Loading...
HomeMy WebLinkAbout20200234 Ver 1_PCN Form Submission_20200212DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200234 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Donna Hood:eads\drhood Information for Initial Review 1a. Name of project: Replace Bridge No. 480165 on SR 1601 (Branton Road) over Rocky Creek 1a. Who is the Primary Contact?* NCDOT - William A. Barrett 1b. Primary Contact Email:* wabarrett@ncdot.gov Date Submitted 2/12/2020 Nearest Body of Water Rocky Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: Longitude: 36.019303-81.010141 A. Processing Information County (or Counties) where the project is located: Iredell Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* IT Yes r No (NCDOT only) T.I.P. or state project number: BR-0114 WBS # (?) 48823.1.1 1a. Type (a) of approval sought from the Corps: Version#* 1 Reviewing Office* Mooresville Regional Office - (704) 663-1699 1c. Primary Contact Phone:* (919)707-6103 U W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 13 - Bank Stabilization 33 - Temporary Construction le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 1598 Mail Service Center Address Line 2 City State / Rovince / legion Raleigh NC Fbstal / Zip Code Country 27699 United States 2e. Telephone Number: 2f. Fax Number: (919)707-6103 r Yes r No r Yes r No 2g. Email Address:* pharris@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (if appropnate) 1c. Nearest municipality/ town: Union Grove 2. Project ctct Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address Address Line 2 (Sty State / Province / Region Foetal / Zip Code Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Rocky Creek 3b. Water Resources Classification of nearest receiving water:* 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401020104 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Undeveloped woods, agriculture land, and some residences. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* F Yes G No F Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 4g. List the total estimated linear feet of all existing streams on the property: 842 4h. Explain the purpose of the proposed project:* The replacement of Bridge No. 480165 is part of the Growing Rural Economy and Agriculture through Transportation and Technology Enhancement or Replacement in North Carolina (GREATTER-NC) Project under the United States Department of Transportation's 2018 Better Utilizing Investments to Leverage Development (BUILD) Grant program. The purpose of the grant and this bridge replacement project is to provide transportation infrastructure to support economic development and improve physical and digital connectivity in rural communities in North Carolina. The posted weight restriction on Bridge No. 460165 prohibits large or heavy vehicles, typically used in transporting agricultural and manufactured products, from using the bridge. Vehicles above the posted weight must detour approximately 3.75 miles to avoid the bridge. Replacing the existing bridge vdll eliminate posted weight limits by providing a safe crossing for all legal loads and will make accommodations for broadband installation in order to support economic competitiveness. The proposed project has been designed to meet the legal load rating. * This project will utilize the NCDOT project BR-0115, Mich proposes the replacement of Bridge No. 480166 on SR 1598 (Coolbrooke Road) over Rocky Creek, as a detour route. As such, NCDOT project BR-0115 Will be constructed prior to this project. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project proposes replacing the epsting two-lane bridge with an approximately 30-foot vide structure with two 10-foot travel lanes with 3-foot 11-inch paved shoulders. The proposed bridge would be approximately 102 feet in length and the proposed right of way varies from 40 feet to 90 feet. The total length of the project is approximately 740 feet. The proposed bridge will not be posted and will be designed to meet the legal load rating. The bridge replacement would be constructed in place using an off -site detour and includes structural and geometric improvements. The roadway is classified as a Local Route with a 55-mile per hour design speed with a sag vertical curve (K value) design exception that will result in a speed limit reduction in the area of the bridge. 4j. Please upload project drawings for the proposed project. BR-0114_Permit Drawings (1).pdf 3.77MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: No wetlands at project site. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Jim Mason and Hayley Wood Agency/Consultant Company: Three Oaks Engineering Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No r Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands 9 Streams -tributaries r- Open Waters r" Pond Construction 3. Stream Impacts r Buffers U F 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact*��me*d. S. na��3e. Stream Type* 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* S1 Site 1: Bank stabilization Permanent Bank Stabilization J Rock Creek y Perennial Both 30 Average (feet) 61 (linearfeet) gy Site 1: Impervious dikes Temporary Dewatering Rocky Creek Perennial Both 30 Average (feet) 3 (lir:earfeet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 61 3i. Total stream and ditch impacts: 64 3i. Total temporary stream impacts: 3 3j. Comments: There will be a total of 64 linear feet (0.01 acre) of temporary impacts from the impervious dike on both the left and right banks of Rocky Creek; however, all but three (3) If are within the bank stabilization impacts. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The proposed single -span bridge (no interior bents) will replace a 3-span bridge. it will be replaced in -place and will utilize an off -site detour. The new bridge will be approximately 12 feet longer than the existing bridge. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Impervious dikes will be used around eAsting abutments to prevent sediment from entering the stream during the removal of eAsting bridge and will be dewatered as needed. Two TB 2GIs will collect water from the pavement and convey it to the stream through a riprap-lined Standard V Ditch. A special lateral V ditch with riprap is provided where capacity is not sufficient, and the flowfrom this ditch dissipates into the floodplain. Best Management Practices for Surface Waters will be used during all phases of construction. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: NCDOT does not propose mitigation for the 61 linear feet of bank stabilization impacts, as bank stabilization does not require fill in the streambed and therefore, under Section 404 of the Clean Water Act, does not constitute Loss of Waters of the U.S. and is not subject to compensatory mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: not located within a Buffer Basin. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOTs Individual NPDES permit NCS000250?* r Yes r No Comments: see attached Permit Drawings. G. Supplementary Information u 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEP/USEPA)?* r Yes r No 1c. If you answered 'yes" to the above, has the document review been finalized bythe State Clearing House?* r Yes r No Ni SEPA Final Approval Letter BR_0114_F ina I_CE. pdf 2. Violations (DWR Requirement) 3.91 MB 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r- Yes r No Se. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r- No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r- Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? r- Yes r- No r Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?' r- Yes r No r Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r- No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? PAC, USFWS website, NCNHP website, and on -site pedestrian surveys. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r- Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* N/SEPA Documentation 7c. Historic or Prehistoric Information Upload BR-0114 Catawba Response 2020-01-16.pdf BR-0114 Cherokee Nation Response 2020-01-14.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination?* FEMA Flood Maps (Panel 3710480300K) Miscellaneous Comments 282.75KB 215.24KB Miscellaneous attachments not previously requested. BR-0114 Application Cover Letter.pdf 371.4KB Signature 17 By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Michael Anthony Turchy Signature x T Date 2/12/2020