Loading...
HomeMy WebLinkAbout20051711 Ver 1_Inspection_20110528Compliance Inspection Report Permit: NCGO10000 Effective: 07/27/07 Expiration: Owner: Burlington- Alamance Regional Airport SOC: Effective: Expiration: Facility: Runway 6-24 Extension Site Preparation County• Alamance N Aviation Dr Region: Winston-Salem DWQ Tracking No: NCR002140 Burlington NC 27215 Contact Person: Dan Danieley Title: Phone: Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/28/2010 Entry Time: 03:00 PM Primary Inspector: Sue L Homewood Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Construction Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: M Construction (See attachment summary) Exit Time: 03:30 PM Phone: 336-771-4964 Inspection Type: Compliance Evaluation Page: 1 Permit: NCR002140 Owner -Facility: Burlington- Alamance Regional Airport Inspection Date: 05/28/2010 Inspection Type: Compliance Evaluation Inspection Summary: Reason for Visit: Routine DLR or Local Program Inspection # Is this inspection related to a DLR / local program inspection? # If Yes, what was the DLR / local program inspection date? Rain Gauge Is a rain gauge present on the site at the time of inspection? Comment: Rain Gauge Records Is rain gauge data measured and recorded? Comment: Inspection Records Are inspection records of erosion & sedimentation control measures and stormwater discharges complete? Comment: Phase 3 inspection records - very good quality Phase 2 inspection records - minimally acceptable Other NCGO10000 Permit Conditions Is the site compliant with other conditions of the NCGO10000 permit? Comment: Other Water Quality Issues Is the site free of any other Water Quality issues as noted during the inspection? Comment: 401 inspection conducted at the same time. ■ Yes No NA NE ■nnn Yes No NA NE ■nnn Yes No NA NE ■nnn Yes No NA NE ■nnn Yes No NA NE ■nnn Page: 2