HomeMy WebLinkAboutNC0024244_Inspection_20171211CNX
N -1 w 0
Water Resources
Environmental duality
December 11, 2017
Mr. Michael Leonas, Public Utility Director
City of Albemarle
Post Office Box 190
Albemarle, North Carolina 28002
Subject: Pretreatment Compliance Inspection
City of Albemarle
NPDES Permit No. NCO024244
Stanly County
Dear Mr. Leonas:
ROY COOPER
Governor
MICHAEL S. BEGAN
Secretary
LINDA CULPEPPER
Interim Director
Enclosed is a copy of the Pretreatment Compliance Inspection Report for the inspection of the
City of Albemarle's Industrial Pretreatment Program on December 8, 2017, by Mr. Wes Bell of this
Office.
Should you have any questions concerning this report, please do not hesitate to contact Mr. Bell
at (704) 235-2192, or via email at wes.bell@gcdenr.gov.
Sincerely,
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Enclosure:
Inspection Report
cc: Brandon Plyler, City of Albemarle (via email)
Monti Hassan, PERCS Unit
MSC-1617 Central -Basement
MO.
State of North Carolina I Environmental Quality) Water Resources I Water Quality Regional Operations
Mooresville Regional Office 1 610 East Center Avenue, Suite 310 1 Mooresville, North Carolina 28115
704-663-1699
:n.
... r �;� t
'�'` . _
K" NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
tN:zter• Resources '
CNVIRONMENIAL QUAL17Y
BACKGROUND INFORMATION (Complete Prior To PCI; Review Program Info Database Sheet(sll
1. Control Authority (POTW) Name: City of Albemarle
2. Control Authority Representative(s): Brandon Plyler
3. Title(s): Pretreatment Coordinator/WWTP ORC
4. Last Inspection Date: 5/24/16 Inspection Type: ❑ PCI ® Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO
6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO
Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ® NA
ICIS CODING
Main Program Permit Number MM/DD/YY
11Tf'(1(12d7dd 12/OR/17
7. Current Number Of Significant Industrial Users SIUs)?
1
8. Number of SIUs With No IUP, or With an Expired 1UP?
00
9. Number of SIUs Not Ins ected By POTW in the Last Calendar Year?
0
10. Number of SIUs Not Sam led By POTW in the Last Calendar Year?
11. Number of SIUs In SNC For Limits Violations D!!!J11g Either of the Last 2 Semi -Annual Periods
0
12. Number of SIUs in SNC For ReportingReporti!Ig DurinE Either of the Last 2 Semi -Annual Periods
0
13. Number of SIUs in SNC with Pretreatment Schedule?
0
14. Number of SIUs on Schedules?
0�
15. Current Number of Cate orical Industrial Users (CIUs)?
A
16. Number CIUs in SNC?
—
u 11
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the Parameters and How are these Problems Being Addressed?
18. Since the Last PCL has the POTW had any Problems Related to an Industrial
Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased
Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
19. Which Industries have been in SNC for Limits or Reporting during N/A
either of the Last 2 Semi -Annual Periods? Not Been Published for Not Pu
Public Notice?(May refer to PAR if Excessive S1Us in SNC)
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an
Order, Has a Signed Copy of the Order been sent to the Division?
21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which
Ones?
[:]YES ® NO
❑ YES ®NO
%shed: N/A
N/A
❑ YES ®NO
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ❑ YES ® NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO
26. If NO to 23 - 26, list violations:
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO
If yes, which ones? Eliminated: Added:
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated. 7/25/07 Page 1
28. PRETREATMENT PROGRAM ELEMENTS REVIEW — Please review POTW files, verify POTW has copy of Program Element in
their file.q cmmnlete with snnnnrtino, dnenments and ennv of PF,RC,S Annroval Letter. and dates consistent with Program Info:
Program Element
Last Submittal Received
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis A
11/21/14
Yes ❑ No
1/12/15
® Yes ❑ No
12/31/19
Industrial Waste Survey IWS
6/28/16
® Yes ❑ No
9/19/16
Yes ❑ No
4/30/21
Sewer Use Ordinance SUO
12/27/12
® Yes ❑ No
1110113
® Yes ❑. No
Enforcement Response Plan (ERP)
6/25/08
® Yes ❑ No
9/12/08
® Yes ❑ No
Long Term Monitoring Plan (LTMP)
4/28/14
® Yes ❑ No
5/12/14
® Yes ❑ No
INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION)
29.
User Name if
I. International Automotive Components
f 2.
30.
IUP Number
0003—��—�
31.
Does File Contain Current Permit?
® Yes ❑ No 1E
❑ Yes ❑ No I
. ❑ Yes ❑ No
r 9/30/18
32. Permit Ex iration Date
33.
Categorical Standard Lk lied I.E. 40 CFR, Etc.) Or N/A
r NA
I
34.
Does File Contain Permit Application Completed Within One Year Prior
® Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
to Permit Issue Date?
35.
Does File Contain an Inspection Com leted Within Last Calendar Year?
