Loading...
HomeMy WebLinkAbout20191546 Ver 1_Memo to file_20200205Memo to file 1-29-2020 site visit — sea wall allowable due to amount of shoreline erosion 2-5-2020 phone conversation with Charlie Washburn of Marine Construction for project measurements: Wooden sea wall - fill • 3.3' tall • I'wide by 50' long (above) • I'wide by 50' long (below) • 1.5' rip rap toe along wall (75sf) Rip rap at shoreline • 1' by 50' above • 1' by 50' below Project is on Gunpowder Creek, not on Lake Rhodhiss - No Catawba Riparian Buffer Rule Impacts Above - 100sf / 0.0023 acres Impacts Below — 175sf / 0.0040 acres