Loading...
HomeMy WebLinkAboutSW5200201_SW Narrative_20200213Shipman Engineering, PLLC Town of Benson Lee Street Athletic Complex Stormwater Design Narrative Project Overview The Lee Street Athletic Complex Improvements Project is a Town of Benson funded development project to expand and improve the existing Dr. PK Vyas Park located at near the intersections of Lee Street, Elm Street, and Mann Street in the downtown area of the Town of Benson. Currently, the park features two baseball fields, as well as an existing parking lot, play equipment, and miscellaneous recreation league athletic equipment and facilities. Our proposal is to expand the park to convert some existing green space into two additional baseball fields, as well as the addition of a new field house, additional on -street parking, and conversion of existing green space into a multi -use field as shown on the drawings. Associated infrastructure such as sidewalks, dugouts, and other features will be constructed as well. Stormwater Management Strategy The existing site is currently extremely low density, with an existing impervious percentage of 6.27% within the project limits. With the addition of proposed impervious areas associated with the site improvements, and additional 15,360 square feet of impervious will be added, bringing the overall total to 8.77% impervious. From a Nitrogen Export perspective, calculations yield a new export of 2.95 Ibs/ac/year, which is below the 3.6 Ibs/ac/yr threshold required for treatment/buydown. The impervious calculations, nitrogen calculations, and project area/drainage basin breakdowns can be found on sheet C-15 of the construction drawings. Based on the calculation results, we conclude that no active stormwater management for peak flow attenuation, water quality volume, or nitrogen removal is required for the project. Shipman Engineering, PLLC 919.900.0006 137 Middlegreen Place zak@shipmanengineering.com Holly Springs, NC 27540 NCBELS License P-1963