N Yes ❑ No
I El Yes ❑ No
❑ Yes '❑ No
36.
a. Does the File Contain a Slug/Spill Control Plan?
a. ®Yes ❑No
a. []Yes []No
a. []Yes []No
b. If No, is One Needed? See Ins ection Form from POT
b. ❑Yes ❑No
b. ❑Yes []No
b. []Yes []No
37.
For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
❑Yes❑NoON/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
Or anic Management Plan TOMP)?
38.
a. Does File Contain Original Permit Review Letter from the Division?
a. ®Yes []No
a. pYes []No
a. ❑Yes []No
b. All Issues Resolved?
I b.❑Yes❑No®N/A
b.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
39.
During the Most Recent Semi -Annual Period, Did the POTW Complete
®Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
.
its Sam lin as Required by IUP, including flow?
40.
Does File Contain POTW Sampling Chain -Of -Custody Forms?
r ® Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
41 a. During the Most Recent Semi -Annual Period, Did the SIU Complete its
®Yes❑No❑N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
SMpljaa as Required ty IUP, including flow?
41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports
®Yes❑No❑N/A
❑Yes❑No❑N/A
[❑YesllNoON/A
on time?
42a. For categorical lUs with Combined Wastestream Formula (CWF), does
❑Yes❑No®N/A
❑YespNo❑N/A
❑Yes❑No❑N/A
file includeprocess/dilution flows as Required by IUP?
42b. For categorical lUs with Production based limits, does file include
❑Yes❑NoON/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
production rates and/or flows as Re uired b IUP?
43a.
During the Most Recent Semi -Annual Period, Did the POTW Identify
❑Yes❑No®NA
❑Yes❑No❑N/A
❑YespNo❑N/A
All Limits Non -Compliance from Both POTW and SIU Sam lin ?
43b. During the Most Recent Semi -Annual Period, Did the POTW Identify
❑Yes❑No®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
All Re ortin Non -Compliance from SIU Sam lin .
44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
a.❑Yes❑No®N/A
a.❑Yes❑No❑N/A
a.❑Yes❑No❑N/A
Monitoring Violations?
b. Did Industry Resample and submit results to POTW Within 30 Days?
b•❑Yes❑No®N/A
b.❑YespNo❑N/A
b.❑Yes❑No❑N/A
e. Did POTW resample within 30 days of knowledge of SIU limit
c.❑Yes❑No®N/A
c.0Yes❑NoE3N/A
c.❑Yes❑No❑N/A
violations from the POTW sam le event?
45.
During the Most Recent Semi -Annual Period, Was the SIU in SNC?
I ElYes ® No
❑ Yes ❑ No
❑ Yes ❑ No
46.
During the Most Recent Semi -Annual Period, Was Enforcement Taken
0Yes0No®N/A
❑YespNo❑N/A
❑Yes❑No❑N/A
as Specified in the POTW's ERP OVs, Penalties, timing, etc.)?
47.
Does the File Contain Penalty Assessment Notices?
❑YespNo®N/A
❑Yes❑No❑N/A
❑Yes❑No❑N/A
48.
Does The File Contain Proof Of Penalty Collection?
O YesONo®N/A
❑Yes❑No❑N/A
❑Yes❑NopN/A
49.
a. Does the File Contain Any Current Enforcement Orders?
a.❑Yes❑No®N/A
azYes❑No❑N/A
a.❑Yes❑No❑N/A
11
b. Is SIU in Compliance with Order?
I b.❑YesUMON/A
b.❑Yes❑No❑N/A
b.❑Yes❑No❑N/A
50.
Did the POTW Representative Have Difficulty in Obtaining Any of This
❑ Yes ® No
❑ Yes ❑ No
[]Yes ❑ No
Requested Information For You?
NC DWR Pretreatment Compliance Inspection (PCI) Form tJpdated 7/25/07 Page 2
FILE REVIEW COMMENTS:
23. The contracted lab's detection levels for ammonia (0.5 mg/L), copper (10 ug/L) and chromium (10 ug/L) were above the LTMP's
detection levels during the October 2017 sampling event. Note: The contract lab did analyze ammonia down to the 0.1 mg/L detection
level in previous LTMP sampling events.
28. SUO adopted on 2/17/14.
39. The POTW contracts Statesville Analytical to perform analyses. Statesville Analytical sub -contracts Prism Laboratories, Inc. (low
level mercury) and ENCO (chromium, copper, molybdenum) to perform selected analyses.
41a. IAC splits metals (chromium and copper) samples with the POTW and contracts Rogers & Callcott for analyses.
44. The POTW performs all monitoring/sampling requirements for the SIU. The POTW currently samples the SI[J three times per
month.
SUMMARY AND COMMENTS:
The POTW must ensure that all detection levels are met and properly reported (molybdenum) during LIMP sampling events.
The records were organized and well maintained. The City's Industrial Pretreatment Program appeared to be properly implemented.
NOD: ❑ YES ® NO
NOV: ❑ YES ® NO
QNCR: ❑ YES ® NO
POTW Rating:
Satisfactory ® Marginal El Unsati actory- ❑
PCI COMPLETED BY: DATE: December 11, 2017
Wes Bell, Mooresville Regional Office
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 3