HomeMy WebLinkAboutSW3190804_2712 - Pine Forest II Signed Supplement EZ form_2/14/2020SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name Pine Forest II
2
1 Project Area ac
29.36
3
Coastal Wetland Area ac
0
4
Surface Water Area (ac
0.397
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7 I Width of vegetated setbacks
Yes
10 1Is streambank stabilization proposed on this project? 1 No I
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
0
14
Stormwater Wetland
0
15
_ ____
Permeable Pavement
0
16
Sand Filter
2
17
Rainwater Harvesting RWH)
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
D Pond
�__ 0
0
0
0
0
23
StormFilter
24
Silva Cell
25
Bayfilter
26
Filterra
FORMS LOADED
DESIGNER
CERTIFICATION
Name and Title:
Patrick Murh y - Department Manager
R. Joe Harris & Associates
1186 Stonecrest Blvd.
Tega Cay, SC 29708
(803) - 802 -1799
pmurphy@rjoeharris.com
27
28
Organization:
29
Street address:
30
City, State, Zip:
31
Phone numbers :
32
Email:
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
ZN CARCAR
Q
,.......
•�•• • SEAL • I SEAL Signature of De 'gner
038
' z C-4168
��•'� ��•°° � Off.?FF � ,��
hretn e`e��
Seal Date
DRAINAGE AREAS
1
Is this a hi h density project?
Yes
2
If so, number of drainage areas/SCMs
2
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
2
4
Type of SCM
342484 sf
Sand Filter
Sand Filter
5
Total BUA in ro'ect s ft
211335 sf
114974 sf
131149 sf
67605 sf
6(sg
New BUA on subdivided lots (subject to permitting)
ft
182579 sf
155985 sf
7
New BUA outside of subdivided lots (subject to
ermittin s
94180 sf
61805 sf
8
Offsite - total area (sq ft
570 sf
13498 sf
9
Offsite BUA (sq ft
sf
1860 sf
10
Breakdown of new BUA outside subdivided lots:
- Parking (sq ft
-Sidewalks ft
19849 sf
11940 sf
7909 sf
- Roof (sq ft
Roadwa s ft
97512 sf
57533 sf
39979 sf
Future (sq ft
Other, please specify in the comment box
below (sq ft
38624 sf
24707 sf
13917 sf
11
New infiltrating permeable pavement on
subdivided lots s ft
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
13permitting)
Exisitng BUA that will remain (not subject to
s ft
14 I
Existin BUA that is alread ermitted s ft
3920 sf
2181 sf
1739 sf
15
Existing BUA that will be removed s ft
16
Percent BUA
27%
50%
37%
17
Desi n storm inches
1 in
1 in
1 in
18
Design volume of SCM cu ft) _
17621 cf
11477 cf
19 Calculation method for design volume
ADDITIONAL INFORMATION—
Please use this space to provide any additional information about the
20 drainage area(s):
"Other" on line 10 made up of portions of driveways within R/W
Simple Method
Simple Method
SAND FILTER
18
SHWT elevation (fmsl)
<786
781
19
Type of sand filter (open or closed)
Open
Open
20
If closed, will the filter will be pre -cast or pour -in -place?
21
If closed, top of grate elevation (fmsl)
22
Is this sand filter designed to attenuate peak flows?
Yes
Yes
[Sediment Chamber
23
' Volume that can be retained in the sediment chamber (cubic feet)
7773 cf
6273 cf
24
Will there be a permanent pool in the sediment chamber?
No
No
25
Bottom of the sediment chamber (fmsl)
790.00
788.00
26
Area of the sediment chamber (square feet)
4262 sf
4727 sf
27
Physical depth of the sediment chamber (inches)
30 in
18 in
28
Ponding depth in the sediment chamber, above any permanent pool
(inches)
30 in
18 in
29
Elevation of top of weir between chambers (fmsl)
794
792
Sand Chamber
30
Volume that can be retained in the sand chamber (cubic feet)
8271 cf
6077 cf
31
Bottom of the sand chamber (fmsl)
790.00
788.00
32
Area of the sand chamber (square feet)
4403 sf
4628 sf
33
Physical depth of the sand chamber (inches)
30 in
18 in
34
Ponding depth in the sand chamber, above any permanent pool
(inches)
30 in
18 in
35
1 Elevation of the bypass device (fmsl)
792.5
789.5
36
Type of bypass device
Orifice
Orifice
37
Mechanism for distributing flow over the sand surface
Reinforced
Forebay Berm W/
Turf Matting
Reinforced
Forebay Berm W/
Turf Matting
38
Sand specification for sand chamber
ASTM C33
ASTM C33
39
Depth above underdrain pipe (inches)
12 in
12 in
40
Will the media be maintained to drain at least two inches per hour at the
sand surface?
Yes
Yes
41
Is at least one clean -out pipe provided at the low point of each
underdrain line?
Yes
Yes
42 1
Will clean -out pipes be capped?
Yes
Yes
Sand Filter 3 6:55 PM 2/12/2020