Loading...
HomeMy WebLinkAbout20200235 Ver 1_PCN Form Submission_20200213DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200235 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Donna Hood:eads\drhood Information for Initial Review 1a. Name of project: Replacement of Bridge #890145 over Little Richardson Creek 1a. Who is the Primary Contact?* Larry Thompson - NCDOT Division 10 1b. Primary Contact Email:* Thompson@ncdot.gov Date Submitted 2/13/2020 Nearest Body of Water Little Richardson Creek Basin Yadkin-PeeDee Water Classification WS-N Site Coordinates Latitude: 34.925182 A. Processing Information County (or Counties) where the project is located: Union Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* IT Yes r No (NCDOT only) T.I.P. or state project number: WBS # (?) 17BP.10.R.151 1a. Type (a) of approval sought from the Corps: Longitude: -80.519249 Version#* 1 Reviewing Office* Mooresville Regional Office - (704) 663-1699 1c. Primary Contact Phone:* (704)983-4400 U W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? V Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT Division 10 2b. Deed book and page no.: WA 2c. Responsible party: 2d.Address Street Address 716 Main Street Address Line 2 City State / Rovince / Rion Albemarle NC Rostal / Zip Code Country 28001 USA 2e. Telephone Number: 2f. Fax Number: (704)983-4400 (704)982-3146 2g. Email Address:* r Yes r No r Yes r No Ithompson@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: ff appropriate) 1c. Nearest municipality/ town: Monroe Project Identification 2a. Property Identification Number: 2b. Property size: N/A 3.5 2c. Project Address Street Address SR 2106 (Macedonia Church Road) at Little Richardson Creek Address Lim 2 Criy State / Province / Ragion Monroe NC Postal / Zip Code Country USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Little Richardson Creek 3b. Water Resources Classification of nearest receiving water:* WS-Iv 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050504 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Existing conditions include SR 2106 (Macedonia Church Road), agricultural land, residential property, undeveloped forest, and the disturbed/maintained right-of-way. This project was formerly T.I.P. #B-5515. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No B Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Monroe USGS Topo.pdf 1.02 MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 20200213_08035408967_36_Soil_Report.pdf 427.62KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 150 4h. Explain the purpose of the proposed project:* To remove Bridge #890145 and replace with a new, modern bridge structure. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Erosion and sedimentation control measures Will be installed, including the installation of impervious dikes around the existing bridge abutments in order to work in dry conditions. Bridge demolition will include the removal of the bridge deck and the removal of the top portion of the bridge abutments, leaving the Tooter and approximately three feet of the concrete abutment to match the excavation elevation and temporary impacts to 85 linear feet to Little Richardson Creek may result. Bridge replacement construction using heavy equipment from the upland roadway approaches. No deck drains are proposed on the bridge and runoff from the bridge will be routed to inlets located on both sides of the road to the northeast of the bridge and discharged to the stream floodplain both upstream and downstream of the bridge. The proposed bridge will be built on the same alignment with a temporary off -site detour. 4j. Please upload project drawings for the proposed project. RA 51_Permit_Plans_2019-08-01.pdf R.151_HYD_SMPv2.08_(20180806)(Apr 2018).pdf 1.73MB 179.44KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: See attached Wetland Determination Data Form, Photographs, and Waters Mapping 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Brandon Phillips, CHMM Agency/Consultant Company: STV Engineers, Inc. Other: 5d1. Jurisdictional determination upload USACE upland data sheet Union 145.pdf R151 Photopages.pdf 6. Future Project Plans 6a. Is this a phased project?* r Yes r No 418.75KB 13.78MB Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Open Waters r Pond Construction 3. Stream Impacts r Buffers F 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* S1 Bridge replacement Temporary Other Little Richardson Cr. Perennial Both 45 85 Average (feet) (lir�rfeel) gy Bridge replacement Temporary Dewatering Little Richardson Cr. Perennial Both 45 69 Average (feet) (linearfeet) S3 Bridge replacement Temporary Dewatering Little Richardson Cr. Perennial Both 45 75 __] Average (feet) (lir�rfeel) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 0 31. Total stream and ditch impacts: 229 3i. Total temporary stream impacts: 229 3j. Comments: Temporary impacts are associated with the demolition of the eAsting bridge and the overlapping dewatering impacts required to remove the ebsting bridge abutments in dry conditions for a total of 85 linear feet of temporary impact to Little Richardson Creek. E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Replace bridge in -place was incorporated to minimize impacts. The bridge span length was a#ended to avoid impacts. Riprap protection of the bridge abutments is being placed outside of the jurisdictional stream boundary of the perennial stream to avoid impacts. Work will be conducted from the upland roadway approaches. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for Construction and Maintenance Activities Will be employed. Demolition and construction methods from the upland roadway approaches will be used to minimize potential temporary demolition related impacts and avoid construction related impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: No permanent impacts are proposed. Minimal temporary impacts of 85 linear feet may occur to Little Richardson from demolition activities and no part of the stream bed will be impacted. The proposed 69 linear feet and 75 linear feet of dewatering impacts to Little Richardson Creek overlap the 85 linear feet of potential demolition related impacts and will not require mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r' Yes r No If no, explain why: Project is located in the Yadkin -Pee Dee River Basin and is not subject to NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: Stormwater runoff from the proposed bridge will be routed to inlets located on the northeast side of the bridge on both sides of the roadway. Please see attached Stormwater Management Plan for details on the minimization of water quality impacts. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments:* Bridge replacement project that required the preparation of a Minimum Criteria Determination Checklist. See attached Minimum Criteria Determination Checklist in Miscellaneous that was signed on 2/10/2020. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r' Yes r No 3b. If you answered "no," provide a short narrative description. Project involves the replacement of an eAsting bridge and is not anticipated to affect future development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* rYes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r- No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r- Yes r No 5e. Is this a DOT project located within Division's 1-8? r- Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r- No 5g. Does this project involve bridge maintenance or removal? r Yes r- No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r- No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r- Yes r No r- Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* r- Yes r No f Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r- Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NCNHP data and site specific surveys. See Supplemental Information attached under Miscellaneous for threatened and endangered species write-ups and biological conclusions. Consultation Documentation Upload NCNHP_ report _17bp10r151_bridge_145_union_05292019.pdf 734.17KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r- Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* See attached "No Archaeological Survey Required Form" and "Historic Architecture and Landscapes No Survey Required Form." 7c. Historic or Prehistoric Information Upload R.151 Archaeological WSurveyRevisit.pdf 1.82MB R.151 B-5515 Historic Architecture NOSurveyUpdate.pdf 1.98MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit Coordination with FEMA. 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM maps Miscellaneous Comments Additional Miscellaneous attachments include Supplemental Information regarding the Threatened and Endangered Species that are listed in Union County. Miscellaneous attachments not previously requested. 1713P.10. R.151 _Signed_MCDC_and_Project_Commitments. pdf Signature 1.22MB * R By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Larry Thompson Signature Date 2/13/2020