Loading...
HomeMy WebLinkAboutSW3190804_2712 - Pine Forest II Storm Water Application Page Revised 2-11-20_2/14/2020IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The storm water runoff will be collected and dischar ed into one of the two BMP's each of which will include dKy detention for quinft management and sand filters for ualimanagement. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph 11- Post Construction 3. Stormwater runoff from this project drains to the Yadkin Pee Dee River basin. 4. Total Property Area: 29.36 acres 5. Total Coastal Wetlands Area: acres 6_ Total Surface Water Area: ±.397 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 28.96 acres T Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHVd) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 30.81 9. How many drainage areas does the project have? 2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Draina e Area 1 Drai_ua e Area 2 Drainage Area _ Draina e Area Receiving Stream Name Duck Creek Duck Creek _ Stream Class * C C Stream Index Number * 12-108-20-4-3 12-108-204-3 Total Drainage Area (sf) 425191 360327 On -site Drainage Area (sf) 424621 346829 Off -site Drainage Area (sf) 570 13498 Proposed Impervious Area** (so 211335 133009 % Impervious Area** (total) 49.70 36.91 Impervious' Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area On -site Buildings/Lots (so 114974 67605 _ On -site Streets (sf) 57533 39979 On -site Parking (sf) On -site Sidewalks (so 11940 7909 Other on -site (sf) 24707 13917 Future (sf) Off -site (sf) 1860 Existing BUA*** (so 2181 1739 Total (sf): 211335 133009 x 5tream Class and Index Number can be determined at: ht . ortal.ncdenr.or veb s csu classi nations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Forrn SWU-101 Version Oct. 31, 2013 Page 3 of 6