HomeMy WebLinkAbout20181462 Ver 1_Mitigation Plans_20200213ID#* 20181462 Version* 1
Select Reviewer:*
Mac Haupt
Initial Review Completed Date 02/13/2020
Mitigation Project Submittal - 2/13/2020
Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No
Type of Mitigation Project:*
V Stream Pr Wetlands r- Buffer r` Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Tara Allden
Project Information
...................................................................................
ID#:* 20181462
Existing IDY
Project Type:
Project Name:
Email Address:*
tara.allden@kimley-horn.com
Version:
*1
Existing Version
r DMS r Mitigation Bank
Weyerhaeuser Neuse 02 Craven 26 Site
County: Beaufort
Document Information
Mitigation Document Type:*
Mitigation Plans
File Upload: Craven26_Mitigation_Plans.pdf 14.62MB
Rease upload only one RDFcf the conplete file that needs to be subnitted...
Signature
Print Name:* Timothy M Aldinger
Signature:*
CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
COVER SHEET01 WEYERHAEUSER NR COMPANYCRAVEN COUNTY, NORTH CAROLINAVICINITY MAPNORTHENGINEER:CHARLOTTE, NORTH CAROLINA 28202200 SOUTH TRYON STREET, SUITE 200KIMLEY-HORN AND ASSOCIATES, INC. (704) 409-1808KYLE HALCHIN, P.E.OWNER:HATTIESBURG, MS 39402406 COLE ROADWEYERHAEUSER NR COMPANY(601) 341-6054DOUG HUGHESSURVEY:BASE MAPPING PROVIDED BY:2014 QL2 LIDARMETADATA CONTACT:PRELIMINARY - NOT FOR CONSTRUCTIONNC FLOODPLAIN MAPPING PROGRAM4105 REEDY CREEK DRIVERALEIGH, NC 27607(919) 715-5711CRAVEN 26 SITE DRAFT MITIGATION PLANSforSheet List TableSheetNumberSheet TitleSANFORD, NC 27330 201 CHATHAM STREET, SUITE 3SWCA ENVIRONMENTAL CONSULTING AND ENGINEERING OF NC, PC(919) 801-9060DAREN PAIT, P.E., CFM
GENERAL NOTES02CRAVEN 26STREAM AND WETLANDMITIGATION BANKPREPARED FOR
PROPOSED PLAN LEGENDPROPOSED PROFILE LEGENDEXISTING PLAN LEGEND1035+00LEGEND AND
SYMBOLS03CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
RIFFLERIFFLERIFFLEMEANDERINGPOOLMEANDERINGPOOLSTRAIGHTPOOLTYPICAL PLAN AND
PROFILE04CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
TYPICAL SECTIONS05CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
TYPICAL SECTIONS06CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
SHEET 15UT
1
-
R
E
ACH
1
UT3 SHEET 16SHEET 17SHEET 18SHEET 19SHEET 20SHEET 21SHEET 08S
H
E
E
T
09 SHEET 10SHEET 11SHEET 12SHEET 24SHEET
2
2
SHEET 23SHEET 13SHEET 14UT1
-
REACH
2UT1 - REACH 3UT3A UT2 - REACH 1UT2 - REACH 2OVERALL PLAN AND
KEY SHEET07 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - REACH 1MATCH LINE STA 10+23.2SEE SHEET 090+000+501+001+502+002+503+003+504+004+505+005+506+006+507+007+508+008+509+009+5010+00PLAN AND PROFILE
UT1 - REACH 108 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - REACH 1MATCH LINE STA 10+23.2SEE SHEET 08MATC
H
L
I
N
E
S
T
A
2
1
+
1
7
.
1
SEE S
H
E
E
T
1
0 10+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+5019+0019+5020+00PLAN AND PROFILE
UT1 - REACH 1&209 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - REACH 2MATCH LINE STA 21+17.1SEE SHEET 09MATCH
L
I
N
E
S
T
A
2
9
+
4
1
.
6
SEE SH
E
E
T
1
1 20+0020+5021+0021+5022+0022+5023+0023+5024+0024+5025+0025+5026+0026+5027+0027+5028+0028+5029+0029+5030+00PLAN AND PROFILE
UT1 - REACH 210 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - REACH 3UT2 - REACH 2(SEE SHEET 21)MATCH LINE STA 29+41.6SEE SHEET 10MA
T
C
H
L
I
N
E
S
T
A
3
9
+
4
1
.
