Loading...
HomeMy WebLinkAboutNCDEQ Submittal Extension_20200214f � DUKE ENERGY February 14, 2020 Mr. Rick Bolich North Carolina Department of Environmental Quality 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Subject Dear Mr. Bolich: Paul Draovitch Senior Vice President Environmental, Health & Safety 526 S. Church Street Mail Code: EC3XP Charlotte, NC 28202 (980) 373-0408 Response to NCDEQ Letter Dated April 5, 2019 — Request for Report Submittal Extension Duke Energy is in receipt of the above -referenced letter from the North Carolina Department of Environmental Quality (NCDEQ) which specified due dates for various upcoming report submittals. As we have discussed with you prior, the iterative nature of subsurface investigations proves difficult to target a certain date until multiple rounds of data have been collected. As an example, another work plan is under development for the coal pile assessment at Roxboro since horizontal delineation was not achieved during the first two rounds of groundwater monitoring well installs. This has been a common occurrence for these alternate source investigations (e.g. gypsums pads, coal piles, etc.). As such, the present due date of March 31, 2020 for these Comprehensive Site Assessments is not achievable. The table below incorporates the extension requested by Duke Energy along with the cutoff dates for data collection to be incorporated into these CSAs. Alternate Source Comprehensive Site Assessments — Proposed Schedule Current Current Proposed Proposed Submittal Data Cutoff Submittal Data Cutoff Facility Description Date Period Date Period Allen CSA for primary and secondary sources not associated with impoundments March 31, Q4 2019 September Q1 2020 (including the gypsum pad) 2020 1, 2020 Belews CSA for primary and secondary sources Creek not associated with impoundments March 31, September (including the structural fill, coal pile and 2020 Q4 2019 1, 2020 Q2 2020 gypsum pad) Cliffside CSA for primary and secondary sources not associated with impoundments (including the raw coal piles north of Unit March 31, Q4 2019 December Q2 2020 6, Unit 6 area, switchyard ash disposal 2020 18, 2020 areas, and gypsum pile) Mayo CSA for primary and secondary sources not associated with impoundments March 31 Q4 2019 December Q3 2020 (including the gypsum pad and coal pile) 2020 31 2020 Roxboro CSA for primary and secondary sources not associated with impoundments March 31, Q4 2019 March 31, Q4 2020 (including the coal pile) 2020 2021 Duke Energy is also in receipt of the NCDEQ letter dated January 31, 2020 which discussed the potential for streamlined site -specific Corrective Action Plans (CAPS) for the eight sites yet to submit CAPS. Five of these eight sites have yet to submit updated CSAs. As the framework of these documents is under discussion with the agency, it is not practical to prepare a document until the framework has been agreed to. As such, the table below incorporates the extension requested by Duke Energy along with the cutoff dates for data collection to be incorporated into these documents. Updated CSAs and CAPs— Proposed Schedule Current Current Proposed Proposed Submittal Data Cutoff Submittal Data Cutoff Facility Description Date Period Date Period Asheville* Updated CSA for impoundments and other primary and secondary sources June 1, 2020 Q4 2019 December Q2 2020 (including the raw coal pile) 1, 2020 Buck* Updated CSA for impoundments and other primary and secondary sources Oc 2020 1' Q12020 February 1, Q2 2020 (including the former coal pile) 2021 Cape Fear* Updated CSA for impoundments and other primary and secondary sources September Q1 2020 December Q2 2020 (including the former coal pile) 1, 2020 1, 2020 Dan River Updated CAP for impoundments and other primary and secondary sources (including the former coal pile, former July 1, 2020 Q1 2020 November Q2 2020 CT area and construction warehouse 2, 2020 area) H.F. Lee* Updated CSA for impoundments and other primary and secondary sources October 1, December (including the former coal pile and lay 2020 Q2 2020 1, 2020 Q2 2020 of land area) Riverbend Updated CAP for impoundments and other primary and secondary sources May 1, 2020 Q4 2019 November Q2 2020 (including the former coal pile) 2, 2020 Sutton Updated CAP for impoundments and other primary and secondary sources (including the former ash disposal area, May 1, 2020 Q4 2019 August 3, Q1 2020 former process area, and former coal 2020 pile) Weatherspoon* Updated CSA for impoundments and other primary and secondary sources August 3, (including the former coal pile and June 1, 2020 Q4 2019 2020 Q1 2020 cooling pond) *Updated CAP due six months after DEQ approval of Updated CSA Duke Energy would be pleased to meet with you and your staff to discuss if additional information is desired. Please contact Mr. Ed Sullivan at 980-373-3719 with any questions you have. Sincerel , Paul Draovitc Senior Vice President Environmental, Health & Safety cc: Ed Sullivan — Duke Energy Scott Davies — Duke Energy Kathy Webb — SynTerra Corp. Jim Wells - Duke Energy Matt Hanchey —Duke Energy