Loading...
HomeMy WebLinkAboutNCC200507_NOI Application_20200214 Action History (UTC-05:00)Eastern Time(US&Canada) Subrrit by Anonymous User 2/7/2020 11:18:11 AM(NCG01 NOI Submission) Approve by Clark, Paul 2/7/2020 2:24:02 PM(Review-Construction NOI 21657) • The task was assigned to Clark, Paul by round robin distribution 2/7/2020 11:18 AM • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: February 11,2020 5:00 PM 2/7/2020 11:18 AM Submit by Garcia, Lauren V 2/14/2020 1:13:48 PM(Payment Verification for NCC200507) * David Geddie • Garcia, Lauren V assigned the task to Garcia, Lauren V 2/14/2020 1:11 PM • The task was assigned to DEMLR NCG01 Payment Team.The due date is: March 20,2020 5:00 PM 2/7/2020 2:24 PM �ThF1 1Construction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System 'D application for•• - .•-under NorthCarolina's General Permit 1 1111:STORIVWATER DISCHARGES associated with construction activities(or NORTH CAROLINA Enrlrnnmenfu�Qr�arlry A. Project Information Part A. Project Location and Waterbody Information 1. Project Name* Pilot Mountain Solar, LLC 2.County* Stokes 3. Highway or Street Old Meadowbrook Dr. Address* Street nacre only is acceptable if no address number assigned yet 4. City or Township* King 5.State* NC 6.Zip Code* 27021 7. Latitude* Enter the latitude in decimal degrees 36.2718 8. Longitude* Enter the longitude in decimal degrees(M.ST be negative) -80.3778 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/10/2020 Estinated Construction Project Start Date 10. Date to End* 12/31/2020 Estimated Construction Project End Cute 11.SIC(Primary)* Commercial(1542) Standard Industrial aassification for Development 12.Acres to be 53.00 disturbed* (including off-site borrow and waste areas) 13.Total site area 53.00 (acres)* 14. Post- 0.00 construction (Estimated) impervious area (acres)* NCC Project NCC-STOKE-2020-Pilot Mountain Solar, LLC Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Crooked Run Creek Wate rbody* Barre of waterbody into which storrrwater runoff will discharge 15b.Waterbody 12-77-4 Index No.* NCWaterbody Index Ninber Stormwater V No discharges will flow r Yes to additional wate rs* 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration-Legally Fbsponsible Entity and Individual Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president,secretary,treasurer, or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1.Organization Horne Brothers Construction INC Name* 2. First Name* C.Jackson ff Corporation,enter Fbgistered Agent First Barre 3. Last Name* Horne If Corporation,enter Faegistered Agent Last%rre 3b.Title President 4. Permitee E-mail trippgeddie@hbc-inc.com Address* 5. Permittee 9107055580 Telephone No.* 6. Permittee Mailing Street Address Address* P.O. Box205 Address Line 2 City State/F rovince/Faegion Fayetteville NC Fbstal/Zip Code Country 28312 us Check box if the r Yes street address the same as mailing address 7. Permittee Street Street Address Address* 1682 Middle River Loop Address Line 2 City State/Frovince/Region Fayetteville NC Fbstal/Zip Code Country 28312-7365 us 8.Type of Non-Government Ownership* C. Site Contact Information Part C. Roject Site Contact Information .............................................................................................................................................................................................................................................................................................................................................................................................. 1. Primary Site Tripp Contact-First Name* 2. Primary Site Geddie Contact-Last Name* 3.Title Civil Manager 4.Site Contact E- trippgeddie@hbc-inc.com mail Address* 5.Site Contact 9107055580 Telephone No.* 6.Organization Horne Brothers Construction Name 7.Site Contact Street Address Mailing Address* P.O. Box205 Address Line 2 City State/Frovince/Pegion Fayetteville NC Postal/Zip Code Country 28312 us 8.Consultant Name (Optional) First and Last name 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. D. E&SC Plan Part D. ^ Erosion&Sediment Control(E&SC)Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/29/2020 Approved* 2. E&SC Plan Project Stoke-2019-005 Number/ID* Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4.State DEQ Office* Winston-Salem(WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project. 5. E&SC Plan Pilot Mountin Letter of Approval.pdf 79.43KB Approval Wst be FDFformat letter/documentation Notes(Optional) Frovide any additional information that might help the reviewer better understand how uploaded documents support the application. 6. NOI Certification Pilot Mountain NOI Form.pdf 56.2KB Form Mist be FDFforrrat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E(i) provides that: Anyperson who knowinglymakes any false statement,representation,or certification in anyapplication,record,report,plan,or other documentfiled or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Artcle;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is,to the best of my knowledge and belief, true,accurate, and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s)and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature r Type Name* C.Jackson Horne Title President Organization Horne Brothers Construction INC Date* 02/07/2020 F. Tracking and COC Info NOI Tracking No. 21657 NC Reference No. NCG01-2020-0507 Uses'count_nurrber'variable(increrrented by SP) Certificate of NCC200507 Coverage (COC) Uses'count number'variable(increrrented by SP) No.* Count Number 507 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed(used to assign YY digits after"NOC'in COCno.)