6
SEE
S
H
E
E
T
1
2 30+0030+5031+0031+5032+0032+5033+0033+5034+0034+5035+0035+5036+0036+5037+0037+5038+0038+5039+0039+5040+00PLAN AND PROFILE
UT1 - REACH 2&311 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - REACH 3MATCH LINE STA 39+41.6SEE SHEET 11
MATCH LINE STA 49+41.6SEE SHEET 1340+0040+5041+0041+5042+0042+5043+0043+5044+0044+5045+0045+5046+0046+5047+0047+5048+0048+5049+0049+5050+00PLAN AND PROFILE
UT1 - REACH 312 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - REACH 3U
T
3
(S
E
E
S
H
E
E
T
2
3
)MATCH LINE STA 49+41.6SEE SHEET 12MATCH LINE STA 59+41.6SEE SHEET 1450+0050+5051+0051+5052+0052+5053+0053+5054+0054+5055+0055+5056+0056+5057+0057+5058+0058+5059+0059+5060+00PLAN AND PROFILE
UT1 - REACH 313 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - REACH 3MATCH LINE STA 59+41.6SEE SHEET 13 60+0060+5061+0061+5062+0062+5063+0063+5064+0064+5065+0065+50PLAN AND PROFILE
UT1 - REACH 314 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT2 - REACH 1MATCH LINE STA 110+00
SEE SHEET 16 Hor. Scale:1"=40'100+00100+50101+00101+50102+00102+50103+00103+50104+00104+50105+00105+50106+00106+50107+00107+50108+00108+50109+00109+50110+00PLAN AND PROFILE
UT2 - REACH 115 N
O
R
T
H
CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT2 - REACH 1MATCH LINE STA 110+00SEE SHEET 15
MATCH LINE STA 120+00SEE SHEET 17Hor. Scale:1"=40'110+00110+50111+00111+50112+00112+50113+00113+50114+00114+50115+00115+50116+00116+50117+00117+50118+00118+50119+00119+50120+00PLAN AND PROFILE
UT2 - REACH 116 N
O
R
T
H
CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT2 - REACH 1MATCH LINE STA 120+00SEE SHEET 16
M
A
T
C
H
L
I
N
E
S
T
A
1
3
0
+
0
0
S
E
E
S
H
E
E
T
1
8 Hor. Scale:1"=40'120+00120+50121+00121+50122+00122+50123+00123+50124+00124+50125+00125+50126+00126+50127+00127+50128+00128+50129+00129+50130+00PLAN AND PROFILE
UT2 - REACH 117 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT2 - REACH 1MATCH LINE STA 130+00SEE SHEET 17
MATCH
L
I
N
E
S
T
A
1
4
0
+
0
0
SEE SHE
E
T
1
9 Hor. Scale:1"=40'130+00130+50131+00131+50132+00132+50133+00133+50134+00134+50135+00135+50136+00136+50137+00137+50138+00138+50139+00139+50140+00PLAN AND PROFILE
UT2 - REACH 118 N
O
R
T
H
CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT2 - REACH 1MATCH LINE STA 140+00SEE SHEET 18
MATCH LINE STA 15
0
+
0
0
SEE SHEET 20 Hor. Scale:1"=40'140+00140+50141+00141+50142+00142+50143+00143+50144+00144+50145+00145+50146+00146+50147+00147+50148+00148+50149+00149+50150+00PLAN AND PROFILE
UT2 - REACH 119 N
O
R
T
H
CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT2 - REACH 2MATCH LINE STA 150+00SEE SHEET 19
MATCH LIN
E
S
T
A
1
6
0
+
0
0
SEE SHEET
2
1 Hor. Scale:1"=40'150+00150+50151+00151+50152+00152+50153+00153+50154+00154+50155+00155+50156+00156+50157+00157+50158+00158+50159+00159+50160+00PLAN AND PROFILE
UT2- REACH 1&220 NO
R
T
H
CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT1 - RE
A
C
H
3
UT1 - RE
A
C
H
2UT2 - REACH 2MATCH LINE STA 160+00SEE SHEET 20
Hor. Scale:1"=40'160+00160+50161+00161+50162+00162+50163+00163+50164+00164+50165+00165+50166+00166+50167+00167+50168+00168+50PLAN AND PROFILE
UT2 - REACH 221 NOR
T
H
CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT3UT
3
A
MATCH LI
N
E
S
T
A
2
1
0
+
0
0
SEE SHEE
T
2
3 200+00200+50201+00201+50202+00202+50203+00203+50204+00204+50205+00205+50206+00206+50207+00207+50208+00208+50209+00209+50210+00210+50PLAN AND PROFILE
UT322 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT3UT1 - REACH 3MATCH LINE STA 210+00SEE SHEET 22210+00210+50211+00211+50212+00212+50213+00213+50214+00214+50215+00215+50216+00216+50217+00217+50218+00218+50PLAN AND PROFILE
UT323 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
UT3AUT3300+00300+50301+00301+50302+00302+50303+00303+50304+00304+50305+00305+50306+00306+50307+00307+50308+00308+50309+00309+50310+00PLAN AND PROFILE
UT3A24 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
U
T
1
-
R
E
A
C
H
1
U
T
3 UT
1
-
REACH
2
UT1 - REACH 3UT3A UT2 - REACH 1UT2 - REACH 2WETLAND PLAN25 NORTHCRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
Not to ScaleBRUSH AND ROLL RIFFLE1STREAM DETAILS26CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
Not to ScaleLOG VANE2Not to ScaleLOG SILL3STREAM DETAILS26CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
Not to ScaleBRUSH TOE PROTECTION5Not to ScaleLOG CROSS VANE4STREAM DETAILS28CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
Not to ScaleCHANNEL BLOCK6Not to ScaleFLOODPLAIN DEPRESSION7STREAM DETAILS29CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
Not to ScaleINSTALLATION GUIDE FOR EROSION CONTROL MATTING8Not to ScaleTEMPORARY SILT FENCE9EROSION CONTROL
DETAILS30CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
Not to ScaleEXAMPLE OF PUMP-AROUND OPERATION10EROSION CONTROL
DETAILS31CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR
VEGETATION NOTES
AND DETAILS32CRAVEN 26
STREAM AND WETLAND
MITIGATION BANK
PREPARED FOR