HomeMy WebLinkAbout20070117 Ver 1_Approval Letter_20070309O~O~ W A T ~9pG
~ ' ~ f~"-
l L.J_W~•~ _~
Q `~ 'C
Fairfield Residential, LLC
Attn: Mr. Scott Schlosser
561 Cartecay Trace
Ellijay, GA 30536
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
March 9, 2007
Alan W. Klimek, P.E. Director
Division of Water Quality
DWQ Project # 2007-0117
County: Wake
Subject Property: Centerview Multi-Familly Assemblage, Raleigh, NC
UT to Walnut Creek [030402, 27-34-(1), C, NSW]
AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B .0233) Authorization Certificate
Dear Mr. Schlosser:
You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below,
to impact approximately 20 linear feet of intermittent stream, 218 ftZ of Zone 1 and 7,406 ft2 of Zone 2 of
the protected riparian buffers as for the purpose of constructing the multi-family apartment complex at the
subject property as described within your application dated January 17, 2007 and received by the Division
of Water Quality (DWQ) on January 18, 2007 with additional information received by DWQ on March 7,
2007. In addition, you should obtain or otherwise comply with any other required federal, state or local
permits before you go ahead with your project including (but not limited to) Erosion and Sediment
Control, Non-discharge regulations.
This authorization is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the property is
sold, the new owner must be given a copy of this authorization letter and is thereby responsible for
complying with all conditions. This authorization requires you to follow the conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount A roved (Units) Plan Location or Reference
Intermittent Stream 20 linear ft. Pa e 8 of the PCN
Zone 1 Buffers 218 (s uare ft.) Pa e 12 of the PCN
Zone 2 Buffers 7,406 (s uare ft.) Pa e 12 of the PCN
401 OversighUExpress Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /.FAX 919-733-6893 /Internet: htto'//h2o enr state.nc us/ncwetlands
N n° Carolina
~tura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Fairfield Residential, LLC
Page 2 of 2
March 9, 2007
2. Diffuse Flow
An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive
velocities through the protected stream buffers and will not re-concentrate before discharging into
the stream as identified within 15A NCAC 2B .0233(5).
3. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
4. Protective Fencing -The outside buffer, wetland or water boundary and along the construction corridor
within these boundaries approved under this authorization shall be clearly marked with orange warning
fencing (or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 2H,
Section .0500.
5. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the
footprint of the impacts depicted in the Pre-Construction Notification. All construction activities,
including the design, installation, operation, and maintenance of sediment and erosion control Best
Management Practices, shall be performed so that no violations of state water quality standards,
statutes, or rules occur.
6. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project.
7. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent modifications,
the applicant is required to return the attached certificate of completion to the 401 Oversight/Express
Fairfield Residential, LLC
Page 2 of 2
March 9, 2007
Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,
Raleigh, NC, 27699-1650.
8. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands,
waters and protective buffers in order to assure compliance for future wetland, water and buffer
impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or
buffers approved for impact under this Authorization Certificate. A sample deed notification can
be downloaded from the 401/Wetlands Unit web site at: http://h2o.enr.state.nc.us/ncwetlands.
The text of the sample deed notification may be modified as appropriate to suit to this project.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall
expire five (5) years from the date of this letter.
This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B
.0233. If you have any questions or would like a copy. of the buffer rules, please call Amy Chapman at
(919) 733-1786. This letter does not authorize any impacts to either Waters of the United States or
Waters of the State. Please contact the US Army Corps of Engineers (USAGE) or NC Division of Water
Quality (DWQ) if any impacts are proposed to either of these waters.
Sincerely, ~G~~ „
J`Q'OA'"
Ci`~
`~ Alan W. Klimek, P.E.
AW Klcbk/asc
Enclosures: Certificate of Completion
cc: Lauren Cobb, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Filename: 070117CenterviewMultiFamilyAssemblage(Wake)NBR