Loading...
HomeMy WebLinkAboutSW4070701_Calcs (Swale Shear)_20200213ECHOTA PHASE IV 2/12/2020 SW4070701 Response 2 TEMPORARY LINER SELECTION CHANNEL Q2(1) SIDE TEMP.(2) LINER(3) Q2 DEPTH SHEAR Td COMMENT NO. CFS SLOPE, Z LINER n FT. PSF PSF 1 1.0 2.0 SWN 0.033 0.43 0.89 1.75 OK 2 1.4 2.0 SWN 0.033 0.51 0.79 1.75 OK 3 0.8 2.0 SWN 0.033 0.37 0.91 1.75 OK 4 1.2 2.0 SWN 0.033 0.51 0.63 1.75 OK 5 2.3 2.0 SWN 0.033 0.57 1.35 1.75 OK 6 0.3 2.0 SWN 0.033 0.20 1.42 1.75 OK 7 0.2 2.0 SWN 0.033 0.23 0.29 1.75 OK 8 0.1 2.0 SWN 0.033 0.16 0.19 1.75 OK 9 0.1 2.0 SWN 0.033 0.15 1.01 1.75 OK 10 0.1 2.0 SWN 0.025 0.22 0.18 1.75 OK 11 0.2 2.0 SWN 0.033 0.22 0.55 1.75 OK 12 0.4 2.0 SWN 0.033 0.25 1.24 1.75 OK 13 0.4 2.0 SWN 0.033 0.25 1.24 1.75 OK 14 0.0 2.0 SWN 0.025 0.07 0.44 1.75 OK 15 0.0 2.0 SWN 0.025 0.09 0.55 1.75 OK 16 0.2 2.0 SWN 0.025 0.24 0.19 1.75 OK 17 0.4 2.0 SWN 0.025 0.26 0.82 1.75 OK 18 0.3 2.0 SWN 0.025 0.22 0.69 1.75 OK 19 0.2 2.0 SWN 0.025 0.22 0.27 1.75 OK 2-YR RATE = 5.27 IN/HR