowbrook Dr. River Basin: Yadkin-PeeDee Stream Classification: WS-IV Submitted By: Horne Brothers Construction, Inc, Date Received by LQS: January 17, 2020 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit, This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at de nc.goyJNCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.goy or Paul Clark at Paul.clarlc@nedenr. og�.After you submit a complete and correct NOI Form,a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However,a$100 fee will soon be charged annually.This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. !9$t1hCdre saUepaetsrdr dP�VsSr afaslalrayI DM"OrEnhw Mdumdedwa*0 1V�u6vv3a�n�ey�t.-"t99�dee�45i5Ylaas-edf�4Ffiusd�#e�ol f0�trk#tHr-SAFsngl�aehYi� Letter of Approval Horne Brothers Construction, Inc. January 29, 2020 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1.The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it.is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. i North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and. approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference.Your cooperation is appreciated. Sincerely, 2acha y L ntz, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet Cc: WSRO File