Loading...
HomeMy WebLinkAbout620012_Inspection_20190226tviskon of Water,Resources Facility'Number Division ofSoil ?and WateraConservation >0 Other'. Agency, ' Type of Visit: 0—Co Hance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visi - Arrival Tim�� � .Sa Departure Time: ; S"L� County: � 'cw/, Region: I 27-- Farm Name: &a eet Co eel c 'j V M Owner Email: Owner Name: cI�CtL'Uo �. Phone: Mailing Address: Physical Address: Facility Contact: ovt y Meow Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Integrator: A/ �__ Pi.CcJVt,, j Certification Number: Certification Number: Longitude: Design . Current Design Current Swine . ` 'Capacity" -Pop.. Wet poultry Capacity Pop.. • Cattle •. Wean to Finish Layer Wean to Feeder f00 1 INon-Layer Feeder to Finish m Farrow to Wean Design Curreut• Farrow to Feeder :. Dry Poultry Capacity , Pop. Farrow to Finish Gilts Boars Other Other Layers Non -Layers Pullets Turkeys T key Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Dairy Cow Dairy Calf Heifer —.Dairy Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes ❑ <eo ❑ NA ❑ NE ❑ Yes [—]No ETA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) [:]Yes [:]No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ®'< ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes [' "No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facility Number: jDate of Inspection: 2 -77 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Q_Na--❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No Ej<A ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): (91Lf 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [allo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes LI]-<o ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes +jo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes to ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes to ❑ NA ❑ NE maintenance or improvement. 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ]�No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Q`lo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ]jNNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ETNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ]�No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ENo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes T No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? I ❑ Yes 0'N-"o ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: tA- Date of Inspection: ` 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [�� ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes LD"1 o' ❑ NA ❑ NE. the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: / 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑-o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes �No❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E3,W D NA ❑ NE ❑ Yes ff No ❑ NA ❑. NE ❑ Yes ❑ NA ❑ NE ❑ Yes E No ❑ NA ❑ NE []Yes E 1 o ❑NA ❑NE ❑ Yes E]l ❑ NA ❑ NE ❑ Yes L _f 1V o ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use dr/awings of facility to better explain situations (use additional pages as necessary). 0 -- /� F- jo - o - �-- /0-- -7, e Reviewer/Inspector Name: 11 Reviewer/Inspector Signature: Page 3 of 3 Phone:��*���7j` 333 Date:`5- 21412015