HomeMy WebLinkAbout20191546 Ver 1_Memo to file_20200205Memo to file
1-29-2020 site visit — sea wall allowable due to amount of shoreline erosion
2-5-2020 phone conversation with Charlie Washburn of Marine Construction for project measurements:
Wooden sea wall - fill
• 3.3' tall
• I'wide by 50' long (above)
• I'wide by 50' long (below)
• 1.5' rip rap toe along wall (75sf)
Rip rap at shoreline
• 1' by 50' above
• 1' by 50' below
Project is on Gunpowder Creek, not on Lake Rhodhiss - No Catawba Riparian Buffer Rule
Impacts Above - 100sf / 0.0023 acres
Impacts Below — 175sf / 0.0040 acres