Loading...
HomeMy WebLinkAbout260072_Inspection_20190423 (2)IdC l t 1 V3U UDivisioh of Water Resources =. Facility Number" 0 Division, of Soil and Water tonservatxon .. ` m a .0 Other Agency Type of Visit: 0=1ince Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access 04 Date of Visit: I Arrival Time: Departure Time: - County: (fa)46 �C14Region: Farm Name: " % Owner Name: �AD 141 iv if,, Mailing Address: Physical Address: Facility Contact: 0";0c� %��� Title: � t! Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Owner Email: Phone: Integrator: Phone: tl" t( Certification Number: if K 7 Latitude: Certification Number: Longitude: Design -Current. Design , Current Swine Capacity .-Pop.' 'Wet Poultry ` Capacitye Pop, ,Cattle Wean to Finish Wean to Feeder if ec c Feeder to Finish Farrow to Wean" Farrow to Feeder Farrow to Finish Gilts Boars Other' Other Layer Non -Layer -Design Current ` '! ;Ut -Poultry' ` Capacity Pop., Layers Non -Layers Pullets Turkeys Turkey Poults Other rrent 'op? ' Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ['l o- ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ®NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No Q'�A ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No �TA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑"Flo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes E(No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued U I: / 6— umber: Date of —Inspection: ?-,3 ✓� Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes C[g_Pdo❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No [j' A- ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes D-No­ ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ®Pdo❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? s U V NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Q<o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ErNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): G © #11V 13. Soil Type(s): Lb4 L71 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes D-N-a ❑ NA ❑ NE 15..Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 0-IT6- ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑'Io ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 0I�o­ ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑,No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes EErgo' ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ED-<o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E]*No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes &No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - 2 Date of Inspection: ,;2, 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Q� ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes Q-ilo`__❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ©-Tq'o-- ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ®moo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 'Co❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes To '❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes EjlIo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Ctll �W`030E-G"C Reviewer/Inspector Name: i l Reviewer/Inspector Signature: Page 3 of 3 Phone: lio 13 3 Date:. L 21412015